36C78620B0002-0002000.docx

DOCX document Posted

Attached to
Fort Gibson National Cemetery Gravesite Expansion, Project Number 844CM3023
Solicitation number
36C78620B0002
Issued by

About this file

This document provides details regarding a federal contract opportunity for the Fort Gibson National Cemetery Gravesite Expansion project. The Department of Veterans Affairs, National Cemetery Administration is seeking bids for the expansion of gravesites at the Fort Gibson National Cemetery in Fort Gibson, Oklahoma. The project includes excavation and installation of 3,000 pre-placed crypts and 3,035 in-ground cremains sites. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses with a business size standard of $36.5 million. The NAICS code for this project is 237990. Bids are due in January 2020 with the contract to be awarded shortly after. Offerors must register in the System for Award Management and Vendor Information Pages databases to be considered for the contract. The point of contact for any questions is provided.

36C78620B0002 0002 36C78620B0002 0002.docx

View the file

Other files

File Type Posted
36C78620B0002-0004001.pdf PDF
36C78620B0002-0004000.docx DOCX document
36C78620B0002-0003013.pdf PDF
36C78620B0002-0003012.docx DOCX document
36C78620B0002-0002002.pdf PDF
36C78620B0002-0002001.pdf PDF
36C78620B0002-0001000.docx DOCX document
36C78620B0002-008.pdf PDF
36C78620B0002-010.pdf PDF
36C78620B0002-002.pdf PDF
36C78620B0002-003.pdf PDF
36C78620B0002-006.pdf PDF
36C78620B0002-001.docx DOCX document
36C78620B0002-007.pdf PDF
36C78620B0002-009.xlsx XLSX spreadsheet
36C78620B0002-004.pdf PDF
36C78620B0002-005.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-31-2020

844CM3023

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78620B0002 01-28-2020

X X X

X The Q&A period has ended! The purpose of this amendment is to provide Government responses to Vendor questions.

Many vendor questions have been received for this requirement and not all have been answered. The remaining questions will be posted in the next amendment sometime between 2-3-20 and 2-6-20.

See the continuation page for Government response to the first round of questions.

Jerry L. Hodson Jr.

Contracting Officer

AMENDMENT-0002, 36C78620B0002

Fort Gibson National Cemetery Gravesite Expansion Contractor Questions & GOV Responses (1 thru 74)

1. Sections 28 & 29 is designated for IGC. There is no detail as to what is required for sections 28 & 29 IGC. Please specify Sheet CS106 calls for 3,035 units of Type 4' x 4' separate from the 3,000 units of precast lawn crypts.

Are we to provide precast 4' x 4' IGC/Urn Crypt Vaults?

1.GOV Response: No Preplaced Urn crypts vaults are required for this project. Review the grading, control markers, section markers, and landscaping sheets.

2. Is specification 01 00 02 missing page 4?

2.GOV Response: See missing page 4 attached with amendment-0002 Named:

“S06_Amendment-0002_Attachment-1_Page 4_SPECIFICATIONS_1-29-19”.

3. Is the specification for 03 48 21 page footer mislabeled 09 48 21?

3. GOV Response: Section 03 48 21 is called out in the Section heading and the Table of Contents. The footer call out is incorrect.

4. Are the specifications supposed to have section 31 25 10 included twice pages 137-138 and 274-275? There are small differences.

4. GOV Response: Ignore the second section 31 25 10

5. Are sections 32 92 19 and 32 92 23 for seed and sod missing per Paragraph 2.2 in section(s) 31 25 10?

5. GOV Response: See Section 32 90 00 for specifications pertaining to sod, 2.3, A and B; and seeding 3.16.

6. Ref 31 25 10: Paragraph 1.1 B. which is correct “ODOT” or “Tribe”?

6. GOV Response: Delete Tribe from Specification.

7. Ref 31 25 10: Paragraph 2.1 A. which is correct “ODOT Prevention, Control, and Abatement of Erosion and Water Pollution” or “ODOT Standard Specification for Erosion and Pollution Control “?

7. GOV Response: The current ODOT applicable criteria is: ODOT Section 220, Management of Erosion, Sedimentation, and Storm Water Pollution Prevention and Control.

8. Please specify the expected LF and the expected location of the 7' privacy construction fencing required on this project.

8. GOV Response: The Project Work is defined by the Contract Documents. The extent of the fencing can be determined by review of the Contract Documents and on-site verification. The location is west of the adjacent existing burial section.

