This document is a comprehensive Technical Question Tracker for the Mountain Home EHRM Infrastructure Upgrades Construction project (Solicitation 36C77624B0024) at the Department of Veterans Affairs Technology Acquisition Center Austin. The project is an SDVOSB set-aside solicitation involving infrastructure upgrades across multiple buildings, with a primary focus on telecommunications, security systems, and network infrastructure improvements. Key components include replacing existing Cat6A cabling, installing new fiber optic pathways, upgrading security systems (including access control, video surveillance, and intrusion detection), and performing associated architectural modifications across approximately 20 buildings.
The project has a projected award date of 10/6/2025, with an anticipated contract period of 730 days after Notice to Proceed. Critical technical requirements include installing Avigilon cameras, Hirsch/Velocity access control systems, new network equipment rooms, and comprehensive cable infrastructure. The VA will provide network switches, and contractors must handle system integration, cabling, and physical infrastructure modifications. Specific technical challenges include working in an operational medical center environment, managing infection control requirements, coordinating utility shutdowns, and ensuring minimal disruption to ongoing hospital operations. Contractors will need CSEIP certification for security systems and must follow detailed specifications for cable management, pathway installation, and system compatibility.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Mountain Home EHRM Infrastructure Upgrades - Construction | Solicitation 36C77624B0024 | |||
| # | RECEIVED | ASSIGNED | CONTRACTOR QUESTION | VA RESPONSE |
| 1 | 6/8/25 | Bancroft | Specifications 00 01 10 (Table of Contents) states that the specifications include specification sections 28 31 00, 31 20 00, 32 05 23, 32 12 16, 32 17 23, 32 90 00, and Appendix A (Structural Calculations). These sections appear to be missing from the Specs Vol II. Please provide the missing spec sections. | Table of Contents and specifications will be coordinated. |
26 05 36 and 26 05 39 are not required and will be removed from INDEX.
| 2 | 6/8/25 | Mountain Home | The project’s scope of work requires excavation for new duct bank. Please clarify if a geotechnical report outlining existing conditions is available. | Geotechnical report is not available. |
| 3 | 6/20/25 | Bancroft | We found no drawings from Division 27 for horizontal distribution, including Work Area Outlets and other copper end points. Please provide detailed drawings. | Work area outlets locations are not part of the SOW for this project. Cable counts are provided on the rack elevations. Percise WAO locations will need to be field verified by contractor. |
| 4 | 6/20/25 | Bancroft | Please provide an extension after the remaining Division 27 drawings are provided. | No additional T drawing available, no extension will be provided. |
| 5 | 6/20/25 | Bancroft | While we were examining the specifications we noticed that several are missing per the Table of Contents. | Table of Contents and specifications will be coordinated. |
26 05 36 and 26 05 39 are not required and will be removed from INDEX.
| 26 05 36 | |||
| 26 05 39 | |||
| 28 31 00 | |||
| 31 20 00 | |||
| 32 05 23 | |||
| 32 12 16 | |||
| 32 17 23 | |||
| 32 90 00 | |||
| Appendix A | |||
| 6 | PCAC | Is this project tax exempt, and if so, will a certificate be issued? | No |
| 7 | PCAC | FAR 52.232-5(b)(2) states that the Contracting Officer may authorize payment for materials not yet incorporated into the work. VAAR 852.232-70(d) similarly notes that the Contracting Officer will consider such payments as part of monthly progress payments. However, we have encountered Contracting Officers who interpret this language to mean payment is optional and choose not to approve payment for uninstalled or stored materials. Can the VA confirm whether payment for uninstalled or stored materials will be authorized on this project? If not, it’s critical that contractors are made aware during bidding so they can account for storage, insurance, and carrying costs in their proposals. | In accordance with contract terms and conditions, Contractors should not submit an offer assuming the Government will approve monthly progress payments for material and/or equipment procured by the Contractor and stored on the construction site, as space is available, or at a local approved location off the site. Payment of stored materials and/or equipment is at the Contracting Officer’s discretion and will be handled on a case-by-case basis during the contract and under such terms and conditions as the Contracting Officer approves. |
| 8 | Mountain Home | Please clarify if Quality Control Manager can also function as the superintendent? | No |
| 9 | Mountain Home | SSHO – Please clarify if the Site Safety and Health Officer required to be onsite full time with no other duties? | Yes, with no other duties. |
| 10 | PCAC | Sustainable Construction Requirements – This is very comprehensive and costly. Will the government consider scaling this back to fit the scope of the project? | Yes please look out for any updates via an official amendment to the solicitation |
| 11 | PCAC | Change order pricing – will change orders be approved with the standard 10% OH +10% profit? | See VAAR 852.243-70 Construction Contract Changes. |
| 12 | Bancroft | Are there any major demolition work elements required that are not listed/depicted in the demolition drawings that need to occur in order for new finishes to be installed. If so, will they by identified on the demolition drawings? | All wall / room that need demolition are shown on current drawings. No additional demolition drawings will be issued. |
| 13 | Bancroft | Is there any clearly defined scope of work that falls under delegated design, requiring the contractor to handle the design and engineering? Delegated design can be challenging for general contractors, as it requires completing design and engineering before bidding to accurately estimate costs. If any items are considered delegated design, please either include them in the construction design package or provide a detailed list to include design criteria. | Deligated design is called out in the documents. Refer to documents for requirements. |
| 14 | Mountain Home | Are there any badging requirements for construction workers? If so, what are they? Will every worker need to be badged or just team leaders/escorts? If the VA takes an unreasonable amount of time to process badges, can temporary daily or weekly badges be used until permanent badges are processed? | All superintendents and foreman will have to have a PIV/Background check. If they have a badge from other VAs, they will not need a new one unless it is expired. All subs that will be continuously onsite will need a PIV badge. All subs that will only be onsite for short or limited times will not need a PIV badge but will sign-in and be the responsibility of the prime contractor. |
| 15 | Mountain Home | Is the contractor responsible for supplying a project/submittal exchange type website? | Yes, Procore. |
