The file's text, extracted by GovTribe without its formatting.
FedBizOpps Combined Synopsis/Solicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE
(MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Combined Synopsis/Solicitation Notice Rev. March 2010 S FY19 New Contract - Cemetery Grounds and Facilities Maintenance Service - Dayton National Cemetery 22556 36C78619Q0011 08-29-2018 N 561730
DEPARTMNET OF VETERANS AFFAIRS
NATIONAL CEMETERY ADMINISTRATION
CONTRACT SERVICES
75 BARRETT HEIGHTS RD. SUITE 309
John M. Carlock 317-916-3863 john.carlock@va.gov
SEE THE ATTACHED FBO DESCRIPTION FOR LOCATION(S)
USA
WWW.CEM.VA.GOV
NCA WEBSITE
JOHN.CARLOCK@VA.GOV
CO'S EMAIL
RFQ FOR COMMERCIAL ITEMS
GENERAL INFORMATION
| Document Type: | | Combined Synopsis Solicitation | |
| Solicitation Number: | | 36C78619Q0011 | |
| Post Date: | | | 08/15/2018 |
| Original Response Date: | 08/29/2018 at 12:00 pm | | |
| Applicable NAICS: | | 561730 | |
| Classification Code: | | S208 | |
| Set Aside Type: | | | Service Disabled Veteran Owned Small Business |
| Period of Performance: | Date of Award – September 30, 2019 with (4) one-year options if exercised | | |
| Issuing Contracting Office: | Department of Veterans Affairs | |
| | National Cemetery Administration, Contract Services |
| | 75 Barrett Heights Rd., Suite 309 |
| | Stafford, VA 22556 |
| Place of Performance: | Dayton National Cemetery | Camp Chase Confederate Cemetery | | | |
| | | 4400 West Third Street | 2900 Sullivant Avenue | |
| | | Dayton, OH 45417 | | Columbus, OH 43204 |
| Attachments: | A – Wage Determination No. 2015-4731, Revision 6 Dayton | |
| | Wage Determination No. 2015-4729 Revision 8 Camp Chase |
| | B – Performance Work Statement |
| | C – Past Performance Questionnaire |
| | D – List of References |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ), solicitation number 36C78619Q0011 This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2005-99-1 Effective July 16, 2018.
This is a 100% set-aside for Service Disabled Veteran Owned Small Business (SDVOSB)
The applicable North American Industrial Classification System (NAICS) code for this procurement is 561730, with a business size standard of $7.5 million.
This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.
The U.S. Department of Veterans Affairs, National Cemetery Administration, anticipates the award of a Firm Fixed Priced Requirements Contract.
Scope: The contractor shall be responsible for providing grounds maintenance to include mow and trim, edging, irrigation system start-up, irrigation system shutdown, pre & post emergence herbicide services at both locations as well as headstone raise and realign, headstone clean (with occasional bump and run alignment), fertilization, aeration, over seeding, mulching, sunken grave repair, cemetery clean-up, snow removal, raise & lower flag at Camp Chase Confederate Cemetery.
PRICE SCHEDULE: Contractor shall provide all labor, supervision, material, equipment, tools and supplies to complete grounds maintenance services at Dayton National Cemetery located in Dayton, OH and Camp Chase Confederate Cemetery located in Columbus, OH following National Cemetery Administration standards. Units and services to be in accordance with Performance Work Statement, Technical Specifications, Performance Incentives/Disincentives, terms and conditions contained in this solicitation.
The schedule price shall be all-inclusive, including all labor, equipment, materials, and supplies to complete the Contract Line Items (CLINs). Offerors shall enter unit price and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.
Offeror is to understand the quantities stated in the schedule are estimates for pricing purposes only.
