This is an Asbestos Containing Materials (ACM) inspection report documenting the 2019 condition assessment of various buildings at what appears to be a Veterans Affairs medical facility. The report covers Buildings 102, 103, 105, 108, 109, 110, and several quarters buildings, cataloging the location, inspection dates, damage conditions, and risk assessments for identified asbestos-containing materials including thermal system insulation (TSI), floor tiles, mastics, joint compounds, transite panels, and vapor barriers.
The inspection data shows most ACM materials are in good condition with low potential for disturbance, though some items show damage ranging from 5% to 50%, particularly noting dry-rotting black and grey mastic and flaking materials in mechanical rooms. The report documents extensive previous abatement activities from 2011 through 2019, including removal of TSI from pipe systems, floor tiles and mastic from various rooms, transite panels from laboratory hoods, and acoustical coatings. Specific abatement dates are provided for completed work, with some materials noted as inaccessible for inspection. The quarters buildings (111, 112, 113) have been fully abated and demolished between 2016-2017. This comprehensive ACM inventory would be critical for any contractor planning infrastructure upgrades or renovations to ensure proper asbestos management protocols are followed.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg 105 - Boiler Plant
| ACM 2019 Update/Inspection | |||||||||
| Homogeneous Material | Location(s) | Date Inspected | Overall Damage Rating | Damage Condition and % | Potential for Disturbance | Effect of Vibration | Potential for Air Errosion | Potential for Water Damage | Notes |
| TSI | Steam Lines - Header Condensate Lines | 6/27/19 - KH | Good | Damaged - 10% | Low | Low | Low | Low | (Gray Pipe TSI abated on 3/30/11) |
| Tan Putty | Vertical Rise - Ground Level | 6/27/19 - KH | Good | Damaged - 10% | Low | Low | Low | Low | |
| TSI | Catwalk - Horizontal Pipe | 6/27/19 - KH | Good | Good | Low | Moderate | Low | Low |
Bldg 108
| ACM 2019 Update/Inspection | |||||||||
| Homogeneous Material | Location(s) | Date Inspected | Overall Damage Rating | Damage Condition and % | Potential for Disturbance | Effect of Vibration | Potential for Air Errosion | Potential for Water Damage | Notes |
| Vapor barrier mastic | Inside exterior walls of facility | 27-Jun-19 | none | Good | Low | Low | Low | Low | |
| Black/Beige Mastic | Sewer Stack, Roof Drains & Fittings | n/a | n/a | n/a | n/a | n/a | n/a | n/a | Room 301 - 4’ of TSI on Galvanized 4” roof drain pipe (Abated on 04/12/18) |
| Duct insulation mastic | Above Main Corridor ceilings | n/a | n/a | n/a | n/a | n/a | n/a | n/a | Abated 12/29/14 – 01/07/15 |
| 9x9 olive color floor tile | Rm 111, Rm 126 & Kitcken storage | n/a | n/a | n/a | n/a | n/a | n/a | n/a | Abated 12/29/14 – 01/07/15 |
| 12x12" grey tile over 12x12" white tile w/ Blk Mastic | Fitness Center/Gym | n/a | n/a | n/a | n/a | n/a | n/a | n/a | Abated 12/29/14 – 01/07/15 |
Bldg 109
| ACM 2019 Update/Inspection | |||||||||
| Homogeneous Material | Location(s) | Date Inspected | Overall Damage Rating | Damage Condition and % | Potential for Disturbance | Effect of Vibration | Potential for Air Errosion | Potential for Water Damage | Notes |
| Joint Compound & Texture | Basement, 1st & 2nd Floors | 25-Jun-19 | Damaged | Localized 5% | Moderate | Low | Low | Low | |
| 12"x12" Floor Tile Mastic - white w/ Lt grey streak | Basement (B17, B19, B38 & B46 only) and 1st Floor | 27-Jun-19 | none | n/a | Low | Low | Low | Low | refered to as Mastic #7 & #6A in previous inspections |