9. If construction fencing is placed on east side of expansion area, is the temporary / privacy fencing required as shown on drawing CS101?

9. GOV Response: Yes.

10. Is the intent to remove all trees and stumps within the stream bed and within the entire expansion area and is fleximate required throughout this area?

10. GOV Response: No, the bed and bank of the stream are not to be disturbed during construction. Such disturbance would trigger environmental and USACE permitting. The trees marked for removal in the stream bed and bank should first be verified as dead or damaged/dangerous, flagged for removal by an NCA official or representative, then cut down leaving as little a stump as possible without disturbing the bed and bank of the stream, see Demolition Sheet CD 101. Flexamat is not required throughout the expansion only at the ends of SWS structures, see CU Sheets for locations.

11. G003 indicates measured quantity bid item - Base Bid as well as Add Alternate #1. Is there Items of Work (Quantities) for the new proposed roadwork shown on CP101 as well as all work within the Proposed Expansion Area. This would be very helpful to insure no expected work is left out of lump sum required for performance of this project. Please advise.

11. GOV Response: All work shown on contract document are part of the based bid, items note in CLIN 2. The quantity schedules are for reference only final quantities for bidding are the responsibility of the contractor to verify. The quantities are to be determined by the bidder.

12. Since there are no Electrical drawings included in the bid package, can you confirm that the only electrical requirements for this project are temporary power for construction activities and power to the Irrigation Controller? Can you also tell us where power is to be pulled from and if the temporary construction activity power will need to be sub metered?

12. GOV Response: The electrical power requirements for the Project will serve the in-ground irrigation system only. Temporary construction power access point is to be coordinated with the COR.

13. How long are typical committal, burial, and cemetery activity shutdowns and what is the minimum notice you can provide the contractors prior to shutdowns?

13. GOV Response: The cemetery director will provide the weekly schedule; the contract will need to check in with the Director daily to see if any the is a change in the daily schedule. Most work can continue in the new burial areas can continue, work around the shelter will need to shut down during the service. The cemetery averages 3 services a day.

14. Specification 10 41 00 EXTERIOR SIGNAGE references related work section 03 30 53, (SHORT FORM) CAST-IN-PLACE CONCRETE, would you please provide 03 30 53 specification section?

14. GOV Response: Refer to Section 03 30 50, delete reference to 03 30 53.

15. Specification 10 41 00 EXTERIOR SIGNAGE references related work section 04 72 00 CAST STONE MASONRY, would you please provide 04 72 00 specification section?

15. GOV Response: Delete reference to Section 04 72 00.

16. Specification 26 05 19 1.2 Related work A Section 07 84 00, FIRESTOPPING: Sealing around penetrations to maintain the integrity of fire-resistant rated construction, would you please provide spec section 07 84 00?

16. GOV Response: Delete reference to Section 07 84 00.

17. Specification 26 05 26 P1.2 Related work Section 26 12 19, PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS: pad-mounted, liquid-filled, medium-voltage transformers, would you please provide spec section 26 12 19?

17. GOV Response: Delete reference to Section 26 12 19.

18. Specification 26 05 26 P1.2 Related work Section 26 13 13, MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR: Medium-voltage circuit breaker switchgear, would you please provide spec section 26 13 13?

18. GOV Response: Delete reference to Section 26 13 13.

19. Specification 26 05 26 P1.2 Related work Section 26 13 16, MEDIUM-VOLTAGE FUSIBLE INTERRUPTER SWITCHES: Medium-voltage fusible interrupter switches, would you please provide spec section 26 23 16?

19. GOV Response: Delete reference to Section 26 23 16.

20. Specification 26 05 26 P1.2 Related work Section 26 22 00, LOW-VOLTAGE TRANSFORMERS: Low-voltage transformers, would you please provide spec section 26 22 00?

20. GOV Response: Delete reference to Section 26 22 00.

21. Specification 26 05 26 P1.2 Related work Section 26 23 00, LOW-VOLTAGE SWITCHGEAR: Low-voltage switchgear, would you please provide spec section 26 23 00?

21. GOV Response: Delete reference to Section 26 23 00.

22. Specification 26 05 26 P1.2 Related work Section 26 23 13, GENERATOR PARALLELING CONTROLS: Generator paralleling controls, would you please provide spec section 26 23 13?

22. GOV Response: Delete reference to Section 26 23 13.

23. Specification 26 05 26 P1.2 Related work Section 26 24 13, DISTRIBUTION SWITCHBOARDS: Low-voltage distribution Switchboards, would you please provide spec section 26 24 13?

23. GOV Response: Delete reference to Section 26 24 13.

24. Specification 26 05 26 P1.2 Related work Section 26 24 16, PANELBOARDS: Low-voltage panelboards, would you please provide spec section 26 24 16?

24. GOV Response: Delete reference to Section 26 24 16.

25. Specification 26 05 26 P1.2 Related work Section 26 24 19, MOTOR CONTROL CENTERS: Motor control centers, would you please provide spec section 26 24 19?

25. GOV Response: Delete reference to Section 26 24 19.

26. Specification 26 05 26 P1.2 Related work Section 26 32 13, ENGINE GENERATORS: Engine generators, would you please provide spec section 26 32 13?

26. GOV Response: Delete reference to Section 26 32 13.

27. Specification 26 05 26 P1.2 Related work Section 26 36 23, AUTOMATIC TRANSFER SWITCHES: Automatic transfer switches, would you please provide spec section 26 36 23?

27. GOV Response: Delete reference to Section 26 36 23.

28. Specification 26 05 26 P1.2 Related work Section 26 41 00, FACILITY LIGHTNING PROTECTION: Lightning protection, would you please provide spec section 26 41 00?

28. GOV Response: Delete reference to Section 26 41 00.

29. Specification 26 05 33 P1.2 Related work Section 06 10 00, ROUGH CARPENTRY: Mounting board for telephone closets, would you please provide spec section 06 10 00?

29. GOV Response: Delete reference to Section 06 10 00.

30. Specification 26 05 33 P1.2 Related work Section 07 60 00, FLASHING AND SHEET METAL: Fabrications for the deflection of water away from the building envelope at penetrations, would you please provide spec section 07 60 00?

30. GOV Response: Delete reference to Section 07 60 00.

31. Specification 26 05 33 P1.2 Related work Section 07 84 00, FIRESTOPPING: Sealing around penetrations to maintain the integrity of fire rated construction, would you please provide spec section 07 84 00?

31. GOV Response: Delete reference to Section 07 84 00.

32. Specification 26 05 33 & 26 05 41 P1.2 Related work Section 07 92 00, JOINT SEALANTS: Sealing around conduit penetrations through the building envelope to prevent moisture migration into the building, would you please provide spec section 07 92 00?

32. GOV Response: Delete reference to Section 07 92 00.

33. Specification 26 05 33 P1.2 Related work Section 09 91 00, PAINTING: Identification and painting of conduit and other devices, would you please provide spec section 09 91 00?

33. GOV Response: Delete reference to Section 09 91 00.

34. Specification 26 05 33 P1.2 Related work Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Conduits bracing., would you please provide spec section 13 05 41?

34. GOV Response: Delete reference to Section 13 05 41.

35. Specification 26 05 41 P1.2 Related work Section 31 20 11, EARTH MOVING (SHORT FORM): Trenching, backfill, and compaction, would you please provide spec section 31 20 11?

35. GOV Response: Refer to Section 31 20 00, delete reference to Section 31 20 11.

36. Specification 26 27 26 P1.2 Related work Section 26 51 00, INTERIOR LIGHTING: Fluorescent ballasts and LED drivers for use with manual dimming controls, would you please provide spec section 26 51 00?

36. GOV Response: Delete reference to Section 26 51 00.

37. The specifications call for a 7’ high, covered chain-link privacy fence around the work limits.

0. There are no manufacturers of 7’ tall screening for a 7’ tall chain-link fence, only 6’ and 8’ screens are produced. Can you clarify if the fence and screen is to be 6’ or 8’ high?

0. Also, the specifications call out for this fence to be placed around the construction limits. Can you clarify if this is required for all of the construction locations scattered throughout the cemetery grounds? It doesn’t seem feasible or necessary for construction fence to be utilized on any other areas other than the cemetery expansion.

37. GOV Response:

a. 6’ tall construction screen fenced is required only on the east edge of expansion area as shown on sheet CS101.

b. See note above.