| 16 | Mountain Home | 01 35 26, 1.9 Inspections states: A Certified Safety Professional (CSP) with specialized knowledge in construction safety or a certified Construction Safety and Health Technician (CSHT) shall randomly conduct a monthly site safety inspection. In lieu of a CSP or CSHT certification will an individual with a 30-hour OSHA certification and experience as an SSHO on construction projects be acceptable? | Yes, prior experience as an SSHO will be acceptable. All 30 hour certifications must be less than five years old. This inspector cannot be anyone working onsite in any other role. You need someone not involved in the project doing the inspection (third party recommended). |
| 17 | Bancroft | TOC lists Divisions 31 and 32. Specification Volume 2 does not include these divisions nor Appendix A. Please provide in updated Volume 2. | Table of Contents and specifications will be coordinated. |
| 18 | Mountain Home | Plan Page GI101; Infection Control Required by ALL Classes note #8. Please clarify that HEPA “All air discharged” means discharged outside of room in common areas and not to the exterior of the building? | HEPA filtered air may be discharged from the construction area through the ICRA barrier into the adjacent common area. |
| 19 | Mountain Home | Plan sheet A-3-102 Ceiling Demolition Legion Notes 1, 2 and 3. This typical note is repeated for common corridor ceiling demolition for installation of new Cat 6a cable runs from TR to user locations. Some of these areas are in Patient Care areas. Common language in all three zones states “Temporarily erect a suspended plastic barrier 6 mil around area of ceiling work to be performed during one shift and G.C. shall remove suspended plastic barrier at the end of shift”. Please clarify that the poly barrier is intended to be placed on the walls within the corridor and the exposed plenum areas will not receive temporary barriers once ceilings are removed and will remain open until replacement ceiling systems are replaced? | Fire rated plastic zip walls may be approved for durations less than 48 hours. The Facility construction safety specialist will review and approve any requests to utilize a zip wall. |
| 20 | Mountain Home | Will common corridor work be limited to after-hours work periods only? | Corridor work in Patient Care areas will be limited to after hours. Other areas are to be coordinated with the COR. |
| 21 | Mountain Home | Plan sheet A503 details 2 and 4. Please identify any known current brick replacement suppliers in the area? | General Shale |
| 22 | Mountain Home | Is there any requirement for specific certification we require to have our bids for: | CSEIP Certification required for PACS/CCTV |
| 28 13 00 Physical Access Control System |
| 28 23 00 Video Surveillance |
| If so, please advise what certification(s) are required. | |||
| 23 | Mountain Home | 281300 – Physical Access Control System: We are adding to the existing security system. Can the VA advise the manufacturer of the existing PACS? Is there an existing maintenance contractor for the security system? If so, can you please provide the contact information for the maintenance contractor? | Hirsh Velocity, Johnson Controls Security Solutions, Jeff Bishop CSEIP Certification required for PACS/CCTV |
| 24 | Mountain Home | 281600 Intrusion Detection System: We are adding to the existing IDS system. Can the VA advise the manufacturer of the existing IDS system? IS there an existing maintenance contractor for this system? If so, can you please provide the contact information for the maintenance contractor? | DMP |
| 25 | Mountain Home | 282300 Video Surveillance: We are adding to the existing SSTV system. Can the VA advise the manufacturer of the existing SSTV system? Is there an existing maintenance contractor for this system? If so, can you please provide the contact information for the maintenance contractor? Will additional licenses be needed for cameras? | Avigilon |
| 26 | Mountain Home | 283100 – Fire Alarm & Detection: We are adding to the existing fire alarm system. Is there an existing maintenance contractor for the fire alarm system? If so, can you please provide the contact information for the maintenance contractor? | Johnson Controls. Simplex office number is 1(423) 467-3547 |
| 27 | Bancroft | 283100 – Fire Alarm & Detection: No Specifications were included in the Project Manual. Can these missing specs be provided? | Section 28 31 00 will be provided. |
| 28 | PCAC | Will the sign-in sheet from site visit be available in addendum? | Yes. |
| 29 | Mountain Home | Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? | No. |
| 30 | Mountain Home | If no to the question above, will the SSHO need to be full-time for this project? | Yes. |
| 31 | Mountain Home | Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? | No. |
| 32 | Mountain Home | If no to the question above, will the QA/QC need to be full time for this project? | Yes. |
| 33 | Mountain Home | Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? | No. |
| 34 | PCAC | Please confirm if tax should be included in our proposal? | Project is not tax exempt. |
| 35 | PCAC | Please provide the latest wage determination for this project’s county. Requesting a new wage determination which has been updated TN20250191 06/06/2025 | The latest wage rate will be incorporated into this requirement via the most up to date amendment. |
| 36 | PCAC | Please confirm if the current prevailing wages will be consistent for the life of the project with no escalation? | The prevailing wage rates at time of bid submission will remain throughout the project. |
| 37 | Bancroft | Please confirm the current design documents meet current VA TIL guidelines. | Design meets VA guidelines at time contract was signed. |
| 38 | PCAC | Please confirm any minority business participation requirements. | This is an SDVOSB Set-aside and does not require a small business subcontracting plan. Refer to VAAR 852.219-73 and -75. |
| 39 | PCAC | Attachment 10 speaks to: “Bidder shall submit unit price for additional Work Area Outlets to include labor and materials to install Cat 6A cabling (80m x 3), terminations and outlet. Bidder shall submit unit price to deduct Work Area Outlets determined to not be needed.” Please explain the expectations to bid this out, per the direction A.3 Price/Cost Schedule, is 1 unit price still an expectation or does Attachment #10 need to add line items to the A3? | Contractor shall provide a unit price as described below to include complete installation, termination, and testing for any additional installations not included within base contract. |
Contractor shall provide (2) levels of installation to include:
1. Complete installation of new backbox, conduit, and (1) cable.
2. Complete installation of single cable.
This unit price shall be used for any additional cables or WAO required to be installed per VA request AND as a deduct for any cables deemed not required. VA has included Attachment 12 for potential offerors to provide their pricing in response to this RFI. Attachment 12 should be included with an offerors bid. Attachment 10 has been modified to remove that language.
