This file contains details of a federal contract opportunity for expanding sterile processing space in Building 200 at the Hines VA Medical Center. The related solicitation seeks proposals to conduct a study of available space in Building 200 to accommodate an expansion of the sterile processing department. The Department of Veterans Affairs Technology Acquisition Center Austin will award a contract under solicitation number 36C77623R0126 with an opportunity type listed as a pre-solicitation and name C1DA--578-375 Expand Sterile Processing - Hines for Building 200. Offerors should study the available 19MB file attached regarding the scope of work for the space study at the Hines VA Medical Center to determine available space for sterile processing expansion in Building 200, with responses due on the date specified in the solicitation.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 200
TRIPP AVENUE
SOUTH 9TH AVENUE
R O
O S E V
E L T R
O A
D
S C
O T T D
R
IV
E
BUILDING 1
BUILDING 128
BUILDING 113
BUILDING 228
BUILDING 14
BUILDING 13
BUILDING 12
EDWARD HINES, JR. VAMC HINES, IL
578-20-003 STUDY OF SPS 100% SUBMISSION
September 21, 2022
BUILDING 200
iii
Table of Contents
Part 1 - Executive Summary 7
Part 2 - Space Allocation Matrix 13 Existing SPS Analysis 13
SPS VA SEPS Room by Room Program 21
SPS VA SEPS Large Equipment List 23
Part 3 - Site Analysis 27
Part 3 - 10 Siting Options : Options 1-5 30
Part 3 - 10 Siting Options : Options 6-9 31
Part 3 - 1- Siting Options : Option 10 32 Site Analysis Score Card 33
Siting Option 1 38
Siting Option 2 44
Siting Option 3 50
Siting Option 4 56
Siting Option 5 62
Siting Option 6 68
Siting Option 7 74
Siting Option 8 80
Siting Option 9 86
Siting Option 10 92
Recommendation of 3 Concept Siting Options 98
Part 4 - Concept Design 101 Concept Design | Option 3 102
Concept Design | Option 8 106
Concept Design | Option 9 110
Part 5 - Reuse Study After SPS Is Relocated 119
Part 5 - Reuse Study 121
Part 5 - Reuse Study 123
Part 6 - A/E SOW for Follow-on Design 127 Appendix A : VA SEPS Equipment List 135
Appendix B : VA Mechanical Drawings w/ Siting Analysis 140
Appendix C : Basis of Design Equipment Cut Sheets 150
Edward Hines, Jr. VA Medical Center | iv
Page Intentionally left Blank
Executive Summary
. E
X C
U T
IV
E
S U
M M
A R
Y
The scope of this feasibility report is to identify possible re-location options for the SPS department to align with modern workfl ow, regulatory compliance, special processing requirements, and workfl ow effi ciencies.
SPS would like to add two additional cart washers for redundancy and requires re-confi guration of workfl ow to separate its internal processes to align with current operating regulations. The Hines VA provides surgical and procedural care for inpatient and outpatient services. The Sterile Processing Department (SPS) serves not only the Surgery Department, but also Radiation Therapy, GU Clinic, Eye Clinic, Radiology, Medical Intensive
Care Unit, Surgery Intensive Care Unit, Surgery, Dental Clinic, Digestive/Endoscopy Clinic, and Pulmonology/
Respiratory Care Clinic. The SPS gathers and distributes instruments throughout the building, with the second fl oor surgery department being the primary location served. The goals to drive the modernization of the SPS are defi ned and have been provided by the SPS leadership team, they are as follows:
• Resolve Vertical Circulation, reduce travel time and cross traffi c with public and other services.
• Upgrade equipment and utility services, including water treatment.
• Modernize departmental workfl ow and staff effi ciency and accuracy.
The new department shall be programmed to provide appropriate staff support areas such as staff lockers, restrooms with shower, staff break room, conference room, workstations, and two offi ces. The processing area shall be provided appropriate separation and fl ow of materials and personnel. The infrastructure shall provide modern air circulation, air supply, dehumidifi cation, treated water, sanitary and emergency electrical supply. Within this study a space program is provided that is created through the VA’s Space Planning Criteria
SEPS software based on the SPS’s provided input data. The program supports a new SPS department at
8,300 net square foot, for a range of 12,000-15,000 building gross square footage. The building gross square footage will vary depending on circulation, structural and utility effi ciencies each option is able to provide.
This program provides the base line for the ten location options in the initial exercise and a development of three concept space layouts from the top three ranking siting options. The concepts incorporate the leadership goals and correct the following FCA defi ciencies:
SPS FCA Defi ciencies to be Corrected:
• Record No. 42259 for equipment that is graded “D”
• Record No. 161422 for fi nishes that are graded “D”
• Record No. 363893 for water infi ltration graded “D”
• Record No. 363898 for water infi ltration graded “D”
• Record No. 363216 for outdated/missing PIV access control graded “D”
The scope of the study includes the identifi cation, analysis, and evaluation through a scoring matrix of fourteen criteria to either expand Building 200 through the construction of an addition, renovate interior space for relocation, or a combination of addition and renovation. All options are required to be attached to or within Building 200. Each location is described, indicated in plan, and outlined 3-dimensionally in its relationship to Building 200. Each option is also scored based on the Assessment Factors further outlined in this report. The Assessment Factors have been provided by the VA, along with the scoring levels. Each of the ten options address the outline below in narrative form and by scoring levels. A comparative matrix of all the options is also provided to provide a location where all the scores for each option may be reviewed.
A project estimate for each concept is provided to communicate magnitude of cost for each option and their relationship to each other. Concept space plans are created for the preferred three relocation options.
The feasibility study concludes with a descriptive statement of work for VA use in procuring design and engineering services.
Ten Options
The ten options reviewed and broken down for further analysis are the following:
Option 1: Relocate SPS to West Roof/Renovate Existing Storage
Option 2: Relocate SPS and OR Sterile Storage to East Roof/ Relocate OR Waiting to OR Storage
Option 3: Relocate SPS to OR Core/ Reconfi gure OR Storage
Option 4: New Two Story SPS Space North Face of Building 200 and Between Building 128
Option 5: Relocate SPS to 15th Floor
Option 6: Relocate SPS to OR PACU/ Relocate PACU and Reconfi gure OR Storage
Option 7: New Two Story SPS Space Southwest Face of Building 200
Option 8: Expand Existing SPS and Reconfi gure Ambulatory Surgery (Basement)
Option 9: New Two Story SPS Space South Face of Building 200/ Reconfi gure South Circle Drop-off
Option 10: Relocate SPS to Orthopedic OR Core/ Relocate Orthopedic OR Services to Ambulatory Surgery
Part 1 - Executive Summary
Edward Hines, Jr. VA Medical Center | 8
Assessment Factors
1. Architecture: Each option shall be rated on its impact to the architecture of the Campus and Building 200.
The highest scores are given to those projects with the least impact to the exterior of the building. An addition would impact the overall look of the building and require more complex construction to connect new construction to the existing building.
2. Civil Engineering and Existing Site Conditions: Each option shall be rated on its impact to the existing Campus.
All projects will require contractor parking and logistics site use. The projects were scored on their lasting impact on the site. Those projects impacting utilities or physical security off sets were ranked the lowest.
3. Constructability: Each option shall be rated based on the disruption to the hospital and Campus operations during construction. This rating shall also consider the sites diffi culty or ease of construction. Projects were ranked based on the impact of construction on fl oors above and below, number of phases, and requirements of relocation of existing services. Those with the most disruptions where ranked the lowest.
4. Cost Estimation for Design and Construction: A cost estimate shall be provided for each option broken out by CSI Divisions which is to include a line-item cost for design services.
5. Electrical: Each option shall be rated based on its impact on the existing and future electrical systems.
The electrical service in the building, upon initial investigation is assumed to support relocation of the department without need to upgrade the service to Building 200. The service to the building is also assumed to support a branch to any new addition.
6. Energy: Each option shall be rated based on effi ciency of energy use. More energy effi cient options are rated higher. Additions require additional energy to operate and rank less than interior renovations where additional space to heat and cool is not provided.
7. Environmental Design: Each option shall be rated based on the environmental impact, such as permeable pavement and re-use of building elements. The additions have the greatest impact on the site and increase stormwater run-off will need to be managed.
8. Function and Adjacencies: Each option is to be rated based on the location’s adjacencies to SPS clients, determines if the location allows for an effi cient fl oor plan, and supports effi cient hospital operations.
Options that create direct adjacencies with the 2nd Floor are ranked the highest while those options furthest from the 2nd fl oor ranked the lowest.
9. Infection Control: Each option shall be rated based on how positively or negatively it impacts the hospital’s infection control eff orts. The options that are proposed with the greatest number of construction phases, cross traffi c with public corridors and which increase transportation time of the instruments for processing rank the lowest.
10. Mechanical: Each option shall be rated based on its impact on the existing and any future mechanical systems. The mechanical system in the building, on initial investigation, require a new air handler unit and exhaust capacity be provided whether it’s an addition or an interior renovation.
11. Phasing of Construction/Schedule Development: Each option shall be rated on the ease of phasing construction to minimize costs and disruption to the hospital and campus’ operations. The projects with no relocation of other services and that proposed the fewest construction phases for completion are ranked highest.
12. Plumbing: Each option shall be based on its impact on the existing and future plumbing systems. The plumbing in the building, upon initial investigation, is assumed to support relocation of the department without need to upgrade the service to Building 200. The plumbing service to the building is also assumed to support a water supply to any new addition. Localized water treatment in all options will be required.
