- Construct EHRM Infrastructure Upgrades | Wilkes-Barre, PA Federal contract opportunity
- Solicitation number
- 36C77625R0056_1
About this file
This document is a Table of Contents for the Specifications of the EHRM Infrastructure Upgrades Project at the Wilkes-Barre VA Medical Center, published on 11-01-2021. The comprehensive specifications cover 33 divisions, including Special Sections, General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood, Thermal and Moisture Protection, Openings, Finishes, Specialties, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities.
The project (Number 693-22-700) is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside competitive procurement with a construction magnitude between $20-50 million. Key technical areas include infrastructure upgrades involving structural, mechanical, electrical, and communications systems modifications. Specification dates range from 2010 to 2024, indicating recent and current engineering standards, with most sections dated 2021-2023. The project will require comprehensive work across multiple building systems at the Wilkes-Barre VA Medical Center, involving detailed technical specifications for construction, installation, and system integration.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM INFRASTRUCTURE UPGRADES PROJECT #: 693-22-700
WILKES-BARRE VA MEDICAL CENTER – WILKES-BARRE, PA PUB. DATE: 11-01-2021
00 01 10 -01
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 07 Seals Page
00 01 10 Table of Contents 11-21
00 01 15 List of Drawing Sheets 11-21
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21
01 33 23 Shop Drawings, Product Data, and Samples 02-23
01 35 26 Safety Requirements for Major Projects 10-22
01 42 19 Reference Standards 11-21
01 45 00 Quality Control 02-21
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17
04 05 16 Masonry Grouting 01-21
04 20 00 Unit Masonry 05-20
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
00 01 10 -02
05 31 00 Steel Decking 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21
07 81 00 Applied Fireproofing 05-22
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 71 00 Door Hardware 05-22
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 06 00 Schedule for Finishes 01-21
09 22 16 Non-Structural Metal Framing 08-16
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 19 Resilient Tile Flooring 05-18
09 66 00 Static Dissipative Sealer for Concrete 01-21
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 01-21
10 44 13 Fire Extinguisher Cabinets 01-21
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
21 22 00 Clean Agent Fire Suppression Systems 05-15
Megan Cary Cloud
Megan Cary Image
00 01 10 -03
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 05-21
22 13 00 Facility Sanitary and Vent Piping 09-20
22 14 00 Facility Storm Drainage 09-15
22 33 00 Electric Domestic Water Heaters 09-20
22 40 00 Plumbing Fixtures 12-22
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 03-23
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 03-23
23 09 23 Direct-Digital Control System for HVAC 03-23
23 10 00 Facility Fuel Systems 04-20
23 21 13 Hydronic Piping 03-23
23 21 13.13 Underground Hydronic Piping 03-23
23 23 00 Refrigerant Piping 03-24
23 31 00 HVAC Ducts and Casings 03-23
23 34 00 HVAC Fans 03-23
23 37 00 Air Outlets and Inlets 03-23
23 40 00 HVAC Air Cleaning Devices 03-23
23 72 00 Air-to-Air Energy Recovery Equipment 03-24
23 73 00 Indoor Central-Station Air-Handling Units 03-23
23 81 00 Decentralized Unitary HVAC Equipment 03-24
23 81 23 Computer-Room Air-Conditioners 03-24
23 81 43 Air-Source Unitary Heat Pumps 03-23
23 82 16 Air Coils 03-24
23 84 00 Humidity Control Equipment 03-24
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
00 01 10 -04
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 05 39 Underfloor Raceways for Electrical Systems 11-22
26 05 41 Underground Electrical Construction 11-22
26 05 73 Overcurrent Protective Device Coordination Study 11-22
26 08 00 Commissioning of Electrical Systems 11-22
26 09 23 Lighting Controls 11-22
26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 11-22
26 22 00 Low-Voltage Transformers 11-22
26 23 00 Low-Voltage Switchgear 11-22
26 24 13 Distribution Switchboards 11-22
26 24 16 Panelboards 11-22
26 25 11 Busways 11-22
26 27 26 Wiring Devices 11-22
26 29 11 Motor Controllers 11-22
26 29 21 Enclosed Switches and Circuit Breakers 11-22
26 32 13 Engine Generators 11-22
26 33 53 Static Uninterruptible Power Supply 11-22
26 36 23 Automatic Transfer Switches 11-22
26 41 00 Facility Lightning Protection 11-22
26 43 13 Surge Protective Devices 11-22
26 51 00 Interior Lighting 03-24
26 56 00 Exterior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 26 Grounding and Bonding for Communications Systems 12-22
27 05 33 Raceways and Boxes for Communications Systems 12-22
27 05 36 Cable Trays for Communication Systems 12-22
27 05 53 Identification for Communication Systems 12-22
27 08 00 Commissioning of Communications Systems 12-22
27 10 00 Control, Communication and Signal Wiring 12-22
27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 12-22
27 11 19 Communications Termination Blocks and Patch Panels 12-22
27 11 26 Communications Rack Mounted Power Protection and Power Strips 12-22
27 13 13 Communications Copper Cable Splicing and Terminations 12-22
27 13 13.13 Communications Copper Cable Splicing and Terminations 12-22
27 13 23 Communications Optical Fiber Splicing and Terminations 12-22
27 13 23.13 Communications Optical Fiber Backbone Cabling 12-22
00 01 10 -05
27 15 13 Communications Copper Horizontal Cabling 12-22
27 16 19 Communications Patch Cords, Station Cords, and Cross Connect Wire 12-22
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security 09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09-11
28 13 00 Physical Access Control System 10-11
28 13 53 Security Access Detection 09-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 09-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-17
33 30 00 Sanitary Sewer Utilities 01-13
33 40 00 Storm Sewer Utilities 01-17