Hampton - IFB Technical Question Sheet - 03.05.24.pdf

PDF 78 KB Posted

Attached to
Y1DA--590-220 Construct Rehab Medicine Facility Minor Construction - Hampton, VA (VA-23-00024211)
Solicitation number
36C77624B0001
Issued by

About this file

This document contains questions and answers related to specifications for a construction project opportunity with the Department of Veterans Affairs. Specification sections list flooring products that are no longer available, and alternates will be considered upon approval in writing. The pervious asphalt specification calls for a specialized mix that most plants cannot supply in the required small quantity; confirmation is requested whether state gradation standards can be accepted instead. Preference for safety sensor locations on garage doors is requested for overhead or both sides of each leaf. Clarification is also sought on finish requirements for operator headers specified as both clear anodized and white.

View the file

Other files

File Type Posted
Hampton - 36C77624B0001 - Amendment 0009.pdf PDF
Hampton - 36C77624B0001 - Amendment 0008.pdf PDF
Hampton - 36C77624B0001 - Amendment 0007.pdf PDF
Hampton - Resubmittal of Generator - NE.pdf PDF
Hampton - 01 45 00 - Quality Control 2022.pdf PDF
Hampton - 10 28 00 - Toilet-Bath-Laundry Acc.pdf PDF
Hampton - 36C77624B0001 - Amendment 0007.pdf PDF
Hampton - Appendix E - Bldg 110B - Lmtd Mold Rep.pdf PDF
Hampton - Rehab Bid Document Drawings - 10.08.23.zip ZIP file
Hampton - 36C77624B0001 - Amendment 0006.pdf PDF
Hampton - RFI Q and A - 02.09.24.pdf PDF
Hampton - Specs and Drawings - 01.09.24.zip ZIP file
Hampton - Alterations to Bldg 52.pdf PDF
Hampton - Geotechnical Study - 05.14.21.pdf PDF
Hampton - 36C77624B0001 - Amendment 0006.pdf PDF
Hampton - Site Visit Sign-in Sheet - 10.04.23.pdf PDF
Hampton - 36C77624B0001 - Amendment 0005.pdf PDF
Hampton - 36C77624B0001 - Amendment 0004.pdf PDF
36C77624B0001 0003.docx DOCX document
Hampton - 36C77624B0001 - Amendment 0002.pdf PDF
Site Map.pdf PDF
36C77624B0001 0001.docx DOCX document
Hampton - Construction SOW - 09.19.23.pdf PDF
36C77624B0001_1.docx DOCX document
Hampton - Attachment 3 - Rehab Bid Document Drawings Vol 3.zip ZIP file
Hampton - Wage Determination - 08.16.23.pdf PDF
Hampton - Attachment 2 - Rehab Bid Document Drawings Vol 2.zip ZIP file
Hampton - Attachment 1 - Rehab Bid Document Drawings Vol 1.zip ZIP file
Hampton - Asbestos and Lead Survey Report - Rev 2.pdf PDF
Hampton - Rehab Bid Specs.pdf PDF
Hampton - Site Map.pdf PDF
Hampton - Security Badge Requirement.pdf PDF
Hampton - Attachment 4 - Rehab Bid Document Drawings Vol 4.zip ZIP file
Hampton - Contractor Training Requirements.pdf PDF
Hampton - VA Privacy Training-No PHI.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Spec sections 09 06 00 (Finish schedule) and 09 65 16, lists WSF-1(Sheet Vinyl) Armstrong Medintone H5300 Cool White and WSF-2(Sheet Vinyl) Armstrong Medintone H5328 Greyed Blue Light. Both are currently not available products and do not have direct crossovers. Please advise of the alternate selections for Vinyl Sheet Flooring in these areas.

Per paragraph 1.2 of section 09 06 00, “Manufacturer’s trade names and numbers used herein are only to identify colors, finishes, textures, and patterns. Products of other manufacturer’s equivalent to colors, finishes, textures, and patterns of manufacturers listed that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer for finish requirements.”

2. The pervious asphalt pavement in spec section 32 12 16 requires a specialized mix (aggregate, liquid, and fibers) for a small amount of asphalt (85 – 100 tons) for the parking bay. Most of the asphalt plants are unable to supply this specialized mix due to the quantity. Please confirm whether VDOT gradation standards for pervious asphalt pavement can be accepted?

Permeable Pavement design was developed with performance comparable to “VIRGINIA DEQ STORMWATER DESIGN SPECIFICATION No. 7”

3. Spec 08 71 13.11 – pg 3, 2.5D, 5 & 6 - Will safety presence sensors be required in the openings with operators? If so, is preference for the sensors to be door mounted on both sides of the leaf, over the opening or both?

Yes. VA to provide preference for location or if there is no preference. - TJS

4. Spec 08 71 13.11, pg 4, 2.7, A 1 through 4 ask for clear anodize finish as well as a painted finish

- Please confirm the finish for the operator headers – Spec appears to call out clear anodize but then a comment on being white.

Finish for operators to match doors. -TJS