This document is a Geotechnical Engineering Report for the proposed construction of an addition to the Wilkes-Barre VA Medical Center in Plains Township, Pennsylvania. The report provides findings from the subsurface exploration and testing, and includes design and construction recommendations for site preparation, foundations, floor slabs, below-grade walls, and seismic design.
Key details include:
- Proposed building of approximately 3,200 SF, up to 3 stories, to be used as a VA Medical Center
- Subsurface conditions consist of up to 3 feet of existing fill materials overlying weathered bedrock
- Conventional shallow foundations (column and strip footings) can be designed for a net allowable bearing pressure of 4,000 psf, with recommendations for treatment of any unsuitable soils
- Floor slabs can be slab-on-grade design, with a modulus of subgrade reaction of 150 pci
- Below-grade walls should be designed for at-rest lateral earth pressures and surcharge loads
- The site can be designed using a Seismic Site Classification of "C"
- Recommendations are provided for earthwork operations, including removal of existing fill and rock excavation
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ECS Mid-Atlantic, LLC Geotechnical Engineering Report
Wilkes-Barre VA Medical Center
1111 East End Blvd.
Plains Township, Pennsylvania
ECS Project Number 18:6007
July 25, 2023
July 25, 2023 Mr. John J. Foley, AIA, LEED AP Apogee Consulting Group, PA 1151 Kildaire Farm Road Raleigh, NC 27511
ECS Project No. 18:6007
Reference: Geotechnical Engineering Report
Wilkes-Barre VA Medical Center Plains Township, Pennsylvania
Dear Mr. Foley:
ECS Mid-Atlantic, LLC (ECS) has completed the subsurface exploration and geotechnical engineering analyses for the above-referenced project. Our services were performed in general accordance with our Proposal No. 18:8614-GP, dated May 23, 2023. This report presents our understanding of the geotechnical aspects of the project, results of the field exploration, laboratory testing, and our design and construction recommendations.
It has been our pleasure to be of service to Apogee Consulting Group, PA, during this phase of this project. We would appreciate the opportunity to remain involved during the continuation of the design phase and to provide our services during construction phase operations as well to verify the assumptions of subsurface conditions made for this report. Should you have any questions concerning the information contained in this report, or if we can be of further assistance to you, please contact us.
Respectfully submitted, ECS Mid-Atlantic, LLC
Kyle T. Eldridge Geotechnical Staff Project Manager keldridge@ecslimited.com
Derek G. Ridinger, P.E.
Associate Principal dridinger@ecslimited.com mailto:mhartman@ecslimited.com DRidinger
DGR
Wilkes Barre VA Medical Center July 25, 2023 ECS Project No. 18:6007 Page i
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1.0 INTRODUCTION
2.0 PROJECT INFORMATION
Project Location Proposed Construction
3.0 FIELD EXPLORATION AND LABORATORY TESTING
Subsurface Characterization Site Geology Soil Survey Mapping Groundwater Observations Laboratory Testing
4.0 DESIGN RECOMMENDATIONS
Foundation Design Floor Slabs Below Grade Walls Seismic Design Characteristics
5.0 SITE CONSTRUCTION RECOMMENDATIONS
Subgrade Preparation
5.1.1 Stripping and Grubbing
5.1.2 Proofrolling
Earthwork Operations
5.2.1 Removal of Existing Structures
5.2.2 Existing Man-Placed Fill
5.2.3 Rock Excavation
5.2.4 Structural Fill Materials
5.2.5 Proposed Fill Slopes
Foundation and Slab Observations Utility Installations
6.0 CLOSING
Wilkes Barre VA Medical Center July 25, 2023 ECS Project No. 18:6007 Page ii
APPENDICES
Appendix A – Drawings & Reports
• Site Location Diagram
• Exploration Location Diagram
• Subsurface Cross-Section A-A’
• Geologic Map
• Soil Survey Map
Appendix B – Field Operations
• Subsurface Exploration Procedure: Standard Penetration Testing (SPT)
• Reference Notes for Boring Logs
• Reference Notes for Rock Cores
• Boring Logs
• Photographs
Appendix C – Laboratory Testing
• Laboratory Test Results Summary
• Plasticity Chart
• Grain Size Analyses
Wilkes Barre VA Medical July 25, 2023 ECS Project No. 18:6007 Page 1
EXECUTIVE SUMMARY
The following summarizes the main findings of the exploration, particularly those that may have a cost impact on the planned development. Further, our principal foundation recommendations are summarized. Information gleaned from the Executive Summary should not be utilized in lieu of reading the entire geotechnical report.
• Provided the subgrades are prepared to the specifications provided herein, the proposed building can be supported by conventional shallow foundations consisting of column and/or strip footings. The foundations can be designed for an allowable bearing pressure of 4,000 psf based on anticipated design loads.
• Significant excavation difficulties which may slow down the construction process may occur, especially in areas of deep utility excavations and foundation excavations. Bedrock encountered prior to reaching the designed bottom of footing elevations should be overexcavated a minimum of 6 inches below the proposed footing elevations and replaced with compacted 2A aggregate.
• Groundwater seepage into our borings was not observed during our exploration at the depths explored.
• Up to approximately 3 feet of existing fill was noted within the proposed building footprint during the subsurface exploration. Due to the presence of fill on-site, select over-excavation of unsuitable fill material should be anticipated at some locations within the building pad where proofrolling reveals instability.
• Natural deposits of soils that meet the definition of Satisfactory Structural Fill do appear to be present on the site at possible excavation depths.
• The site can be designed utilizing a Seismic Site Classification of “C.”
Refer to the text of the report for site specific design and construction recommendations.
ECS Project No. 18:6007 Page 2
1.0 INTRODUCTION
The purpose of this study was to provide geotechnical information for design and construction of a proposed building addition at the project site. The recommendations developed for this report are based on project information supplied by Apogee Consulting Group, PA.
Our services were provided in accordance with the Proposal No. 18:8614-GP, dated May 23, 2023, as authorized by Apogee Consulting Group, PA, which includes our Terms and Conditions of Service.
This report contains the results of our subsurface exploration, site characterization, laboratory testing, engineering analyses, and recommendations for the design and construction of the proposed development.
This report includes the following:
• A review of area and site geologic conditions.
• A review of surface topographical features and site conditions.
• A brief review and description of our field procedures.
• A brief review and description of our field and laboratory test procedures and the results of testing conducted.
• A review of subsurface soil stratigraphy with pertinent available physical properties.
• Final copies of our boring logs.
• Discussion of site preparation including depth of removal of soil or rock and over-excavation.