13. Security: Each option shall be rated on the ease of physical security. Additions require alignment with the
VA’s Physical Security Design Guide. One key aspect of that design guide is that all new construction shall maintain a 50’ setback from any vehicular movement, which would require civil work to re-align drop off s and access drives. Interior options would require security access control, which would be through the use of door and card reader access.
14. Structural: Each option shall be rated on the structural effi ciency and impact of each site.
Assessment Scoring Levels
5 Points - Exceptional: One or more strong points that will signifi cantly benefi t the VA. No weak points.
4 Points - Very Good: One or more strong points that will benefi t the VA. Weak points, if any, are minor.
Strong points outweigh any minor weak points.
3 Points - Satisfactory: Few or no strong points that will benefi t VA. Strong and weak points are off setting or will have little impact on performance.
2 Points - Marginal: One or more weak points that are not off set by strong points.
1 Points - Unsatisfactory: No strong points. Weak points/numerous weak points exist.
0 Points – not an acceptable solution to the category. This eff ectively eliminates an option from consideration.
Part 1 - Executive Summary
3 Concepts
The Hines VA facility group assessed the ten options with the design team and three options were identifi ed for conceptual development based on the Score Card cumulative score and meeting the needs of the facility.
The selected options are the following:
Option 3 which is the reconfi guration and consolidation of surgery support spaces to accommodate the relocation of SPS services to the Second fl oor.
Option 8 which is the expansion of SPS services in place in the Basement which involves correcting existing building infrastructure issues and re-confi guring ambulatory surgery to increase the SPS footprint.
Option 9 which is the expansion of Building 200 with an addition on the south side and reconfi guration of the existing drive and drop of, which also corrects existing physical security defi ciencies.
These three options are presented with concept fl oor plans, all three of which align with the VA SEPS generated program presented in the Space Allocation section of this report. The three concepts are also presented with a refi ned project cost.
Reuse Study
Two of the presented concepts will leave a vacated space available for future renovation and relocation or expansion of other service areas on campus. Upon conversations with the hospital’s planning staff , the following uses for the vacated areas are reviewed within this report.
1. Inpatient Pharmacy
2. Eye Clinic Consolidated with adjacent Ambulatory Surgery
3. Caregiver Support and Respite
4. Facility Central Locker, Lounge and Touchdown Space
Option 1 to relocate Inpatient Pharmacy to the basement fl oor from the fi rst fl oor would vacate critical space on the fi rst fl oor which can be used for patient facing care clinics.
Option 2 to relocate the Eye Clinic would consolidate the Eye Clinic next to Ambulatory Surgery where
Ophthalmology provides procedures and surgeries.
Option 3 for creating a central Caregiver Support and Respite Clinic would fi ll a patient care need that had been identifi ed as being needed for the population of veterans at this location. This would be a new space within the hospital.
Option 4 to provide facility lockers and central staff support staff would fi ll a need that is not provided and is a core support for staff in the hospital. The central lockers and lounge would provide a place for logistics, EMS, Facilities, Nutrition, and other services a place to go for a break and to change before and after work. The space would also be provided with touchdown workstations to support computer access for email, training, and an onsite location for remote workers when they come to the building. Training and conference rooms would also be provided and available to staff working in Building 200 and on campus.
A/E Scope of Work
The report includes narrative language for the VA to include within their Scopes of Work to solicit for design and engineering services. There is a scope of work narrative provided for each of the three concept design options that outlines program needs, proposed consultant needs, scope of work and important information needed for a fi rm to provide an appropriate fee for design and construction administrative services.
Edward Hines, Jr. VA Medical Center | 10
Page Intentionally left Blank
SPACE ALLOCATION MATRIX
. S p a c e
A llo c a tio n
M a trix
The basis of study for this section are the current conditions aff ecting the state of workfl ow and compliance issues for the SPS. The review includes observations of the existing site’s physical condition, equipment, utilities, and workfl ow defi ciencies. The SPS requires additional space for separation of processes between low temperature instrument, standard instrument, and scope processing. The SPS department needs staff support facilities such as workstations, break area, and locker rooms.
This study also includes an analysis of SPS services provided throughout the hospital, space programming needs for a modern department, equipment needs, and review of the existing campus for potential building expansion.
The existing SPS footprint is approximately 7,000 sf, an equivalent modern department with segregated workfl ow and staff areas based on VA standards would be around 8,300 sf net square footage. A gross building square footage need of approximately 12,000-15,000 sf total would be required for a new location. An area’s shape and proportions infl uence the gross building square footage depending on number of corridors, mechanical chase, and such to support a new area, thus the reason for the range in gross building square footage.
Part 2 - Space Allocation Matrix
| � | � |
| � | �� |
| � | � |
| � | �� |
| � | ��� | |
| ����� �� | �� |
| � | ���������� | |
| � | � |
| � | � | � |
| � | ��� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| �+ | ��� |
| � | � |
Existing SPS Analysis
Existing SPS Analysis - Basement Floor
Congestion at elevators, none are dedicated to transport dirty or clean materials, cross traffi c is an issue.
DECOMTAM
SIDE
CLEAN
SIDE
DISPATCH
Single entry/ ante-room into SPS
Scope processing area
Bank of 5 sterilizers
Packet sterilizers
Existing elevator shaft through all fl oors of
Building 200. Option to use 1 shaft for new cart elevator conveyor system to transport dirty materials between fl oors. Access would need to be provided at fl oors B, 1, 2, 12, 13 and
14. The EHRM project for new telecom rooms utilizes these vertical chases.
Edward Hines, Jr. VA Medical Center | 14
Part 2 - Space Allocation Matrix
| � | � |
| � | �� |
| � | � |
| � | �� |
| � | ��� | |
| ����� �� | �� |
| � | ���������� | |
| � | � |
| � | � | � |
| � | ��� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| � | ���������� | |
| � | � |
| �+ | ��� |
| � | � |
Photo Views- Basement Floor
F
G
H
E D
C
AB
Key workfl ow defi ciencies identifi ed within the department include the following:
• Outside access through ante rooms to dirty and clean areas for donning and doffi ng PPE, as well as receiving vendors and their equipment.
• Scope processing is completed in the decontamination area with an ineffi cient manner to process scopes and to transfer them to the clean side of SPS for distribution.
• Defi cient separation of low temperature processing of eye instruments from standard instrument processing.
• Lack of instrument and scope sterile supply storage in a central area. All the supplies are stored wherever a cabinet will fi t, thus creating an ineffi cient workfl ow for compiling sterile packets.
• Defi cient HVAC air exchanges and exhaust of the space, thus the space is challenged to meet requirements for air exchanges, exhaust, and humidity control.
• Distribution issue with transporting materials to and from the area in the building due to elevator traffi c congestion.
A & B Clean workroom, workstation and instruction storage
C. D & E Case cart assembly and dispatch area
F, G, & H Existing sterilizers
Existing Photos
A
B
C
D
E
F
G
H
Edward Hines, Jr. VA Medical Center | 16
U T
IL
IT
Y
L E G E N D
U E
B U R
IE
D
E L E C T R
IC
B T
B U R
IE
D
T E L E P H O N E
F O C
B U R
IE
D
F
IB
E R
O P T
IC
C A B L E
C T V
B U R
IE
D
C A B L E
T V
G A S
G A S
W A T E R
S T M
S T E A M
U N K
B U R
IE
D
U N K N O W N
U T
IL
IT
Y
F L
F U E L
L
IN
E
O X Y G E N
L
IN
E
S S
S A N
IT
A R Y
S E W E R
S T
S T O R M
S E W E R
C
IV
IL
E
N G
IN
E
E R
IN
G
* T R
A N
S P
O R
T A
T
IO
N
* E
N V
IR
O
N M
E N
T A
L
* P
L A
N N
IN
G
* U T
IL
IT
Y E
N G
IN
E
E R
IN
G
/L O
C A
T
IN
G
E L E C T R
IC
P E D E S T A L
M E T E R
S T O R M
IN
L E T
S T O R M
M A N H O L E
M A N H O L E
M A N H O L E
M A N H O L E V A U L T
S A N
IT
A R Y
M A N H O L E
M E T E R
V A U L T
H A N D H O L E
VA Hines Utility Map
EXPANSION
AREA A
EXPANSION
AREA B
EXPANSION
AREA C EXPANSION
AREA E
EXPANSION
AREA D
BUILDING
BUILDING
BUILDING
BUILDING 13
B U
IL
D
IN
G
B U
IL
D
IN
G
The exterior site was reviewed around the perimeter of Building 200 to identify possible locations to provide a new two-story addition to accommodate a new SPS department. All two-story additions would require having a connector over the existing roof of Building 200 to connect the new addition to the second fl oor. Connectors on the fi rst fl oor would disrupt patient clinics with material being transported through the spaces or the clinics would be reduced in size to accommodate new corridor construction.
Area A is set between Building 200 and Building 128. There is a drive directly to the west for support and delivery vehicles to Building 200.
This drive would require a security gate, bollards, and other security provisions to align with the VA Physical Security requirements. The open area has a linear accelerator and photon therapy vault underground that a new addition would have to be constructed over.
Area B is adjacent to the current Emergency Department and a second fl oor addition would remove exterior patient windows, which are a requirement for patient rooms. The addition would decommission intensive care rooms, cause disruptions, and possible emergency room shutdowns. Due to these critical confl icts, an option in this area will not be further explored in this study.
Area C is an open space with an area well where the main water, steam and electrical services come into Building 200. To construct in this area would require construction over or relocation of utilities, which could require utility shutdowns to portions of Building 200. This area will be further explored in this study to understand utility impacts of an addition.
