This document includes a request for proposal (RFP) and related project details. The RFP is for renovation services at the Fort Harrison National Cemetery maintenance building in Richmond, Virginia. The Department of Veterans Affairs National Cemetery Administration is soliciting proposals for a firm fixed price contract to provide all labor, materials, equipment, and supervision to complete the renovation project according to the provided statement of work, specifications, and drawings. Pricing proposals will be evaluated using lowest price technically acceptable criteria. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The contractor must have the capability to perform the required renovation services at the maintenance building located at the Fort Harrison National Cemetery.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

RFP No. 36C78622R004236C78622B0015
Project Name: Fort Harrison Natl CemBeverly National Cemetery | Restoration, Repair, and Replacement of Perimeter Fence
DivisionBASE BIDADD ALT 0001ADD ALT 0002ADD ALT 0003ADD ALT 0004TOTAL
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $ $ $