36C78619Q0011-0003000.docx

DOCX document 31 KB Posted

Attached to
FY19 New Contract - Cemetery Grounds and Facilities Maintenance Service - Dayton National Cemetery
Solicitation number
36C78619Q0011
Issued by

About this file

36C78619Q0011 0003 36C78619Q0011 0003.docx

View the file

Other files

File Type Posted
36C78619Q0011-0004000.docx DOCX document
36C78619Q0011-0002000.docx DOCX document
36C78619Q0011-0001000.docx DOCX document
36C78619Q0011-003.pdf PDF
36C78619Q0011-002.pdf PDF
36C78619Q0011-000.docx DOCX document
36C78619Q0011-001.pdf PDF
36C78619Q0011-004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FedBizOpps Amendment to a Previous Combined Solicitation

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 S FY19 New Contract - Cemetery Grounds and Facilities Maintenance Service - Dayton National Cemetery 22556 36C78619Q0011

COMBINE

09-26-2018 N 561730 Department of Veterans Affairs National Cemetery Administration Contracting Service 75 Barrett Heights Road, Suite 309 John M. Carlock john.carlock@va.gov 317-916-3863 575 N. Pennsylvania Street, Suite 495 Midwest District Indianapolis, IN 46204 Dayton National Cemeteery 4400 West Third Street Dayton, OH 45417

USA

john.carlock@va.gov john.carlock@va.gov 36C78619Q0011 Amendment 0003

1. See the attached REVISED Price Schedule

2. Offer due date is hereby extended to September 26, 2018 at 12;00 noon.

3. All other terms and conditions remain unchanged.

SCHEDULE OF UNIT PRICES

Base Period: Date of Award through September 30, 2019

CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
0001
Camp Chase: Turfgrass - mowing, 2 acres.
39
JB
$______
$_________
0002
Camp Chase: Trim headstones and markers w/ every mowing
39
JB
$______
$_________
0003
Camp Chase: Edging - walks and curbs
9
JB
$______
$_________
0004
Camp Chase: Headstone Raise and Realign.
50
EA
$______
$_________
0005
Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch.
2
JB
$______
$_________
0006
Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June).
2
JB
$______
$_________
0007
Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May).
2
JB
$______
$_________
0008
Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept).
3
JB
$______
$_________
0009
Camp Chase: Turfgrass - aerification (1 x year).
1
JB
$______
$_________
0010
Camp Chase: Turfgrass - overseeding (1 x year).
1
JB
$______
$_________
0011
Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings.
2
JB
$______
$_________
0012
Camp Chase: Sunken grave repair (grade correction and repace turf).
25
EA
$______
$_________
0013
Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings).
52
JB
$______
$_________
0014
Camp Chase: Snow Removal per event.
3
JB
$______
$_________
0015
Camp Chase: POW/MIA Flag raise and lower.
6
JB
$______
$_________
0016
Dayton: Turfgrass - mowing, 107 acres.
39
JB
$______
$_________
0017
Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959 estimated
39
JB
$______
$_________
0018
Dayton: Edging - walks, curbs.
9
JB
$______
$_________
0019
Dayton: Irrigation system - startup only.
1
JB
$______
$_________
0020
Dayton: Irrigation system: shutdown.
1
JB
$______
$_________
0021
Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June).
2
JB
$______
$_________
0022
Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May).
2
JB
$______
$_________
0023
Dayton: Edging - flat markers 9,896
39
JB
$______
$_________
Estimated Total Cost Base Period:
$__________

Option Period 1: October 1, 2019 through September 30, 2020

CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
1001
Camp Chase: Turfgrass - mowing, 2 acres.
39
JB
$______
$_________
1002
Camp Chase: Trim headstones and markers w/ every mowing
39
JB
$______
$_________
1003
Camp Chase: Edging - walks and curbs
9
JB
$______
$_________
1004
Camp Chase: Headstone Raise and Realign.
50
EA
$______
$_________
1005
Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch.
2
JB
$______
$_________
1006
Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June).
2
JB
$______
$_________
1007
Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May).
2
JB
$______
$_________
1008
Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept).
3
JB
$______
$_________
1009
Camp Chase: Turfgrass - aerification (1 x year).
1
JB
$______
$_________
1010
Camp Chase: Turfgrass - overseeding (1 x year).
1
JB
$______
$_________
1011
Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings.
2
JB
$______
$_________
1012
Camp Chase: Sunken grave repair (grade correction and repace turf).
25
EA
$______
$_________
1013
Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings).
52
JB
$______
$_________
1014
Camp Chase: Snow Removal per event.
3
JB
$______
$_________
1015
Camp Chase: POW/MIA Flag raise and lower.
6
JB
$______
$_________
1016
Dayton: Turfgrass - mowing, 107 acres.
39
JB
$______
$_________
1017
Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959 estimated
39
JB
$______
$_________
1018
Dayton: Edging - walks, curbs.
9
JB
$______
$_________
1019
Dayton: Irrigation system - startup only.
1
JB
$______
$_________
1020
Dayton: Irrigation system: shutdown.
1
JB
$______
$_________
1021
Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June).
2
JB
$______
$_________
1022
Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May).
2
JB
$______
$_________
1023
Dayton: Edging - flat markers 9,896
39
JB
$______
$_________
Estimated Total Cost Option Period 1:
$__________

Option Period 2: October 1, 2020 through September 30, 2021

CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
2001
Camp Chase: Turfgrass - mowing, 2 acres.
39
JB
$______
$_________
2002
Camp Chase: Trim headstones and markers w/ every mowing
39
JB
$______
$_________
2003
Camp Chase: Edging - walks and curbs
9
JB
$______
$_________
2004
Camp Chase: Headstone Raise and Realign.
50
EA
$______
$_________
2005
Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch.
2
JB
$______
$_________
2006
Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June).
2
JB
$______
$_________
2007
Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May).
2
JB
$______
$_________
2008
Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept).
3
JB
$______
$_________
2009
Camp Chase: Turfgrass - aerification (1 x year).
1
JB
$______
$_________
2010
Camp Chase: Turfgrass - overseeding (1 x year).
1
JB
$______
$_________
2011
Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings.
2
JB
$______
$_________
2012
Camp Chase: Sunken grave repair (grade correction and repace turf).
25
EA
$______
$_________
2013
Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings).
52
JB
$______
$_________
2014
Camp Chase: Snow Removal per event.
3
JB
$______
$_________
2015
Camp Chase: POW/MIA Flag raise and lower.
6
JB
$______
$_________
2016
Dayton: Turfgrass - mowing, 107 acres.
39
JB
$______
$_________
2017
Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959
39
JB
$______
$_________
2018
Dayton: Edging - walks, curbs.
9
JB
$______
$_________
2019
Dayton: Irrigation system - startup only.
1
JB
$______
$_________
2020
Dayton: Irrigation system: shutdown.
1
JB
$______
$_________
2021
Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June).
2
JB
$______
$_________
2022
Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May).
2
JB
$______
$_________
2023
Dayton: Edging - flat markers 9,896
39
JB
$______
$_________

Estimated Total Cost Option Period 2:

Option Period 3: October 1, 2021 through September 30, 2022

CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
3001
Camp Chase: Turfgrass - mowing, 2 acres.
39
JB
$______
$_________
3002
Camp Chase: Trim headstones and markers w/ every mowing
39
JB
$______
$_________
3003
Camp Chase: Edging - walks and curbs
9
JB
$______
$_________
3004
Camp Chase: Headstone Raise and Realign.
50
EA
$______
$_________
3005
Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch.
2
JB
$______
$_________
3006
Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June).
2
JB
$______
$_________
3007
Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May).
2
JB
$______
$_________
3008
Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept).
3
JB
$______
$_________
3009
Camp Chase: Turfgrass - aerification (1 x year).
1
JB
$______
$_________
3010
Camp Chase: Turfgrass - overseeding (1 x year).
1
JB
$______
$_________
3011
Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings.
2
JB
$______
$_________
3012
Camp Chase: Sunken grave repair (grade correction and repace turf).
25
EA
$______
$_________
3013
Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings).
52
JB
$______
$_________
3014
Camp Chase: Snow Removal per event.
3
JB
$______
$_________
3015
Camp Chase: POW/MIA Flag raise and lower.
6
JB
$______
$_________
3016
Dayton: Turfgrass - mowing, 107 acres.
39
JB
$______
$_________
3017
Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959
39
JB
$______
$_________
3018
Dayton: Edging - walks, curbs.
9
JB
$______
$_________
3019
Dayton: Irrigation system - startup only.
1
JB
$______
$_________
3020
Dayton: Irrigation system: shutdown.
1
JB
$______
$_________
3021
Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June).
2
JB
$______
$_________
3022
Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May).
2
JB
$______
$_________
3023
Dayton: Edging - flat markers 9,896
39
JB
$______
$_________
Total Cost Option Period 3:
$__________

Option Period 4: October 1, 2022 through September 30, 2023

CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
4001
Camp Chase: Turfgrass - mowing, 2 acres.
39
JB
$______
$_________
4002
Camp Chase: Trim headstones and markers w/ every mowing
39
JB
$______
$_________
4003
Camp Chase: Edging - walks and curbs
9
JB
$______
$_________
4004
Camp Chase: Headstone Raise and Realign.
50
EA
$______
$_________
4005
Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch.
2
JB
$______
$_________
4006
Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June).
2
JB
$______
$_________
4007
Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May).
2
JB
$______
$_________
4008
Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept).
3
JB
$______
$_________
4009
Camp Chase: Turfgrass - aerification (1 x year).
1
JB
$______
$_________
4010
Camp Chase: Turfgrass - overseeding (1 x year).
1
JB
$______
$_________
4011
Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings.
2
JB
$______
$_________
4012
Camp Chase: Sunken grave repair (grade correction and repace turf).
25
EA
$______
$_________
4013
Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings).
52
JB
$______
$_________
4014
Camp Chase: Snow Removal per event.
3
JB
$______
$_________
4015
Camp Chase: POW/MIA Flag raise and lower.
6
JB
$______
$_________
4016
Dayton: Turfgrass - mowing, 107 acres.
39
JB
$______
$_________
4017
Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959
39
JB
$______
$_________
4018
Dayton: Edging - walks, curbs.
9
JB
$______
$_________
4019
Dayton: Irrigation system - startup only.
1
JB
$______
$_________
4020
Dayton: Irrigation system: shutdown.
1
JB
$______
$_________
4021
Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June).
2
JB
$______
$_________
4022
Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May).
2
JB
$______
$_________
4023
Dayton: Edging - flat markers 9,896
39
JB
$______
$_________
Total Cost Option Period 4:
$__________

Total Aggregate Cost Base Period and All Options

End of Document

File details come from the government source that posted it.