Area D would require the shutdown of the south entry and reconfi guration of the existing drive to align with the VA Physical Security Manual. Utilities can be relocated or constructed over. This location has been determined as a possible location to support an addition and will be further explored in the study.
Area E has been assigned to house an emergency generator farm and is currently a design and construction project. This area is not available for further study.
Existing SPS Site
ACS SPECIALTY CARE
COMMON SPACE
EDUCATION
ENGINEERING
ENVIRONMENTAL MGMT
LINEN SERVICE
NURSING SVC ADMIN
NUTRITION/FOOD
PATHOLOGY
RADIATION THERAPY
REHAB MEDICINE
SPD SERVICE
SURGICAL
UNASSIGNED VACANT SPACE
VERTICAL SPACE
TO BLDG.
OPEN TO
BELOW
TO BLDG.
OPEN
OPEN
SURGICAL
RECOVERY
A001
1,919 SF
SURGICAL
SUPPLY
STORAGE
A001F
111 SF
SURGICAL
STORAGE
A001E
108 SF
SURGICAL
LOUNGE
A001C
161 SF
SURGICAL
SPECIMEN
ROOM
A001D
157 SF
SURGICAL
OFFICE
A002
192 SF
SURGICAL
OPERATING ROOM
A003
380 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A004
368 SF
SURGICAL
OPERATING ROOM
A005
528 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A006
361 SF
UNASSIGNED
VACANT SPACE
STORAGE
A007
101 SF
SURGICAL
SUPPLY STORAGE
A009
429 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A010
387 SF
SURGICAL
OPERATING ROOM
A011
561 SF UNASSIGNED VACANT SPACE
STORAGE
A012
374 SF
UNASSIGNED
VACANT SPACE
STORAGE
A013
108 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A015
386 SF
SURGICAL
EQUIPMENT
STORAGE
A017
97 SF
SURGICAL
OPERATING ROOM
A018
364 SF
UNASSIGNED
VACANT SPACE
H.A.C.
A020
46 SF
UNASSIGNED VACANT SPACE
OXYGEN TANK STORAGE
A029
64 SF
SURGICAL
CHASE
RCCB03C
7 SF
UNASSIGNED
VACANT SPACE
CHASE
RCCB04C
8 SF
SURGICAL
CHASE
RCCB05C
17 SF
UNASSIGNED
VACANT SPACE
CHASE
RCCB06C
7 SF
SURGICAL
CHASE
RCCB08C
8 SF
SURGICAL
CHASE
RCCB07C
9 SF
SURGICAL
CHASE
RCCB10C
8 SF
UNASSIGNED
VACANT SPACE
CHASE
RCCB09C
7 SF
SURGICAL
CHASE
RCCB11C
15 SF
COMMON
SPACE
RCCB01R
7 SF
SURGICAL
CHASE
RCCB01C
93 SF
SURGICAL
CHASE
RCCB02C
12 SF
COMMON SPACE
CORRIDOR
RCCB02R
1,685 SF
COMMON SPACE
CORRIDOR
RCCB03R
1,319 SF
SPD SERVICE
PUMP ROOM STORAGE
A021
236 SF
SPD SERVICE
GAS CONTAINER STORAGE
A022B
45 SF
SPD SERVICE
EQUIPMENT STORAGE
A023C
1,529 SF
SPD SERVICE
LINEN
A023D
280 SF
SPD SERVICE
H.A.C.
A023E
40 SF
SPD SERVICE
CART WASH
A025C
112 SF
SPD SERVICE
LINEN
A023F
348 SF
ENVIRONMENTAL
MGMT
H.A.C.
A025B
29 SF
ENVIRONMENTAL
MGMT
H.A.C.
A025D
48 SF
SPD SERVICE
SUPPLY STORAGE
A024C
85 SF
ENVIRONMENTAL
MGMT
LOCKER ROOM
A024A
144 SF
SPD SERVICE
STERILE
PROCESSING
A023I
244 SF
SPD SERVICE
STORAGE
RCCB04R
37 SF
SPD SERVICE
PREPERATION &
STERILIZATION
A025
3,808 SF
ENVIRONMENTAL MGMT
LOCKER ROOM
A024B
125 SF
SPD SERVICE
OFFICE
A023G
155 SF
COMMON SPACE
MECHANICAL ROOM
A023J
70 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB12C
7 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB13C
7 SF
COMMON
SPACE
RCCB05R
3 SF
SPD SERVICE
CHASE
RCCB14C
9 SF
SPD SERVICE
STORAGE
RCCB06R
37 SF
COMMON SPACE
CORRIDOR
RCCB07R
60 SF
SURGICAL
ANESTHESIA WORK ROOM
B003
478 SF
SURGICAL
H.A.C.
B006
62 SF
LINEN SERVICE
LINEN
B006B
144 SF
SURGICAL
BLOOD GAS ANALYSIS
B008A
117 SF
COMMON
SPACE
RCCB08R
19 SF
SURGICAL
OFFICE
B009
174 SF
SURGICAL
LOCKER ROOM
B010
322 SF
SURGICAL
TOILET
B010A
143 SF
SURGICAL
LOUNGE
B011
291 SF
SURGICAL
COPY ROOM
B012
259 SF
SURGICAL
LOCKER ROOM
B014
385 SF
SURGICAL
TOILET
B014A
139 SF
SURGICAL
CHASE
RCCB15C
45 SF
COMMON
SPACE
RCCB09R
4 SF
COMMON SPACE
CORRIDOR
RCCB10R
363 SF
COMMON SPACE
CORRIDOR
RCCB11R
471 SF
COMMON SPACE
CORRIDOR
RCCB12R
268 SF
VERTICAL
SPACE
STAIR
RCCB13R
141 SF
SURGICAL
PATIENT HOLDING
B016
583 SF
SURGICAL
SOILED UTILITY
B017
81 SF
SURGICAL
TOILET
B016B
36 SF
SURGICAL
CHASE
RCCB16C
12 SF
SURGICAL
CONFERENCE ROOM
B018
265 SF
SURGICAL
CHASE
RCCB17C
10 SF
COMMON SPACE
CORRIDOR
RCCB14R
1,423 SF
SURGICAL
OFFICE
B019
836 SF
SURGICAL
OFFICE
B019B
88 SF
SURGICAL
OFFICE
B019C
93 SF
SURGICAL
TOILET
B020B
46 SF
COMMON SPACE
CORRIDOR
RCCB15R
174 SF
SURGICAL
TOILET
B020A
38 SF
SURGICAL
RECEPTION
B020
715 SF
SURGICAL
EXAM
B022A
99 SF
SURGICAL
EXAM
B022B
84 SF
SURGICAL
EXAM
B022C
83 SF
SURGICAL
EXAM
B022D
82 SF
SURGICAL
EXAM
B022E
76 SF
SURGICAL
EXAM
B022F
77 SF
SURGICAL
EXAM
B022G
131 SF
SURGICAL
URODYNAMIC
LAB
B022H
192 SF
SURGICAL
TOILET
B022I
37 SF
SURGICAL
UTILITY
B023D
48 SF
COMMON SPACE
CORRIDOR
RCCB16R
520 SF
SURGICAL
CHASE
RCCB19C
7 SF
SURGICAL
TOILET
B024A
30 SF
SURGICAL
TOILET
B023C
30 SF
SURGICAL
TOILET
B023B
33 SF
SURGICAL
STORAGE
B026
133 SF
SURGICAL
PROCEDURE
ROOM
B027
260 SF
SURGICAL
LOCKER ROOM
B024
163 SF
SURGICAL
RECOVERY
B023
1,353 SF
SURGICAL
DRESSING
ROOM
B024B
34 SF
SURGICAL
DRESSING
ROOM
B024C
34 SF
SURGICAL
H.A.C.
B024F
26 SF
SURGICAL
CHASE
RCCB20C
13 SF
SURGICAL
CHASE
RCCB21C
12 SF
SURGICAL
LOCKER ROOM
B024D
57 SF
SURGICAL
LOCKER ROOM
B024E
47 SF
SURGICAL
DECONTAMINATION
ROOM
B025A
48 SF
SURGICAL
SOILED UTILITY
B025B
48 SF
SURGICAL
CLEAN ROOM
B029B
95 SF
SURGICAL
PROCEDURE ROOM
B028
350 SF
SURGICAL
PROCEDURE ROOM
B029
346 SF
COMMON SPACE
CORRIDOR
RCCB17R
470 SF
SURGICAL
CHASE
RCCB22C
8 SF
SURGICAL
CHASE
RCCB24C
20 SF
SURGICAL
CHASE
RCCB23C
14 SF
SURGICAL
CHASE
RCCB25C
7 SF
SURGICAL
CHASE
RCCB27C
7 SF
SURGICAL
CHASE
RCCB26C
18 SF
SURGICAL
ANESTHESIA STORAGE
B036
717 SF
SURGICAL
OFFICE
B036A
96 SF
ENVIRONMENTAL
MGMT
H.A.C.
