This solicitation and statement of work document outlines requirements for a firm fixed price renovation contract at Fort Harrison National Cemetery in Virginia. The National Cemetery Administration seeks proposals to renovate the maintenance building, including providing all labor, materials, equipment, and supervision to complete work in accordance with attached specifications, drawings, and statement of work. Offerors are to submit fixed unit pricing for the base contract scope and four deductive alternates involving asphalt removal, lighting protection, cemetery entrance improvements, and garage accessories. Proposals will be evaluated using lowest price technically acceptable criteria, with price reasonableness determined in relation to an independent government cost estimate. The contract type is 100% set aside for service-disabled veteran-owned small businesses, with an anticipated 180-day performance period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78622R0042 A0004.docx | DOCX document | |
| 36C78622R0042 A0003.docx | DOCX document | |
| RFP Contractor Cost Estimate Worksheet for Fort Harrison Natl Cem.xlsx | XLSX spreadsheet | |
| 36C78622R0042 A0002.docx | DOCX document | |
| 36C78622R0042 A0001.docx | DOCX document | |
| Wage Determination-Davis Bacon - Fort Harrison Natl Cem - Project No 849-NRM22-01.pdf | ||
| Statement of Work SOW - Fort Harrison Natl Cem.pdf | ||
| 36C78622R0042.docx | DOCX document | |
| 849-NRM22-01 Drawings.pdf | ||
| 849-NRM22-01 Specifications.pdf | ||
| Wage Determination DB Fort Harrison Natl Cem.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location: FORT HARRISON NATIONAL CEMETERY
8620 VARINA RD, RICHMOND, VA 23231
Project Title: Renovate Maintenance Building
Project Control #: 849-NRM22-01
Statement of Work Summary:
Contractor shall furnish all tools, labor, materials, equipment, and services to perform work described below, in the specification sections, and on the drawings at the Fort Harrison
National Cemetery.
A. General
1. Contractor is strongly encouraged to survey the project area prior to bidding to adequately understand the full scope of work and all requirements. Contractor is required to submit any questions or clarifications prior to bid. A bid submitted will be taken as agreement that the work shall be performed to meet the requirements herein based on the existing conditions in the field.
2. The specifications and drawings have the following project number on them which corresponds to the design project number: 849-NRM19-15. Contractor shall note that this differs from the scope of work project control number listed above which is being used for this construction project: 849-NRM22-01.
3. The contractor shall submit submittals including shop drawings and any other specification requirements to the COR for review and approval prior to fabrication/installation. Submittals approved by the owner (VA/NCA) are required prior to starting on the corresponding work.
4. The contractor shall submit a draft invoice/payment request concurrently to the field COR and the Project Engineer for dual approval. Only when the field COR and the Project Engineer approve of the draft invoice may it then be submitted for formal payment.
