This document provides details on a federal construction contract opportunity for renovations, improvements, and repairs at the Long Island National Cemetery. The solicitation number is 36C78624B0005 and is seeking bids for Project No. 815CM3041 to renovate and repair buildings and grounds at the cemetery operated by the Department of Veterans Affairs National Cemetery Administration. Responses are due by the date listed in the pre-solicitation notice for the construction work required. The 12MB file attached outlines the bid set and specifications for the work to be performed on this infrastructure project at the Long Island National Cemetery.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

5' -2

10'-4"+/-

AD-331

AD-331

AD

-3

AD

-3

DS DS

DSDS

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

PUBLIC RESTROOMS:

DEMOLITION FLOOR, CEILING &

ROOF PLANS

AD-311

1 FLOOR PLAN

1/4" = 1'-0"

0 1' 2' 4' 6'

5 MECHANICAL ROOM: BOILER FLUE UP TO CHIMNEY

(EXISTING, NOT TO SCALE)

4 ATTIC: EXIST. CHIMNEY & CUT-THRU CEILING JOISTS

(EXISTING, NOT TO SCALE)

04 TYPICAL

TYPICAL

12 TYPICAL 8'-1"±

CEILING

8'-1"±

CEILING

8'-1"±

CEILING

8'-1"±

CEILING

8'-1"±

CEILING

3 REFLECTED CEILING PLAN

1/4" = 1'-0"

2 ROOF PLAN

1/4" = 1'-0"

TYP.

13TYP.

05 05

REMOVE ALL EXISTING DOORS, FRAMES & HARDWARE.

PREP LINTELS FOR PAINT AT EXTERIOR DOORS.

REMOVE EXISTING PARTITION IN ITS ENTIRETY.

REMOVE ALL EXISTING PLUMBING FIXTURES.

REMOVE ALL EXISTING CASEWORK, TOILET COMPARTMENT

PARTITIONS AND URINAL SCREENS IN THEIR ENTIRETY.

REMOVE ALL EXISTING WINDOWS AND TRIM. PREP LINTELS

FOR PAINT.

REMOVE EXISTING FLOOR TILES AND MORTAR BED. CLEAN

AND PREP FLOOR FOR NEW TILES.

REMOVE ALL EXISTING WALL TILE, GWB & PLASTER DOWN

TO FRAMING ON EXISTING WALLS TO REMAIN.

REMOVE AND REPLACE 2 EXISTING P.T. WOOD COLUMNS, 1x

WOOD TRIM AND BASE. SEE DETAIL ON SHEET AE-801.

REMOVE ALL EXISTING GWB AND PLASTER CEILING AND

INSULATION IN ITS ENTIRETY. REMOVE ATTIC ACCESS DOOR.11

REMOVE EXISTING CEILING SOFFIT AND SOFFIT FRAMING.10

KEYPLAN

KEYNOTES

REMOVE ALL EXISTING ROOF SHINGLES AND ALL LAYERS OF

UNDERLAYMENT, FLASHING, GUTTERS, DOWNSPOUTS, AND

VENTS. PREPARE FOR REPLACEMENT, FOLLOWING THE

SECRETARY OF THE INTERIOR HISTORICAL RESTORATION

STANDARDS.

REMOVE EXISTING BRICK CHIMNEY AND FLASHING. SEE

PHOTO IN DETAIL 4, THIS SHEET.14

DEMOLISH FLOOR DRAIN, REFER TO PLUMBING DRAWINGS.09

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

REMOVE ALL EXISTING CEILING FIXTURES, TYPICAL. REFER

TO ELECTRICAL DRAWINGS FOR FURTHER REQUIREMENTS.12

REMOVE EXISTING VCT FLOORING AND ALL LAYERS OF

UNDERLAYMENT.15

EXISTING SECURITY CAMERAS TO REMAIN IN OPERATION

DURING RENOVATION. RELOCATE TEMPORARILY PER COR.16

REMOVE EXISTING WALL MOUNTED ACCESSORIES IN LOBBY.17

REMOVE AND REPLACE ALL EXISTING CEILING JOISTS IN ATTIC.

SEE STRUCTURAL DRAWINGS FOR DETAILS. SUPPORT, SHORE

AND BRACE EXISTING ROOF RAFTERS AND ADJACENT JOISTS

DURING CONSTRUCTION, TYPICAL. (SEE GENERAL NOTES AND

HAZMAT NOTES ON SHEET A-001 FOR FULL LIST OF NOTES) SEE

4/AD-231.

NOT TO SCALE

EXISTING

MECHANICAL ROOM

EXISTING CUT & DAMAGED 2x8 CEILING JOISTS AT EACH 2x2 LIGHT

FIXTURE, TYPICAL. SEE STRUCTURAL

DRAWINGS FOR JOIST REPLACEMENT

DETAILS, SEE ALSO NOTE 18.