B030
50 SF
NURSING SVC ADMIN
WHEEL CHAIR STORAGE
B031
2,144 SF
ENVIRONMENTAL
MGMT
TOILET
B032
57 SF
ENGINEERING
ELEVATOR MACHINE ROOM
B033
114 SF
SURGICAL
ELECTRICAL CLOSET
B037A
50 SF
COMMON SPACE
CORRIDOR
RCCB18R
1,147 SF
COMMON
SPACE
RCCB19R
23 SF
COMMON SPACE
CORRIDOR
RCCB21R
1,004 SF
COMMON
SPACE
RCCB20R
25 SF
SURGICAL
C005A
3 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB28C
12 SF
VERTICAL SPACE
ELEVATOR
RCCB29C
81 SF
ENGINEERING
COMMUNICATIONS
B040
1,114 SF
ENGINEERING
BED REPAIR
B039
1,338 SF
SURGICAL
ANESTHESIA STORAGE
B037
1,061 SF
SURGICAL
TELEPHONE CLOSET
B037C
12 SF
SURGICAL
COMPUTER
ROOM
B037B
14 SF
SURGICAL
ELECTRICAL CLOSET
B037D
23 SF
COMMON
SPACE
RCCB22R
2 SF
ACS-SPECIALTY CARE
WAITING ROOM
B038
527 SF
ACS-SPECIALTY CARE
EXAM
B038C
127 SF
ACS-SPECIALTY CARE
EXAM
B038D
143 SF
ACS-SPECIALTY CARE
EXAM
B038E
143 SF
ACS-SPECIALTY
CARE
EXAM
B038F
92 SF
ACS-SPECIALTY CARE
EXAM
B038G
92 SF
ACS-SPECIALTY CARE
OFFICE
B038H
154 SF
ENVIRONMENTAL MGMT
TOILET
B038I
38 SF
VERTICAL SPACE
STAIR
RCCB30C
156 SF
ENGINEERING
COMMUNICATIONS
B040A
69 SF
SPD SERVICE
OXYGEN TANK
STORAGE
C003
67 SF
NUTRITION/FOOD
ELECTRICAL CLOSET
C003A
229 SF
ENGINEERING
STORAGE
C004
140 SF
VERTICAL SPACE
CHASE
C004a
49 SF
VERTICAL
SPACE
CHASE
RCCB31C
25 SF
VERTICAL SPACE
CHASE
C099
68 SF
SURGICAL
OFFICE
C005
124 SF
SURGICAL
OFFICE
C006
144 SF
REHAB MEDICINE
OFFICE
C007
132 SF
ENVIRONMENTAL
MGMT
TOILET
C008
40 SF
SURGICAL
OFFICE
C009
261 SF
NUTRITION/FOOD
OFFICE
C010
230 SF
SURGICAL
CHASE
RCCB32C
12 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB33C
9 SF
ENGINEERING
TOILET
C021
508 SF
ENGINEERING
CHASE
RCCB39C
8 SF
ENGINEERING
CHASE
RCCB38C
12 SF
NUTRITION/FOOD
OFFICE
C011
331 SF
ENGINEERING
ELECTRICAL
STORAGE
C012
180 SF
NUTRITION/FOOD
OFFICE
C012
302 SF
ENVIRONMENTAL MGMT
SOILED LINEN ROOM
C012A
152 SF
ENGINEERING
STORAGE
C012C
73 SF
ENGINEERING
STORAGE
C012D
109 SF ENGINEERING
STORAGE
C012E
45 SF
COMMON SPACE
ELECTRICAL CLOSET
C014
793 SF
NUTRITION/FOOD
TOILET
C015
84 SF
NUTRITION/FOOD
TOILET
C016
82 SF
NUTRITION/FOOD
CHASE
RCCB34C
14 SF
COMMON SPACE
ELECTRICAL CLOSET
C017
1,810 SF
NUTRITION/FOOD
OFFICE
C018
411 SF
NUTRITION/FOOD
CHASE
RCCB35C
13 SF
COMMON SPACE
ELECTRICAL CLOSET
C022
1,623 SF
VERTICAL SPACE
STAIR
RCCB36C
159 SF
VERTICAL
SPACE
CHASE
RCCB37C
25 SF
COMMON SPACE
C020
44 SF
COMMON
SPACE
C020A
10 SF
COMMON SPACE
CORRIDOR
RCCB23R
1,900 SF
NUTRITION/FOOD
H.A.C.
C029
33 SF
NUTRITION/FOOD
TOILET
C025
88 SF
NUTRITION/FOOD
CHASE
RCCB41C
13 SF
VERTICAL SPACE
ELEVATOR
RCCB42C
75 SF
VERTICAL SPACE
ELEVATOR
RCCB43C
149 SF
VERTICAL SPACE
STAIR
RCCB40C
155 SF
NUTRITION/FOOD
ELECTRICAL
CLOSET
C026
99 SF
ENGINEERING
UTILITY
RCCB24R
57 SF
NUTRITION/FOOD
FRIDGE
C024
445 SF
NUTRITION/FOOD
FRIDGE
C025A
316 SF
COMMON SPACE
CORRIDOR
RCCB25R
803 SF
NUTRITION/FOOD
FRIDGE
C025B
365 SF
NUTRITION/FOOD
FREEZER
C031A
713 SF
NUTRITION/FOOD
THAW BOX
C031
326 SF
NUTRITION/FOOD
LOCKER ROOM
C032H
44 SF
NUTRITION/FOOD
H.A.C.
C032G
54 SF
NUTRITION/FOOD
H.A.C.
D011D
47 SF
NUTRITION/FOOD
TOILET
D011E
47 SF
NUTRITION/FOOD
MAIN KITCHEN
C032
8,333 SF
NUTRITION/FOOD
DISH ROOM
C032A
1,243 SF
NUTRITION/FOOD
H.A.C.
C032C
36 SF
NUTRITION/FOOD
DRY FOOD STORAGE
C032D
906 SF
NUTRITION/FOOD
LIQUID STORAGE
C032E
393 SF
NUTRITION/FOOD
FRIDGE
C032F
318 SF
NUTRITION/FOOD
OFFICE
C032K
115 SF
NUTRITION/FOOD
OFFICE
C032L
176 SF
VERTICAL SPACE
CHASE
RCCB44C
74 SF
SPD SERVICE
RCCB26R
26 SF
SPD SERVICE
RCCB27R
28 SF
RADIATION THERAPY
NURSE STATION
D008D
306 SF
NUTRITION/FOOD
TOILET
D001
78 SF
NUTRITION/FOOD
TOILET
D002
73 SF
NUTRITION/FOOD
H.A.C.
D004
36 SF
NUTRITION/FOOD
STORAGE
D005
125 SF
RADIATION THERAPY
STORAGE
D006
166 SF
RADIATION THERAPY
SUPPLY STORAGE
D006A
131 SF
RADIATION THERAPY
STORAGE
D006B
133 SF
SURGICAL
RCCB28R
72 SF
VERTICAL SPACE
ELEVATOR
RCCB45C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB46C
75 SF
VERTICAL SPACE
ELEVATOR
RCCB47C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB48C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB49C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB50C
86 SF
VERTICAL SPACE
ELEVATOR
RCCB51C
87 SF
VERTICAL SPACE
ELEVATOR
RCCB52C
86 SF
COMMON SPACE
CORRIDOR
RCCB29R
1,595 SF
NUTRITION/FOOD
CHASE
RCCB53C
11 SF
VERTICAL SPACE
STAIR
RCCB54C
196 SF
NUTRITION/FOOD
CHASE
RCCB55C
14 SF
RADIATION THERAPY
STORAGE
D007
431 SF
RADIATION THERAPY
DARK ROOM
D007B
71 SF
RADIATION THERAPY
RADIATION THERAPY
D007C
429 SF
RADIATION THERAPY
RECEPTION
D008
156 SF
RADIATION
THERAPY
WASH ROOM
D008A
59 SF
RADIATION
THERAPY
MEDS
D008B
58 SF
RADIATION THERAPY
OFFICE
D008C
122 SF
COMMON SPACE
CORRIDOR
RCCB30R
964 SF
COMMON
SPACE
RCCB31R
18 SF
COMMON SPACE
RCCB32R
24 SF
RADIATION THERAPY
OFFICE
D008M
328 SF
RADIATION THERAPY
EXAM
D008K
118 SF
RADIATION THERAPY
EXAM
D008J
144 SF
RADIATION THERAPY
COBALT THERAPY
D008I
477 SF
RADIATION THERAPY
CONSULT
RCCB33R
108 SF
RADIATION
THERAPY
TOILET
D008E
80 SF
RADIATION
THERAPY
TOILET
D008F
75 SF
RADIATION THERAPY
RADIATION THERAPY
D008H
574 SF
RADIATION THERAPY
CHASE
RCCB56C
23 SF
COMMON SPACE
CHASE
RCCB58C
68 SF
VERTICAL SPACE
ELEVATOR
RCCB57C
75 SF
COMMON SPACE
CORRIDOR
RCCB34R
1,731 SF
VERTICAL
SPACE
ELEVATOR
RCCB60C
59 SF
VERTICAL
SPACE
ELEVATOR
RCCB59C
59 SF
VERTICAL SPACE
STAIR
RCCB61C
38 SF
EDUCATION
TRAINING ROOM
D009
1,626 SF
NUTRITION/FOOD
PATIENT DINING
D009A
333 SF
NUTRITION/FOOD
CORRIDOR
RCCB36R
64 SF
NUTRITION/FOOD
CHASE
RCCB62C
65 SF
EDUCATION
ENTRY
RCCB35R
110 SF
NUTRITION/FOOD
STORAGE
D009F
122 SF
NUTRITION/FOOD
CHASE
RCCB64C
10 SF
NUTRITION/FOOD
CHASE
RCCB63C
21 SF
COMMON
SPACE
RCCB37R
3 SF
NUTRITION/FOOD
H.A.C.