• Discussion of groundwater concerns relative to the planned construction.
• Recommended allowable soil bearing pressure and recommendations for suitable shallow foundations and anticipated maximum settlement.
• Recommended frost depth.
• Recommendations regarding specifications for Structural Fill.
• Discussion of parameters for slab on grade construction and modulus of subgrade reaction.
• Recommendations for site seismic design coefficients based on the 2018 IBC parameters.
• Design and construction recommendations for below-grade or site retaining wall construction, including lateral earth pressures, sliding resistance coefficients and allowable bearing pressures, if applicable.
ECS Project No. 18:6007 Page 3
2.0 PROJECT INFORMATION
PROJECT LOCATION
The project site is located at the physical address of 1111 East End Blvd. in Plains Township, Pennsylvania. The site is located on the Wilkes Barre VA Medical Center Campus, just North of the American Legion onsite. At the time of exploration, the project site consisted of an undeveloped courtyard and the site was generally flat with a total topographic relief on the order of approximately ±2 feet.
Refer to Figure 2.1.A and the Site Location Map in Appendix A for a detailed depiction of the project site location.
Figure 2.1.A – Site Location
PROPOSED CONSTRUCTION
Based on the provided Foundation Plan- Area A, by Apogee Consulting Group, PA, dated January 27, 2023, we understand that the proposed construction consists of an addition to the existing building.
The following information explains our understanding of the structure and assumed loads:
DESIGN VALUES
SUBJECT DESIGN INFORMATION / EXPECTATIONS
Approximate Building Footprint Approximately 3,200 S.F.
# of Stories Assumed 1 to 3 stories above grade
Usage VA Medical Center
Column Loads 75.0 Kips maximum
Wall Loads 10.0 kips/ft maximum
Lowest Finish Floor Elevation
(FFE)
Estimated ±1 foot of existing; estimated approximate El. 894.0
ECS Project No. 18:6007 Page 4
3.0 FIELD EXPLORATION AND LABORATORY TESTING
Our exploration procedures are explained in greater detail in Appendix B including the insert titled Subsurface Exploration Procedure. Our scope of work included drilling a total of two (2) geotechnical borings. Our exploration locations were located with a handheld GPS unit and their approximate locations are shown on the Exploration Location Diagram in Appendix A.
SUBSURFACE CHARACTERIZATION
The following sections provide generalized characterizations of the soil strata. Please refer to both the Subsurface Cross-Section in Appendix A and the boring logs in Appendix B.
SUBSURFACE STRATIGRAPHY
Stratum Description n/a Surficial Material:
Topsoil approximately 6 to 8 inches thick
I FILL Materials sampled as GRAVEL (GW/GM) with varying amounts of silt and sand, brown and gray, moist, medium dense to very dense
II
SANDSTONE, moderately weathered, soft, highly fractured, and gray, resulted in auger refusal as shallow as 2.5 feet below existing grade
SITE GEOLOGY
According to the Geologic Map of Pennsylvania (1980)1, the site is underlain by the Llewellyn Formation.
This formation is included in The Engineering Characteristics of the Rocks of Pennsylvania2, and are described as having the following characteristics.
The Llewellyn formation is an interbedded sandstone, siltstone, and conglomerate, exhibiting medium to coarse grain sizes. The formation is light gray to brown containing coal and dark gray to black shales.
The joints are moderately developed, moderately abundant, exhibiting a blocky pattern with moderate spacing. The bedrock formation is slightly too moderately weathered and found to be slightly weathered to a shallow depth. The Llewellyn formation possesses good surface drainage with moderate secondary porosity and permeability.
SOIL SURVEY MAPPING
Based on our review of the Soil Survey (USDA - Natural Resources Conservation Service (websoilsurvey.ncrs.usda.gov), the site soils are mapped as cut and fill land. This soil type is described as having the following properties:
1 Berg, T. M., Edmunds, W. E., Geyer, A. R., and others, compilers, 1980, Geologic map of Pennsylvania (2nd ed.): Pennsylvania Geological Survey, 4th ser., Map 1, 3 sheets, scale 1:250,000 2 Geyer, A. R., and Wilshusen, J. P., (1982), Engineering Characteristics of the Rocks of Pennsylvania. Bureau of Topographic and Geologic Survey.
ECS Project No. 18:6007 Page 5
SOIL MAPPING SUMMARY
Mapped Soil Unit
Soil Unit
Symbol
Origin/ Type
Depth to Restrictive
Feature
Depth to Water Table
Hydrologic Soil
Group
KSat (in/hr)
Cut and Fill Land CF Man made >80 inches >80 inches N/A N/A
GROUNDWATER OBSERVATIONS
Groundwater was not encountered during our subsurface exploration at the locations and depths explored. Additionally, no apparent signs of the seasonal high ground water table were observed while probing below the infiltration testing depths.
Variations in the long term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, construction activities, and other factors.
LABORATORY TESTING
The laboratory testing consisted of selected tests performed on samples obtained during our field exploration operations. Classification and index property tests were performed on representative soil samples.
Each sample was visually classified on the basis of texture and plasticity in accordance with ASTM D2488 Standard Practice for Description and Identification of Soils (Visual-Manual Procedures) and including USCS classification symbols, and ASTM D2487 Standard Practice for Classification for Engineering Purposes (Unified Soil Classification System (USCS)). After classification, the samples were grouped in the major zones noted on the boring logs in Appendix B. The group symbols for each soil type are indicated in parentheses along with the soil descriptions. The stratification lines between strata on the logs are approximate; in situ, the transitions may be gradual.
ECS Project No. 18:6007 Page 6
4.0 DESIGN RECOMMENDATIONS
FOUNDATION DESIGN
Provided subgrades and engineered fills are prepared as discussed herein, the proposed addition can be supported by conventional shallow foundations consisting of column and continuous wall footings. The design of the foundations shall utilize the following parameters:
FOUNDATION DESIGN PARAMETERS
Design Parameter Column Footing Wall Footing
Net Allowable Bearing Pressure1 4,000 psf 4,000 psf
Acceptable Bearing Soil Material Stratum II or Structural
Fill
Stratum II or Structural Fill
Minimum Width 24 inches 18 inches
Minimum Footing Embedment Depth for Interior Foundations (below slab or finished grade) 24 inches 24 inches
Minimum Footing Embedment Depth for Exterior Foundations (below slab or finished grade)
36 inches 36 inches
Estimated Total Settlement (max.) 1 inch 1 inch
Estimated Differential Settlement Less than ½ inch between columns Less than ½ inch over
35 feet
Note1: Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation.