REMOVE EXISTING A/C UNIT,

AND PREPARE CAVITY FOR

FRAMING AND BRICK INFILL.

COORDINATE W/ MECH. DWGS.

FW, MS MS

EXISTING METAL FLUE UP THRU ATTIC

INTO BRICK CHIMNEY ABOVE AND

MECHANICAL EQUIPMENT TO BE

REMOVED, SEE MECHANICAL DRAWINGS

19 REMOVE EXISTING BRICK PAVERS BELOW EXISTING COVERED

PORCH AND REMOVE EARTH AS REQUIRED TO INSTALL NEW

CONCRETE SLAB. SEE CP-301 FOR INFORMATION

REGARDING CONCRETE SIDEWALK. TEMPORARILY SUPPORT,

SHORE AND BRACE PORCH ROOF DURING CONSTRUCTION.

SEE GENERAL NOTES ON SHEET A-001.

SCRAPE, SAND AND PREP FOR NEW PAINT ALL EXISTING

PORCH CEILING, SOFFIT AND BEAMS.20

REMOVE EXISTING

BRICK CHIMNEY IN

ITS ENTIRETY

STEEL ANGLE ON 2 SIDES

TO BE REMOVED

2x4 WOOD STUDS RESTING ON

EXISTING JOISTS AT EACH

CORNER TO BE REMOVED

WELDED STEEL BRACES

TO BE REMOVED

EXISTING CUT 2X8 ATTIC /

CEILING JOISTS TO BE REPLACED,

SEE STRUCTURAL DRAWINGS.

SAWCUT AND REMOVE A PORTION OF EXISTING CONCRETE

EQUIPMENT PAD. COORDINATE WITH MECHANICAL AND

PLUMBING DRAWINGS.

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZARDOUS

MATERIALS NOTES FOR THIS PROJECT, TYPICAL.

2. VERIFY AND DOCUMENT PORCH SIZE AND DIMENSIONS

PRIOR TO DEMOLITION. SUBMIT DRAWINGS FOR

APPROVAL.

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

TYPICAL

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

PUBLIC RESTROOMS:

DEMOLITION ELEVATIONS

AD-331

1 SOUTH ELEVATION

1/4" = 1'-0"

0 2' 4' 8' 16'

REMOVE ALL EXISTING WINDOWS AND PREPARE OPENINGS

TO RECEIVE NEW WINDOWS. PREP ALL LINTELS FOR PAINT.

REMOVE EXISTING DOORS, FRAMES AND HARDWARE;

PREPARE OPENING TO RECEIVE NEW DOORS, FRAMES &

HARDWARE.

REMOVE ALL EXISTING ROOFING.

REMOVE ALL EXISTING VENTS.

REMOVE EXISTING CHIMNEY AND FLASHING. PROTECT

ROOF OPENING FROM WEATHER DURING ROOF REPAIR AND

CONSTRUCTION. RELOCATE TWO (2) EXISTING SECURITY

CAMERAS AND MAST-POLE FOR TEMPORARY RELOCATION

DURING CONSTRUCTION. COORDINATE WITH COR.

REMOVE ALL EXISTING GUTTERS AND DOWNSPOUTS.

EAST ELEVATION

1/4"=1'-0"

3 NORTH ELEVATION

1/4" = 1'-0"

2 WEST ELEVATION

1/4" = 1'-0"

KEYNOTES

02 01

04 04

0102 02

07 06 07

REMOVE EXISTING COLUMNS AND BASE TRIM AND PREPARE

ENTRY AREA TO RECEIVE NEW SLAB, COLUMNS AND TRIM.

TEMPORARILY SUPPORT AND BRACE PORCH ROOF DURING

DEMOLITION AND CONSTRUCTION.

FW MS, JP

REMOVE EXISTING AIR CONDITIONING UNIT AND PREPARE

OPENING TO RECEIVE MATCHING BRICK, VAPOR BARRIER,

SHEATHING, WOOD FRAMING, INSULATION, GWB, PATCH

AND PAINT INFILL. SEE ALSO MECHANICAL DRAWINGS,

COORDINATE DEMOLITION WITH OTHER TRADES. PROTECT

OPENING FROM WEATHER DURING DEMOLITION AND

CONSTRUCTION.

REMOVE EXISTING SINGLE SHRUB AND MULCH. PREPARE

GROUND FOR INSTALLATION OF NEW CONCRETE

MECHANICAL EQUIPMENT PADS AND SPLASH BLOCKS.

RESTORE MUCH BED PER 32 93 00.

SAND AND PREP FOR NEW PAINT ALL EXISTING RAKE

BOARDS, WOOD VENTS, FASCIA BOARDS, TRIM BOARDS

AND SOFFITS.