Period of Performance: Date of award through September 30, 2019
SCHEDULE OF UNIT PRICES
Base Period: Date of Award through September 30, 2019
| CLIN |
| Operation |
| Est. Quantity |
| Unit |
| Unit Cost |
| Total Cost |
| 0001 |
| Camp Chase: Turfgrass - mowing, 2 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 0002 |
| Camp Chase: Trim headstones and markers w/ every mowing |
| 39 |
| JB |
| $______ |
| $_________ |
| 0003 |
| Camp Chase: Edging - walks and curbs |
| 9 |
| JB |
| $______ |
| $_________ |
| 0004 |
| Camp Chase: Headstone Raise and Realign. |
| 50 |
| EA |
| $______ |
| $_________ |
| 0005 |
| Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. |
| 2 |
| JB |
| $______ |
| $_________ |
| 0006 |
| Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 0007 |
| Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| 0008 |
| Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). |
| 3 |
| JB |
| $______ |
| $_________ |
| 0009 |
| Camp Chase: Turfgrass - aerification (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 0010 |
| Camp Chase: Turfgrass - overseeding (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 0011 |
| Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. |
| 2 |
| JB |
| $______ |
| $_________ |
| 0012 |
| Camp Chase: Sunken grave repair (grade correction and repace turf). |
| 25 |
| EA |
| $______ |
| $_________ |
| 0013 |
| Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). |
| 52 |
| JB |
| $______ |
| $_________ |
| 0014 |
| Camp Chase: Snow Removal per event. |
| 3 |
| JB |
| $______ |
| $_________ |
| 0015 |
| Camp Chase: POW/MIA Flag raise and lower. |
| 6 |
| JB |
| $______ |
| $_________ |
| 0016 |
| Dayton: Turfgrass - mowing, 107 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 0017 |
| Dayton: Trim headstones and markers in conjuction w/ every mowing. |
| 39 |
| JB |
| $______ |
| $_________ |
| 0018 |
| Dayton: Edging - flat markers (headstones), walks, curbs. |
| 9 |
| JB |
| $______ |
| $_________ |
| 0019 |
| Dayton: Irrigation system - startup only. |
| 1 |
| JB |
| $______ |
| $_________ |
| 0020 |
| Dayton: Irrigation system: shutdown. |
| 1 |
| JB |
| $______ |
| $_________ |
| 0021 |
| Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 0022 |
| Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| Estimated Total Cost Base Period: |
| $__________ |
Option Period 1: October 1, 2019 through September 30, 2020
| CLIN |
| Operation |
| Est. Quantity |
| Unit |
| Unit Cost |
| Total Cost |
| 1001 |
| Camp Chase: Turfgrass - mowing, 2 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 1002 |
| Camp Chase: Trim headstones and markers w/ every mowing |
| 39 |
| JB |
| $______ |
| $_________ |
| 1003 |
| Camp Chase: Edging - walks and curbs |
| 9 |
| JB |
| $______ |
| $_________ |
| 1004 |
| Camp Chase: Headstone Raise and Realign. |
| 50 |
| EA |
| $______ |
| $_________ |
| 1005 |
| Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. |
| 2 |
| JB |
| $______ |
| $_________ |
| 1006 |
| Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 1007 |
| Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| 1008 |
| Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). |
| 3 |
| JB |
| $______ |
| $_________ |
| 1009 |
| Camp Chase: Turfgrass - aerification (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 1010 |
| Camp Chase: Turfgrass - overseeding (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 1011 |
| Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. |
| 2 |
| JB |
| $______ |
| $_________ |
| 1012 |
| Camp Chase: Sunken grave repair (grade correction and repace turf). |
| 25 |
| EA |
| $______ |
| $_________ |
| 1013 |
| Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). |
| 52 |
| JB |
| $______ |
| $_________ |
| 1014 |
| Camp Chase: Snow Removal per event. |
| 3 |
| JB |
| $______ |
| $_________ |
| 1015 |
| Camp Chase: POW/MIA Flag raise and lower. |
| 6 |
| JB |
| $______ |
| $_________ |
| 1016 |
| Dayton: Turfgrass - mowing, 107 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 1017 |
| Dayton: Trim headstones and markers in conjuction w/ every mowing. |
| 39 |
| JB |
| $______ |
| $_________ |
| 1018 |
| Dayton: Edging - flat markers (headstones), walks, curbs. |
| 9 |
| JB |
| $______ |
| $_________ |
| 1019 |
| Dayton: Irrigation system - startup only. |
| 1 |
| JB |
| $______ |
| $_________ |
| 1020 |
| Dayton: Irrigation system: shutdown. |
| 1 |
| JB |
| $______ |
| $_________ |
| 1021 |
| Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 1022 |
| Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| Estimated Total Cost Option Period 1: |
| $__________ |
Option Period 2: October 1, 2020 through September 30, 2021
| CLIN |
| Operation |
| Est. Quantity |
| Unit |
| Unit Cost |
| Total Cost |
| 2001 |