| Transite in Vent Hoods | B36, 104, 105, 106, 113, 114, 116, 117, 129, 136, 136A, 137A, 137B, 206A, 207C, 212, | 27-Jun-19 | none | Good | Low | Low | Low | Low | Oct or Nov 2019 - 213, 216, 223, 227 to be abated and demo'd |
| 12"x12" White Marbled Floor Tile & Mastic | most of 1st floor & 2nd Floor Hallway | 25-Jun-19 | none | Good | Low | Low | Low | Low | refered to Mastic #5 & 10 in previous reports |
| 12x12" floor Tile Mastic - White w/ Lt Brn Specs (tan) | 2nd Floor - 202A &B, W' restroom & 236 | 25-Jun-19 | none | Good | Low | Low | Low | Low | refered to Mastic #8 in previous reports |
| Black Epoxy Countertops | Transite - 1st Floor 131, 132, 136A, 138, 140, 126, 129, 137, 137A, 137B, 119, 117, 115, 113, 111, 105, 104, 118, 116, 114, 112, 110, 108, 106, 104 | 25-Jun-19 | none | Good | Low | Low | Low | Low | |
| Black Epoxy Countertops | Transite - 2nd Floor 221C, 221B, 224, 226, 234, 236, 220, 222, 223, 225, 227, 227A, 233, 235, 219, 216, 213, 209, 207, 207B, 204, 218, 215, 212, 206B, 206, 205, 203 | 25-Jun-19 | none | Good | Low | Low | Low | Low | |
| Black & Grey Mastic | Outside Chiller | 25-Jun-19 | Damaged | 50% - dryrotting | Low | Low | Low | Low | |
| Chalking | Penthouse - Rm 207 Duct work | 25-Jun-19 | none | Good | Low | Moderate | Low | Low | |
| Black Mastic on wood floor beam | Penthouse - throughout Mech Rm | 25-Jun-19 | Damaged | 40% - flaking off | Low | Low | Low | Low | |
| TSI - Hot Water Distribution Loop | Penthouse | n/a | n/a | n/a | n/a | n/a | n/a | n/a | Abated in 2016 & 2017 |
| Grey carpet & adhesive over black mastic | 130, 228 | 25-Jun-19 | none | Good | Low | Low | Low | Low | |
| Window Chalking | throughout building | 25-Jun-19 | none | Good | Low | Low | Low | Low | |
| Wall Sealant - Black | B2 | ||||||||
| TSI white/silver mastic | Basement - elbow 8" water line | ||||||||
| HVAC white/silver mastic | Basement |
Sept 2019 - Transite panels in lab hood removed in 213, 216, 218, 223, 227
| · N.W. Entrance (Smoke Shelter Entrance) – (Approx 220 sqft of floor tile/mastic – Abated: 04/06/16) |
| · Room 205 - Joint Compound: 580 sqft. Floor tile (unknown date)/Mastic: 210 sqft. Abated: 09/23/14 |
| · Room 140 – Door entry – Wall texture/joint compound |
| · Room 132 – 12” vinyl floor tile (RFCI protocol) 04/12/18 |
| · Room 221C – 12” vinyl floor tile (RFCI Protocol) 04/13/18 |
| · Room 207 – Former darkroom ( ) Asbestos/Chrysotile 2%/Sheetrock/420 sqft, and Transite/Chrysotile 15%/6 sqft. Lead based paint (Orange/White/Yellow) on cabinets and electrical box |
| Rennovation in Rm 206 - unknown what was done |
| Sheetrock, floor tile & mastic, transite panels in vent hood - asb pos (A&B Labs 8/27/14) |
Bldg 110
| ACM 2019 Update/Inspection | |||||||||
| Homogeneous Material | Location(s) | Date Inspected | Overall Damage Rating | Damage Condition and % | Potential for Disturbance | Effect of Vibration | Potential for Air Errosion | Potential for Water Damage | Notes |
| 12x12" (Pink)Brwn & Tan Floor Tile & Mastic | 2nd floor - by elevator, 213, 236 3rd Floor - 302(covered w/ carpet), 312 & 317 | 2-Jul-19 | Good | 0% | Low | Low | Low | Low | previous reports have mastic at 10-12% Crysotile (Loflin 10/29/2007) |
| 12x12" White marbled Floor Tile & Mastic | several - see May 2017 report from USFin | 2-Jul-19 | Good | 10% - several cracks, but stabilized | Low | Low | Low | Low | Some torn up where it looks like the mastic is not longer there (12 tiles total removed in small space between 142 & 146, ~3'sq) previous reports have mastic at 10-12% Crysotile (Loflin 10/29/2007) |