10 10

REMOVE EXISTING BRICK PAVERS BELOW EXISTING COVERED

PORCH AND REMOVE EARTH AS REQUIRED TO INSTALL NEW

CONCRETE SLAB. SEE STRUCTURAL SHEET S-203, DETAILS 10

AND 11, AND SHEET LS-402 DETAIL 1 FOR INFORMATION

REGARDING CONCRETE SIDEWALK. TEMPORARILY SUPPORT,

SHORE AND BRACE PORCH ROOF DURING CONSTRUCTION.

SEE GENERAL NOTES ON SHEET A-001.

11 11

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND

HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,

TYPICAL.

TEMPORARY

LOCATION

TEMPORARY

LOCATION

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

EXISTING. N.I.C.

04 04

05 05

06 TYPICAL

THIS ROOM

06 TYPICAL

THIS ROOM

07 TYPICAL

THIS ROOM

07 TYPICAL

THIS ROOM

0"±+6"

+6"0"±

12 TYPICAL

THIS ROOM

12 TYPICAL

THIS ROOM

E06

E05

E04E03E02

E01E01 E01

E07

101A

BAY 2

STORAGE

PARTS

HALLWAY

FERTILIZER

OFFICE

BAY 3

BAY 4

BAY 1

108A

BAY 5

10 FE

FE

FE

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

MAINTENANCE BUILDING:

DEMOLITION

FLOOR PLAN

AD-411

1 FLOOR PLAN

1/4" = 1'-0"

0 2' 4' 8' 12'

REMOVE EXISTING VEHICLE LIFT IN ITS ENTIRETY.02

EXISTING VEHICLE LIFT TO REMAIN, PROTECT FROM DAMAGE.

REMOVE EXISTING CONCRETE SLAB-ON-GRADE MINIMALLY

AS REQUIRED FOR REMOVAL OF ADJACENT LIFT, PREPARE

AREA TO RECEIVE REPLACEMENT CONCRETE (4 S.F.).

REMOVE EXISTING DOOR, FRAME & HARDWARE IN THEIR

ENTIRETY, PREPARE OPENING TO RECEIVE NEW DOOR,

FRAME & HARDWARE. PREP LINTELS FOR PAINT AT

EXTERIOR DOORS.

REMOVE EXISTING WINDOW & FRAME IN THEIR ENTIRETY,

PREPARE OPENING TO RECEIVE NEW WINDOW. THREE (3)

SECURITY GRATES AT WINDOWS SHOWN ARE EXISTING TO

REMAIN; REMOVE AND RE-INSTALL AS REQUIRED TO

INSTALL NEW WINDOWS. PREP LINTELS FOR PAINT.

06 EXISTING SHELVING, STORAGE & OFFICE FURNITURE: TO BE

REUSED. PROTECT FROM DAMAGE, REMOVE, STORE AND

REINSTALL AFTER SUBSTANTIAL COMPLETION BY

CONTRACTOR.

07 RELOCATE ALL EXISTING SHELVING, STORAGE & OFFICE

FURNITURE, TEMPORARILY STORE IN SECURED INTERMODAL

CONTAINERS; RE-INSTALL AFTER CONSTRUCTION.

EXISTING FIRE EXTINGUISHER CABINET: TO REMAIN,

PROTECT FROM DUST AND DAMAGE.08

EXISTING FLOOR DRAIN: PROTECT DURING CONSTRUCTION.09

REMOVE ENTIRE WALL. SUPPORT ADJACENT CEILINGS

TEMPORARILY AS REQUIRED.10

REMOVE PORTION OF EXISTING NON-MASONRY WALLS

MINIMALLY AS REQUIRED TO INSTALL NEW BLOCKING;

COORDINATE w/ NEW SHELVING LAYOUT.

EXX EQUIPMENT (EXISTING) TAG: SEE EQUIPMENT SCHEDULE

ON SHEET AE-805

13 REMOVE EXISTING OVERHEAD SHELVING IN ITS ENTIRETY.

14 REMOVE EXISTING MECHANICAL EQUIPMENT: SEE

MECHANICAL DOCUMENTS. PREPARE OPENING TO RECEIVE

NEW MATCHING BRICK INFILL, WATERPROOFING, AND CMU

BLOCK INFILL. PROTECT OPENING FROM WEATHER DURING

CONSTRUCTION.

FW MS

AD-431

AD-431

AD-431

AD-431

/ KEYNOTES

AREA OF WORK

REMOVE EXISTING MECHANICAL EQUIPMENT: SEE

MECHANICAL DOCUMENTS. PREPARE TO INSTALL NEW

EQUIPMENT. PROTECT OPENING FROM WEATHER DURING

CONSTRUCTION.

REMOVE LAYER OF EXISTING PLYWOOD FROM PARTITION IN

STORAGE ROOM 102. INSTALL WOOD BLOCKING AS NOTED

ON ELEVATIONS, SHEET AE-431.

