About this file

This file is a Questions and Answers (Q&A) document for a federal contract opportunity involving infrastructure upgrades at the Lebanon VA Medical Center. The solicitation (36C77625R0055_1) is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside competitive procurement for constructing EHRM Infrastructure Upgrades. The project involves comprehensive technology infrastructure work, including network cabling upgrades (CAT6a), installation of new CCTV cameras, access control system modifications, and telecommunications room (TR) equipment installations.

Key technical details include replacing existing network cabling, installing new cameras in telecom rooms, maintaining current access control and fire alarm systems, and performing work across multiple shifts (Monday-Sunday). The project requires extensive cabling work, with contractors providing 10% additional CAT6a cables and data rough-in, using Siemens-provided licensing for access control and video management systems. Work will be performed at the Lebanon VA campus, with specific considerations for potential underground conditions in a limestone karst area. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center in Austin, with the work to be completed using a phased, multi-shift approach accommodating hospital operational needs.

View the file

Other files for this federal contract opportunity

Other files attached to Construct EHRM Infrastructure Upgrades | Lebanon, PA, newest first.
File Type Posted
S06 - 0007 - Att1 - Wage Determination.txt TXT text file
S06 - 0007 - 36C77625R0055 0007.pdf PDF
S06 - 0006 - Att2 - Addendum 2 - Maxcell 4-cell Innerducts.pdf PDF
S06 - 0006 - Att1 - Addendum 2 - Narrative.pdf PDF
S06 - 0006 - 36C77625R0055 0006.pdf PDF
S06 - 0005 - Att 6 - Wage Determination.txt TXT text file
S06 - 0005 - 36C77625R0055 0005.pdf PDF
S06 - 0005 - Att 4 - Addendum 1 - INTRUSION DETECTION.pdf PDF
S06 - 0005 - Att 3 - Addendum 1 - Drawings Combined.pdf PDF
S06 - 0005 - Att 5 - Addendum 1 - VIDEO SURVEILLANCE.pdf PDF
S06 - 0005 - Att 2 - Addendum 1 - Narrative.pdf PDF
S06 - 0005 - Att 1 - Addendum 1 - ToC.pdf PDF
S06 - 0004 - 36C77625R0055 0004.pdf PDF
S06 - 0004 - Att1 - Post Deadline Vendor QA Responses 7.14.25.xlsx XLSX spreadsheet
S06 - 0003 - Att 5 - Addendum 1 - VIDEO SURVEILLANCE.pdf PDF
S06 - 0003 - Att 4 - Addendum 1 - INTRUSION DETECTION.pdf PDF
S06 - 0003 - Att 3 - Addendum 1- Drawings Combined.pdf PDF
S06 - 0003 - 36C77625R0055 0003.pdf PDF
S06 - 0003 - Att 2 - Addendum 1- Narrative.pdf PDF
S06 - 0003 - Att 1 - Addendum 1 - Table of Contents.pdf PDF
S06 - 0002 - 36C77625R0055.pdf PDF
S06 - 0001 - Site Visit Sign-In Sheet.pdf PDF
S06 - 0001 - Site Visit Agenda.doc DOC document
S06 - 0001 - 36C77625R0055.pdf PDF
S02 - Att4 - Drawings - Vol 2.pdf PDF
S02 - Att7 - Design Alert - All.pdf PDF
S02 - Att8 - Limitations on Subcontracting Cert.pdf PDF
S02 - 36C77625R0055.pdf PDF
S02 - Att1 - CD Specs - Vol.1.pdf PDF
S02 - Att2 - CD Specs - Vol.2.pdf PDF
S02 - Att3 - Drawings - Vol 1.pdf PDF
S02 - Att5 - Drawings - Vol 3.pdf PDF
S02 - Att6 - Wage Determination.txt TXT text file
S02 - Att9 - Redacted JA.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