D009E
32 SFNUTRITION/FOOD
FRIDGE
D009G
159 SF
NUTRITION/FOOD
CHASE
RCCB65C
16 SF
NUTRITION/FOOD
DEEP FREEZE
D009H
106 SF
NUTRITION/FOOD
DESSERT REFRIG
D009I
106 SF
RADIATION THERAPY
WAITING ROOM
D010
289 SF
RADIATION THERAPY
CHASE
RCCB66C
7 SF
RADIATION THERAPY
OFFICE
D010A
86 SF
RADIATION
THERAPY
EXAM
D010B
87 SF
RADIATION THERAPY
EXAM
D010C
99 SF
RADIATION THERAPY
EXAM
D010D
98 SF
RADIATION THERAPY
OFFICE
D010E
476 SF
RADIATION
THERAPY
DRESSING
ROOM
D010F
128 SF
RADIATION
THERAPY
SUPPLY
STORAGE
D010G
41 SF
RADIATION
THERAPY
STORAGE
CLOSET
D010I
41 SF
RADIATION THERAPY
RADIATION THERAPY
D010J
879 SF
RADIATION THERAPY
ELECTRICAL CLOSET
D010K
135 SF
RADIATION THERAPY
ELECTRICAL CLOSET
D010N
24 SF
RADIATION
THERAPY
LINEN
D010Q
40 SF
COMMON SPACE
CORRIDOR
RCCB38R
1,607 SF
RADIATION THERAPY
CHASE
RCCB67C
4 SF
RADIATION THERAPY
CHASE
RCCB69C
54 SF
RADIATION THERAPY
RECEPTION
RCCB39R
49 SF
RADIATION THERAPY
CHASE
RCCB68C
24 SF
RADIATION THERAPY
OFFICE
D011A
297 SF
RADIATION THERAPY
OFFICE
D011B
257 SF
NUTRITION/FOOD
LOUNGE
D011F
124 SF
RADIATION THERAPY
STORAGE
D011G
443 SF
RADIATION
THERAPY
RCCB40R
29 SF
COMMON SPACE
CORRIDOR
RCCB41R
205 SF
PATHOLOGY
WORK ROOM
D012
172 SF
PATHOLOGY
FRIDGE
D013
192 SF
PATHOLOGY
AUTOPSY SUITE
D014
616 SF
PATHOLOGY
TOILET
D015
111 SF
PATHOLOGY
H.A.C.
D016
42 SF
PATHOLOGY
TOILET
D017
77 SF
PATHOLOGY
CHASE
RCCB70C
9 SF
PATHOLOGY
CHASE
RCCB71C
7 SF
COMMON SPACE
CORRIDOR
RCCB42R
180 SF
COMMON SPACE
CORRIDOR
RCCB43R
55 SF
COMMON
SPACE
ELEVATOR
MACHINE
ROOM
D021
108 SF
COMMON SPACE
MECHANICAL ROOM
D018
746 SFCOMMON
SPACE
COMM CLOSET
D018A
14 SF
COMMON SPACE
ELECTRICAL CLOSET
D018B
29 SF
VERTICAL SPACE
STAIR
RCCB72C
154 SF
COMMON
SPACE
F/E CLOSET
D021A
3 SF
COMMON SPACE
CORRIDOR
RCCB44R
570 SF
VERTICAL
SPACE
ELEVATOR
RCCB73C
85 SF
NUTRITION/FOOD
GREASE ROOM
D022
343 SF
NUTRITION/FOOD
SUPPLY ROOM
D023
940 SF
NUTRITION/FOOD
CHASE
RCCB74C
38 SF
COMMON
SPACE
RCCB45R
3 SF
VERTICAL SPACE
STAIR
RCCB75R
70 SF
UNASSIGNED VACANT SPACE
CORRIDOR
RCCB76R
1,341 SF
CONTRACTING FIRM: CLIENT &
PROJECT
NAME:
DRAWING SCALE:
DRAWING TITLE:
APPROVED BY:
BLDG NUMBER:
PROJECT NUMBER:
ISSUE DATE:
NORTH ARROW
1/
/2
2:
:5
P
M
3/64" = 1'-0"CAI DEPARTMENT FLOOR PLAN - BASEMENT
EDWARD HINES, JR. VA HOSPITAL
RFP: UPDATE HINES CAPITAL ASSETS INVENTORY RECORDS
01/20/2016
578-14-012
ERIC J. KUTCHE
CAI DEPARTMENT AREA
ACS SPECIALTY CARE 1,277 SF
COMMON SPACE 23,964 SF
EDUCATION 1,736 SF
ENGINEERING 3,767 SF
ENVIRONMENTAL MGMT 718 SF
LINEN SERVICE 144 SF
NURSING SVC ADMIN 2,144 SF
NUTRITION/FOOD 18,623 SF
PATHOLOGY 1,225 SF
RADIATION THERAPY 7,580 SF
REHAB MEDICINE 132 SF
SPD SERVICE 7,086 SF
SURGICAL 17,089 SF
UNASSIGNED VACANT SPACE 3,558 SF
VERTICAL SPACE 2,522 SF
LEVEL NET GROSS TOTAL 91,564 SF
7,613.9 sf
SPS staff admin spaces identifi ed during site investigation.
SPS new lockers under construction during site investigation.
Vacated ASC space and location of foundation water fi ltration issue.
Area is secured and no access permitted at time of investigation.
SPS
NUTRITION
ASC
NUCLEAR MEDICINE
VA Space Allocation Plan -Basement Floor
The basement fl oor off ers opportunity to expand the existing SPS in its current location. The Ambulatory Surgery Center (ASC) is only utilizing half of the ORs provided in the surgery core. There is an existing foundation water infi ltration issue that has caused an infection control issue for the department, and the department has consolidated their suite to only one corridor of ORs. If the foundation wall is repaired, the ASC could shift to the south, gain an additional two ORs, with two
ORs reconfi gured and modernized with new technology from their current state. This reconfi guration would free up space to expand SPS to the east, into the vacated ASC area. The amount of space available for expansion allows for the construction to be phased to maintain SPS and ASC surgery operations.
There is an existing vacated shaft that is proposed for new equipment to transport carts through the building. Dirty carts are proposed for this shaft in this study. This vertical transport of materials would be applicable to all presented options and concepts in this report. The shaft location is coordinated with the facilities EHRM design and construction project currently in design and will require additional coordination as both this study and that project move forward.
VA Space Allocation Plan Basement Floor Plan Analysis
ACS SPECIALTY CARE
COMMON SPACE
EDUCATION
ENGINEERING
ENVIRONMENTAL MGMT
LINEN SERVICE
NURSING SVC ADMIN
NUTRITION/FOOD
PATHOLOGY
RADIATION THERAPY
REHAB MEDICINE
SPD SERVICE
SURGICAL
UNASSIGNED VACANT SPACE
VERTICAL SPACE
TO BLDG.
OPEN TO
BELOW
TO BLDG.
OPEN
OPEN
SURGICAL
RECOVERY
A001
1,919 SF
SURGICAL
SUPPLY
STORAGE
A001F
111 SF
SURGICAL
STORAGE
A001E
108 SF
SURGICAL
LOUNGE
A001C
161 SF
SURGICAL
SPECIMEN
ROOM
A001D
157 SF
SURGICAL
OFFICE
A002
192 SF
SURGICAL
OPERATING ROOM
A003
380 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A004
368 SF
SURGICAL
OPERATING ROOM
A005
528 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A006
361 SF
UNASSIGNED
VACANT SPACE
STORAGE
A007
101 SF
SURGICAL
SUPPLY STORAGE
A009
429 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A010
387 SF
SURGICAL
OPERATING ROOM
A011
561 SF UNASSIGNED VACANT SPACE
STORAGE
A012
374 SF
UNASSIGNED
VACANT SPACE
STORAGE
A013
108 SF
UNASSIGNED VACANT SPACE
OPERATING ROOM
A015
386 SF
SURGICAL
EQUIPMENT
STORAGE
A017
97 SF
SURGICAL
OPERATING ROOM
A018
364 SF
UNASSIGNED
VACANT SPACE
H.A.C.
A020
46 SF
UNASSIGNED VACANT SPACE
OXYGEN TANK STORAGE
A029
64 SF
SURGICAL
CHASE
RCCB03C
7 SF
UNASSIGNED
VACANT SPACE
CHASE
RCCB04C
8 SF
SURGICAL
CHASE
RCCB05C
17 SF
UNASSIGNED
VACANT SPACE
CHASE
RCCB06C
7 SF
SURGICAL
CHASE
RCCB08C
8 SF
SURGICAL
CHASE
RCCB07C
9 SF
SURGICAL
CHASE
RCCB10C
8 SF
UNASSIGNED
VACANT SPACE
CHASE
RCCB09C
7 SF
SURGICAL
CHASE
RCCB11C
15 SF
COMMON
SPACE
RCCB01R
7 SF
SURGICAL
CHASE
RCCB01C
93 SF
SURGICAL
CHASE
RCCB02C
12 SF
COMMON SPACE
CORRIDOR
RCCB02R
1,685 SF
COMMON SPACE
CORRIDOR
RCCB03R
1,319 SF
SPD SERVICE
PUMP ROOM STORAGE
A021
236 SF
SPD SERVICE
GAS CONTAINER STORAGE
A022B
45 SF
SPD SERVICE
EQUIPMENT STORAGE
A023C
1,529 SF
SPD SERVICE
LINEN
A023D
280 SF
SPD SERVICE
H.A.C.
A023E
40 SF
SPD SERVICE
CART WASH
A025C
112 SF
SPD SERVICE
LINEN
A023F
348 SF
ENVIRONMENTAL
MGMT
H.A.C.
A025B
29 SF
ENVIRONMENTAL
MGMT
H.A.C.