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND

HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,

TYPICAL.

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

101A

BAY 2

STORAGE

PARTS

HALLWAY

FERTILIZER

OFFICE

BAY 3

BAY 4

BAY 1

108A

BAY 5

EXISTING. N.I.C.

02 02 02

03 TYPICAL

THIS ROOM

03 TYPICAL

THIS ROOM

TYPICAL

THIS ROOM

03 TYPICAL

THIS ROOM

03 TYPICAL

THIS ROOM

04 04

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

MAINTENANCE BUILDING:

DEMOLITION

REFLECTED CEILING PLAN

AD-412

1 REFLECTED CEILING PLAN

1/4" = 1'-0"

0 2' 4' 8' 12'

REMOVE EXISTING LIGHT FIXTURE IN ITS ENTIRETY. SEE

ELECTRICAL DOCUMENTS.03

REMOVE EXISTING COILING DOOR AND HOUSING IN ITS

ENTIRETY, PREPARE OPENING TO RECEIVE NEW.

01 EXISTING ATTIC ACCESS DOOR: REMOVE, PREP FRAMING

FOR NEW ACCESS DOOR.

04 EXISTING MECHANICAL EQUIPMENT: REMOVE AS SHOWN

ON MECHANICAL DOCUMENTS.

REMOVE EXISTING OVERHEAD SHELVING: SEE DEMOLITION

FLOOR PLAN.

EXISTING VEHICLE LIFT: TO REMAIN, PROTECT FROM

DAMAGE.

07 REMOVE EXISTING GYPSUM BOARD CEILING AND

INSULATION IN ITS ENTIRETY IN THIS ROOM AND PREPARE

EXISTING FRAMING FOR NEW FRT PLYWOOD CEILING AND

INSULATION.

FW MS

/ KEYNOTES

AREA OF WORK

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND

HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,

TYPICAL.

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

020303

03 03

05 05 05 05

EXISTING. N.I.C.

(TYPICAL)(TYPICAL)

(TYPICAL)(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL) (TYPICAL)(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

MAINTENANCE BUILDING:

DEMOLITION

ROOF PLAN

AD-413

1 ROOF PLAN

1/4" = 1'-0"

0 2' 4' 8' 12'

REMOVE ALL EXISTING GUTTERS.02

EXISTING ASPHALT ROOF SYSTEM TO BE REMOVED.

REMOVE ALL EXISTING DOWNSPOUTS.03

REMOVE EXISTING EXHAUST FANS AND CURBS.

COORDINATE WITH MECHANICAL DOCUMENTS.04

05 REMOVE AND REINSTALL EXISTING LIGHTNING PROTECTION

SYSTEM. SEE ELECTRICAL DRAWINGS E-003 AND EP-414 FOR

DETAILS AND SYSTEM REQUIREMENTS.

3001 FW MS

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND

HAZARDOUS MATERIALS FOR THIS PROJECT, TYPICAL.

/ KEYNOTES

AREA OF WORK

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

MAINTENANCE BUILDING

DEMOLITION ELEVATIONS

AD-431

1 SOUTH ELEVATION

1/4" = 1'-0"

0 1' 2' 4' 6'

REMOVE ALL EXISTING WINDOWS AND PREPARE ROUGH

OPENINGS TO RECEIVE NEW WINDOWS. PREP ALL LINTELS

FOR NEW PAINT.

REMOVE ALL EXISTING DOORS, FRAMES AND HARDWARE;

PREPARE OPENINGS TO RECEIVE NEW DOORS, FRAMES &

HARDWARE. PREP ALL LINTELS FOR NEW PAINT. STEEL

JAMBS AT GARAGE DOORS ARE EXISTING TO REMAIN AND

SHALL BE SANDED AND PREPPED FOR NEW PRIMER AND

PAINT AS SCHEDULED.

3 EAST ELEVATION

1/4"=1'-0"

2 NORTH ELEVATION

1/4" = 1'-0"

4 WEST ELEVATION

1/4" = 1'-0"

LEGEND / KEYNOTES

020202

02 01

01 01 01 0101

REMOVE ALL EXISTING SOFFIT, GUTTERS AND DOWNSPOUTS.03

EXISTING HORIZONTAL ELECTRICAL CONDUIT AND HANGERS

(NOT SHOWN) ARE EXISTING TO REMAIN.

REMOVE EXISTING MECHANICAL FANS. SEE MECHANICAL

DOCUMENTS FOR REPLACEMENT OF FANS AND HEATER

EXHAUST FLUES.

0504 04

CYLINDER TANK STORAGE FENCING IN THIS AREA IS EXISTING

TO REMAIN.06

FW MS, JP

RELAMP OR DEMOLISH EXISTING LIGHT FIXTURES, SEE

ELECTRICAL DOCUMENTS.07

REMOVE EXISTING ROOFING IN ITS ENTIRETY, REPLACE ANY

DAMAGED OR SOFT PLYWOOD ROOF PANELS (UP TO 832

SQUARE FEET) AND PREPARE EXISTING PLYWOOD FOR NEW

ASPHALT SHINGLE ROOFING SYSTEM. REMOVE EXISTING

COPPER STEP FLASHING AND PREPARE SUBSTRATE TO

RECEIVE NEW COPPER STEP FLASHING.

EXISTING EXHAUST FAN TO REMAIN. SEE MECHANICAL

DRAWINGS.10

REMOVE ALL EXISTING RAKE BOARDS AND PLYWOOD

PANELS. SAND AND CLEAN EXISTING WOOD TRIM AND

VENTS. PREPARE SUBSTRATE TO RECEIVE NEW RAKE

BOARDS AND PLYWOOD PANELS.

0909 09

09 09

09 09

03 03

NOT IN CONTRACT

EXISTING SIGNAGE, EQUIPMENT, HOSE AND HOSE REELS TO

REMAIN. PROTECT WITH POLYSHEETING DURING

CONSTRUCTION.

11 11

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZARDOUS

MATERIALS NOTES FOR THIS PROJECT, TYPICAL.

2. SEE AE-423 FOR EXTERIOR FINISHES AND COLORS.

05 05

12 REMOVE EXISTING MECHANICAL EQUIPMENT: SEE

MECHANICAL DOCUMENTS. PREPARE OPENING TO RECEIVE

NEW MATCHING BRICK INFILL, WATERPROOFING, AND CMU

BLOCK INFILL. PROTECT OPENING FROM WEATHER DURING

CONSTRUCTION.

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

DN

UTILITIES

BASEMENT

14 14

UTILITIES

14 14

TYPICAL

UP

BASEMENT

01 TYPICAL

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

PUMP HOUSE:

DEMOLITION,

FLOOR AND ROOF PLANS

AD-511

2 BASEMENT FLOOR: PLAN

1/4" = 1'-0"

0 1' 2' 4' 6'

4 GROUND FLOOR: PLAN

1/4" = 1'-0"

01 EDGE OF EXISTING FOOTING BELOW.

02 REMOVE PAINT FROM EXISTING TANK, SEE HAZMAT NOTES ON

SHEET A-001.

03 AREA OF EXISTING ELECTRICAL EQUIPMENT: SEE ELECTRICAL

DOCUMENTS

EXISTING MAINTENANCE PADS OR SHAFT FOR MECHANICAL

EQUIPMENT: EXISTING TO REMAIN.04

05 REMOVE EXISTING WINDOW, FRAME & HARDWARE, PREPARE

SILL, JAMBS AND HEAD FOR INSTALLATION OF NEW WINDOW.

PREP LINTEL FOR NEW PAINT.

06 REMOVE EXISTING DOOR & HARDWARE. EXISTING FRAME TO

REMAIN, METAL PATCH REPAIR LOWER LEFT SECTION AND

FINISH TO MATCH EXISTING. PREP LINTEL FOR NEW PAINT.

6 ROOF PLAN

1/4" = 1'-0"

1 BASEMENT FLOOR : REFLECTED CEILING PLAN

1/4" = 1'-0"3 GROUND FLOOR: REFLECTED CEILING PLAN

1/4" = 1'-0"

REMOVE ALL EXISTING GUTTERS AND DOWNSPOUTS IN

THEIR ENTIRETY.07

REMOVE EXISTING ROOFING SYSTEM DOWN TO PLYWOOD

SUBSTRATE; REPLACE ALL DAMAGED OR SOFT PLYWOOD

SHEATHING (UP TO 350 S.F.) WITH NEW PLYWOOD

SHEATHING. SEE HAZMAT NOTES ON SHEET A-001.

10 EXTERIOR FACE OF EXISTING WALL BELOW.

11 REMOVE DAMAGED WALL PARGING - PREP MASONRY FOR

REPAIR. SEE DETAIL 4, SHEET AE-511.

12 EXISTING METAL "EYEBROW" VENT & HOUSING TO REMAIN.

INFILL PORTION OF EXISTING HOLE IN ROOF WITH PLYWOOD

SUBSTRATE/SHEATHING & FRAMING TO MATCH EXISTING

ADJACENT. CONTRACTOR SEQUENCING NOTE: KEEP EXISTING

HOLE IN ROOF IN PLACE UNTIL AFTER THE EXISTING WELL AND

PUMP COMPONENTS HAVE BEEN PULLED AND THE EXISTING

WELL HAS BEEN DECOMMISIONED. WAIT UNTIL ALL WORK ON

THE EXISTING WELL IS COMPLETE AND APPROVED BY THE

PERMIT AUTHORITY(IES) HAVING JURISDICTION.