#QuestionAnswer
1Are firms allowed to utilize Past Performance of key teaming partners or major subcontractors to meet the past performance requirement?Past Performance of the offeror will be used as the primary source for the evaluation.
2Since the issuance of this RFP there have been additional EHRM RFP's that have been issued. Those EHRM RFP's indicate that the response to Factor 1 Technical Capability may include the experience of subcontractors. Is it acceptable to include subcontractor experience in the response to Factor 1 for this RFP?Offeror's must submit the technical information as requested. Information provided for Factor 1 Technical Capability shall be that completed by the offeror that performed as the Prime Contractor on the project(s) submitted.
3Do the existing access control panels, CCTV switches, and intrusion detection equipment currently located in the FITS closets need to be removed and relocated as part of this project?Intrusion detection system located in existing FITS closets shall remain. CCTV switches and new wiring will be moved to the new TR's.
4Is it required to upgrade the network cabling for both the existing and new CCTV cameras to CAT6a?Yes, all are on the VA network.
5Are any new CCTV cameras included in the scope of this project?Yes, new Telecom Room (TR) camera's.
6For the FITS closets that are being relocated, what is the plan for the existing access control system components currently installed in those spaces?Existing access control system components shall remain.
7The existing CCTV cameras operate on a private network utilizing non-VA fiber. Does the scope require replacement of this fiber infrastructure with new fiber?The existing camera's are NOT on a separate network, they are on the VA network and all need to be run with new fiber//CAT6a.
8There are no specifications provided for the CCTV and intrusion detection systems. Please advise if specifications will be issued or if design-build input is required.Spec section for video surveillance and intrusion detection will be issued as part of upcoming addendum #1
9Access control for Building 2’s FITS closet is currently integrated into the CPAC access control system. Should this remain as-is, or should it be migrated to the VA access control system?Existing access control system shall remain as is. New CAT6a cable will be provided from TR to exisitng panels.
10All FITS closets and associated equipment are shown with new cameras, except the one depicted on drawing 04-TN400. Is a new camera required at that location?Yes.
11We have completed extensive work in the past at the Lebanon VA campus and experienced a number of sink holes and voids within the soil, some of which were very large. We recommend that an allowance be establised in the event these conditions are encountered during this project. If an allowance is not established by the VA how would you like us to address this unknown within our propsal?No allowances are included for this, any issues will be addressed as they occur based on location and severity.
12PACS 281300 – Will additional camera licenses be needed and if so, will the VA provide these?No, license provided by vendor (Siemens)
13Fire Detection & Alarm 283100 – Can the VA provide the contact information for the maintenance contactor of the existing Fire Alarm system?Pull up Edwards website you will find a strategic partner by the name of Eastern Time, Inc. 746 Hanover Ave., Allentown PA 18109
14Is all work to be performed during regular work hours?No. See Spec SECTION 01 00 00, GENERAL, 1.2 General Intention, F Contractor Work Hours. Work will be Monday-Sunday, 3-full shifts depending on Building, work required and patient hospital operational needs.
On Sheet 00-TN000, it states under the “Technology Installation Notes” that for the television locations, we are to provide new Cat6A cable and jacks. It then mentions existing Coax cable. I just want to confirm that we are not to provide new Coax cable for these locations.Yes, existing coax cables shall remain but reinstalled in new common faceplate with CAT6a cable
16Under the “Technology Equipment Schedule” on sheet 00-TN602, only cable tray products are included. I also want to confirm that we are not to include any sort of ladder rack in the closet fitouts as well.Yes, only cable tray system provided in new TR. No ladder runway systems allowed.
17Is this project tax-exempt, if so, will a certificate be provided?No, VA projects are not tax exempt
18ET series drawings for CCTV camera. Bid spec documents do not specified what system are currently in place for this project, please answer the following questions: a. What is the manufacturer of the current video management system? b. What version/existing is the current video management system operating? c. Are we expected to support version upgrades as part of this contract? d. Are there sufficient existing licenses to support the new cameras? e. Are the cameras to be 2MP pan/tilt/zoom or fixed dome? f. Is there a current vendor/installer of this system that we can contacta. Siemens, b. Confirm with vendor, c. Upgrades are covered by Siemens.,d. New License provide by Siemens. E. Fixed., F. Charles Killian w/Siemens Industry Inc