A025D
48 SF
SPD SERVICE
SUPPLY STORAGE
A024C
85 SF
ENVIRONMENTAL
MGMT
LOCKER ROOM
A024A
144 SF
SPD SERVICE
STERILE
PROCESSING
A023I
244 SF
SPD SERVICE
STORAGE
RCCB04R
37 SF
SPD SERVICE
PREPERATION &
STERILIZATION
A025
3,808 SF
ENVIRONMENTAL MGMT
LOCKER ROOM
A024B
125 SF
SPD SERVICE
OFFICE
A023G
155 SF
COMMON SPACE
MECHANICAL ROOM
A023J
70 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB12C
7 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB13C
7 SF
COMMON
SPACE
RCCB05R
3 SF
SPD SERVICE
CHASE
RCCB14C
9 SF
SPD SERVICE
STORAGE
RCCB06R
37 SF
COMMON SPACE
CORRIDOR
RCCB07R
60 SF
SURGICAL
ANESTHESIA WORK ROOM
B003
478 SF
SURGICAL
H.A.C.
B006
62 SF
LINEN SERVICE
LINEN
B006B
144 SF
SURGICAL
BLOOD GAS ANALYSIS
B008A
117 SF
COMMON
SPACE
RCCB08R
19 SF
SURGICAL
OFFICE
B009
174 SF
SURGICAL
LOCKER ROOM
B010
322 SF
SURGICAL
TOILET
B010A
143 SF
SURGICAL
LOUNGE
B011
291 SF
SURGICAL
COPY ROOM
B012
259 SF
SURGICAL
LOCKER ROOM
B014
385 SF
SURGICAL
TOILET
B014A
139 SF
SURGICAL
CHASE
RCCB15C
45 SF
COMMON
SPACE
RCCB09R
4 SF
COMMON SPACE
CORRIDOR
RCCB10R
363 SF
COMMON SPACE
CORRIDOR
RCCB11R
471 SF
COMMON SPACE
CORRIDOR
RCCB12R
268 SF
VERTICAL
SPACE
STAIR
RCCB13R
141 SF
SURGICAL
PATIENT HOLDING
B016
583 SF
SURGICAL
SOILED UTILITY
B017
81 SF
SURGICAL
TOILET
B016B
36 SF
SURGICAL
CHASE
RCCB16C
12 SF
SURGICAL
CONFERENCE ROOM
B018
265 SF
SURGICAL
CHASE
RCCB17C
10 SF
COMMON SPACE
CORRIDOR
RCCB14R
1,423 SF
SURGICAL
OFFICE
B019
836 SF
SURGICAL
OFFICE
B019B
88 SF
SURGICAL
OFFICE
B019C
93 SF
SURGICAL
TOILET
B020B
46 SF
COMMON SPACE
CORRIDOR
RCCB15R
174 SF
SURGICAL
TOILET
B020A
38 SF
SURGICAL
RECEPTION
B020
715 SF
SURGICAL
EXAM
B022A
99 SF
SURGICAL
EXAM
B022B
84 SF
SURGICAL
EXAM
B022C
83 SF
SURGICAL
EXAM
B022D
82 SF
SURGICAL
EXAM
B022E
76 SF
SURGICAL
EXAM
B022F
77 SF
SURGICAL
EXAM
B022G
131 SF
SURGICAL
URODYNAMIC
LAB
B022H
192 SF
SURGICAL
TOILET
B022I
37 SF
SURGICAL
UTILITY
B023D
48 SF
COMMON SPACE
CORRIDOR
RCCB16R
520 SF
SURGICAL
CHASE
RCCB19C
7 SF
SURGICAL
TOILET
B024A
30 SF
SURGICAL
TOILET
B023C
30 SF
SURGICAL
TOILET
B023B
33 SF
SURGICAL
STORAGE
B026
133 SF
SURGICAL
PROCEDURE
ROOM
B027
260 SF
SURGICAL
LOCKER ROOM
B024
163 SF
SURGICAL
RECOVERY
B023
1,353 SF
SURGICAL
DRESSING
ROOM
B024B
34 SF
SURGICAL
DRESSING
ROOM
B024C
34 SF
SURGICAL
H.A.C.
B024F
26 SF
SURGICAL
CHASE
RCCB20C
13 SF
SURGICAL
CHASE
RCCB21C
12 SF
SURGICAL
LOCKER ROOM
B024D
57 SF
SURGICAL
LOCKER ROOM
B024E
47 SF
SURGICAL
DECONTAMINATION
ROOM
B025A
48 SF
SURGICAL
SOILED UTILITY
B025B
48 SF
SURGICAL
CLEAN ROOM
B029B
95 SF
SURGICAL
PROCEDURE ROOM
B028
350 SF
SURGICAL
PROCEDURE ROOM
B029
346 SF
COMMON SPACE
CORRIDOR
RCCB17R
470 SF
SURGICAL
CHASE
RCCB22C
8 SF
SURGICAL
CHASE
RCCB24C
20 SF
SURGICAL
CHASE
RCCB23C
14 SF
SURGICAL
CHASE
RCCB25C
7 SF
SURGICAL
CHASE
RCCB27C
7 SF
SURGICAL
CHASE
RCCB26C
18 SF
SURGICAL
ANESTHESIA STORAGE
B036
717 SF
SURGICAL
OFFICE
B036A
96 SF
ENVIRONMENTAL
MGMT
H.A.C.
B030
50 SF
NURSING SVC ADMIN
WHEEL CHAIR STORAGE
B031
2,144 SF
ENVIRONMENTAL
MGMT
TOILET
B032
57 SF
ENGINEERING
ELEVATOR MACHINE ROOM
B033
114 SF
SURGICAL
ELECTRICAL CLOSET
B037A
50 SF
COMMON SPACE
CORRIDOR
RCCB18R
1,147 SF
COMMON
SPACE
RCCB19R
23 SF
COMMON SPACE
CORRIDOR
RCCB21R
1,004 SF
COMMON
SPACE
RCCB20R
25 SF
SURGICAL
C005A
3 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB28C
12 SF
VERTICAL SPACE
ELEVATOR
RCCB29C
81 SF
ENGINEERING
COMMUNICATIONS
B040
1,114 SF
ENGINEERING
BED REPAIR
B039
1,338 SF
SURGICAL
ANESTHESIA STORAGE
B037
1,061 SF
SURGICAL
TELEPHONE CLOSET
B037C
12 SF
SURGICAL
COMPUTER
ROOM
B037B
14 SF
SURGICAL
ELECTRICAL CLOSET
B037D
23 SF
COMMON
SPACE
RCCB22R
2 SF
ACS-SPECIALTY CARE
WAITING ROOM
B038
527 SF
ACS-SPECIALTY CARE
EXAM
B038C
127 SF
ACS-SPECIALTY CARE
EXAM
B038D
143 SF
ACS-SPECIALTY CARE
EXAM
B038E
143 SF
ACS-SPECIALTY
CARE
EXAM
B038F
92 SF
ACS-SPECIALTY CARE
EXAM
B038G
92 SF
ACS-SPECIALTY CARE
OFFICE
B038H
154 SF
ENVIRONMENTAL MGMT
TOILET
B038I
38 SF
VERTICAL SPACE
STAIR
RCCB30C
156 SF
ENGINEERING
COMMUNICATIONS
B040A
69 SF
SPD SERVICE
OXYGEN TANK
STORAGE
C003
67 SF
NUTRITION/FOOD
ELECTRICAL CLOSET
C003A
229 SF
ENGINEERING
STORAGE
C004
140 SF
VERTICAL SPACE
CHASE
C004a
49 SF
VERTICAL
SPACE
CHASE
RCCB31C
25 SF
VERTICAL SPACE
CHASE
C099
68 SF
SURGICAL
OFFICE
C005
124 SF
SURGICAL
OFFICE
C006
144 SF
REHAB MEDICINE
OFFICE
C007
132 SF
ENVIRONMENTAL
MGMT
TOILET
C008
40 SF
SURGICAL
OFFICE
C009
261 SF
NUTRITION/FOOD
OFFICE
C010
230 SF
SURGICAL
CHASE
RCCB32C
12 SF
ENVIRONMENTAL
MGMT
CHASE
RCCB33C
9 SF
ENGINEERING
TOILET
C021
508 SF
ENGINEERING
CHASE
RCCB39C
8 SF
ENGINEERING
CHASE
RCCB38C
12 SF
NUTRITION/FOOD
OFFICE
C011
331 SF
ENGINEERING
ELECTRICAL
STORAGE
C012
180 SF
NUTRITION/FOOD
OFFICE
C012
302 SF
ENVIRONMENTAL MGMT
SOILED LINEN ROOM
C012A
152 SF
ENGINEERING
STORAGE
C012C
73 SF
ENGINEERING
STORAGE
C012D
109 SF ENGINEERING
STORAGE
C012E
45 SF
COMMON SPACE
ELECTRICAL CLOSET
C014
793 SF
NUTRITION/FOOD
TOILET
C015
84 SF
NUTRITION/FOOD
TOILET
C016
82 SF
NUTRITION/FOOD
CHASE
RCCB34C
14 SF
COMMON SPACE
ELECTRICAL CLOSET
C017
1,810 SF
NUTRITION/FOOD
OFFICE
C018
411 SF
NUTRITION/FOOD
CHASE
RCCB35C
13 SF
COMMON SPACE
ELECTRICAL CLOSET
C022
1,623 SF
VERTICAL SPACE
STAIR
RCCB36C
159 SF
VERTICAL
SPACE
CHASE
RCCB37C
25 SF
COMMON SPACE
C020
44 SF
COMMON
SPACE
C020A
10 SF
COMMON SPACE
CORRIDOR
RCCB23R
1,900 SF
NUTRITION/FOOD
H.A.C.