UNIT HEATER - SEE MECHANICAL DRAWINGS.

OPENING IN CEILING / FLOOR FOR STAIR TO LEVEL ABOVE.15

OPENING IN CEILING / FLOOR LEVEL ABOVE IS EXISTING TO

REMAIN. PREPARE TO INSTALL FLOOR GRATE AFTER

EQUIPMENT IS REMOVED. SEE IRRIGATION AND

MECHANICAL DRAWINGS.

REMOVE EXISTING LIGHT FIXTURES. SEE ELECTRICAL

DOCUMENTS.

OPENING IN CEILING - PART OF OPENING IN ORIGINAL ROOF

ABOVE, SEE ROOF PLAN FOR ADDITIONAL INFORMATION.

CONTRACTOR SEQUENCING NOTE: SEE KEYNOTE 09 ABOVE.

REMOVE ALL EXISTING PLYWOOD SOFFIT IN ITS ENTIRETY,

PREPARE TRIM TO RECEIVE NEW VENTED SOFFIT PER

SPECIFICATIONS AND DETAIL 5/AE-801. REMOVE ANY

ROTTED FASCIA BOARDS BEHIND GUTTERS (UP TO 45 LINEAR

FEET) AND PREPARE RAFTER ENDS TO RECEIVE NEW FASCIA

AS REQUIRED. PREP ALL TRIM TO RECEIVE NEW PAINT.

IK, FW MS

5 EXISTING SOFFIT AND TRIM

NOT TO SCALE

REMOVE EXISTING DRYWALL CEILING IN ITS ENTIRETY. SEE

HAZMAT NOTE #1, SHEET A-001. REMOVE ALL EXISTING

INSULATION AND PREP ATTIC TO RECEIVE NEW INSULATION.

SAW-CUT VENTILATION OPENINGS IN BRICK AND MASONRY,

WALL - TO ALLOW FOR AIR VENTS INSTALLATION.

COORDINATE WITH MECHANICAL DRAWINGS. SEE DETAIL

12/AE-801.

SAWCUT 14" X 24" OPENING IN CEILING FOR NEW ATTIC

ACCESS. PREPARE TO INSTALL NEW FRAMING AS REQUIRED.

SEE SHEET AE-521.

AD-522

AD-522

AD-522

AD-522

/ KEYNOTES

AD-511

1. SEE ALL GENERAL NOTES AND HAZARDOUS MATERIALS

NOTES ON SHEET A-001.

NOTES

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

PUMP HOUSE

DEMOLITION ELEVATIONS

AD-522

1 WEST ELEVATION

1/4" = 1'-0"

0 2' 4' 8' 16'

1. FOR ALL GENERAL NOTES AND HAZMAT NOTES, SEE SHEET

A-001.

2. SEE AE-531 FOR EXTERIOR FINISHES AND COLORS.

4 NORTH ELEVATION

1/4"=1'-0"

3 SOUTH ELEVATION

1/4" = 1'-0"

2 EAST ELEVATION

1/4" = 1'-0"

LEGEND / KEYNOTES

NOTES

01 REMOVE TEMPORARY PLYWOOD COVER AND ROOFING.

PREPARE HOLE IN ROOF TO RECEIVE NEW FRAMING AND

ROOFING.

02 PREPARE EYEBROW VENTS TO RECEIVE NEW PAINT.

03 REMOVE EXISTING DOOR AND HARDWARE. EXISTING FRAME

TO REMAIN, METAL PATCH REPAIR LOWER LEFT FRAME

SECTION AND PREP FRAME FOR REPAINTING. PREP LINTEL

FOR NEW PAINT.

REMOVE ALL EXISTING GUTTERS, DOWNSPOUTS AND SOFFIT.

REMOVE UP TO 45 LINEAR FEET OF ROTTED FASCIA BOARD

BEHIND GUTTERS AND PREPARE END RAFTERS TO RECEIVE

NEW FASCIA BOARD.

REMOVE EXISTING EXTERIOR LIGHTS AND PREPARE FOR

INSTALLATION OF NEW FIXTURES, SEE ELECTRICAL DRAWINGS.

REMOVE EXISTING WINDOW, FRAME AND HARDWARE,

PREPARE OPENING TO RECEIVE NEW WINDOW. PREP LINTEL

FOR NEW PAINT.

REMOVE DAMAGED BRICK AT CORNER OF SILL AND PREPARE

TO RECEIVE NEW REPLACEMENT BRICK AND REPOINTING.07

5 NORTH WALL

1/4"=1'-0"

MULTIPLE CRACKS AT EXISTING BRICK WALL. REMOVE AND

REPLACE BROKEN BRICKS IN-KIND; (UP TO 50 SQUARE FEET).