The materials at the foundation bearing elevation are anticipated to be a combination of existing fill materials, new structural fill, and/or bedrock. If soft soils, existing fill, or otherwise unsuitable soils are observed at the footing bearing elevations, the unsuitable soils should be undercut and removed.
Foundation undercut excavations should be widened 1 foot beyond the footing dimension on each side and then 1 foot for every 1 foot of over excavation (equivalent to a 1(H):1(V) slope for improved bearing area) where overexcavation exceeds 2 feet in depth. The undercut areas should be backfilled with Structural Fill (such as 2A aggregate) and compacted under engineering review until the designed bearing elevation has been reached. As an alternate, lean concrete (f’c=1,000 psi) may be used to backfill the undercut. If lean concrete is used, the excavation should be 6 inches larger than the footing on each side and no additional lateral overexcavation is necessary.
Bedrock encountered prior to reaching the designed bottom of footing elevations should be overexcavated a minimum of 6 inches below the proposed footing elevations and replaced with compacted 2A aggregate. Transition zones from rock to soil should incorporate a minimum of 15 lineal feet of footing with overexcavation and replacement with 2A aggregate to a minimum depth of 1 foot to reduce the potential for differential settlement in the soil section.
ECS Project No. 18:6007 Page 7
FLOOR SLABS
Provided subgrades and Structural Fills are prepared as discussed herein, the proposed floor slabs can be constructed as Ground Supported Slabs (or Slab-On-Grade). Based on a lowest finished floor elevation of EL. 894.0 ft, it appears that the slabs will bear on Stratum I – Fill, GRAVEL (GW/GM).
Stratum I can be used for support of the slabs-on-grade provided the exposed subgrade passes a proofroll as described in this report. It should be noted that the long-term performance across the slab may be variable due to the presence of existing fill The following graphic depicts our soil-supported slab recommendations:
Figure 4.2.A
1. Drainage Layer Thickness: 6 inches minimum recommended
2. Drainage Layer Material: Coarse Graded Aggregate
3. Subgrade compacted to 95% maximum dry density in Accordance with ASTM D698
Soft or yielding soils may be encountered in some areas. Those soils should be removed and replaced with compacted Structural Fill in accordance with the recommendations included in this report.
Subgrade Modulus: Provided the Structural Fill and Granular Drainage Layer are constructed in accordance with our recommendations, the slab may be designed assuming a modulus of subgrade reaction, k1 of 150 pci (lbs./cu. inch). The modulus of subgrade reaction value is based on a 1 ft by 1 ft plate load test basis.
Vapor Barrier: Before the placement of concrete, a vapor barrier may be placed on top of the granular drainage layer to provide additional protection against moisture penetration through the floor slab.
When a vapor barrier is used, special attention should be given to surface curing of the slab to reduce the potential for uneven drying, curling and/or cracking of the slab. Depending on proposed flooring material types, the structural engineer and/or the architect may choose to eliminate the vapor barrier.
Slab Isolation: Soil-supported slabs should be isolated from the foundations and foundation-supported elements of the structure so that differential movement between the foundations and slab will not induce excessive shear and bending stresses in the floor slab. Where the structural configuration prevents the use of a free-floating slab such as in a drop down footing/monolithic slab configuration, the slab should be designed with suitable reinforcement and load transfer devices to preclude overstressing of the slab.
BELOW GRADE WALLS
We recommend that below grade walls be designed to withstand at-rest lateral earth pressures and surcharge loads from adjacent building foundations, and/or streets. These recommendations apply to a “drained” condition which is where there is drainage material behind below grade walls that prevents hydrostatic water pressures on the back of the below grade wall.
Concrete Slab Vapor Barrier
Granular Capillary Break/Drainage Layer
Compacted Subgrade
ECS Project No. 18:6007 Page 8
To accomplish a drained condition, drainage materials such as a free draining gravel, geocomposite drainage panels, weep holes, and an underslab drainage system should be used.
We recommend that walls that are restrained from movement at the top be designed for a linearly increasing lateral earth pressure. The following Figure depicts our recommended at-rest lateral earth pressure condition for a “drained below-grade wall” with restrained wall top:
Surcharge loads imposed within a 45-degree slope of the base of the wall should be considered in the below grade wall design. The influence of these surcharge loads on the below grade walls should be based on an at-rest pressure coefficient, k0, of 0.5 in the case of restrained walls.
SEISMIC DESIGN CHARACTERISTICS
The International Building Code (IBC) 2018 requires site classification for seismic design based on the upper 100 feet of a soil profile. At least two methods are utilized in classifying sites, namely the shear wave velocity (vs) method and the Standard Penetration Resistance (N-value) method. The latter method (Standard Penetration Resistance) was used in classifying this site.
H (feet)
Surcharge Load (psf)
Lateral Earth Pressure = 60 H psf (For below grade walls restrained from movement at top and bottom, drained conditions presumed;
Internal angle of friction of 30 degrees and a unit weight of 120 pcf.
This diagram is not suitable for the design of Support of Excavation or temporary shoring systems.
Horizontal Pressure from Surcharge = 0.5 x Vertical Surcharge
ECS Project No. 18:6007 Page 9
SEISMIC SITE CLASSIFICATION
Site Class
Soil Profile Name Shear Wave Velocity, Vs, (ft./s) N value (bpf)
A Hard Rock Vs > 5,000 fps N/A
B Rock 2,500 < Vs ≤ 5,000 fps N/A
C Very dense soil and soft rock 1,200 < Vs ≤ 2,500 fps >50
D Stiff Soil Profile 600 ≤ Vs ≤ 1,200 fps 15 to 50
E Soft Soil Profile Vs < 600 fps <15
Based upon our interpretation of the subsurface conditions, the appropriate Seismic Site Classification is “C” as shown in the preceding table.
Ground Motion Parameters: In addition to the seismic site classification noted above, ECS has determined the design spectral response acceleration parameters following the IBC 2018 methodology. The Mapped Reponses were estimated from the free seismic design maps available from Structural Engineers Association of California (SEAOC) (http://seismicmaps.org). The design responses for the short (0.2 sec, SDS) and 1-second period (SD1) are noted in bold at the far right end of the following table.