| Camp Chase: Turfgrass - mowing, 2 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 2002 |
| Camp Chase: Trim headstones and markers w/ every mowing |
| 39 |
| JB |
| $______ |
| $_________ |
| 2003 |
| Camp Chase: Edging - walks and curbs |
| 9 |
| JB |
| $______ |
| $_________ |
| 2004 |
| Camp Chase: Headstone Raise and Realign. |
| 50 |
| EA |
| $______ |
| $_________ |
| 2005 |
| Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. |
| 2 |
| JB |
| $______ |
| $_________ |
| 2006 |
| Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 2007 |
| Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| 2008 |
| Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). |
| 3 |
| JB |
| $______ |
| $_________ |
| 2009 |
| Camp Chase: Turfgrass - aerification (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 2010 |
| Camp Chase: Turfgrass - overseeding (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 2011 |
| Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. |
| 2 |
| JB |
| $______ |
| $_________ |
| 2012 |
| Camp Chase: Sunken grave repair (grade correction and repace turf). |
| 25 |
| EA |
| $______ |
| $_________ |
| 2013 |
| Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). |
| 52 |
| JB |
| $______ |
| $_________ |
| 2014 |
| Camp Chase: Snow Removal per event. |
| 3 |
| JB |
| $______ |
| $_________ |
| 2015 |
| Camp Chase: POW/MIA Flag raise and lower. |
| 6 |
| JB |
| $______ |
| $_________ |
| 2016 |
| Dayton: Turfgrass - mowing, 107 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 2017 |
| Dayton: Trim headstones and markers in conjuction w/ every mowing. |
| 39 |
| JB |
| $______ |
| $_________ |
| 2018 |
| Dayton: Edging - flat markers (headstones), walks, curbs. |
| 9 |
| JB |
| $______ |
| $_________ |
| 2019 |
| Dayton: Irrigation system - startup only. |
| 1 |
| JB |
| $______ |
| $_________ |
| 2020 |
| Dayton: Irrigation system: shutdown. |
| 1 |
| JB |
| $______ |
| $_________ |
| 2021 |
| Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 2022 |
| Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
Estimated Total Cost Option Period 2:
Option Period 3: October 1, 2021 through September 30, 2022
| CLIN |
| Operation |
| Est. Quantity |
| Unit |
| Unit Cost |
| Total Cost |
| 3001 |
| Camp Chase: Turfgrass - mowing, 2 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 3002 |
| Camp Chase: Trim headstones and markers w/ every mowing |
| 39 |
| JB |
| $______ |
| $_________ |
| 3003 |
| Camp Chase: Edging - walks and curbs |
| 9 |
| JB |
| $______ |
| $_________ |
| 3004 |
| Camp Chase: Headstone Raise and Realign. |
| 50 |
| EA |
| $______ |
| $_________ |
| 3005 |
| Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. |
| 2 |
| JB |
| $______ |
| $_________ |
| 3006 |
| Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 3007 |
| Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| 3008 |
| Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). |
| 3 |
| JB |
| $______ |
| $_________ |
| 3009 |
| Camp Chase: Turfgrass - aerification (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 3010 |
| Camp Chase: Turfgrass - overseeding (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 3011 |
| Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. |
| 2 |
| JB |
| $______ |
| $_________ |
| 3012 |
| Camp Chase: Sunken grave repair (grade correction and repace turf). |
| 25 |
| EA |
| $______ |
| $_________ |
| 3013 |
| Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). |
| 52 |
| JB |
| $______ |
| $_________ |
| 3014 |
| Camp Chase: Snow Removal per event. |
| 3 |
| JB |
| $______ |
| $_________ |
| 3015 |
| Camp Chase: POW/MIA Flag raise and lower. |
| 6 |
| JB |
| $______ |
| $_________ |
| 3016 |
| Dayton: Turfgrass - mowing, 107 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 3017 |
| Dayton: Trim headstones and markers in conjuction w/ every mowing. |
| 39 |
| JB |
| $______ |
| $_________ |
| 3018 |
| Dayton: Edging - flat markers (headstones), walks, curbs. |
| 9 |
| JB |
| $______ |
| $_________ |
| 3019 |
| Dayton: Irrigation system - startup only. |
| 1 |
| JB |
| $______ |
| $_________ |
| 3020 |
| Dayton: Irrigation system: shutdown. |
| 1 |
| JB |
| $______ |
| $_________ |
| 3021 |
| Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 3022 |
| Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| Total Cost Option Period 3: |
| $__________ |
Option Period 4: October 1, 2022 through September 30, 2023
| CLIN |
| Operation |
| Est. Quantity |
| Unit |
| Unit Cost |
| Total Cost |
| 4001 |
| Camp Chase: Turfgrass - mowing, 2 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 4002 |
| Camp Chase: Trim headstones and markers w/ every mowing |
| 39 |
| JB |
| $______ |
| $_________ |
| 4003 |
| Camp Chase: Edging - walks and curbs |
| 9 |
| JB |
| $______ |
| $_________ |
| 4004 |