C029
33 SF
NUTRITION/FOOD
TOILET
C025
88 SF
NUTRITION/FOOD
CHASE
RCCB41C
13 SF
VERTICAL SPACE
ELEVATOR
RCCB42C
75 SF
VERTICAL SPACE
ELEVATOR
RCCB43C
149 SF
VERTICAL SPACE
STAIR
RCCB40C
155 SF
NUTRITION/FOOD
ELECTRICAL
CLOSET
C026
99 SF
ENGINEERING
UTILITY
RCCB24R
57 SF
NUTRITION/FOOD
FRIDGE
C024
445 SF
NUTRITION/FOOD
FRIDGE
C025A
316 SF
COMMON SPACE
CORRIDOR
RCCB25R
803 SF
NUTRITION/FOOD
FRIDGE
C025B
365 SF
NUTRITION/FOOD
FREEZER
C031A
713 SF
NUTRITION/FOOD
THAW BOX
C031
326 SF
NUTRITION/FOOD
LOCKER ROOM
C032H
44 SF
NUTRITION/FOOD
H.A.C.
C032G
54 SF
NUTRITION/FOOD
H.A.C.
D011D
47 SF
NUTRITION/FOOD
TOILET
D011E
47 SF
NUTRITION/FOOD
MAIN KITCHEN
C032
8,333 SF
NUTRITION/FOOD
DISH ROOM
C032A
1,243 SF
NUTRITION/FOOD
H.A.C.
C032C
36 SF
NUTRITION/FOOD
DRY FOOD STORAGE
C032D
906 SF
NUTRITION/FOOD
LIQUID STORAGE
C032E
393 SF
NUTRITION/FOOD
FRIDGE
C032F
318 SF
NUTRITION/FOOD
OFFICE
C032K
115 SF
NUTRITION/FOOD
OFFICE
C032L
176 SF
VERTICAL SPACE
CHASE
RCCB44C
74 SF
SPD SERVICE
RCCB26R
26 SF
SPD SERVICE
RCCB27R
28 SF
RADIATION THERAPY
NURSE STATION
D008D
306 SF
NUTRITION/FOOD
TOILET
D001
78 SF
NUTRITION/FOOD
TOILET
D002
73 SF
NUTRITION/FOOD
H.A.C.
D004
36 SF
NUTRITION/FOOD
STORAGE
D005
125 SF
RADIATION THERAPY
STORAGE
D006
166 SF
RADIATION THERAPY
SUPPLY STORAGE
D006A
131 SF
RADIATION THERAPY
STORAGE
D006B
133 SF
SURGICAL
RCCB28R
72 SF
VERTICAL SPACE
ELEVATOR
RCCB45C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB46C
75 SF
VERTICAL SPACE
ELEVATOR
RCCB47C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB48C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB49C
74 SF
VERTICAL SPACE
ELEVATOR
RCCB50C
86 SF
VERTICAL SPACE
ELEVATOR
RCCB51C
87 SF
VERTICAL SPACE
ELEVATOR
RCCB52C
86 SF
COMMON SPACE
CORRIDOR
RCCB29R
1,595 SF
NUTRITION/FOOD
CHASE
RCCB53C
11 SF
VERTICAL SPACE
STAIR
RCCB54C
196 SF
NUTRITION/FOOD
CHASE
RCCB55C
14 SF
RADIATION THERAPY
STORAGE
D007
431 SF
RADIATION THERAPY
DARK ROOM
D007B
71 SF
RADIATION THERAPY
RADIATION THERAPY
D007C
429 SF
RADIATION THERAPY
RECEPTION
D008
156 SF
RADIATION
THERAPY
WASH ROOM
D008A
59 SF
RADIATION
THERAPY
MEDS
D008B
58 SF
RADIATION THERAPY
OFFICE
D008C
122 SF
COMMON SPACE
CORRIDOR
RCCB30R
964 SF
COMMON
SPACE
RCCB31R
18 SF
COMMON SPACE
RCCB32R
24 SF
RADIATION THERAPY
OFFICE
D008M
328 SF
RADIATION THERAPY
EXAM
D008K
118 SF
RADIATION THERAPY
EXAM
D008J
144 SF
RADIATION THERAPY
COBALT THERAPY
D008I
477 SF
RADIATION THERAPY
CONSULT
RCCB33R
108 SF
RADIATION
THERAPY
TOILET
D008E
80 SF
RADIATION
THERAPY
TOILET
D008F
75 SF
RADIATION THERAPY
RADIATION THERAPY
D008H
574 SF
RADIATION THERAPY
CHASE
RCCB56C
23 SF
COMMON SPACE
CHASE
RCCB58C
68 SF
VERTICAL SPACE
ELEVATOR
RCCB57C
75 SF
COMMON SPACE
CORRIDOR
RCCB34R
1,731 SF
VERTICAL
SPACE
ELEVATOR
RCCB60C
59 SF
VERTICAL
SPACE
ELEVATOR
RCCB59C
59 SF
VERTICAL SPACE
STAIR
RCCB61C
38 SF
EDUCATION
TRAINING ROOM
D009
1,626 SF
NUTRITION/FOOD
PATIENT DINING
D009A
333 SF
NUTRITION/FOOD
CORRIDOR
RCCB36R
64 SF
NUTRITION/FOOD
CHASE
RCCB62C
65 SF
EDUCATION
ENTRY
RCCB35R
110 SF
NUTRITION/FOOD
STORAGE
D009F
122 SF
NUTRITION/FOOD
CHASE
RCCB64C
10 SF
NUTRITION/FOOD
CHASE
RCCB63C
21 SF
COMMON
SPACE
RCCB37R
3 SF
NUTRITION/FOOD
H.A.C.
D009E
32 SFNUTRITION/FOOD
FRIDGE
D009G
159 SF
NUTRITION/FOOD
CHASE
RCCB65C
16 SF
NUTRITION/FOOD
DEEP FREEZE
D009H
106 SF
NUTRITION/FOOD
DESSERT REFRIG
D009I
106 SF
RADIATION THERAPY
WAITING ROOM
D010
289 SF
RADIATION THERAPY
CHASE
RCCB66C
7 SF
RADIATION THERAPY
OFFICE
D010A
86 SF
RADIATION
THERAPY
EXAM
D010B
87 SF
RADIATION THERAPY
EXAM
D010C
99 SF
RADIATION THERAPY
EXAM
D010D
98 SF
RADIATION THERAPY
OFFICE
D010E
476 SF
RADIATION
THERAPY
DRESSING
ROOM
D010F
128 SF
RADIATION
THERAPY
SUPPLY
STORAGE
D010G
41 SF
RADIATION
THERAPY
STORAGE
CLOSET
D010I
41 SF
RADIATION THERAPY
RADIATION THERAPY
D010J
879 SF
RADIATION THERAPY
ELECTRICAL CLOSET
D010K
135 SF
RADIATION THERAPY
ELECTRICAL CLOSET
D010N
24 SF
RADIATION
THERAPY
LINEN
D010Q
40 SF
COMMON SPACE
CORRIDOR
RCCB38R
1,607 SF
RADIATION THERAPY
CHASE
RCCB67C
4 SF
RADIATION THERAPY
CHASE
RCCB69C
54 SF
RADIATION THERAPY
RECEPTION
RCCB39R
49 SF
RADIATION THERAPY
CHASE
RCCB68C
24 SF
RADIATION THERAPY
OFFICE
D011A
297 SF
RADIATION THERAPY
OFFICE
D011B
257 SF
NUTRITION/FOOD
LOUNGE
D011F
124 SF
RADIATION THERAPY
STORAGE
D011G
443 SF
RADIATION
THERAPY
RCCB40R
29 SF
COMMON SPACE
CORRIDOR
RCCB41R
205 SF
PATHOLOGY
WORK ROOM
D012
172 SF
PATHOLOGY
FRIDGE
D013
192 SF
PATHOLOGY
AUTOPSY SUITE
D014
616 SF
PATHOLOGY
TOILET
D015
111 SF
PATHOLOGY
H.A.C.
D016
42 SF
PATHOLOGY
TOILET
D017
77 SF
PATHOLOGY
CHASE
RCCB70C
9 SF
PATHOLOGY
CHASE
RCCB71C
7 SF
COMMON SPACE
CORRIDOR
RCCB42R
180 SF
COMMON SPACE
CORRIDOR
RCCB43R
55 SF
COMMON
SPACE
ELEVATOR
MACHINE
ROOM
D021
108 SF
COMMON SPACE
MECHANICAL ROOM
D018
746 SFCOMMON
SPACE
COMM CLOSET
D018A
14 SF
COMMON SPACE
ELECTRICAL CLOSET
D018B
29 SF
VERTICAL SPACE
STAIR
RCCB72C
154 SF
COMMON
SPACE
F/E CLOSET
D021A
3 SF
COMMON SPACE
CORRIDOR
RCCB44R
570 SF
VERTICAL
SPACE
ELEVATOR
RCCB73C
85 SF
NUTRITION/FOOD
GREASE ROOM
D022
343 SF
NUTRITION/FOOD
SUPPLY ROOM
D023
940 SF
NUTRITION/FOOD
CHASE
RCCB74C
38 SF
COMMON
SPACE
RCCB45R
3 SF
VERTICAL SPACE
STAIR
RCCB75R
70 SF
UNASSIGNED VACANT SPACE
CORRIDOR
RCCB76R
1,341 SF
CONTRACTING FIRM: CLIENT &
PROJECT
NAME:
DRAWING SCALE:
DRAWING TITLE:
APPROVED BY:
BLDG NUMBER:
PROJECT NUMBER:
ISSUE DATE:
NORTH ARROW
1/
/2
2:
:5
P
M
3/64" = 1'-0"CAI DEPARTMENT FLOOR PLAN - BASEMENT
EDWARD HINES, JR. VA HOSPITAL
RFP: UPDATE HINES CAPITAL ASSETS INVENTORY RECORDS
01/20/2016
578-14-012
ERIC J. KUTCHE
CAI DEPARTMENT AREA
ACS SPECIALTY CARE 1,277 SF
COMMON SPACE 23,964 SF
EDUCATION 1,736 SF
ENGINEERING 3,767 SF
ENVIRONMENTAL MGMT 718 SF
LINEN SERVICE 144 SF
NURSING SVC ADMIN 2,144 SF
NUTRITION/FOOD 18,623 SF
PATHOLOGY 1,225 SF
RADIATION THERAPY 7,580 SF
REHAB MEDICINE 132 SF
SPD SERVICE 7,086 SF
SURGICAL 17,089 SF
UNASSIGNED VACANT SPACE 3,558 SF
VERTICAL SPACE 2,522 SF
LEVEL NET GROSS TOTAL 91,564 SF
7,613.9 sf
Existing elevator shaft through all fl oors of
Building 200. Option to use 1 shaft for new cart elevator conveyor system to transport dirty materials between fl oors. Access would need to be provided at fl oors b, 1, 2, 12, 13 and