B. Specific work items:
1. Perform all work in accordance with the contract drawings and specifications below and attached.
SPECIFICATION SECTIONS:
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 10 Table of Contents 04-29-20
00 01 15 List of Drawing Sheets 04-29-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 02 General Requirements (Minor NCA Projects) 04-29-20
01 23 00 Alternates 04-29-20
01 33 23 Shop Drawings, Product Data, and Samples 04-29-20
01 42 19 Reference Standards 04-29-20
01 45 29 Testing Laboratory Services 04-29-20
01 56 39 Temporary Tree and Plant Protection 04-29-20
01 57 19 Temporary Environmental Controls 04-29-20
01 74 19 Construction Waste Management 04-29-20
DIVISION 02 – EXISTING CONDITIONS
02 41 10 Demolition and Site Clearing 04-29-20
02 83 33.13 Lead-Based Paint Removal and Disposal 04-29-20
DIVISION 03 – CONCRETE
03 30 53 Cast-in-Place Concrete 04-29-20
DIVISION 04 - MASONRY
04 03 22 Historic Brick Unit Masonry Repair 04-29-20
04 03 23 Historic Brick Unit Masonry Repointing 04-29-20
04 05 13 Masonry Mortaring 04-29-20
04 20 00 Unit Masonry 04-29-20
DIVISION 05 - METALS
05 50 00 Metal Fabrications 04-29-20
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 04-29-20
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 52 16 SBS Modified Bituminous Membrane Roofing 04-29-20
07 60 00 Flashing and Sheet Metal 04-29-20
07 92 00 Joint Sealants 04-29-20
DIVISION 08 - OPENINGS
08 80 00 Glazing 04-29-20
08 11 13 Hollow Metal Doors and Frames 04-29-20
08 51 13 Aluminum Windows 04-29-20
08 71 00 Door Hardware 04-29-20
DIVISION 09 – FINISHES
09 22 16 Non Structural Metal Framing 04-29-20
09 29 00 Gypsum Board 04-29-20
09 30 13 Tiling 04-29-20
09 91 00 Painting 04-29-20
DIVISION 10 – SPECIALTIES
10 14 00 Signage 04-29-20
10 28 00 Toilet and Bath Accessories 04-29-20
10 44 16 Fire Extinguishers 04-29-20
10 56 13 Steel Shelving and Garage Accessories 04-29-20
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 04-29-20
22 05 23 General Duty Valves for Plumbing Piping 04-29-20
22 11 00 Facility Water Distribution 04-29-20
22 13 00 Facility Sanitary Sewer 04-29-20
22 33 00 Electric Water Heaters 04-29-20
22 40 00 Plumbing Fixtures 04-29-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 04-29-20
23 34 00 HVAC Fans 04-29-20
23 82 39 Unit Heaters 04-29-20
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 04-29-20
26 05 19 Low-Voltage Electrical Power Conductors and Cables (600 Volts and
Below)
04-29-20
26 05 26 Grounding and Bonding for Electrical Systems 04-29-20
26 05 33 Raceway and Boxes for Electrical Systems 04-29-20
26 05 41 Underground Electrical Construction 04-29-20
26 05 73 Overcurrent Protective Device Coordination Study 04-29-20
26 24 16 Panelboards 04-29-20
26 27 26 Wiring Devices 04-29-20
26 41 00 Facility Lightning Protection 04-29-20
26 51 00 Interior Lighting 04-29-20
26 56 00 Exterior Lighting 04-29-20
DIVISION 31 – EARTHWORK
31 20 11 Earth Moving (Short Form) 04-29-20
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 04-29-20
DRAWINGS:
DRAWING NUMBER TITLE
1 GI-001 COVER SHEET & CODE ANALYSIS
2 GI-002 ABBREVIATIONS, SYMBOLS AND NOTES
3 GI-003 SITE PLAN - EXISTING
4 TP-101 TREE PROTECTION PLAN
5 AD-101 SITE PLAN - DEMOLITION
6 AS-101 ENLARGED PARTIAL SITE PLAN
7 AS-201 SITE DETAILS
8 AS-202 SITE DETAILS
9 AD-102 ARCHITECTURAL PLANS - DEMOLITION
10 AD-201 EXTERIOR WALLS - DEMOLITION
11 A-101 ARCHITECTURAL PLANS - NEW WORK
12 A-201 EXTERIOR WALLS - REPAIRS & NEW WORK
13 A-401 ENLARGED RESTROOM PLAN & ELEVATIONS,
SCHEDULES
14 A-402 BUILDING DETAILS
15 M-001 MECHANICAL SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