38. Drawing Sheet G-003

a. Drawing sheet G-003 calls out 2 different schedules of work items. This general list of items doesn’t appear to align with all of the intended work that is shown on sheetsG-004, CI 101 and the cemetery expansion sheets. Can you please clarify?

b. The second work item schedule is titled as “ADD ALT #1 Existing Drainage Channel Improvements”. There is no mention of ADD Alternates in the specifications or the Bid Schedule. Can you please clarify what this work item schedule is intended for?

c. Also, the quantities for the drainage channel improvements seem exceptionally light if Channel #1 and #2 are both considered as part of this.

38. GOV Response:

a. All work shown on contract document are part of the General Construction CLIN 01, except items note in CLIN 02. The quantity schedules are for reference only, final quantities for bidding are the responsibility of the contractor to determined. The quantities are to be determined by the bidder.

b. All work shown on contract document are part of the General Construction CLIN 01, except items note in CLIN 02. The quantity schedules are for reference only, final quantities for bidding are the responsibility of the contractor to determined. The quantities are to be determined by the bidder.

c. All work shown on contract document are part of the General Construction CLIN 01, except items note in CLIN 02. The quantity schedules are for reference only, final quantities for bidding are the responsibility of the contractor to determine. The quantities are to be determined by the bidder.

39. The specifications call for a 3” layer of sand installed on the top of the Crypts. The crypt details do not show this sand layer. Can you please clarify?

39. GOV Response: No sand layer required per plan sheet CG504. Disregard reference in spec.

40. Can the crypt field be sloped vs stepped?

40. GOV Response: No, the crypts must be stepped

41. Can you clarify if dewatering will be necessary for the crypt field excavation and installation?

41. GOV Response: No sand layer required per plan sheet CG504. Disregard reference in spec.

42. Chain-link Fence, drawing sheet CS101 only shows construction fence on the east side of the cemetery expansion and it is called out at 6’ tall. Can you clarify that this is the only location for construction fence and the height is what’s required?

42. GOV Response: 6’ tall construction screen fenced is required only on the east edge of expansion area as shown on sheet CS101.

43. Spec 01 00 02 para 1.3.C Guards- Is this area known for Theft or Vandalism that warrants this comment? If this becomes applicable will it be an authorized change order due to unforeseen conditions?

43. GOV Response: Section Removed

44. Spec 01 00 02 para 1.5.H Fence- This spec references a standard 7' high construction fence. Typical fence panels are 6' high. Can this be modified? The only location of the fence on the drawings is in a location that height changing wouldn't be affected.

44. GOV Response: Fence to be 6’ high as called on sheet CS101.

45. Spec 01 00 02 para 1.5.L.2 Cleanup- This spec sections directs that all equipment tools and materials must be removed for designated holidays. Can materials being used within the two week schedule remain in place and areas cleared back to the staging area?

45. GOV Response: Contractor shall coordinate with Cemetery Director for all schedule activities.

46. Spec 01 00 02 para 1.13.E AutoCad Drawings- What version of Autocad is required to meet this spec?

46. GOV Response: Per VA standards, drawings shall be in AutoCad 2018 version.

47. Spec 01 00 02 para 1.28.B Final Photos- There is no Columbarium Court on this project so will the quantity of Professional Required Photos remain the same? Outside of the PPC and IGC this project is spread across the existing cemetery. Will Professionally framed photography be required of all these areas?

47. GOV Response: Provide minimum of eight (4) images of the burial areas, No framed photographs will be required.

48. Spec 01 00 02 para 1.30.A Project Health and Safety Plan- This requirement appears to be redundant considering the Spec Section 01 35 26 requires a complete Accident Prevention Plan (APP) that is also site specific. Would the government be willing to drop the APP in lieu of a completed Site Specific Safety Plan that contains JHA's vs AHA's?

48. GOV Response: Section 01 35 26 is deleted

49. Spec 01 32 17 para 1.1.A Microsoft Projects 2003- Would the government consider P6 or a newer version of Projects as acceptable?

49. GOV Response: Microsoft Project 2003 is the minimum.

50. Spec 01 35 26 para 1.1 Publications- There are multiple publications listing Healthcare Facilities and Nuclear Radiation. The item of question is the applicability of OSHA 29 CFR which DOES NOT require APP but does require Site Specific Safety Plans. Would the government consider dropping the requirement of the APP and using the OSHA regulated Site-specific Safety Plans?