GROUND MOTION PARAMETERS [IBC 2018 METHOD]
Period (sec)
Mapped Spectral Response
Accelerations (g)
Values of Site Coefficient for Site Class
Maximum Spectral Response Acceleration
Adjusted for Site Class (g)
Design Spectral Response
Acceleration (g)
Reference Figures 1613.2.1
(1) & (2) Tables 1613.2.3
(1) & (2) Eqs. 16-37 &
16-38 Eqs. 16-39 &
16-40
0.2 SS 0.153 Fa 1.3 SMS=FaSs 0.199
SDS=2/3
SMS
0.133
1.0 S1 0.058 Fv 1.5 SM1=FvS1 0.087
SD1=2/3
SM1
0.058
The Site Class definition should not be confused with the Seismic Design Category designation which the Structural Engineer typically assesses. If a higher site classification is beneficial to the project, we can provide additional testing methods that may yield more favorable results.
ECS Project No. 18:6007 Page 10
5.0 SITE CONSTRUCTION RECOMMENDATIONS
SUBGRADE PREPARATION
5.1.1 Stripping and Grubbing
The subgrade preparation should consist of stripping all vegetation, rootmat, topsoil, unsuitable existing fill, asphalt, and other soft or unsuitable materials from the 10-foot expanded building and 5-foot expanded pavement limits, and 5 feet beyond the toe of Structural Fills. Deep topsoil or organic laden soils may be present within the existing mulched areas. Additionally, organic materials such as roots were observed within the existing fill materials. ECS should be retained to verify that topsoil and unsuitable surficial materials have been removed prior to the placement of Structural Fill or construction of structures.
5.1.2 Proofrolling
Prior to fill placement or other construction on subgrades, the subgrades should be evaluated by an ECS field technician. The exposed subgrade should be thoroughly proofrolled with construction equipment having a minimum axle load of 10 tons [e.g. fully loaded tandem-axle dump truck]. Proofrolling should be traversed in two perpendicular directions with overlapping passes of the vehicle under the observation of an ECS technician. This procedure is intended to assist in identifying localized yielding materials.
Where proofrolling identifies areas that are unstable or “pumping” subgrade those areas should be repaired prior to the placement of subsequent Structural Fill or other construction materials. Methods of stabilization include undercutting, moisture conditioning, or chemical stabilization. The situation should be discussed with ECS to determine the appropriate procedure. Test pits may be excavated to explore the shallow subsurface materials to help in determining the cause of the observed unstable materials, and to assist in the evaluation of appropriate remedial actions to stabilize the subgrade.
EARTHWORK OPERATIONS
5.2.1 Removal of Existing Structures
Development of the project will include removal of existing sidewalks, a covered shelter, and electrical utilities present onsite.
Existing foundation elements and utilities within the footprint of the proposed buildings should be removed and backfilled with compacted Structural Fill placed under engineering review. Existing foundations or slabs situated within the proposed pavement areas should be over-excavated and removed such that the top of the concrete is a minimum of 2 feet below the finished subgrade elevation. The foundations and pavements may be processed for reuse as Structural Fill provided all steel reinforcement is removed and the material is well-graded containing no fragments larger than 4-inches in diameter and conforms to the parameters presented in Section 5.2.4. If existing slabs are to remain, they should be rubblized to allow downward migration of water.
ECS Project No. 18:6007 Page 11
5.2.2 Existing Man-Placed Fill
Fill Content: Up to approximately 3 feet of existing fill was noted within the proposed building footprint during the subsurface exploration. Due to the presence of fill on-site, select over-excavation of unsuitable fill material should be anticipated at some footing locations, and some locations within the building pad where proofrolling reveals instability.
5.2.3 Rock Excavation
Bedrock was encountered in both borings performed, signified by auger refusal. Rock coring was performed in each boring, with samples indicating that the underlying rock was composed of gray Sandstone that is moderately weathered, soft, and highly fractured. The Sandstone was encountered at depths as shallow as approximately 2.5 foot below existing grade. Significant excavation difficulties which may slow down the construction process may occur, especially in areas of deep utility excavations and foundation excavations. Usually, rock saws employed for trench excavations are capable of exceeding our refusal depths by several feet, but with some difficulty. The use of hydraulic rams on heavy duty excavation equipment may be required depending on the proposed excavations depths.
We recommend that no “rock” fills be placed, and that fills meet the grain size criteria provided. Rock fill consists of rock particles that have a high void content between the rock particles. Rock fills are not suitable for satisfactory long term performance. These rock materials can be blended with other soils types to form a suitable particle size distribution for reuse as Structural Fill as outlined above.
5.2.4 Structural Fill Materials
Prior to placement of Structural Fill, representative bulk samples (about 50 pounds) of on-site and/or off-site borrow should be submitted to ECS for laboratory testing, which will typically include Atterberg limits, natural moisture content, grain-size distribution, and moisture-density relationships (i.e., Proctors) for compaction. Import materials should be tested prior to being hauled to the site to determine if they meet project specifications.
Satisfactory Structural Fill Materials: Materials satisfactory for use as Structural Fill should consist of inorganic soils with the following engineering properties and compaction requirements.
STRUCTURAL FILL INDEX PROPERTIES
Subject Property
Building and Pavement Areas LL < 40, PI <20
Max. Particle Size 4 inches
Minimum Dry Density 105 pcf
STRUCTURAL FILL COMPACTION REQUIREMENTS
Subject Requirement
Compaction Standard Standard Proctor, ASTM D698
Required Compaction 95% of Max. Dry Density
Moisture Content ±2 % points of the soil’s optimum value
Loose Thickness 8 inches prior to compaction
ECS Project No. 18:6007 Page 12
On-Site Borrow Suitability: Natural deposits of soils that meet the definition of Satisfactory Structural Fill do appear to be present on the site at possible excavation depths.
Fill Placement: Fill materials should not be placed on frozen soils, on frost-heaved soils, and/or on excessively wet soils. Borrow fill materials should not contain frozen materials at the time of placement, and all frozen or frost-heaved soils should be removed prior to placement of Structural Fill or other fill soils and aggregates. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned.
5.2.5 Proposed Fill Slopes
Slopes comprised of Structural Fill may be constructed at a slope of 3(H):1(V) or flatter. Slopes steeper than 3(H):1(V) should be evaluated by ECS. All slopes should be properly vegetated to reduce the likelihood of surficial erosion and sloughing.
FOUNDATION AND SLAB OBSERVATIONS
Protection of Foundation Excavations: Exposure to the environment may weaken the soils at the footing bearing level if the foundation excavations remain open for too long a time. Therefore, foundation concrete should be placed the same day that excavations are made. If the bearing soils are softened by surface water intrusion or exposure, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if rainfall becomes imminent while the bearing soils are exposed, a 1 to 3-inch thick “mud mat” of “lean” concrete should be placed on the bearing soils before the placement of reinforcing steel.
Footing Subgrade Observations: Most of the soils at the foundation bearing elevation are anticipated to be suitable for support of the proposed structure. It is important to have ECS observe the foundation subgrade prior to placing foundation concrete, to confirm the bearing soils are what was anticipated.