| 40 | Bancroft | Who is responsible for contracting the commissioning agent? | VA is responsible for contracting commissioning agent per specification section 01 91 00 |
| 41 | Mountain Home | Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? | Starc walls will be acceptable. |
| 42 | Mountain Home | Will shutdowns be required to be done during off hours or weekends? | Yes. |
| 43 | Mountain Home | Please provide three recommended resources for vendors or contractors local to the project site. | The VA does not recommend vendors or contractors. |
| 44 | Mountain Home | Please confirm if there is assumed asbestos that is to be removed whether underground or within manholes or in buildings? | There is no assumed asbestos to be removed. |
| 45 | Mountain Home | Please confirm if there is any lead paint in the work areas? | There is no assumed lead paint in the work areas. |
| 46 | Mountain Home | Will mechanical and IT rooms be cleared of all stored debris prior to the contractor entering those areas? | Yes. |
| 47 | Mountain Home | Will a full-time fire watch be required during activities such as cutting, brazing, and welding? How long after such activities are completed? | A fire watch will be required while performing hot work and for any post hot work inspections. This will be covered in orientation training. Prime contractors will be responsible for issuing hot work permits to subs and then returned to the safety office. Full time fire watches will be the responsibility of the prime contractor when necessary. This will also be covered in orientation training. |
| 48 | Mountain Home | Is there a particular vendor or contractor currently servicing and maintaining the Building Automation System or Temperature Controls System? | Computrols is the BAS system. |
| 49 | Mountain Home | Is there a particular vendor or contractor that currently services the telecommunications system? | No. |
| 50 | Mountain Home | Is there a particular vendor or contractor currently services the security and fire alarm systems? | Johnson Controls |
| 51 | Mountain Home | With regards to underground utility work how much open trenching be allowed at a time? | All open trenches will require an Excavation permit. All open trenches will require a dedicated superintendent so number of trenches will depend on available personnel. |
| 52 | Mountain Home | After backfilling, topsoil and seed have been applied who is responsible for watering? If the contractor is responsible will water be provided by the facility? | Reference the project specs. |
| 53 | Bancroft | On all underground utility work please confirm if excavated material is acceptable for re-use as backfill? | Reference the project specs. |
| 54 | Bancroft | Please confirm if the contractor is responsible for any rock removal that is encountered. If so, what is the assumed elevations and quantity of rock material? | Yes, contractor shall remove material unsuitable for re-use. Elevations and quantities are unknown. |
| 55 | Bancroft | Please confirm if a unit price can be established for rock removal as opposed to carrying in bid? | No. |
| 56 | Bancroft | If an extreme amount of rock is encountered/removed, please confirm if extra time will be added to the contract completion date? | To be deterimined at that time. |
| 57 | Mountain Home | Please confirm if there is a separate staging area onsite for fill material to be stockpiled for re-use? | Material suitable for re-use shall be stored adjacent to the trench. All other materials shall be disposed of off site. |
| 58 | Mountain Home | Please confirm if an onsite arborist is required for any tree removal or tree protection? | Tree removal is not anticipated. |
| 59 | Mountain Home | Please advise if the site contains any contaminated soil that needs to be removed. | No known contaminated soil. |
| 60 | Mountain Home | If the underground site package requires removal of contaminated soils. Will the site contractor be required to have operators trained and certified in all various levels of contamination handling? | To be determined at that time. |
| 61 | Mountain Home | Please confirm if we will be allowed to keep a locked storage container or conex box within the grounds. | Yes. |
| 62 | PCAC | To allow sufficient time to review responses and prepare our bid we kindly request that you please extend the bid date. | Reference Amendment 0004, dated 8/5/2025. |
| 63 | Bancroft | What will be the hours of work for the project? | Normal hours of work will be 7:00AM to 4:30PM per specifications section 01 00 00 1.2F |
| 64 | Mountain Home | Are there any ICRA requirements on the job and can the VA provide us the areas it will be required? | Reference the project specs. |
| 65 | Mountain Home | Is the VA requiring metering of the electrical panels for 30 days to see if the panels have sufficient loads for the new TR panels? | Yes. |
| 66 | Mountain Home | Where patient rooms are in the hospital, how many rooms will the VA allow us to work at a time? | To be determined pending census at that time. |
| 67 | Mountain Home | How many weeks ahead are we required to ask for a shutdown to tie in the existing panels. Now in critical panels will the electrician have the time for a deenergize work, Or will it have to be hot work? | No hot work allowed, two weeks notice required for shutdown. |
| 68 | Mountain Home | What name brand of Equipment is installed on site today? (Access Control, Video and IDS equipment) | HIRSCH/Velocity, Avigilon, DMP |
| 69 | Mountain Home | If current security equipment lines/equipment are damaged/removed during construction, would that be considered part of this project to replace? (Existing security network rooms.) | Yes. |
| 70 | Mountain Home | Would the department owner of the security systems be available to go over system availability and connections prior to project starting? | Yes. |
| 71 | Mountain Home | Can you supply information on existing panel capacity for Access, IDS and Video systems? | Velocity- Non Existing, Video is expandale |
| 72 | Mountain Home | If any security system capacity has been reached or would be reached in some areas, would mitigation be considered part of this project? | To be determined at that time. |
| 73 | Mountain Home | Based on initial design will changes in pathways be considered if it is found to be more advantageous to the security systems layout and possible be more cost effective? | Yes. |