| 12x12" Drk Brwn Floor Tile & Mastic | Hall By - 211, N' stair & 221 | 2-Jul-19 | Good | 1% - couple of small corners missing, but stabilized | Low | Low | Low | Low | previous reports have mastic at 10-12% Crysotile (Loflin 10/29/2007) |
| White/Grey Insulations - Pipe Chases | Central Bldg, W' Restroom, 2nd Level Sofits | n/a | n/a | n/a | n/a | n/a | n/a | n/a | inaccessible |
| Friable ACM’s |
| · TSI located on piping in six identified pipe chases extending from the first floor to the third floor of the central building. TSI located in these identified pipe chases was the same as material that had already been abated in other parts of the building and was therefore known to contain asbestos (600 linear feet). |
| Non-Friable ACM’s |
| · Transite soffit located on the second floor roof overhang (680 sq/ft) (Abated: 12/20/16 – 12/22/16) |
| · 12x12 Brown floor tile and mastic border located in the central building second floor hallway and offices (1,450 sq/ft) |
| · 12x12 Tan floor tile and black mastic located in the central building second floor hallway and offices (10,038 sq/ft) |
| · 12x12 Beige floor tile and black mastic located in the second floor central building mechanical room (100 sq/ft) |
| · Black floor tile mastic located in the second floor break room (300 sq/ft) |
| · Black floor tile mastic located in the east wing, second floor (6,000 sq/ft). Rooms 226, 240, 244, 254,258,264,262A and the corridor. Abated: 01/24/14) |
| · Black floor tile mastic located in center wing south half (4,000 sq/ft) |
| · 12x12 Tan floor tile and brown tile strips located in the office doorways located in the eastern hallway, third floor of the central building (600 sq/ft) |
| · Room 136 – 12” of vinyl floor tile (RFCI Protocol) Abated: 04/13/18 |
| · Room 138 – 12” of vinyl floor tile (RFCL Protocol) Abated: 04/16/18 |
Bldg 102 - Grounds Equip Storag
| ACM 2019 Update/Inspection | |||||||||
| Homogeneous Material | Location(s) | Date Inspected | Overall Damage Rating | Damage Condition and % | Potential for Disturbance | Effect of Vibration | Potential for Air Errosion | Potential for Water Damage | Notes |
Gray acoustical coating Sink n/a n/a n/a n/a n/a n/a n/a Abated - 04/23/11
Bldg 103 - Grounds Shop
| ACM 2019 Update/Inspection | |||||||||
| Homogeneous Material | Location(s) | Date Inspected | Overall Damage Rating | Damage Condition and % | Potential for Disturbance | Effect of Vibration | Potential for Air Errosion | Potential for Water Damage | Notes |
Gray acoustical coating Sink n/a n/a n/a n/a n/a n/a n/a Abated - 04/23/11
Quaters Bldgs
| ACM 2019 Update/Inspection | ||||
| Homogeneous Material | Location(s) | Testing Lab | Testing Date | Testing Results |
| Quarters Building -111 (Abated: 6/29/ and 6/30, 2016. Demoed: 6/27 & 6/28, 2016) |
| Friable ACM’s |
| · Wall chases/TSI |
| · Under kitchen counter/behind wall |
| Non-Friable ACM’s |
| · Upstairs restroom/Behind medicine cabinet (0.25%) |
| · Kitchen floor tile and black mastic |
| Quarters Building – 112 (Abated: 6/29/ and 6/30, 2016. Demoed: 6/27 & 6/28, 2016) |
| Friable ACM’s |
| · Wall chases/TSI |
| Non-Friable ACM’s |
| · Kitchen – Green block pattern linoleum |
| · Utility room sink – Black acoustical coating |
| · Library – Sheetrock/Drywall/Joint compound |
| · Library – Black mastic |
| Quarters Building -113 (Quarters Building 113 Abated: 12/19/2016. Demoed: 12/27/28/2016) |
| Friable ACM’s |
| · Wall chases/TSI |
| Non-Friable ACM’s |
| · Library – 9x9 beige floor tile |
| · Library – Wall texture/Joint Compound |