50. GOV Response: Spec 01 35 26 deleted

51. Spec 01 35 26 para 1.8.C Competent Person (CP). The government is requesting that the CP have "SPECIALIZED FORMAL COURSE" in their activities as a CP. Does the government consider "in house" formal course? An OSHA "competent person" is defined as "one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them" [29 CFR 1926.32(f)] There is no OSHA requirement for them to be Specialized Formally Trained. Would the government consider following the OSHA standard or removing the SPECIALIZED FORMAL COURSE?

51. GOV Response: Spec 01 35 26 deleted

52. Spec 01 35 26 para 1.7.C SSHO- Would the government consider allowing other collateral duties to the SSHO as to maximize the efforts of all onsite employees?

52. GOV Response: Spec 01 35 26 deleted

53. Spec 01 35 26 para 1.8.D OSHA 10- Typical OSHA standards allow in house training of Safety regulations to meet the OSHA-10 requirement. Will the government consider letters from contractors that the employee has received education training on OSHA applicable standards related to the hazards of their jobs?

53. GOV Response: Spec 01 35 26 deleted

54. Spec 01 35 26 para 1.9.B Inspections- Would the government consider removing the requirement for a CSP or CSHT if a full time SSHO is required. This project is redundant in task and will allow a better cost option to the government?

54. GOV Response: Spec 01 35 26 deleted

55. Spec 01 35 26 para 1.9.B Inspections- Would the government consider removing the requirement for a CSP or CSHT if a full time SSHO is required. This project is redundant in task and will allow a better cost option to the government?

55. GOV Response: Spec 01 35 26 deleted

56. Spec 01 35 26 para 1.9.B Inspections- Would the government consider removing the requirement for a CSP or CSHT if a full time SSHO is required. This project is redundant in task and will allow a better cost option to the government

56. GOV Response: Spec 01 35 26 deleted

57. Spec 01 81 13 Sustainable Construction Requirements- This section is typically reserved for vertical construction of buildings over 5000SF. Would the government consider removing this entire section and it's reporting requirements considering the scope of work is outdoors.?

57. GOV Response: Spec 01 35 26 deleted

58. Will the VA please provide a copy of the sign-in sheet from the Pre-Bid Site Visit.

58. GOV Response: Sign-in sheet will be provided

59. The RFI deadline is Tuesday, 21 January 2020. However, the site visit was just held on Thursday, January 16, 2020, one day before a three-day federal holiday weekend. Would the VA please consider extending the RFI deadline to Thursday, January 23, 2020, to provide seven (7) days between the site visit and when RFIs are due so Contractors have time to thoroughly review the solicitation, specifications, drawings and site visit?

59. GOV Response: RFI deadline is completed.

60. Please confirm that only a completed SF1442, acknowledgement of all amendments, the CLIN Schedule, and bid bond are the only files to include in the bid submission

60. GOV Response: Minimum required bid documents mailed in accordance with the solicitation Bid Instructions page are: 1 set (Unstapled) originals of the following documents:

Completed and Signed 2 pages of SF1442;

Completed 1 page SECTION B, B.1 PRICE/COST SCHEDULE;

Completed, as many pages needed of, S02_Attachment-8 _IFB Contractor Cost Estimate Worksheet Executed 20% Bid Bond

61. Section 01 00 02, page 2, paragraph 1.1(G)(2) states that all employees of general contractor and subcontractor shall have a minimum of OSHA 10 certification. Would the VA please consider and allow the requirements to be that all general contractor and subcontractor site supervisors and/or foremen have OSHA 30 certification in lieu of all personnel having OSHA 10?

61. GOV Response: No

62. Drawing G-003 states that there is an Add Alternate for Existing Drainage Channel Improvements. However, the CLIN schedule does not include any options or add alternates. There are only two CLINs, the first being the turn-key project, and the second asking for just to furnish and deliver (i.e, not to include installation), the 3,000 pre-placed crypts. Please confirm that the note on Drawing G-003 is incorrect and should be ignored?

62. GOV Response: All work shown on contract document are part of the General Construction CLIN 01, except items note in CLIN 02. The quantity schedules are for reference only, final quantities for bidding are the responsibility of the contractor to determine. The quantities are to be determined by the bidder.

63. Section 01 00 02, paragraph 1.3(C)(1) states, “The general contractor shall provide unarmed guards at the project site after construction hours when theft or vandalism warrants.” Please confirm that “this statement only pertains to protecting and securing contractor-owned equipment and property, and that Offerors are not required to provide these unarmed guards for the VA Cemetery use and protection.