| Camp Chase: Headstone Raise and Realign. |
| 50 |
| EA |
| $______ |
| $_________ |
| 4005 |
| Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. |
| 2 |
| JB |
| $______ |
| $_________ |
| 4006 |
| Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 4007 |
| Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| 4008 |
| Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). |
| 3 |
| JB |
| $______ |
| $_________ |
| 4009 |
| Camp Chase: Turfgrass - aerification (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 4010 |
| Camp Chase: Turfgrass - overseeding (1 x year). |
| 1 |
| JB |
| $______ |
| $_________ |
| 4011 |
| Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. |
| 2 |
| JB |
| $______ |
| $_________ |
| 4012 |
| Camp Chase: Sunken grave repair (grade correction and repace turf). |
| 25 |
| EA |
| $______ |
| $_________ |
| 4013 |
| Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). |
| 52 |
| JB |
| $______ |
| $_________ |
| 4014 |
| Camp Chase: Snow Removal per event. |
| 3 |
| JB |
| $______ |
| $_________ |
| 4015 |
| Camp Chase: POW/MIA Flag raise and lower. |
| 6 |
| JB |
| $______ |
| $_________ |
| 4016 |
| Dayton: Turfgrass - mowing, 107 acres. |
| 39 |
| JB |
| $______ |
| $_________ |
| 4017 |
| Dayton: Trim headstones and markers in conjuction w/ every mowing. |
| 39 |
| JB |
| $______ |
| $_________ |
| 4018 |
| Dayton: Edging - flat markers (headstones), walks, curbs. |
| 9 |
| JB |
| $______ |
| $_________ |
| 4019 |
| Dayton: Irrigation system - startup only. |
| 1 |
| JB |
| $______ |
| $_________ |
| 4020 |
| Dayton: Irrigation system: shutdown. |
| 1 |
| JB |
| $______ |
| $_________ |
| 4021 |
| Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). |
| 2 |
| JB |
| $______ |
| $_________ |
| 4022 |
| Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). |
| 2 |
| JB |
| $______ |
| $_________ |
| Total Cost Option Period 4: |
| $__________ |
Total Aggregate Cost Base Period and All Options
Services to be Provided: See Attachment B – Performance Work Statement SITE VISIT: Offerors are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. If you plan to conduct a site visit / inspection of the Dayton National Cemetery and Camp Chase Confederate Cemetery, YOU MUST CONTACT one of the following personnel to make arrangements:
Douglas Ledbetter, Director; Phone:937-268-2221 Mark A. Wilson, M&O Supervisor, Phone 937-268-2221
Responses to this Request for Quotation (RFQ) are due to the Contracting Officer no later than 12:00 pm on 08/29/2018. Responses to this announcement will result in a Firm-Fixed Price Requirements Contract and the Government intends to make award without discussions. All information submitted in response to this announcement is voluntary and the Government will not pay for information provided nor will it compensate any respondent for any cost incurred in developing information provided for the Government. Offerors are responsible for obtaining any and all amendments or additional information concerning this announcement at https://fbo.gov.
All questions regarding this solicitation are to be submitted to the contracting officer, via email, no later than (5) calendar days before the closing date of the solicitation. Questions will not be addressed using the telephone.
Proposal Format and Submission Information:
Offers must be submitted on company letterhead. Commercial format is encouraged. All offerors shall include the following information as part of their quote:
· Legal Business/Company Name (as listed in www.sam.gov)
· DUNS Number
· Point of Contact Name
· Telephone number
· Email Address
-Pricing shall be submitted as requested in the Schedule of Supplies/Services -Technical Package for Evaluation -Past Performance Questionnaire (Attachment C) -List of References (Attachment D)
Proposals shall be submitted via email or via mail to the following addresses:
| Email: | john.carlock@va.gov |
| Mail: | 575 N. Pennsylvania Street |
| Midwest District, Suite 495 |
| Indianapolis, IN 46204 |
For proposals mailed, proposals shall be submitted on compact disk (CD) and files shall be in either Microsoft Word or Adobe pdf formats. DVDs are not acceptable as the Government computer is unable to read this media type. Any DVDs received in response to this announcement will be rated as technically unacceptable and removed from consideration.
Questions pertaining to this announcement shall be sent by email to: john.carlock@va.gov . Telephone inquiries will not be accepted.
Evaluation Process:
The Government intends to award a firm fixed price, Requirements contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation that provides the best benefit to the Government, price and other factors considered. Offers will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the “best” as a whole.