| 74 | Bancroft | Can you provide a network map that indicates where that network is established? (LAN Network) | Network map is not available. |
| 75 | Mountain Home | Is all security equipment on a stand-alone LAN network? If so, can you list the components of that network and available expansion. (LAN Network) | No, Yes. |
| 76 | Bancroft | Will any new switches need to be provided for this Bid? If so, can you list the exact model and manufacture of switch needed. (LAN Network) | The VA will provide all switches. |
| 77 | Bancroft | Would a new video server be needed to support the additional cameras for this project? (Video Server / New Equipment) | No. Cameras will be intergrated into existing system. |
| 78 | Mountain Home | Would any additional video License be needed for the new cameras? (Video Server) | YES, license requied for each additional cameras installed. |
| 79 | Mountain Home | If new licenses are needed, please provide what level of license they have existing. (Enterprise, Standard) | standard IP license |
| 80 | Mountain Home | Will any additional license be needed to add new readers to the existing access control platform? (Access Control Equipment) | no |
| 81 | Mountain Home | If new licenses are needed, please provide what level of license they have existing (Enterprise, Standard) | Standard |
| 82 | Bancroft | Will any new network switches be required for any of the new security products? (Network Switches) | The VA will provide all switches. |
| 83 | Bancroft | If they are required, can you supply the exact model number of the switches needed? (Network Switches) | The VA will provide all switches. |
| 84 | Bancroft | If they are required, can you supply the exact Location of the new switch/switches? (Network Switches) | The VA will provide all switches. |
| 85 | Bancroft | Where do the motions in each room terminate into. No IDS panel is listed on the prints and no Keypads to disarm upon opening the room? (Motion Detectors) | Per current VA standards and discussions with HEFP/SEP, seperate card readers/keypad to deactive motion detectors is not required. |
Current design is to connect motion detectors to nearest IDS panels currently servicing IT closets. Motion detectors will be connected to card reader/keypad used to disarm door position switch.
IDS panels will need to be located in the field with assistance by VA.
If Mt Home stations requires different setup this will have to be addressed during construction via RFI process.
| 86 | Bancroft | What IDS panel is needed if not installed? (Panel Equipment) | New IDS panels are not part of current design. Security devices are to utilize existing IDS panels that are servicing existing IT rooms. |
| 87 | Bancroft | For communications fire rated sleeves, is it permissible to fill fire rated assemblies such as Hilti Speed Sleeves to 100% fill per manufacturers recommendations or, do these also need to adhere to a 40% fill ratio such as EMT sleeves? | Fill shall be allowed per manufacturers recommendations. |
Filling per manufacturers recommendations shall not diminish overall number of required sleeves required along cable tray path or entering TR.
88 Bancroft Is fiber optic cable to be armored constructed or installed in innerduct? If the intent is to be installed in innerduct, can armored cable be substituted for innerduct and non-armored cable? Optical fiber cable shall be in a manner to protected from damage. Armored cable is an acceptable option.
If armored cable is installed in cable tray, contractor shall provide means to protect Cat 6A cable jacket from damage.
| 89 | Bancroft | What is the intended fiber optic pathway types, j-hooks, cable tray, etc? | Cable tray or conduit. J-hook installation shall not be approved. |
| 90 | Bancroft | Is the communications contractor to provide an allowance for additional Cat 6A cabling which may not be identified within the bid documents? It appears that the quantity of Cat 6A cables per TR is solely based on populating the identified quantity of patch panels 100%. | Contractor shall provide a unit price per horizontal cable to include complete installation. |
This unit price shall be used for any additional cables required to be installed AND as a deduct for any cables deemed not required.
91 Bancroft Is it the intent of the VA and A/E that the awarded contractor is to survey the project campus and develop shop drawings of work area outlet locations and cable quantities per location? Will the VA and/or A/E provide personnel to support these surveys to approve/disapprove the findings and final counts? Yes, markup plan drawings for as-builts.
Yes, limited support for access only into restricted/critical areas.
92 Bancroft Is it correct that Cat 6A data cabling shall be blue in color? Is it intended that WAP cabling will also be blue in color, or shall green be utilized for WAPs? Data outlet cabling to be red-white-blue.
- Red: Data / VoIP
- White: Printer
- Blue: Fax / analog WAP cabling shall be green.
| 93 | Bancroft | Are camera Cat 6A cables to be purple in color to distinguish security cabling versus data cabling? | Security cabling is to be purple. |
| 94 | Bancroft | Can you please clarify what patch cords are to be provided by the contractor for Cat 6A and fiber optic cable systems? i.e., Cat 6A patch cords for TR side only, both ends, etc. | Patch cords shall be provided with the TR for: |
- Cat 6A
- MM fiber
- SM fiber Cat 6A patch cords shall be provided at WAO.
----Lengths to be coordinated with VA
| 95 | Bancroft | Can you please confirm that VA OI&T will perform the relocation of network switches and perform patching? The communications contractor shall only be responsible for providing patch cords to the VA OI&T staff. | Yes. |
| 96 | Mountain Home | What is the manufacturer of the existing CCTV system? Are there sufficient licenses and video storage to add additional cameras under this contract? | Avigilon, license must be purchased for each new Avigilon H5M camera installed. |
| 97 | Mountain Home | What is the manufacturer of the existing access control system? Are there sufficient licenses to add additional doors under this contract? | Hirsch/Velocity |
| 98 | Bancroft | Can you please confirm the design intent of bonding the cable trays within each TR is to be one continuous run of #6 awg green wire throughout the tray with each section of tray being bonded to the single conductor? | Review Cable Tray Bonding Detail again. |
Cable tray sections shall be connected to each other at juntions of seperate sections.