19ET series drawings for card reader/pin pad. Bid spec documents do not specified what system are currently in place for this project, please answer the following questions: a. What is the manufacturer of the current access control system. b. What version/existing software is the access control system operating. c. Are we expected to support the version? updates as part of the contract? d. Are the sufficient licenses to support the new doors? e. Is there any existing integration between the access control and CCTV systems? f. Is there a current vendor/installer of this system that we can contact?a. Siemens, b. Confirm with vendor, c. Upgrades are covered by Siemens., d. New License provide by Siemens. E. Fixed., F. Charles Killian w/Siemens Industry Inc
20Is there an allowance of Cat 6A cables & 1” data rough-in that should be carried within the Div.26&27 pricing? Some previous requirements on other projects requested 5-10% additional Cat 6A cables & 1” data rough-in to cover what may have missed during design.Provide 10% additional CAT6a cable & 1" data rough-in.
21Is there a current maintenance vendor/installer of the existing fire alarm system that we can contact?Pull up the Edwards website you will find a strategic partner by the name of Eastern Time, Inc. 746 Hanover Ave., Allentown PA 18109
22Is there a current maintenance vendor/installer of the current nurse call system that we can contact?Lebanon VA Medical Center uses the Hilrom Nurse Call systems. They will be able to provide you a list of local distributors/suppliers.
23Is conduit required for grounding conductors running/installed ceiling & risers?No. But if routing/environment requires bonding conductor to be in conduit, the conductor shall be bonded to each end of conduit using a grounding bushing or minimum size #6awg at each end of conduit
24Is there a requirement for x-ray scanning of concrete floor slabs prior to core drilling for floor-to-floor sleeves/conduits?Yes.
25Is there a location where site asphalt and concrete can be stored/separated? Can this material be removed from the site once per week?You will use your laydown area, that area will be provided following contract award.
26Will soil testing be performed prior to construction, to determine if any soils are contaminated?No, construction is not planned for any areas with known or suspected contaminated soil
27Is there a location where spoil dirt can be stored?You will use your laydown area, that area will be provided following contract award.
28Is there a specific location that will be used as a laydown yard during construction?You will be provided a laydown area, that area will be provided following contract award.
29Will erosion control plans be provided?Sediment and Errosion Control measures are shown on the various civil drawings
30Has there been any boring samples/test made for duct bank pathway/trench to determine subsurface condition?We are in a limestone karst area with extensive dolomite. Trenching will require rock removal in many locations
31WAO-There are no prints that indicate new locations. Is this a 1 for 1 replacement for existing cables?No, there are not "brand new" WAO locations. But, not all existing locations are re-used and not all outlets on new plans have same quatnity of cables as existing outlet at same location.
32Is there required a full survey of every room/above ceiling? If so, who dictates the outlet location and quantity of cables per location?A full survey of every room was performed by VA and are indicated on plans.
33Can the government provide a quantity of CAT6a cables that need to be installed by TR? Please provide a Drop Count Matrix that needs to be provided.Contractor shall refer to WAO plans for outlet locations and cable quantities.
34What is the drop counts of each coverage zone? If it is a 1 for 1 swap, how many existing drops are located in each coverage zone?Contractor shall refer to WAO plans for outlet locations and cable quantities.
35Is there a count and length for Cat6A patch cords?For bidding assume 7'-0" patch cord length. But patch cords shall be fit to size required without excessive length. Provide patch cords for 100% of horizontal cables
36Are we to provide one patch cable for each station and closet end?Yes.
37Is there a count and length for Fiber Patch cords?For bidding assume 7'-0" patch cord length. But fiber patch cords shall be fit to size required without excessive length. Provide pacth cords for 100% of fiber strands
38Are we to provide patch cables for each pair of strand at each end?Yes.
39Is there any copper backbone (25-pair or larger) needed?No.
40On plan 00-TN000 Technology Installation Notes#1.C: Please give quantity & locationAssume this is required for outlet locations with three (3) or more CAT6a cables
41On plan 00-TN000 Technology Installation Notes#2: Please give quantity & locationAssume this is required for outlet locations with three (3) or more CAT6a cables
RFI RESPONSES DATED 6-30-2025