Slab Subgrade Verification: Prior to placement of a drainage layer, the subgrade should be prepared in accordance with the recommendations found in Section 5.1.2 Proofrolling.
UTILITY INSTALLATIONS
Utility Subgrades: The soils encountered in our exploration are expected to be generally suitable for support of utility pipes. The pipe subgrades should be observed and probed for stability by ECS. Loose or unsuitable materials encountered should be removed and replaced with suitable compacted Structural Fill, or pipe stone bedding material.
Utility Backfilling: The granular bedding material (often AASHTO #57 stone) should be at least 4 inches thick, but not less than that specified by the civil engineer’s project drawings and specifications. We recommend that the bedding materials be placed up to the springline of the pipe. Fill placed for support of the utilities, as well as backfill over the utilities, should satisfy the requirements for Structural Fill and Fill Placement.
Utility Excavation Dewatering: It is possible that perched water may be encountered by utility excavations which extend below existing grades. It is expected that removal of perched water which
ECS Project No. 18:6007 Page 13 seeps into excavations could be accomplished by pumping from sumps excavated in the trench bottom and which are backfilled with AASHTO No. 57 Stone or open graded bedding material. Should water conditions beyond the capability of sump pumping be encountered, the contractor should submit a Dewatering Plan in accordance with project specifications.
Excavation Safety: All excavations and slopes should be constructed and maintained in accordance with OSHA excavation safety standards. The contractor is solely responsible for designing, constructing, and maintaining stable temporary excavations and slopes. The contractor’s responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor’s safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ECS is providing this information solely as a service to our client. ECS is not assuming responsibility for construction site safety or the contractor’s activities; such responsibility is not being implied and should not be inferred.
ECS Project No. 18:6007 Page 14
6.0 CLOSING
ECS has prepared this report to guide the geotechnical-related design and construction aspects of the project. We performed these services in accordance with the standard of care expected of professionals in the industry performing similar services on projects of like size and complexity at this time in the region. No other representation, expressed or implied, and no warranty or guarantee is included or intended in this report.
The description of the proposed project is based on information provided to ECS by Apogee Consulting Group. If any of this information is inaccurate, either due to our interpretation of the documents provided or if the site’s design changed, ECS should be contacted immediately to review the report in light of the changes and provide additional or alternate recommendations as required to reflect the proposed construction.
We recommend that ECS review the project plans and specifications so we can confirm that those plans/specifications are in accordance with the recommendations of this geotechnical report.
Field observations, and quality assurance testing during earthwork and foundation installation are an extension of, and integral to, the geotechnical design. We recommend that ECS be retained to apply our expertise throughout the geotechnical phases of construction, and to provide consultation and recommendation should issues arise.
ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report.
Appendix A - Drawings and Reports
Site Location Diagram Exploration Location Diagram(s) Subsurface Cross-Section(s) Geologic Survey Map Soil Survey Map
7/18/2023
Service Layer Credits: Esri, HERE, Garmin, (c) OpenStreetMap contributors
²
ENGINEER
SCALE
18:6007
PROJECT NO.
FIGURE
DATE
DGR
APOGEE CONSULTING GROUP, PA
WILKES-BARRE VA MEDICAL CENTER
1111 EAST END BLVD, PLAINS TWP, PENNSYLVANIA
SITE LOCATION DIAGRAM
0 600300
Feet
AS NOTED
B-01 B-02
A A'
7/18/2023
Service Layer Credits: Esri, HERE, Garmin, (c) OpenStreetMap contributors
²
ENGINEER
SCALE
18:6007
PROJECT NO.
FIGURE
DATE
DGR
Legend Approximate Boring Locations
Approximate Cross-Section Location
APOGEE CONSULTING GROUP, PA
WILKES-BARRE VA MEDICAL CENTER
1111 EAST END BLVD, PLAINS TWP, PENNSYLVANIA
EXPLORATION LOCATION DIAGRAM
0 5025
895 895
894 894
893 893
892 892
891 891
890 890
889 889
888 888
887 887
886 886
885 885
884 884
883 883
882 882
881 881
0.
.9
8.
6.
Legend Key Topsoil
Poorly Graded
GRAVEL
Well Graded
GRAVEL
Sandstone
Notes:
1- EOB: END OF BORING AR: AUGER REFUSAL SR: SAMPLER REFUSAL.
2- THE NUMBER BELOW THE STRIPS IS THE DISTANCE ALONG THE BASELINE.
3- SEE INDIVIDUAL BORING LOG AND GEOTECHNICAL INFORMATION.
4- STANDARD PENETRATION TEST RESISTANCE (LEFT OF BORING) IN BLOWS PER
FOOT (ASTM D1586).
Plastic Limit Water Content Liquid Limit X─────────⚫─────────△
[FINES CONTENT %]
BOTTOM OF CASING
LOSS OF CIRCULATION
CALIBRATED PENETROMETER
WL (First Encountered)
WL (Completion)
WL (Estimated Seasonal High Water)
WL (Stabilized)
Fill
Possible Fill
Probable Fill
Rock
GENERALIZED SUBSURFACE SOIL PROFILE
A-A'
Wilkes-Barre VA Medical Center Apogee Consulting Group, PA
1111 East End Blvd, Plains Twp, Pennsylvania, 18711 Project No: 18:6007 Date: 07/18/2023
50/1"
[RQD=17%]
[REC=100%]
[RQD=27%]
[REC=100%]
*B -0
EOB @ 13
Topsoil
GW
Sandstone
Sandstone
60/11"
50/1"
[RQD=0%]
[REC=100%]
*B -0
EOB @ 7.5
Topsoil
GP-GM
Sandstone
Estimated Building FFE: EL. 894.0 ft
7/18/2023
Service Layer Credits: Esri, HERE, Garmin, (c) OpenStreetMap contributors
²
ENGINEER
SCALE
18:6007
PROJECT NO.
FIGURE
DATE
DGR
APOGEE CONSULTING GROUP, PA
WILKES-BARRE VA MEDICAL CENTER
1111 EAST END BLVD, PLAINS TWP, PENNSYLVANIA
GEOLOGIC SURVEY MAP
0 1,200600
SOURCE
DATE
6/21/2023
Web Soil Survey https://websoilsurvey.nrcs.usda.gov
PROJECT NO.