Continuous conductor is connection of RBB back to wall mounted gounding busbar within TR.
Also review Pathway, Rack, Bonding Conductor Join Requirements.
| 99 | Bancroft | Is the communications contractor responsible for providing grounding and bonding jumpers from the rack mount ground bars to VA provided equipment? Besides grounding of UPS and PDU’s are there any additional rack mounted equipment that need to be grounded by the contractor? | Yes. VA equipment such as switches and/or routers. |
| 100 | Mountain Home | What contractor holds the warranties on any of the roofs at the facility? | No single contractor holds the roof warranties. Eskola is the preferred roofing contractor. |
| 101 | Mountain Home | No Wall protection was mentioned for any of the areas, please provide manufacture of the current WP system at the hospital. | Inpro Palladium Rigid Vinyl Sheets or Construction Specialties Acrovyn Wall Covering both in .40 thickness. Selection and color will be to match existing in area and needs to be approved through Interior Design. |
| 102 | Bancroft | Will entire med gas system need to be shut down to cap the lines as per P-B200-401 detail #2 or can system be isolated at the ZVB? | The medical gas and vacuum systems serving the inlets/outlets to be removed should be shut down at the zone control box and the piping removed back to the line serving the terminals. Typically the lines from the zone valve box to the caps should be re-certified and tested for purity. |
| 103 | Mountain Home | Can you provide geotechnical report for any of the civil work areas where excavation needs to take place. | Geotechnical report is not available. |
| 104 | Mountain Home | How many ports need to be re-certified when med gas system is capped? | Any port where the line was open. Field verification required. |
| 105 | Bancroft | On sheet TT-1.01 there is a box detail depth of 30” / Sheet CD101 & CD102 shows coverage in pipe bank, please clarify. | Per sheet TT-1.01, pullbox is 30" deep. Per CD101, conduit is to have minimum of 5' of cover. Detail 4 on CD101 will be upddated to reflex this and coordinate between TT and CD sheets. |
| 106 | PCAC | Once contract is awarded. Will it be feasible to add 3 months to the contract for (Prime & Subcontractors contracts, submittal reviews, qualifications, and kickoff meetings) | No, adequate time for said tasks are already built into the overall project schedule. |
| 107 | PCAC | Solicitation does not include descoped rooms as per attachment 10. Is the contractor to assume that the descoped rooms are to be included on the final base bid item 0001 or will a new price schedule sheet be made available to include the deducts? | No. The descoped rooms are not to be included on the final base bid item 0001. |
| 108 | PCAC | On attachment 5, what is the meaning of the highlighted rooms, name of file, and meaning of the 1148 days? Please clarify. | The highlighted rooms are for internal tracking of new TRs. Disregard the column labeled "days". |
| 109 | PCAC | On attachment 10, need clarification on both the statements at the bottom page |
- Bidder shall submit unit price for additional Work Area Outlets to include labor and materials to install Cat 6A cabling (80m x 3), terminations and outlet.
- Bidder shall submit unit price to deduct Work Area Outlets determined to not be needed Contractor shall provide a unit price as described below to include complete installation, termination, and testing for any additional installations not included within base contract.
Contractor shall provide (2) levels of installation to include:
1. Complete installation of new backbox, conduit, and (1) cable.
2. Complete installation of single cable.
This unit price shall be used for any additional cables or WAO required to be installed per VA request AND as a deduct for any cables deemed not required. VA has included Attachment 12 for potential offerors to provide their pricing in response to this RFI. Attachment 12 should be included with an offerors bid. Attachment 10 has been modified to remove that language.
| 110 | Bancroft | Specifications 00 01 10 (Table of Contents) states that the specifications include specification sections 28 31 00, 31 20 00, 32 05 23, 32 12 16, 32 17 23, 32 90 00, and Appendix A (Structural Calculations). These sections appear to be missing from the Specs Vol II. Please provide the missing spec sections. | Refer to Question #1 |
| 111 | Mountain Home | The project’s scope of work requires excavation for a new duct bank. Please clarify if a geotechnical report outlining existing conditions is available | Geotechnical report is not available. |
| 112 | Bancroft | The GI301 and CU100 series drawings incorrectly reference existing site conditions. For example, GI301B shows that the new ductbank running West to East between buildings 35 and 17 is located in the parking lot, which is not correct, as a straight line from parking lot U will place this ductbank into the landscape area. Similarly, CU102 also shows this ductbank in the parking lot, but the parking lot is incorrectly shown on CU102. Moreover, the parking lot North of building 5 is not shown on CU102 at all (instead, it abruptly stops North of building 17). Furthermore, the masonry building to the North of Building 36 and the large transformer to the North of Building 116 are not shown, even though they may conflict with the proposed ductbank routing. Please provide true civil drawings that show existing features and the exact routing of the duct bank on the accurate background of existing conditions. | Provided drawings are the information currently available. |
Routing was reviewed and approved by VA.
If there are routing changes that need to be made onsite for field adjustments during construction, the winning bidder can submit an RFI as to proposed changes.
Will coordinate GI and CU sheets.
113 Bancroft The GI301 and CU100 series drawings incorrectly reference existing site conditions. If a new civil drawing is not available, please define site repair quantities for all GCs to bid the same scope (for example, LF of curb to be repaired, SF of sidewalk replacement, SF of asphalt repair, SF of landscape repair, etc.). This information is needed because current documents do not accurately show existing conditions, and the civil scope shown within current documents conflicts from one drawing to another. Provided drawings are the information currently available.
Will coordinate GI and CU sheets.
Measurements and quantities are contractors responibility.
| 114 | Mountain Home | Pages GI301A-C keynotes 1 and 7 require the use of concrete temporary barriers to block off traffic. Please clarify if plastic temporary barriers can be used in lieu of concrete barriers to block off traffic. | Plastic barriers filled with water can be allowed for non-pedestrian barriers. Any barrier required to safeguard pedestrians from active traffic will required concrete barriers. |
| 115 | Bancroft | Although the pavement marking specs section 32 17 23 is missing, please clarify if any striping repairs will need to be done using thermoplastic paint or not. | 32 17 23 provided in Addendum #1 |
| 116 | Bancroft | This project will require striping and asphalt repairs in areas of the new duct bank. Existing asphalt and striping on-site are in a deteriorating condition. Please confirm that striping and asphalt repairs should be limited only to the extent of new trenching (per details 5 and 6 on CD101) and NOT a curb-to-curb resurfacing/restriping. | Correct. |
| 117 | Bancroft | Please clarify if concrete encased ductbank trenches can be backfilled using flowable fill in lieu of type II aggregate base course backfill compacted to 95% of max density as shown in details 1 and 2 on CD101. | Follow project documents. |
Deviations from projects documents will require formal substituation request.
| 118 | Bancroft | CD101 details 1 and 2 require a 12” separation between conduits, whereas detail 3 on CD101 shows a 3” separation, as per SD260541-02. Please confirm 3” separation is acceptable. | 3" seperation of concrete encased telecommunications conduits is acceptable. |
| 119 | Bancroft | CD102 detail 8 is an asphalt paving detail that shows the following section: 2” type S4 asphalt o/ 4” type 3” asphalt o/ 8” aggregate base o/ separator fabric. However, CD101 detail 5 shows 2” minimum asphalt over 4” minimum ABC. Please clarify where does asphalt paving detail (8/CD102) occurs? | Will coordinate details. |
Additional details will be provided.
| 120 | Bancroft | Page CD101 features two details: detail 5, Type 1 utility trench patch asphalt pavement, and detail 6, Type 3 Utility trench patch concrete pavement. Unfortunately, CU100 series pages do not clearly differentiate the conditions under which each detail would be used. Please identify the exact areas where each detail would be applicable and provide a plan outlining which detail to use in which area. | Notes on each detail refer to when to use each detail based on width of utility trenching. |
| 121 | Mountain Home | CD101 details 1 and 2 state to use the drain backfill section in areas of excessive ground water or poor subgrade material. Please clarify the location of excessive ground water or poor subgrade material. | Specific areas of excessive ground water or poor subgrade material are unknown. |
| 122 | Bancroft | TT-BB-00 shows a hallway between building 204 and 77, 77 and 205, and 77 and 200. Each of these hallways has a fiber pathway running through those hallways. Unfortunately, the extent of ceiling repairs shown on A-77-101, A-200-10G, A-204-10G, and A-205-10B does not include these hallways. Please provide an updated A-series page(s) that show the extent of the unaccounted ceiling work between buildings 69, 77, 200, 204, and 205 or clarify GC’s scope associated with ceiling repairs through these corridors. | Contractor to use ICRA cart for installation of cable tray. Replacing any tiles, grid, light fixtures, diffusers, sprinkler heads, and other ceiling mounted accessories damaged as a result of the installation of cable tray. |
| 123 | Bancroft | TT-BB-00 shows the running fiber pathway through corridors from Building 77 to Buildings 8 and 160. Unfortunately, the tunnel ceiling repairs for buildings 8 and 160 are absent from all plans. Please provide A-series pages that demonstrate the extent of ceiling repairs in the corridor from building 77 to building 8, from building 77 to building 160, or clarify the extent of ceiling repairs in these areas. | Contractor to use ICRA cart for installation of cable tray. Replacing any tiles, grid, light fixtures, diffusers, sprinkler heads, and other ceiling mounted accessories damaged as a result of the installation of cable tray. |
| 124 | Bancroft | Pages GI301B, CU100, and CU105 show a new duct bank entering building 204 on the North side of the building. Page TT-BB-00 shows the fiber pathway inside the building. It’s worth noting that the North side of building 204 has a patio. Unfortunately, none of the drawings address the repair scope associated with running the ductbank through the patio of building 204. Please provide details for duct bank routing through building 204 patio and include any applicable details like patio slab repair detail, if the conduit will penetrate the patio wall surface-mount or below the footing, and how the duct bank enters the building below (or above) the building 204 patio. | Provided drawings are the information currently available. |
Routing was reviewed and approved by VA.
If there are routing changes that need to be made onsite for field adjustments during construction, the winning bidder can submit an RFI as to proposed changes.
Will coordinate GI and CU sheets.
125 Bancroft Please provide details for the duct bank as it penetrates each building. Specifically, provide details that address whether the ductbank enters below or above grade level, how to backfill the hole in the masonry wall, and what couplings to use, among other relevant considerations. If there are multiple conditions, such as duct banks entering the building above and below grade, please provide multiple details that show the condition of the duct banks and their penetrations above and below grade. Intent is for all ductbanks to enter building underground.
Core drill / sleeve is common practice for conduit penetrating foundation.
Foundation will be repaired to as before penetration.
This is a means and methods item to be field coordinated.
| 126 | Bancroft | Page CU105 shows the duct bank entering building 37 on the plan Northwest corner. However, TT-B37-10B shows the ductbank entering on the Southwest corner of the building. Please clarify which scenario is correct and provide updated drawings or describe the correct scope associated with this correction, for example, if additional sidewalk needs to be demolished/repaired to bring the ductbank to the Southwest corner of the building or if additional ceilings will need to be repaired to pick up the duct bank on the Northwest corner of the building. | Entrance locations will be coordinated.. |
| 127 | Bancroft | Page TT-B37-10B detail 1, where the duct bank enters/leaves the building in the Southwest corner, there’s a reference “see sheet TT-SK-001 for continuation”. Similar reference is shown on page TT-B162-101 detail 1, TT-B160-101, etc. Sheet TT-SK-001 is not included in this set nor listed within the Drawing Index. Please provide the TT-SK-001 page or provide another drawing that shows how to connect the fiber pathway inside the building to the duct bank onsite. | Reference will be changed. TT-SK-001 was incorperated into current plans. |
| 128 | Bancroft | CU100 shows a ductbank entering building 35 (theater) on the plan Northwest corner. However, page TT-B35-101 does not show the duct bank entering this building, nor is there a fiber pathway shown from the ductbank to room 104. Please provide an updated plan that shows if a fiber pathway will need to run through building 35, the routing, and any necessary ceiling/wall repair details. | Entrance locations will be coordinated. If a building does not have internal routing shown, contractor shall field coordinate routing. |
| 129 | Bancroft | Page TT-B53-10B shows 2 fiber pathways going to the exterior. However, CU100 only shows 1 duct bank going to this building. Please clarify which information is correct: one ductbank or two fiber pathways, and clarify the correct location of the fiber pathway/ductbank. | One ductbank, dual pathway. TT-B53-10B will be coordinated with site plan. |
| 130 | Bancroft | The TT series plans do not show fiber pathways inside the following buildings: 15, 17, 19, 36, 39, 40, 41, 42, 43, 44, 45, 46, 47, and 201. Please provide updated plans that show if a fiber pathway will need to run through building, the routing, and any necessary ceiling/wall repair details/symbols. | Fiber to be routed overhead from exterior wall to TE. |
Will provide note/proposed routing option where approperate.
| 131 | Bancroft | CU102 and TT-1.01 show a (3) 2” ductbank running to building 13. There are no plans for the interior work at building 13. Please provide all the necessary plans that depict the contractor’s scope at building 13 (including IT infrastructure and finishes). Please note that the riser diagram on TT-6.03 shows fiber going to room TE-B13 | New ductbank to building, new fiber extending to existing TR/TE only. Routing from entrance to existing TR/TE to be field coordinated. |
| 132 | Bancroft | CU102 and TT-1.01 show a (3) 2” ductbank running to building 208. There are no plans for the interior work at building 208. Please provide all the necessary plans that depict the contractor’s scope at building 208 (including IT infrastructure and finishes). Please note that the riser diagram on TT-6.03 shows fiber going to room TE-B208. | Drawing A-B208-101 shows extent of architectural work for Building 208. |
Fiber to be routed overhead from exterior wall to existing TE.
Will provide note/proposed routing option.
| 133 | Bancroft | CU104 and TT-1.01 show a (3) 2” ductbank running to building 20. There are no plans for the interior work at building 20. Please provide all the necessary plans that depict the contractor’s scope at building 20 (including IT infrastructure and finishes). Please note that the riser diagram on TT-6.02 shows Building 20 as “future”. If that is the case, please clarify the conditions of prepping/stubbing the “future” duct bank for Building 20. | New ductbank to building, new fiber extending to existing TR/TE only. Routing from entrance to existing TR/TE to be field coordinated. |
| 134 | Bancroft | Detail 3 on CD101 shows dotted line around the group of conduits potentially implying rebar. However, the only written reference to rebar is a general note 2 to provide #4 reinforcing rods on top and bottom (no quantity specified) when crossing or placed in roadways. Please clarify rebar requirements at concrete encasement of duct banks | According to detail, the dashed line is a Tie Wire. |
| 135 | Mountain Home | GI301A-C keynote 2 states to provide temp barriers to designate pedestrian and delivery access routes. Please elaborate on this requirement if this is merely a sign directing pedestrian and delivery traffic flow or is this a temp pedestrian walk-way or something else entirely. | Provide signs directing pedestrian and delivery traffic flow to open entrances. |
| 136 | Mountain Home | GI301A-C keynote 3 requires metal temporary fence. Please clarify if temp fencing will be with t-stand and sand bags or will it needs to be with ground-driven posts. | T-stand and sand bags is acceptable. |
| 137 | Mountain Home | Pages GI301A-C keynotes 1 and 8 are not shown on plans. Please clarify where do these conditions occur. | Keynotes 1 and 8 not applicable. |
| 138 | Bancroft | Detail 10 on CD102 shows silt fencing. –SF—symbol is shown in Legend of page CU101, which represents silt fencing. Silt fencing symbol is not shown anywhere on the plans. Please clarify the location of silt fencing on this project. | Means and Methods |
| 139 | Bancroft | Please provide the erosion control plan that shows all the necessary information, including, but not limited to, construction entrance, staging area, silt fence location, and inlet protection. Alternatively, please clarify how many inlet protections to install, the location of the staging area, the requirements for the construction entrance, etc. | Means and Methods |
| 140 | Mountain Home | Please clarify if Storm Water Pollution Prevention Plan, along with monthly and rain event inspections, will be required on this project. | Yes. |
| 141 | Bancroft | CU101-CU106 Legend has a dashed line symbol that represents “existing underground fiber pathway – not usable”. Page TT-BB-00 South of building 200 shows a fiber pathway “to existing manhole C1”. Similarly, South of building 69 has a fiber pathway “to existing manhole X10”. There appears to be a conflict between these notes as one note calls to run fiber to existing structures whereas the other one says existing structures are not usable. Also, manhole X10 and existing manhole C1 do not appear to be shown in the riser diagram on TT-6.01. Please clarify GC’s scope associated with existing manholes/ductbanks. | No work involving existing ductbank is part of the SOW. |
Notes will be revised to not include reference to existing ductbank connections.
| 142 | Mountain Home | Specifications section 07 84 00 para 1.5.C state that the GC needs to engage a qualified inspector to perform inspections of firestopping. Please confirm this is your intent to require a 3rd party firestopping inspector to be utilized on this project. | Confirmed |
| 143 | Mountain Home | GI002 Fire and Safety Note 14 states that removing more than 10% of ceiling impairs the sprinkler system and any impairment of sprinkler system greater than 4 hours in a 24-hour period requires a fire watch. Please clarify if the 10% of a ceiling prerequisite is based on 10% of the room, 10% of the sprinkler zone, or 10% of the floor area. | Based on 10% of the room. |
| 144 | Mountain Home | Will the owner provide the fire watch during the period that the fire suppression and/or fire alarm system is not in service? | No. |
| 145 | Bancroft | GI002 General Construction Notes 4.A, GI101 Infection Control Required By All Classes Note 1, and GI101 Additional Requirement mention Fargo VAMC. Please confirm that the rest of the notes are applicable to this project, which is located at Mt. Home VAMC (Johnson City, TN). | Drawing revised in Addendum #1 |
| 146 | Mountain Home | GI002 General Construction Note 12 states to confirm with VAMC for the location of construction staging, equipment, trailer, and vehicle parking. Please outline these requirements for this project. | Laydown area will be provided on the very west end of campus. |
| 147 | Mountain Home | GI002 General Construction Notes 5 and 34 state temporary construction fencing/barriers to be 1 hour rated. Page GI401 and demolition plan note 2 on A-series pages show temporary partitions to be dust containment and infection control system BOD Edge Guard or VA-approved equal. Please clarify if temporary walls can be framed using metal stud framing with gypsum board finish or if they must be a dust containment and infection control system like Edge Guard or Starc. | Walls can be metal stud framed with gypsum board. |
| 148 | Bancroft | GI002 General Construction Note 36 states “whether existing or new, no cables, ducts conduit, pipes, insulation, etc shall be allowed to touch or rest on sprinkler piping” and “any violation will require correction… at no cost to the government”. During the jobwalk, we’ve observed numerous conditions in violation of this requirement. Considering that the existing space above ceilings is greatly congested, please confirm that this requirement can be waived for existing conditions and new conditions will be discussed with CO on a case-by-case basis (but at no time to be assumed to be included at no cost to the government). | All existing conditions will have to be reviewed with VA whenever these conditions are found to discuss resolution. |
In no case will new installations be allowed to rest on or touch sprinkler piping and any new work found to be touching or resting on sprinler piping WILL be corrected at no expense to government.
| 149 | Bancroft | GI002 General Construction Note 37 states “do not use steel deck for hanging supports of building components including suspended ceilings, electrical light fixtures, plumbing, heating, or air conditioning pipes or duct or electrical conduits”. During our jobwalk, we’ve observed numerous conditions where existing lights, pipes, and conduits were suspended from existing metal deck using all-thread rods (for example, in rooms N4537, N502, and FB137. Please confirm that this requirement can be ignored for this project. | Disregard this requirement. |
| 150 | Mountain Home | GI001 Occupied Area Protection Protocols Note 9 states “unless directly specified and confirmed by VA/COR otherwise, all temporary protection and enclosures are to be set-up and knocked-down on a daily basis”. Please confirm to ignore this requirement as it will not be required/enforced or please outline a list of areas where temporary protection must be set-up and knocked-down on daily basis. | Temporary protection and enclosures may remain throughout duration of construction in a given area unless it blocks access for VA Patients and Staff to adjacent areas not under construction. |
| 151 | Bancroft | TT-1.01 indicates 2 types of duct banks on this project: (4) 4” backbone and (3) 2” lateral. CD101 detail 3 only provides a 4-way duct line. Please provide a detail for 3-way duct line. | Will update drawings and provide detail. |
| 152 | Bancroft | CD101 detail 3 General Note 3 states minimum cover 24” or as otherwise specified in 26 05 41. 26 05 41 does not specify cover. Details 1 and 2 on CD101 state 5’ minimum cover. Please confirm 24” cover above ductbank will be sufficient or clarify the correct depth for shading/cover above the top of concrete encased ductbank. | Ductbank will be at 5'. |
Will coordinate details.
| 153 | Bancroft | TT-1.01 calls for (3) sets of 3-1” Maxcell fabric innerduct in one of the raceways at backbone pathways. Please confirm that this means 3 sets of triple fabric innerduct (1”) in one of the four conduits of the backbone pathway. | Installed (3) sets of 3-cell 1" MaxCell in Three (3) out of the Four (4) 4" conduits. |
| 154 | Bancroft | TT-1.01 calls for one set of 3-1” Maxcell fabric innerduct in one of the raceways at lateral pathways. Please confirm that this means 1 set of triple fabric innerduct (1”) in one of the three conduits of the lateral pathway. | Correct. |
| 155 | Bancroft | CD102 Detail 9 Note 8 states “construction of sidewalk shall include #4 bars”. Please clarify the rebar/WWF specifications and spacing to be used for concrete sidewalks. | Additional details will be provided. |
| 156 | Bancroft | CD102 Detail 9 does not provide the concrete sidewalk underlayment. Please provide sidewalk section / detail that explains if sidewalk to be installed over compacted soil or base. Specify thickness of each layer. A written RFI response will be sufficient in lieu of a detail. | Additional details will be provided. |