SEE SPECIFICATION DIVISION 04 SECTIONS FOR INFORMATION

ON HISTORIC BRICK REPAIR. REFER TO (CP-) PAVEMENT, (I-)

IRRIGATION AND (LS-) SITE DEVELOPMENT DRAWINGS FOR

ADDITIONAL SITE WORK AT EXTERIOR.

IK, FW JP, MS

REMOVE ALL LAYERS OF EXISTING ROOFING SYSTEM DOWN

TO PLYWOOD SUBSTRATE; REPLACE ALL DAMAGED OR SOFT

SHEATHING (UP TO 350 S.F.) WITH NEW PLYWOOD

SHEATHING.

10 EXISTING FIRE EXTINGUISHER CABINET TO REMAIN.

AD-522

11 REMOVE BRICKS AND CMU FOR NEW ALUMINUM BRICK VENT 7

3/4" X 12", SEE SHEET AE-531 AND MECHANICAL DRAWINGS.

11 11

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

B C DA

UTILITY

COMMTL

'-8

12'-3" ± 36'-6" ±

FE

- 3

3' -9

" V

IF

+/- 33'-8" VIF

B C DA

UTILITY

COMMTL

DS

DS

DS

DS

- 3

3' -9

" V

IF

+/- 33'-8" VIF

SLOPE DN

SLOPE DN

SLOPE DN SLOPE DN

- 3

3' -9

" V

IF

+/- 33'-8" VIF

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

COMMITTAL SHELTER A:

FLOOR, CEILING AND ROOF

DEMOLITION PLANS

AD-611

5 ROOF PLAN

1/4" = 1'-0"

0 2' 4' 8' 12'

4 CEILING PLAN

1/4" = 1'-0" 1 FLOOR PLAN

1/4" = 1'-0"

TO PARKING

NOTES

02 REMOVE EXISTING GUTTER SYSTEM IN ITS ENTIRETY

03 REMOVE EXISTING DOWNSPOUT SYSTEM IN ITS ENTIRETY

REMOVE ALL LAYERS OF EXISTING ROOF SYSTEM DOWN TO

PLYWOOD SUBSTRATE. REPLACE UP TO 30% OF DAMAGED

ROOF PLYWOOD SHEATHING.

CLEAN EXISTING UNIT PAVING (INCLUDING UTILITY 101) &

ASSOCIATED CONCRETE CURBS, 1,450 SF

06 EXISTING BENCHES TO REMAIN

07 EXISTING BIER WALL TO REMAIN

REMOVE EXISTING DOORS, FRAMES AND HARDWARE;

PREPARE OPENING TO RECEIVE NEW DOORS, FRAMES &

HARDWARE.

REMOVE ALL EXISTING BIRD SPIKES FROM TOPS OF BEAMS,

COLUMNS AND WALLS, TYPICAL.

09 REMOVE EXISTING LIGHT FIXTURES

11 CLEAN AND PREP ALL EXPOSED SIDES OF EXPOSED WOOD

CEILING, SOFFIT AND BEAMS, STRIP STAIN AND SAND FOR

RE-STAINING AND SEALING. SEE AE-611 FOR NEW WORK.

REPAIR AND REPLACE WOOD SIDING WHERE REQUIRED TO

MATCH EXISTING, +/- 120 SF.

2 EXISTING COMMITTAL SHELTER

IK, FW FW

EXISTING UNIT PAVING

EXISTING CONCRETE HEADER

AD-631

AD-631

AD-631

AD-631

3 UTILITY 101 DOOR

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZMAT

NOTES FOR THIS PROJECT, TYPICAL.

2. REFER TO AD-631 FOR ADDITIONAL DEMOLITION

REQUIREMENTS.

3. REFER TO AE-631 FOR FINISHES AND COLORS

R

EP

LA

CE

D O

O R

AN

D

FR

AM

E

12 CLEAN AND PREP EXISTING METAL TRANSOM PANEL TO

REMAIN FOR REPAINTING.

CLEAN AND PREP EXISTING METAL GRATE AT MECHANICAL

ROOM CEILING FOR REPAINTING, MATCH EXISTING COLOR.

13 REMOVE AND REPLACE EXISTING FIRE EXTINGUISHER CABINET.

REFER TO AE-621 FOR #8, 5 SEAL REMOVAL WITH NEW

ORDER AND REPAIRS.