SCALE
NTS
18:6007
SOIL SURVEY MAP
WILKES-BARRE VA MEDICAL
CENTER
1111 EAST END BLVD, PLAINS TWP, PENNSYLVANIA
APOGEE CONSULTING GROUP, PA
DRAFTER
CBP
Appendix B – Field Operations
Reference Notes Exploration Procedures Boring Logs Photographs
REFERENCE NOTES FOR BORING LOGS
MATERIAL1,2
1Classifications and symbols per ASTM D 2488-17 (Visual-Manual Procedure) unless noted otherwise.
2To be consistent with general practice, “POORLY GRADED” has been removed from GP, GP-GM, GP-GC, SP, SP-SM, SP-SC soil types on the boring logs.
3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol [Ex: (SM-FILL)].
4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot (tsf).
5Standard Penetration Test (SPT) refers to the number of hammer blows (blow count) of a 140 lb. hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches (ASTM D 1586). “N-value” is another term for “blow count” and is expressed in blows per foot (bpf). SPT correlations per 7.4.2 Method B and need to be corrected if using an auto hammer.
6The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in granular soils. In clay and cohesive silts, the determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally employed.
7Minor deviation from ASTM D 2488-17 Note 14.
8Percentages are estimated to the nearest 5% per ASTM D 2488-17.
Reference Notes for Boring Logs (09-02-2021).doc © 2021 ECS Corporate Services, LLC. All Rights Reserved
COHESIVE SILTS & CLAYS
UNCONFINED
COMPRESSIVE
STRENGTH, QP4
<0.25
0.25 - <0.50
0.50 - <1.00
1.00 - <2.00
2.00 - <4.00
4.00 - 8.00
>8.00
SPT5
(BPF)
CONSISTENCY7
(COHESIVE)
GRAVELS, SANDS & NON-COHESIVE SILTS
SPT5
DENSITY
<5 5 - 10
11 - 30 31 - 50
>50
Very Loose Loose
Medium Dense Dense
Very Dense
WATER LEVELS6
RELATIVE
AMOUNT7
Trace
With
Adjective (ex: “Silty”)
COARSE
GRAINED
(%)8
<5
FINE
GRAINED
(%)8
<5
DRILLING SAMPLING SYMBOLS & ABBREVIATIONS
PARTICLE SIZE IDENTIFICATION
DESIGNATION PARTICLE SIZES
Hollow Stem Auger Power Auger (no sample) Bulk Sample of Cuttings Wash Sample Shelby Tube Sampler Split Spoon Sampler
Rock Quality Designation % Rock Sample Recovery % Rock Core, NX, BX, AX Rock Bit Drilling Pressuremeter TestSS
ST
WS
BS
PA
HSA
RQD
PM
RD
RC
REC
Boulders Cobbles
Gravel:
Sand:
Silt & Clay (“Fines”) Fine Medium
Coarse Fine Coarse
0.074 mm to 0.425 mm (No. 200 to No. 40 sieve) <0.074 mm (smaller than a No. 200 sieve)
0.425 mm to 2.00 mm (No. 40 to No. 10 sieve)
2.00 mm to 4.75 mm (No. 10 to No. 4 sieve)
4.75 mm to 19 mm (No. 4 sieve to ¾ inch) ¾ inch to 3 inches (19 mm to 75 mm) 3 inches to 12 inches (75 mm to 300 mm) 12 inches (300 mm) or larger
>50 31 - 50 16 - 30
9 - 15 5 - 8 2 - 4 <2
Very Hard Hard
Very Stiff
Stiff Firm Soft
Very Soft
ASPHALT
CONCRETE
GRAVEL
TOPSOIL
VOID
BRICK
AGGREGATE BASE COURSE
GW
GP
GM
GC
SW
SP
SM
SC
ML
MH
CL
CH
OL
OH
PT
WELL-GRADED GRAVEL
gravel-sand mixtures, little or no fines
POORLY-GRADED GRAVEL
gravel-sand mixtures, little or no fines
SILTY GRAVEL
gravel-sand-silt mixtures
CLAYEY GRAVEL
gravel-sand-clay mixtures
WELL-GRADED SAND
gravelly sand, little or no fines
POORLY-GRADED SAND
gravelly sand, little or no fines
SILTY SAND
sand-silt mixtures
CLAYEY SAND
sand-clay mixtures
SILT
non-plastic to medium plasticity
ELASTIC SILT
high plasticity
LEAN CLAY
low to medium plasticity
FAT CLAY
high plasticity
ORGANIC SILT or CLAY non-plastic to low plasticity
ORGANIC SILT or CLAY high plasticity
PEAT
highly organic soils
WL (First Encountered)
WL (Completion)
WL (Seasonal High Water)
WL (Stabilized)
FILL POSSIBLE FILL PROBABLE FILL ROCK
FILL AND ROCK
25 - 45
10 - 20
30 - 45
10 - 25
REFERENCE NOTES FOR ROCK CORES
*ASTM D6032‐17: RQD is performed on cores using BQ to PQ sized bits (1.433 to 3.345 inch diameter cores, respectively) Reference Notes for Rock Cores (03‐22‐2019) © 2019 ECS Corporate Services, LLC. All Rights Reserved
ROCK CLASSIFICATION TYPES
Igneous Sedimentary Metamorphic
Coarse Grained
DIABASE
DIORITE
GABBRO
GRANITE
PEGMATITE
PERIDOTITE
SYENITE
Fine Grained
ANDESITE
BASALT
RHYOLITE
TRACHYTE
Pyroclastic
OBSIDIAN
PUMICE
TUFF
Clastic (sediment)
SHALE
SILTSTONE
SANDSTONE
CONGLOMERATE
LIMESTONE, OOLITIC
Chemically Formed
DOLOSTONE
GYPSUM
HALITE
LIMESTONE
Organic Remains
CHALK
COAL
COQUINA
Foliated
GNEISS
PHYLLITE
SCHIST
SLATE
Non‐Foliated
AMPHIBOLITE
HORNFELS
MARBLE
QUARTZITE
HARDNESS
Very Soft Deformed by hand
Soft Scratched with a fingernail
Moderately Hard Scratched easily with a knife
Hard Scratched with difficulty with a knife
Very Hard Cannot be scratched with a knife
JOINT/FRACTURE SPACING BEDDING
Fractured/Jointed Spacing Thinly ≤ 0.3 ft.
Very Widely > 10 feet Medium >0.3 ft. ≤ 1 ft.
Slightly 3 ‐ 10 feet Thickly >1 ft. ≤ 3 ft.
Moderately 1 ‐ 3 feet Massive >3 ft.
Highly 2 inches ‐ 1 foot
Intensely < 2 inches
JOINT OR FRACTURE CONTINUITY
It shall be noted whether the joints or fractures are continuous or discontinuous. If continuity of joints is not discernable at the scale of the rock core, continuous joints or fractures shall be assumed.