Quotes will be evaluated by performing a direct comparison of one offer with another in a uniform manner to determine which quote provides the government with its needs, as identified in the RFQ. The government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the government. The government has the discretion to accept other than the lowest priced offeror that provides additional benefits. The government also has the discretion to make an award based on whether the lowest priced of the quotations/offers having the highest past performance rating possible represents the best benefit to the government.
The following factors shall be used to evaluate offers:
1. Pricing: The sum of all the CLINs, to include options, will represent the total evaluated price. Proposed price must be determined to be fair and reasonable in order to be eligible for award.
2. Technical Acceptability
1. Demonstrated experience performing this requirement
2. Demonstrated qualifications to perform services
3. Use of Sub-Contractors
3. Past Performance
4. SDVOSB Status verification in CVE
Proposal Contents:
-Pricing shall be submitted as requested in the Schedule of Supplies/Services.
-Technical Package for Evaluation
The following shall be included as part of the offeror’s submission:
· Experience of company and subcontractors anticipated to perform work under this contract
· Managerial & Technical Qualifications of key personnel
· Qualifications of any proposed sub-contractors and the percentage of work they will be performing.
-Past Performance. The offeror is responsible for providing three (3) references of their choosing. Send a copy of the attached Past Performance Questionnaire (Attachment C) for their completion. The completed questionnaire is to be returned to the Contracting Officer for review. The completed questionnaires shall be sent to: john.carlock@va.gov no later than the solicitation’s closing date and time. The references chosen by the offer should be selected based on past projects of the same or similar work.
In addition to the past performance questionnaires, the offeror is responsible for providing a completed copy of the List of References (Attachment D) to the contracting officer. The completed list of references shall be included with the offeror’s proposal submission.
Solicitation Provisions and Contract Clauses The full text of FAR/VAAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
https://www.va.gov/oal/library/vaar/
The following solicitation provisions apply to this acquisition:
FAR 52.212-1 Instructions to Offerors – Commercial Items (Jan 2017) VAAR 852.270-1 Representatives of Contracting Officers (Jan 2008) VAAR 852.215-70 VA Notice of Total Service-Disabled Veteran-Owned Small Business Evaluation Factors
Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3 “Offerors Representations and Certifications – Commercial Items.” If paragraph (j) of the provision is applicable, a written submission is required.
The following solicitation clauses apply to this acquisition:
The clause at 52.212-4, Contract Terms and Conditions – Commercial Items (Jan 2017) applies to this acquisition.
Addendum to FAR clause 52.212-4, Contract Terms and Conditions – Commercial Items (Jan 2017):
FAR 52.216-18 Ordering (Oct 1995) (date of award through September 30, 2019) FAR 52.216-19 Order Limitations (Oct 1995) ($250.00 | $25,000.00 | $45,000.00| 30 days) FAR 52.216-21 Requirements (Oct 1995) (September 30, 2019) FAR 52.217-8 Option to Extend Services (Nov 1999) (15 days) FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) FAR 52.237-3 Continuity of Services (Jan 1991) VAAR 852.203-70 Commercial Advertising (Jan 2008) VAAR 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business (Jul 2016) (DEVIATION) VAAR 852.219-74, Limitations on Subcontracting – Monitoring and Compliance (Jul 2018) VAAR 852.232-72 Electronic Submission of Payments Requests (Nov 2012) VAAR 852.237-70 Contractor Responsibilities (Apr 1984)
The clause at 52.212-5 “Contract Terms and Conditions Required to Implement Statutes or Executive Orders” (Jul 2018) applies to this acquisition. The following subparagraphs of FAR 52.212-5 are applicable: (b)(4), (b)(18), (b)(22), (b)(25), (b)(26), (b)(27), (b)(28), (b)(30), (b)(33)(i), (b)(42), (b)(49), (b)(55), (c)(2), (c)(8), and (c)(9).
(c)(3) 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67)
Employee Class
Monetary Wage – Fringe Benefits
| Laborer, Grounds Maintenance WG 3-1 |
| $14.84 + $4.50 |
| Laborer, Grounds Maintenance WG 3-3 |
| $16.08+ $4.50 |
| Laborer, Grounds Maintenance WG 3-5 |
| $17.32 + $4.50 |
End of Addenda End of Document
See attached document: 36C78619Q0011 ATTACHMENT A Wage Determination - Dayton National Cemetery.
See attached document: 36C78619Q0011 ATTACHMENT A Wage Determination - Camp Chase.
See attached document: 36C78619Q0011 DNC PWS FY19 Grounds and Facilities Maintenance.
See attached document: 36C78619Q0011 Past performance Questionnaire _ List of references.