63. GOV Response: The contractor is responsible for the security of his equipment.

64. Section 01 00 02, paragraph 1.19(A) states that the contractor is responsible for paying for electrical service. Please provide the rates for electrical usage so contractor can include this in their bids.

64. GOV Response: Contractor is responsible for verifying electricity information and pricing.

65. Please confirm that the Superintendent can also serve as the designated Site Safety and Health Officer, as long as that person meets the qualifications of both positions

65. GOV Response: Yes, Superintendent can serve as Site Safety and Health Officer.

66. Section 01 35 26, paragraph 1.13, states that Tuberculosis Screening is required for all personnel who will be onsite. This requirement is a standards for working within an occupied VA hospital. However, when working outside, at a VA cemetery, would the VA please consider removing this costly requirements since there is no concern on this project that is typically associated with ensuring personnel are cleared of TB when working in a hospital?

66. GOV Response: Spec 01 35 26 deleted.

67. The project scope includes providing 3,000 pre-placed crypts and 3,035 in-ground cremains. There is a specification section for the precast crypts (Section 03 48 21), and there are details for the crypts on CG503 and CG504. However, we have not located any information on the 3,035 in-ground cremains. Please provide similar specification sections and detailed drawings for the 3,035 in-ground cremains.

67. GOV Response: No preplaced urn crypts required for this project. Review grading, control markers, section markers, landscaping sheets.

68. Drawing CD101 has a note to remove 185-LF of existing fence. At the site visit, there were conex boxes located within the fenced area. Question 1): Are Offerors to only remove the fence? And, if so, where are Offerors to place the fence once it is removed? Question 2) Please confirm that Offerors are not to relocate and re-erect the fence. If required, please provide the location where the fence is to be relocated and re-erected. Question 3) Please confirm that all items located within the fenced area are to be removed by others.

68. GOV Response: Correct

69. The drawings appear to include a new storm sewer running on the south end, starting at the east end of the project site, running west, then turning north at the west end of Section 26, and discharging onto a new flexamat. However, there is no information on where this new storm sewer ties into on the east end of the site. Is our understand that the new storm sewer does not tie into anything on the east end, and starts from a new inlet, then runs west and then north to discharge as shown on the drawings?

69. GOV Response: Correct

70. The details of the precast crypts show a PVC drainage system under the crypts. However, we can’t locate information showing what this drainage system ties into? Please provide information showing what this underground PVC drainage system is supposed to tie into?

70. GOV Response: Crypts undrain system daylights into to existing channel.

71. LI502 includes details for a bench, flower vases, and trash receptacles, but there is no schedule showing the quantity. Are offerors to count off of Drawing LP101? If not, please provide the correct quantity.

71. GOV Response: Contractor is responsible to gather quantity information from Contract Documents.

72.There are a lot of quantities listed in the drawings via schedules. Please confirm that these quantities are accurate, and that Offerors are to follow the quantities shown on the schedules for bidding purposes. If we are not to follow the schedules and if there are discrepancies shown on the plans, how are Offerors to price the quantities? In order to evenly compare prices, we recommend instructing Offerors to price the stated schedules.

72. GOV Response: All work shown on contract document are part of the General Construction CLIN 01, except items note in CLIN 02. The quantity schedules are for reference only, final quantities for bidding are the responsibility of the contractor to determine. The quantities are to be determined by the bidder.

73. There is a new six-space parking area to be provided adjacent to the maintenance building. However, during the site visit, it was noticed that there are a significant number of irrigation control valves that conflict with the new parking area. However, on Drawing CI106, only show to relocate two of these irrigation control valves. Please clarify is Offerors are to relocate all conflicting control valves in this area, or only the two shown on the drawings?

73. GOV Response: All irrigation valves in conflict with proposed construction shall be relocated.

74. Will Offerors be required to remove and reinstall the cemetery entry gates before/after the asphalt mill/overlay activities, or will the cemetery personnel complete these activities?

74. GOV Response: Offerors shall be responsible for removing, protecting, and reinstalling gates.

NOTE: The Q&A Period has ended. Questions received that have not been answered in this amendment will follow in the next amendment tentatively scheduled to be posted the week of FEB 3-7.

See attached document: S06_Amendment-0002_Attachment-1_Page 4_SPECIFICATIONS_1-29-19.

See attached document: S06_Amendment-0002_Attachment-2_Site Visit Attendance.

End of Document