JOINT/FRACTURE ORIENTATION
The range or average orientation of each joint set or fracture trend shall be measured in degrees from a horizontal plane where possible.
If no measurement is possible, the qualitative terms High, Moderate or Low‐angle shall be used. Record whether the joints are present in Conjugate sets (i.e. having an opposite sense of dip)
High 61‐90 degree
Moderate 31‐60 degree
Low‐angle 0‐30 degree
Dip‐angle (1‐90) ____ degrees (if measured)
Description Sequence Example Rock Classification Description
ROCK TYPE, [REC=_%,RQD=_%], Weathering, Hardness, Bedding, Joint/Fracture Spacing, Joint/Fracture Surface Condition, Wall Rock Condition, Joint or Fracture Continuity, Joint/Fracture Orientation, Color, Additional Features
LIMESTONE, [REC=95%,RQD=60%], Highly Weathered, Hard, Thinly Bedded, Slightly Fractured/Jointed, Slightly Rough, Hard Wall Rock, Continuous, Moderate‐angle Dip, Gray White
Recovery (REC(%))
Total rock recovered from run Total Run Length
Rock Quality Designation (RQD(%))*
Sum of core pieces ≥ 4 inches long Total Run Length
RQD% Description of Rock Quality
0‐25% Very Poor
>25%‐50% Poor
>50%‐75% Fair
>75%‐90% Good
>90% Excellent
WEATHERING
Unweathered No evidence of any chemical or mechanical alteration.
Slightly Weathered
Slight discoloration on surface, slight alteration along discontinuities, less than 10 percent of the rock volume altered.
Moderately Weathered
Discoloring evident, surface pitted and altered with alteration penetrating well below rock surfaces, weathering 'halos' evident. 10 to 50 percent of the rock altered.
Highly Weathered
Entire mass discolored, alteration pervading nearly all of the rock, with some pockets of slightly weathered rock noticeable, some minerals leached away.
Decomposed Rock reduced to a soil with relict rock structure remaining (i.e. saprolite).
Generally molded and crumbled by hand (friable).
JOINT/FRACTURE SURFACE CONDITION
The following qualitative terms shall be used to describe surface condition of joints and fractures. Multiple terms can be used.
Very rough Slightly rough Slickensided Gouge
WALL ROCK CONDITION
The qualitative terms 'hard wall rock' or 'soft wall rock' shall be used to describe the condition of the parent rock on either side of the joint or fracture.
SUBSURFACE EXPLORATION PROCEDURE:
STANDARD PENETRATION TESTING (SPT)
ASTM D 1586
Split-Barrel Sampling
Standard Penetra on Tes ng, or SPT, is the most frequently used subsurface explora on test performed worldwide. This test provides samples for iden fica on purposes, as well as a measure of penetra on resistance, or N-value. The N-Value, or blow counts, when corrected and correlated, can approximate engineering proper es of soils used for geotechnical design and engineering purposes.
• Involves driving a hollow tube (split-spoon) into the ground by dropping a 140-lb hammer a height of 30-inches at desired depth
• Recording the number of hammer blows required to drive split-spoon a distance of 18-24 inches (in 3 or 4 Increments of 6 inches each)
• Auger is advanced* and an addi onal SPT is per-formed
• One SPT typically performed for every two to five feet. An approximate 1.5 inch diameter soil sam-ple is recovered.
*Drilling Methods May Vary— The predominant drilling methods used for SPT are open hole fluid rotary drilling and hollow-stem auger drilling.
SPT Procedure:
DE
PT
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-1
S-2
R-1
R-2
SA
M
PL
E
TY
PE
SS
SS
RC
RC
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[8.00"]
(GW FILL) FILL, WELL-GRADED
GRAVEL, brown and gray, moist, medium dense to very dense
SANDSTONE, [REC=100%,RQD=17%],
Moderately Weathered, SoŌ, Highly Fractured/Jointed, Gray
SANDSTONE, [REC=100%,RQD=27%],
Moderately Weathered, SoŌ, Highly Fractured/Jointed, Gray
END OF BORING AT 13 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
BL
O
W S/
6"
2-8-6-50/3" (14)
50/1" (50/1")
50/1"
1.7
2.7
[0.8%]
CLIENT:
Apogee ConsulƟng Group, PA
PROJECT NAME:
Wilkes-Barre VA Medical Center
PROJECT NO.: BORING NO.:
18:6007 B-01
DRILLER/CONTRACTOR:
Negley's Well Drilling, Inc.
SHEET:
SITE LOCATION:
1111 East End Blvd, Plains Twp, Pennsylvania, 18711
LOSS OF CIRCULATION
NORTHING:
703282.0
EASTING:
2495003.4
STATION: SURFACE ELEVATION:
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
N/E
N/E
N/E
BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
Acker Rebel
Jun 29 2023
Jun 29 2023
LOGGED BY:
MSD2
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
3.25" HSA
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
20 40 60 80 100
ROCK QUALITY DESIGNATION &
RECOVERY
RQD
REC
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
DE
PT
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-1
S-2
R-1
SA
M
PL
E
TY
PE
SS
SS
RC
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"]
(GP-GM FILL) FILL, GRAVEL WITH SILT
And SAND, brown and gray, moist, very dense
SANDSTONE, [REC=100%,RQD=0%],
Moderately Weathered, SoŌ, Highly Fractured/Jointed, Gray
END OF BORING AT 7.5 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
BL
O
W S/
6"
4-10-50/5" (60/11")
50/1" (50/1")
60/11"
50/1"
3.7
5.7
CLIENT:
Apogee ConsulƟng Group, PA
PROJECT NAME:
Wilkes-Barre VA Medical Center
PROJECT NO.: BORING NO.:
18:6007 B-02
DRILLER/CONTRACTOR:
Negley's Well Drilling, Inc.