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

UTILITY

COMMTL

DCBA

36'-8" ±

'-6

10'-0" ±

FE

UTILITY

COMMTL

DCBA

DS

DS

DS

DS

SLOPE DN

SLOPE DN

SLOPE DN SLOPE DN

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

COMMITTAL SHELTER B:

FLOOR, CEILING AND ROOF

DEMOLITION PLANS

AD-612

3 ROOF PLAN

1/4" = 1'-0"

0 2' 4' 8' 12'

2 CEILING PLAN

1/4" = 1'-0" 1 FLOOR PLAN

1/4" = 1'-0"

TO PARKING

02 REMOVE EXISTING GUTTER SYSTEM IN ITS ENTIRETY

03 REMOVE EXISTING DOWNSPOUT SYSTEM IN ITS ENTIRETY

06 EXISTING BENCHES TO REMAIN

07 EXISTING BIER WALL TO REMAIN

REMOVE EXISTING DOORS, FRAMES AND HARDWARE;

PREPARE OPENING TO RECEIVE NEW DOORS, FRAMES &

HARDWARE

REMOVE ALL EXISTING BIRD SPIKES FROM TOPS OF BEAMS,

COLUMNS AND WALLS, TYPICAL.

09 REMOVE EXISTING LIGHT FIXTURES

4 EXISTING COMMITTAL SHELTER

IK, FW FW

EXISTING UNIT PAVING

EXISTING CONCRETE HEADER

AD-632

AD-632

AD-632

AD-632

5 UTILITY 101 DOOR

RE

M

O

VE

A N

D

RE

PL

AC

E

DO

O R

AN

D

FR

AM

E

AT ALL EXPOSED SIDES OF EXPOSED WOOD CEILING, SOFFIT

AND BEAMS, STRIP STAIN, SAND, CLEAN AND PREP SURFACES

FOR RE-STAINING AND SEALING. SEE AE-612 FOR NEW WORK.

REPAIR AND REPLACE SIDING WHERE REQUIRED TO MATCH

EXISTING.

12 CLEAN AND PREP EXISTING METAL TRANSOM PANEL TO

REMAIN FOR REPAINTING.

CLEAN EXISTING UNIT PAVING (INCLUDING UTILITY 101) &

ASSOCIATED CONCRETE CURBS, 1,450 SF

REMOVE ALL LAYERS OF EXISTING ROOF SYSTEM DOWN TO

PLYWOOD SUBSTRATE. REPLACE UP TO 30% OF DAMAGED

ROOF SHEATHING.

CLEAN AND PREP EXISTING METAL GRATE AT MECHANICAL

ROOM CEILING FOR REPAINTING, MATCH EXISTING COLOR.

13 REMOVE AND REPLACE EXISTING FIRE EXTINGUISHER CABINET.

REFER TO AE-621 FOR #8, 5 SEAL REMOVAL WITH NEW

ORDER AND REPAIRS.

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZMAT

NOTES FOR THIS PROJECT, TYPICAL.

2. REFER TO AD-631 FOR ADDITIONAL DEMOLITION

REQUIREMENTS.

3. REFER TO AE-631 FOR FINISHES

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

GSPublisherVersion 379.93.93.100

U N I T

E D

STATE S OF

AM

E

R I C A

E

N T

OF

VETERANS

A F F A I R S

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

Final Construc on Documents - Issued for Construc on

U N I T

E D

STATE S OF

AM

E

R I C A

E

N T

OF

VETERANS

A F F A I R S

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

PRIME CONSULTANT

Walker Federal Services, LLC 7820B-162 Wormans Mill Rd Frederick, Maryland 2 1 7 0 1

CONSULTANTS

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

FW

May 22, 2023

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K I

A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

0 2' 4' 8' 12'

AD-631

COMMITTAL SHELTER A:

EXTERIOR ELEVATIONS

DEMOLITION

- 1

5' -1

1' -0

- 7

'-9 " V

IF

- 1

5' -1

1' -0

4"

- 7 '-9

" V

IF +/

- 1 5'

-1

1' -0

4"

- 7 '-9

" V

IF

- 1

5' -1

1' -0

4"

- 7 '-9

" V

IF

JP

SCALE: 1/4" = 1'-0"1 NORTH ELEVATION

SCALE: 1/4" = 1'-0"5 WEST ELEVATION

SCALE: 1/4" = 1'-0"2 SOUTH ELEVATION

SCALE: 1/4" = 1'-0"4 EAST ELEVATION

6 CORNER VIEW 3 VIEW OF BRICKS AT BASE OF WALL

REMOVE EXISTING DOORS, FRAMES AND HARDWARE; PREPARE

OPENING TO RECEIVE NEW DOORS, FRAMES & HARDWARE.

CLEAN AND PREP EXISTING METAL TRANSOM PANEL TO

REMAIN FOR REPAINTING. SEE DRAWING 3/AD-611.

REMOVE EXISTING GUTTER SYSTEM IN ITS ENTIRETY

REMOVE EXISTING DOWNSPOUT SYSTEM IN ITS ENTIRETY

REMOVE EXISTING ASPHALT SHINGLES ROOF SYSTEM DOWN

TO PLYWOOD SUBSTRATE

REMOVE EXISTING ALUMINUM FASCIA.

AT BASE OF ALL BRICK WALLS AND COLUMNS, REMOVE LOOSE

AND DETERIORATED MORTAR AND CLEAN…