This document is a pre-solicitation notice for a federal contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The VA is seeking Architect-Engineering (A-E) services for the design of a new Radiation Oncology Building in Lexington, Kentucky. The project has an estimated construction cost between $10-20 million and a required facility size of 14,000 gross square feet. The VA will award a firm-fixed-price design contract to the most highly qualified A-E firm, selected through an evaluation process focused on specialized experience, professional qualifications, capacity, past performance, and knowledge of the locality. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Firms must be SBA-certified SDVOSBs to be eligible. Submissions are due by October 16, 2024, and the contract award is anticipated in late January 2025 with a 280-day design completion period.

View the file

Other files

File Type Posted
36C77624R0144_2.docx DOCX document
SF330 TQ Tracking Spreadsheet - Lex Rad Onc Design.pdf PDF
36C77624R0144_1.docx DOCX document
SOW Att. 01 - AE CPM Schedules.pdf PDF
SOW Att. 06 - LDP Process.pdf PDF
SOW Att. 08 - Additional Technical Requirements.pdf PDF
SOW Att. 03 - Campus Map.pdf PDF
SOW Att. 02 - PG-18-15 Volume C.pdf PDF
SOW Att. 05 - KHC Cover Sheet 106 Review.pdf PDF
SOW Att. 04 - Sample Air Emissions Permit Application.pdf PDF
SOW_596-335.pdf PDF
36C77624R0144.docx DOCX document
PPQ.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 8.24.18

Summary of LFUCG Ordinance entitled “Reduction of Soil Erosion” (Chapter 16, Article X, Division 5)

Size of Land Disturbance

Ordinance Requirements (See Note 1 for Exemptions)

LFUCG Land Disturbance Permit

Required

LFUCG Level of Review and Inspection

1 One acre or more, including lots that are less than one acre but are part of a larger common plan of development

Section 16‐104. Permit application must include a SWPPP prepared in accordance with KYR10 and LFUCG Stormwater Manual.

Incorporates state KYR10 requirements into LFUCG’s Ordinance.

KYR10 inspection certification by corporate officer not applicable

KYR10 critical area and buffer zone applies to MS4 inlets, in addition to “Waters of the Commonwealth.”

Yes Review SWPPP, inspect monthly.

See Note 3.

2 5,000 sf to one acre and not part of Category 1, or any size disturbance where a new commercial or residential building is being constructed

Section 16‐101. Permit application must include an ESC Plan prepared in accordance with LFUCG Stormwater Manual. See Note 2 regarding vegetated buffers.

Yes Review ESC plan, inspect monthly.

See Note 3.

3 Less than 5,000 sf with no building or utility line construction. (See Category 2 for new buildings and Category 4 for utility line construction)

Section 16‐103. General requirement to use practical controls to minimize discharge of sediment. See Note 2 regarding vegetated buffers.

No Inspect on a complaint basis.

4 Linear Utility Line Construction Projects of 500 linear feet or more but less than one acre of disturbance, that are not in Category 1.

Section 16‐102. Permit application must include an ESC Plan prepared in accordance with LFUCG Stormwater Manual. LFUCG will require utility companies that routinely conduct such activities to apply for a general permit with a duration of two years. See Note 2 regarding vegetated buffers.

Yes Review ESC plan, inspect monthly.

See Note 3.

Note 1: The following activities are exempted: seed / sod replacement of less than 10,000 sf, agricultural activities, and cemetery lots (Section 16‐100).

Note 2: An undisturbed vegetated buffer must be maintained within 50’ of a perennial or intermittent stream bank, MS4 storm sewer inlet, sinkhole, or wetland, unless impractical due to nature of the project, in which case a protective alternate control shall be used.

Note 3: “Review” means the LFUCG level of review necessary to assess whether plans reasonably include measures that address potential water quality impacts from construction. LFUCG does not accept responsibility for the design, installation, and operation and maintenance of the erosion and sediment controls.