SHEET:
SITE LOCATION:
1111 East End Blvd, Plains Twp, Pennsylvania, 18711
LOSS OF CIRCULATION
NORTHING:
703302.9
EASTING:
2495053.2
STATION: SURFACE ELEVATION:
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
N/E
N/E
N/E
BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
Acker Rebel
Jun 29 2023
Jun 29 2023
LOGGED BY:
MSD2
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
3.25" HSA
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
20 40 60 80 100
ROCK QUALITY DESIGNATION &
RECOVERY
RQD
REC
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
RUN DEPTH RECOVERY RQD
1 2.5’ to 7.5’ 100% 0%
Project Number:6007 Boring Number: B-01 Boring Completed: June 2023
Rock Core Photographs
WILKES-BARRE VA MEDICAL
CENTER
1111 EAST END BLVD, PLAINS TWP, PENNSYLVANIA
APOGEE CONSULTING GROUP, PA
RUN DEPTH RECOVERY RQD
1 2.5’ to 7.5’ 100% 0%
Project Number:6007 Boring Number: B-01 Boring Completed: June 2023
Rock Core Photographs
WILKES-BARRE VA MEDICAL
CENTER
1111 EAST END BLVD, PLAINS TWP, PENNSYLVANIA
APOGEE CONSULTING GROUP, PA
R-1
R-2
Appendix C – Laboratory Testing
Laboratory Testing Summary Grain Size Analysis/Analyses Plasticity Chart(s)
S-1 1.7 GW NP NP NP 0.8
S-2 2.7
S-1 3.7
S-2 5.7
Project:
Client:
Laboratory Testing Summary
Sample Location Sample
Number Depth ()
^MC
Soil
Type
Atterberg Limits **Percent
Passing
No. 200
Sieve
Moisture - Density CBR (%)
#Organic
Content (%)
LL PL PI
<Maximum
Density (pcf)
<Optimum
Moisture (%)
0.1 in. 0.2 in.
B-01 0.0-1.8
B-01 2.0-2.1
B-02 0.0-1.4
B-02 2.0-2.1
Notes: See test reports for test method, ^ASTM D2216-19, *ASTM D2488, **ASTM D1140-17, #ASTM D2974-20e1 < See test report for D4718 corrected values
Definitions: MC: Moisture Content, Soil Type: USCS (Unified Soil Classification System), LL: Liquid Limit, PL: Plastic Limit, PI: Plasticity Index, CBR: California
Bearing Ratio, OC: Organic Content
Wilkes-Barre VA Medical Center Project No.: 18:6007
Apogee Consulting Group, PA Date Reported: 7/6/2023
Office / Lab Address Office Number / Fax
ECS Mid-Atlantic LLC - York 52-6 Grumbacher Road
York, PA 17406
(717)767-4788
(717)767-5658
Tested by Checked by Approved by Date Received
JGates agolihew
D90 D50 D10
D85 D30 Cu
D60 D15 Cc
PARTICLE SIZE DISTRIBUTION
TEST RESULTS (ASTM D6913M-17-METHOD A)
Sieving Hydrometer Sedimentation Dry Mass of sample, g 78.6
Particle Size % Passing Particle Size mm % Passing
Very coarse, >3" sieve 0
3" 100 Sample Proportions % dry mass
1 1/2" 100
2" 100
1" 100 Gravel, 3" to # 4 sieve 88
3/4" 41
3/8" 27 Coarse Sand, #4 to #10 sieve 4
#4 12
#10 8 Medium Sand, #10 to #40 3
#20 6
#40 5 Fine Sand, #40 to #200 4
#60 4
#100 2 Fines <#200 1
#140 2
#200 1
USCS GW Liquid Limit NP 23.870 19.840 3.258
AASHTO A-1-a Plastic Limit NP 23.330 11.200 6.378
USCS Group Name Well graded gravel Plasticity Index NP 20.780 5.532 1.853
Project: Wilkes-Barre VA Medical Center Project No.: 18:6007
Client: Apogee Consulting Group, PA Depth (ft): 0.0 - 1.8
Sample Description: Well Graded Gravel Sample No.: S-1
Sample Source: B-01 Date Reported: 7/6/2023
Office / Lab Address Office Number / Fax
ECS Mid-Atlantic LLC - York 52-6 Grumbacher Road
York, PA 17406
(717)767-4788
(717)767-5658
Tested by Checked by Approved by Date Received Remarks
JGates agolihew ø ö ç ç è æ m m
SILT
SAND
FineMediumCoarse GRAVEL CLAYVery Coarse
3" 2" 1.5" 1"3/4" 1/2"3/8" #4 #10 #20 #40 #60 #100 #140 #200
0.0010.010.11101001000
P e rc e n ta g e P a s s in g
Particle Size mm
LL PL PI %<#40 AASHTO
NP NP NP 5.0 A-1-a
LIQUID AND PLASTIC LIMITS TEST REPORT
TEST RESULTS (ASTM D4318-10 (MULTIPOINT TEST))
Sample
Location
Sample
Number
Sample
Depth (ft) %<#200 USCS Material Description
B-01 S-1 0.00-1.75 0.8 GW Well Graded Gravel
Project: Wilkes-Barre VA Medical Center Project No.: 18:6007
Client: Apogee Consulting Group, PA Date Reported: 7/6/2023
Office / Lab Address Office Number / Fax
ECS Mid-Atlantic LLC - York 52-6 Grumbacher Road
York, PA 17406
(717)767-4788
(717)767-5658
Tested by Checked by Approved by Date Received
JGates agolihew
0 10 20 30 40 50 60 70 80 90 100 110
LIQUID LIMIT
ML or OLCL-ML MH or OH
P L A S T I C I T Y I N D E X
Dashed line indicates the approximate upper limit boundary for natural soils
| Sheets and Views |
| Layout2 |
| 6007 Wilkes Barre VA Medical Center Geotechnical Report.DOCX |
| EXECUTIVE SUMMARY |
| 1.0 INTRODUCTION |
| 2.0 PROJECT INFORMATION |
| 2.1 Project Location |
| 2.2 Proposed Construction |
| 3.0 FIELD EXPLORATION AND LABORATORY TESTING |
| 3.1 Subsurface Characterization |
| 3.2 Site Geology |
| 3.3 Soil Survey Mapping |
| 3.4 Groundwater Observations |
| 3.5 Laboratory Testing |
| 4.0 DESIGN RECOMMENDATIONS |
| 4.1 Foundation Design |
| 4.2 Floor Slabs |
| 4.3 Below Grade Walls |
| 4.4 Seismic Design Characteristics |
| 5.0 SITE CONSTRUCTION RECOMMENDATIONS |
| 5.1 Subgrade Preparation |
| 5.1.1 Stripping and Grubbing |
| 5.1.2 Proofrolling |
| 5.2 Earthwork Operations |
| 5.2.1 Removal of Existing Structures |
| 5.2.2 Existing Man-Placed Fill |
| 5.2.3 Rock Excavation |
| 5.2.4 Structural Fill Materials |
| 5.2.5 Proposed Fill Slopes |
| 5.3 Foundation and Slab Observations |
| 5.4 Utility Installations |
6.0 CLOSING
| 2023-07-25T11:28:57-0400 | |