16 M-101 MECHANICAL FLOOR PLANS
17 M-201 MECHANICAL SCHEDULES
18 P-001 PLUMBING SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
19 P-101 PLUMBING FLOOR PLANS
20 P-201 PLUMBING SCHEDULES
21 E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
22 ES-101 ELECTRICAL SITE PLAN - EXISTING, DEMOLITION
AND NEW WORK
23 ED-101 LIGHTING AND POWER - MAINTENANCE AND
STORAGE BUILDING - DEMOLITION PLAN
24 E-101 LIGHTING AND POWER PLAN - MAINTENACE AND
STORAGE BUILDING
25 E-201 POWER RISER DIAGRAM, PANEL AND LIGHTING
SCHEDULES
26 E-301 COMCHECK
27 E-401 LIGHTNING PROTECTION - ROOF PLAN - NEW
WORK
28 S-101 STRUCTURAL DETAILS AND NOTES - NEW WORK
29 S-102 STRUCTURAL KEY PLAN - NEW WORK
Pre-Bid Site Visit: Bidders are strongly urged to inspect, site investigate by observation, and Request for Information (RFI) and responses through the Contracting Office to satisfy their understanding of the work to be done, all general, local and technical conditions that may affect the cost and the feasibility of their proposal. In no event shall failure to inspect the site constitute grounds for a claim after award. Visitors planning to conduct a site visit shall contact the Cemetery Director or Foreman to make arrangements:
Cemetery POC(s):
Hampton National Cemetery Director Michael Faust (Fort Harrison is a satellite thereof)....... (804) 795-2031 or michael.faust@va.gov
Technical POC (Submit all submittals concurrently to the COR and Technical POC below):
Rico J. Silvetti, North Atlantic District (NAD) Engineer....... rico.silvetti@va.gov
PRICE/COST SCHEDULE
Contractor shall provide all labor, tools, materials, equipment, services, testing.
submittals, approvals, and professional supervision related work for the Renovate
Maintenance Building Project (849-NRM22-01), Base Contract, located at the Fort
Harrison National Cemetery. The work Shall be completed In Accordance With (IAW) the Statement of Work (SOW), Specifications, and Drawings.
mailto:michael.faust@va.gov
ITEM INFORMATION
Contract Line Item Description Quantity Unit Unit Price Total Price
0001 WORK ELEMENT 01, MAINTENANCE
BUILDING BASE CONTRACT
1 JB
TOTAL PRICE (CLIN 0001)
TOTAL PRICE WRITTEN:
PRICE/COST SCHEDULE DEDUCT ALTERNATES
Contractor shall provide all labor, tools, materials, equipment, services, testing.
submittals, approvals, and professional supervision related work for the Renovate
Maintenance Building Project (849-NRM22-01), Deduct Alternates, located at the Fort
Harrison National Cemetery. The work Shall be completed In Accordance With (IAW) the Statement of Work (SOW), Specifications, and Drawings.
ITEM INFORMATION
Contract Line Item Description Quantity Unit Unit Price Total Price
0001 CONTRACT OPTION 01, “DEDUCT
ALTERNATE #1”. REMOVE ASPHALT
PAVEMENT SECTION, SEE KEYNOTE 02,
DRAWING AD-101. INSTALL NEW
CONCRETE PAVEMENT PER KEYNOTE
02, DRAWING AS-102.
0002 CONTRACT OPTION 02, “DEDUCT
ALTERNATE #2”. LIGHTNING
PROTECTION FOR FLAMMABLE
STORAGE AND MAINTENANCE
BUILDINGS. SEE DRAWING E-401.
0003 CONTRACT OPTION 03, “DEDUCT
ALTERNATE #3”. WORK ITEMS AT
CEMETERY ENTRANCE - ADA WARNING
PLATE, ENTRY GATE STOP AND CANE
BOLT, BRONZE ENTRY SIGN. SEE
DRAWING 2 / AS-201.
0004 CONTRACT OPTION 04, “DEDUCT
ALTERNATE #4”. GARAGE
ACCESSORIES, SEE DRAWING AND
SCHEDULE ON A-401.
TOTAL PRICE FOR DEDUCT ALTERNATES
CLINS 0001 THROUGH 0004
TOTAL PRICE WRITTEN:
Duration: Term of the contract shall be one hundred and eighty days (180 days) from date of award. The Contractor shall complete all work within 180 calendar days after receipt of
Notice to Proceed, subject to all terms, conditions, provisions and schedules of the contract.
(END OF PRICE/COST SCHEDULES)