36C78619B0021-0004001.docx

DOCX document 14 KB Posted

Attached to
835-036 Chattanooga TN Renovate Admin, Maint. (VA-19-00078715)
Solicitation number
36C78619B0021
Issued by

About this file

36C78619B0021 0004 36C78619B0021 - P0004.docx

View the file

Other files

File Type Posted
36C78619B0021-0006001.jpg JPG image
36C78619B0021-0006000.docx DOCX document
36C78619B0021-0005000.docx DOCX document
36C78619B0021-0005001.xlsx XLSX spreadsheet
36C78619B0021-0004000.docx DOCX document
36C78619B0021-0003001.pdf PDF
36C78619B0021-0003000.docx DOCX document
36C78619B0021-0002000.docx DOCX document
36C78619B0021-0001000.docx DOCX document
36C78619B0021-013.pdf PDF
36C78619B0021-009.pdf PDF
36C78619B0021-006.docx DOCX document
36C78619B0021-016.pdf PDF
36C78619B0021-011.pdf PDF
36C78619B0021-014.pdf PDF
36C78619B0021-015.pdf PDF
36C78619B0021-008.pdf PDF
36C78619B0021-012.pdf PDF
36C78619B0021-007.pdf PDF
36C78619B0021-010.docx DOCX document
36C78619B0021-000.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chattanooga National Cemetery - 36C78619B0021 – P0004

Question: There is a conflict in the plans regarding placement of the concrete - Shot blast or pour new concrete slab in the maintenance building at the new managers office see page AC101 Note 5 and page AC102 Note 10 for the conflict. Please advise on the preferred concrete method.

Answer: Both. The existing floor is currently (or have in the past) being used as a ‘garage’. The shot blasting method is use to clean and prepare the surface to receive the new 4” concrete slab for the new office. This ‘raised floor’ also protects against water intrusion, and ties back into the existing exterior curb.

Question: Are the lockers all single or double tier?

Answer: To be Single Tier.

Question: What is the lock mechanism that we will be using (lockers)? There are four specified.

1. Combination Lock Built-In

1. Combination Lock Built-In

1. Key Lock Built-In

1. Padlocks

1. Positive Automatic and Pre-locking

Answer: Lock mechanism to be Padlocks.

Question: Will the lockers in the maintenance building be on a 4” slab or will they be on a wood base? Specs (10 51 13) and drawings (AC301 Detail 10 / AA102 note 6 ) are showing both.

Answer: Lockers to be on 4” Concrete Slab.

Question: Can we get more information on finishes:

1. Carpet – Type, brand, squares, rolled goods?

1. Ceramic Tile – Type, brand, sizes?

1. Pavers (Admin Building) – Type, brand, size?

1. Countertops – Type?

Answer: consult approved color boards.