14. The EHRM project for new telecom rooms utilizes these vertical chases.
VACANT
Edward Hines, Jr. VA Medical Center | 18
VA Space Allocation Plan First Floor Plan Analysis
ACS URGENT CARE
CANTEEN SERVICE
CARDIOLOGY
CHAPLAIN
COMMON SPACE
ENVIRONMENTAL MGMT
EYE CLINIC
MEDICAL ADMIN
PATHOLOGY
PHARMACY
POLICE/SECURITY
RADIOLOGY
UNASSIGNED VACANT SPACE
VERTICAL SPACE
MEDICAL ADMIN
PATIENT ID
A126
50 SF
ACS-URGENT CARE
OFFICE
A123G
66 SF
COMMON SPACE
VESTIBULE
A100A
188 SF
COMMON SPACE
VESTIBULE
A100B
387 SF
MEDICAL ADMIN
INFO DESK
A101B
445 SF
MEDICAL ADMIN
ADMISSIONS DESK
A102A
416 SF
MEDICAL ADMIN
ADMISSIONS OFFICE
A102B
391 SF
COMMON SPACE
FIRE ALARM PANEL ROOM
A102C
56 SF
MEDICAL ADMIN
INTERVIEW
A102D
164 SF
MEDICAL ADMIN
TOILET
A102E
353 SF
MEDICAL ADMIN
TOILET
A102F
344 SF
MEDICAL ADMIN
CHASE
RCC101C
19 SF
MEDICAL ADMIN
TOILET
A102G
80 SF
COMMON SPACE
TELEPHONE CLOSET
A102I
37 SF
COMMON SPACE
ELECTRICAL CLOSET
A102J
68 SF
COMMON SPACE
CORRIDOR
A103A
4,432 SF
CANTEEN SERVICE
CAFÉ
A103B
1,063 SF
CANTEEN SERVICE
CAFÉ WORK RM.
A103C
299 SF CANTEEN
SERVICE
CAFÉ
SUPPLIES
A103D
65 SF
PATHOLOGY
BLOOD BANK
A104
1,078 SF
PATHOLOGY
OFFICE
A106
132 SF
PATHOLOGY
OFFICE
A107
113 SF
COMMON
SPACE
RCC101R
9 SF
COMMON SPACE
CHASE
RCC102C
13 SF
VERTICAL
SPACE
ELEVATOR
103C
59 SF
VERTICAL
SPACE
ELEVATOR
104C
59 SF
PATHOLOGY
CHASE
RCC105C
6 SF
PATHOLOGY
CHASE
RCC106C
28 SF
PATHOLOGY
OFFICE
A110
531 SF
RADIOLOGY
X-RAY
A111
390 SF
RADIOLOGY
ELECTRICAL CLOSET
A112
40 SF
ACS-URGENT
CARE
TOILET
A117
38 SFACS-URGENT
CARE
TOILET
A118
58 SF
ACS-URGENT
CARE
TOILET
A119
59 SF
ACS-URGENT
CARE
CHASE
RCC107C
13 SF
ACS-URGENT
CARE
ELECTRICAL
CLOSET
A129B
49 SF
ACS-URGENT
CARE
ELECTRICAL
CLOSET
A121A
44 SF
ACS-URGENT
CARE
ELECTRICAL
CLOSET
A129A
42 SF
ACS-URGENT CARE
OFFICE
A121B
96 SF
ACS-URGENT CARE
OFFICE
A129D
103 SF
ACS-URGENT CARE
OFFICE
A121
1,230 SF
COMMON SPACE
CHASE
68 SF
COMMON
SPACE
CHASE
RCC108C
12 SF
COMMON
SPACE
CHASE
RCC110C
13 SF
ACS-URGENT
CARE
H.A.C.
A105
43 SF
ACS-URGENT CARE
STORAGE
RCC102R
17 SF
ACS-URGENT CARE
WAITING / RECEPTION
A122
1,151 SF
ACS-URGENT CARE
OFFICE
A123A
116 SF
ACS-URGENT CARE
LOUNGE
A123D
159 SF
ACS-URGENT
CARE
BREAK ROOM
A123E
167 SF
ACS-URGENT CARE
LOCKER ROOM
A123F
85 SF
ACS-URGENT
CARE
CHASE
RCC111C
9 SF
COMMON
SPACE
CORRIDOR
RCC103R
131 SF
ACS-URGENT CARE
TREATMENT ROOM
A142S
124 SF
POLICE/SECURITY
SECURITY
A124
149 SF
ACS-URGENT CARE
OFFICE
A127
105 SF
ACS-URGENT CARE
SOILED UTILITY
A128
102 SF
ACS-URGENT CARE
TREATMENT ROOM
A129C
145 SF
ACS-URGENT
CARE
TOILET
A130
40 SF
ACS-URGENT CARE
NURSE STATION
A142A
299 SF
VERTICAL SPACE
STAIR
RCC112C
158 SF
ACS-URGENT CARE
BREAK ROOM
A142B
165 SF
ACS-URGENT CARE
MEDICINE ROOM
A142F
56 SF
ACS-URGENT
CARE
CHASE
RCC113C
32 SF
ACS-URGENT CARE
CHASE
RCC114C
7 SF
ACS-URGENT CARE
STORAGE
A142G
118 SF
ACS-URGENT CARE
TREATMENT ROOM
A142H
104 SF
ACS-URGENT CARE
ANTE ROOM
A142I
101 SF
ACS-URGENT CARE
TREATMENT ROOM
A142J
137 SF
ACS-URGENT CARE
TREATMENT ROOM
A142K
107 SF
ACS-URGENT CARE
TREATMENT ROOM
A142L
120 SF
ACS-URGENT CARE
TREATMENT ROOM
A142M
129 SF
ACS-URGENT CARE
TREATMENT ROOM
A142N
114 SF
ACS-URGENT CARE
EXAM
A142P
120 SF
ACS-URGENT CARE
TRIAGE
A142Q
118 SF
ACS-URGENT CARE
CONSULT
A142R
120 SFACS-URGENT CARE
CHASE
RCC115C
14 SF
ACS-URGENT CARE
TREATMENT ROOM
A142T
120 SF
ACS-URGENT CARE
TREATMENT ROOM
A143
128 SF
ACS-URGENT CARE
TREATMENT ROOM
A144A
238 SF
ACS-URGENT
CARE
EXAM
A146A
96 SF
ACS-URGENT
CARE
EXAM
A146B
81 SF
ACS-URGENT
CARE
EXAM
A146C
100 SF
ACS-URGENT
CARE
EXAM
A146D
91 SF
ACS-URGENT
CARE
WORK STATION
A146E
95 SF
ACS-URGENT CARE
TREATMENT ROOM
A146F
136 SF
ACS-URGENT CARE
TREATMENT ROOM
A146G
139 SF
ACS-URGENT
CARE
H.A.C.
A146H
24 SF
ACS-URGENT CARE
TREATMENT RM
A146J
124 SF
COMMON SPACE
CORRIDOR
RCC104R
355 SF
ACS-URGENT CARE
CHASE
RCC116C
90 SF
COMMON SPACE
CORRIDOR
A125B
422 SF
COMMON SPACE
CORRIDOR
1,098 SF
COMMON SPACE
CORRIDOR
RCC106R
2,490 SF
ACS-URGENT CARE
PATIENT INTERVIEW
RCC107R
200 SF
ACS-URGENT CARE
UTILITY
A147
84 SF
ACS-URGENT CARE
CONFERENCE ROOM
A148
185 SF
ACS-URGENT CARE
OFFICE
A149
124 SF
ACS-URGENT CARE
OFFICE
A150
126 SF
ACS-URGENT CARE
OFFICE
A152
123 SF
EYE CLINIC
WAITING ROOM
A153
793 SF
EYE CLINIC
CHASE
RCC117C
23 SF
EYE CLINIC
PHARMACY
A155
99 SF
EYE CLINIC
EXAM
A156
150 SF
EYE CLINIC
EXAM
A157
92 SF
EYE CLINIC
EXAM
A158
92 SF
EYE CLINIC
EXAM
A159
144 SF
EYE CLINIC
EXAM
A160
109 SF
EYE CLINIC
EXAM
A161
122 SF
EYE CLINIC
EXAM
A162
118 SF
EYE CLINIC
EXAM
A163
128 SF
EYE CLINIC
EXAM
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .