P01 - 10 Infection Control Risk Assessment (ICRA).docx

DOCX document 24 KB Posted

Attached to
C1DA--578-375 Expand Sterile Processing - Hines for Building 200 (VA-23-00068948)
Solicitation number
36C77623R0126
Issued by

About this file

This document is an Infection Control Risk Assessment (ICRA) for a construction project at a Veterans Affairs medical facility. The ICRA outlines four classes of construction activity based on dust levels and risk groups, with increasing precautions required for higher class projects. Class I projects involve low dust activities in low risk areas, while Class IV projects entail major demolition and construction in highest risk clinical spaces. The ICRA specifies containment, barrier, cleaning, and personal protective equipment requirements for contractors to minimize airborne dust and cross-contamination during projects classified from Class I through IV. Signatures from the contractor, project planner, supervisor, and infection control are required on the completed ICRA.

The related federal contract opportunity is a pre-solicitation notice from the Department of Veterans Affairs for expansion of the sterile processing department at the Hines VA Medical Center. The notice provides basic information about the planned procurement but does not include response dates, award dates, pricing terms, or set-aside designations.

View the file

Other files

File Type Posted
SF330 amendment 0001.docx DOCX document
P01 - 14 OIT Horizontal Cable Requirements.pdf PDF
P01 - 12 Contractor Parking.pdf PDF
P01 - 13 AE Design Checklist.pdf PDF
P01 - 16 No Smoking Policy 10-1-19.pdf PDF
P01 - 19b SOW Final Study of SPS Space in Building 200.pdf PDF
P01 - 08 Pre-Construction Risk Assessment (PCRA).docx DOCX document
P01 - 05 Cutting Welding and Other Hot Work.pdf PDF
P01 - 09 Interim Life Safety Measures (ILSM).docx DOCX document
P01 - 19c SOW Final Study of SPS Space in Building 200.pdf PDF
P01 - 02 Hines Underground Utility Plan.pdf PDF
P01 - 21 VHA Directive 1116(2) dated 3-23-16.pdf PDF
P01 - 04 Safety and Health During Construction Activities.pdf PDF
P01 - 15 Fire Protection Code Reviews.pdf PDF
P01 - 03 Pre-Construction Checklist.pdf PDF
P01 - 07 Above Ceiling Entry and Wall Construction Permits.pdf PDF
P01 - 06 Dig Permit SOP Form.pdf PDF
P01 - 19d SOW Final Study of SPS Space in Building 200.pdf PDF
P01 - 20 Sterile Processing Service Design Guide 9-1-22.pdf PDF
P01 - 19a SOW Final Study of SPS Space in Building 200.pdf PDF
P01 - 11 Contractor PIV Instructions and Form.pdf PDF
P01 - 01 SPS Expansion Plans.pdf PDF
Design SOW 578-375 Expand SPS for Building 200 -Final.pdf PDF
36C77623R0126.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Infection Control Risk Assessment for Construction / Renovation Projects

Project Name:
Project or Work-Order Number:
Project Manager or COR:
Extension:
Building Number:
Floor(s)/Room(s):
Start date:
Projected completion date:
Construction Activity
Infection Control Risk Group

☐ TYPE A: DUST LEVEL Low Non-invasive activity, low noise, no vibration.

☐ GROUP 1: LOW

Office areas, FMS areas, all non-patient care areas.

☐ TYPE B: DUST LEVEL: Moderate to High Small scale, short duration, low-moderate noise, low-moderate vibration.

☐ GROUP 2: MEDIUM

All other patient care areas including general medicine floors, ultrasound, Rehab, Occupational Therapy.

☐ TYPE C: DUST LEVEL Moderate to High Requires more than one work shift (independent of working days) to complete, low-moderate noise, moderate–high vibration

☐ GROUP 3: MEDIUM/HIGH

ED, Radiology/MRI, admissions, food service areas, laboratories.

☐ TYPE D: DUST LEVEL High Major demolition and construction activities. Requires consecutive work shifts, moderate-high noise, moderate-high vibration

☐ GROUP 4: HIGHEST

Operating rooms, SPS, ICU’s, Outpatient areas, oncology, anesthesia, post anesthetic recovery, all endoscope areas, Pharmacy, Renal Dialysis

Project Class Determination Matrix

Construction Activity Type Risk Group Type “A” Type “B” Type “C” Type “D”

Group 1
I
II
II
III
Group 2
I
II
III
IV
Group 3
I
III
III
IV
Group 4
III
IV
IV
IV

Contractors Actions by Project Class

All personnel will have Emergency Preparedness training/posting/ID card.

CLASS

I

1. Execute work to minimize air-borne dust dispersed into atmosphere from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

3. Contain construction waste before transport in tightly covered containers.

4. Clean work area upon completion of task including wiping surfaces with disinfectant.

5. Contact EMS for appropriate preparation for return to operation(s).

CLASS

II

In addition to above:

6. Post the signed ICRA at the entrance.

7. Isolate work area from patients/staff. Use appropriate temporary barriers and more permanent containment methods (i.e., seal holes in walls, tape gaps in doors, etc.)

8. Water mist work surfaces to control dust while cutting.

9. Block off and seal supply air vents. Place filter over return/exhaust vents.

10. Place dust mat or wipe feet at entrance/exit of work area.

11. Wet mop and/or vacuum w/HEPA filtered vacuum before leaving work areas.

CLASS

III

In addition to above:

12. Install barriers to create a negative pressure ante room and/or workroom.

13. Maintain negative air pressure in work area at all times until completion utilizing HEPA-equipped air filtration units.

14. Vacuum personnel with HEPA vacuum before leaving. Or, Don-Doff coveralls each time leaving work site. All wear shoe covers changed each time exiting the area.

15. Vacuum the entire work area with HEPA vacuums or wet mop with disinfectant at the completion of project.

16. Do not remove barriers until completed project is inspected by Safety, IC-Team, EMS, and Area Manager.

17. Carefully remove barriers to minimize spread of dirt and debris. Contact EMS for final clean.

CLASS

IV

In addition to above:

18. Provide a disinfectant wipe down of any tool carts or waste transports prior to leaving the containment area.

19. Do not remove barriers until terminal clean is performed inside work zone and barriers are included in the cleaning process.

20. Perform 2nd terminal cleaning after removal of barriers. Contact EMS for final clean.

Signatures
Date

Contractor’s Signature:

(Projects Only)

Project Planner or Maintenance Worker Signature:

Supervisor Signature:

Infection Control: