Attachment 12 - RFI 39 - WAO Pricing.docx

DOCX document 14 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrade Construction - Mountain Home Federal contract opportunity
Solicitation number
36C77624B0024
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a Request for Information (RFI) related to pricing for Work Area Outlets (WAO) in a VA infrastructure upgrade project. The RFI requests bidders to submit unit prices for two specific scenarios: (1) the cost to add additional Work Area Outlets, which includes labor and materials for installing Cat 6A cabling (80m x 3), terminations, and outlets, and (2) the unit price to deduct Work Area Outlets that are determined unnecessary. The document indicates that any additions or deductions beyond the specified amount would be addressed through a contract modification.

The associated federal contract opportunity is a Department of Veterans Affairs solicitation (36C77624B0024) for an EHRM Infrastructure Upgrade Construction project at the Mountain Home VAMC, managed by the Department of Veterans Affairs Technology Acquisition Center in Austin. The solicitation focuses on infrastructure improvements, with this specific RFI addressing network cabling and outlet pricing details as part of the broader construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrade Construction - Mountain Home, newest first.
File Type Posted
Redacted Bid Opening Abstract Statement - Mountain Home EHRM.pdf PDF
36C77624B0024 0011.docx DOCX document
Bid Opening Attendees List.docx DOCX document
36C77624B0024 0010.docx DOCX document
36C77624B0024 0009.docx DOCX document
Updated Technical Question Tracker - Mountain Home EHRM.xlsx XLSX spreadsheet
36C77624B0024 0008.docx DOCX document
Corrected Revised Drawings - Mountain Home EHRM - Vol. 2.pdf PDF
Corrected Revised Specs - Mountain Home EHRM - Vol. 2.pdf PDF
Corrected Revised Specs - Mountain Home EHRM - Vol. 1.pdf PDF
36C77624B0024 0007.docx DOCX document
Revised Drawings - Mountain Home EHRM - Vol. 1.pdf PDF
36C77624B0024 0006.docx DOCX document
Revised Specs - Mountain Home EHRM - Vol. 1.pdf PDF
Revised Specs - Mountain Home EHRM - Vol. 2.pdf PDF
Revised Drawings - Mountain Home EHRM - Vol. 2.pdf PDF
Revised Attachment 10 - Rooms Descoped From Project.docx DOCX document
Technical Question Tracker - Mountain Home EHRM.xlsx XLSX spreadsheet
36C77624B0024 0005.docx DOCX document
36C77624B0024 0004.docx DOCX document
36C77624B0024 0003.docx DOCX document
Attachment 12 - Redacted Brand Name Justification.pdf PDF
Attachment 8 - Wage Determination - Washington County TN - 6-6-2025.pdf PDF
36C77624B0024 0002.docx DOCX document
S06 - 36C77624B0024 0001.docx DOCX document
S06 - Site Visit Sign In Sheet.pdf PDF
36C77624B0024.docx DOCX document
Attachment 2 - EHRM_IFB_Spec_Vol2_05222025 1.pdf PDF
Attachment 4b - EHRM_Moutain Home_EHRM_IFB_Dwgs VOL 2b.pdf PDF
Attachment 4a - EHRM_Moutain Home_EHRM_IFB_Dwgs VOL 2a.pdf PDF
Attachment 11 - Site Visit Instructions.docx DOCX document
Attachment 8 - Construction Wage Rates - Washington County TN - 5-2-25.pdf PDF
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 7 - Asbestos Survey Report 2.pdf PDF
Attachment 1 - EHRM_IFB_Spec_Vol1_05222025 1.pdf PDF
Attachment 10 - Rooms Descoped From Project.docx DOCX document
Attachment 3a - EHRM_Moutain Home_EHRM_IFB_Dwgs VOL 1a.pdf PDF
Attachment 3b - EHRM_Moutain Home_EHRM_IFB_Dwgs VOL 1b.pdf PDF
Attachment 5 - List of TRs and TEs 5.20.2025.pdf PDF
Attachment 6 - Mtn Home Port List Report.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

In regards to RFI #39, bidder shall submit unit price for additional Work Area Outlets to include labor and materials to install Cat 6A cabling (80m x 3), terminations and outlet. $__________________________________

Bidder shall submit unit price to deduct Work Area Outlets determined not to be needed. $__________________________________

A modification would be issued for any addition or deduction beyond the amount listed.

File details come from the government source that posted it. Updated .