This document contains questions and answers regarding a federal solicitation for construction of a parking garage at the Department of Veterans Affairs Medical Center in West Haven, Connecticut. The solicitation seeks a design-bid-build project to construct a new parking garage within the period of performance. The awarded contractor will be responsible for coordinating with on-site systems and following all plans and specifications while mitigating impacts to operations and managing storage constraints. Relevant details include requirements for site utilities integration, communications and security systems tie-ins, elevator specifications, and sustainable construction standards.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The SF1442, Block 10 states that “There will be no bid deducts included in this project. Please fill in the single CLIN on the price schedule.” The specifications and drawings indicate several bid options. Please clarify.
a. The Bid Alternate Deducts in the specifications will not be used for this project and have been replaced with the single CLIN identified on the Price Schedule inclusive of all work.
2. AE501 Detail 2 shows a precast ledge (for support of the precast double tee stems). Some precast manufacturers utilize spot corbels on their spandrels for this purpose. General notes for Structural Precast on SI002 state that the precast supplier is responsible for all design and details of the precast members and their connection. Are these details just representative and can the precast supplier utilize their standard details, as long as the aesthetics and layout of the deck are not impacted?
a. Spot Corbels are acceptable to A/E. VA Concurs with A/E’s recommendations.
3. AE501 Detail 1 thru 5 show the wire metal mesh fall deterrent connection details. These are noted at the inside face of openings. The connections for these will conflict with the prestressing strand in the panels. Strands are located at the top and bottom of panels. The first expansion anchor should be 5” from the top or bottom of spandrel. The details may need to be revised to work with precast details. Please clarify how to handle?
a. Extend vertical support member so first expansion anchor is 5” from the top of the spandrel.
4. SF502 details 6, 7, 8 & 9 calls for steel canopy embeds to be by precast manufacturer. There are no reaction loads provided at these embeds for the precast firm to design them appropriately. Please provide embed design for precast manufacturer to price accordingly?
a. Loading information for canopies is provided on SI003.
5. In the New England area, precast parking structures washes are typically not utilized around the perimeter of the garage. Can New England precast parking structure standards be utilized on this project and eliminate the requirement for these perimeter washes?
a. Parking garage to have washes as shown on plans.
6. The SF Drawings call for field applied cast-in-place concrete washes within the parking structure. In New England it is industry standard to utilize precast washes in a lot of cases. There will still be field applied cast-in-place concrete washes required in some locations around stairs, drains, and skewed corners, but most could be precast. Is it acceptable for precast washes to be utilized on this project where they can be?
a. Use of precast washes are acceptable.
7. The SF Drawings call out precast product sizes (i.e.: 8” thick spandrels and walls). General notes for Structural Precast on SI002 state that the precast supplier is responsible for all design and details of the precast members and their connection. Are these details just representative and can the precast supplier utilize member sizes per their designs, as long as the aesthetics and layout of the deck are not impacted?
a. Changes to precast details and product sizes are acceptable, provided that formal RFIs are issued for the VA and A/E to determine the full impact of said change on the project. Contractor shall be responsible for all additional costs that their proposed changes to the design incur. GC to coordinate all changes required based on design. Updated construction documents will not be provided for bidding but changes will be captured in Record Drawings.
8. The precast spandrel details shown on SF503 for the snow chute location does not work structurally. General notes for Structural Precast on SI002 state that the precast supplier is responsible for all design and details of the precast members and their connection. Are these details just representative and can the precast supplier utilize their standard details per their design calculations, as long as the function ability and layout of the chute are not impacted?
a. A/E and VA finds this acceptable.
9. Specification 03 45 00 is for architectural precast cladding. Exterior structural products will receive an architectural finish but fall under the requirements of Structural precast. Please confirm all products on this parking structure fall under specification 03 41 33 for structural precast?
a. Yes, All Precast will fall under 03 41 33.
10. If specification 03 45 00 is not applicable, will a mockup panel still be required as called for in this specification?
a. Yes, a mockup panel is required.
11. Specification 09 06 00 calls for the precast concrete to have a light gray finish and references PCI 228. PCI 228 calls for white cement with dye. Is it the Architects intent for this to be the precast firm’s standard grey concrete utilizing 100% grey cement? Please clarify.
a. Wall panels visible from the exterior to have PCI 228 Color. Double tees and lite walls panels may be precasters standard concrete mix.
12. Drawing AE301 indicate vertical litewall construction for the interior ramp / shear wall that are 14’ wide with gaps in between. There are a number of concerns with this layout, i.e. the vertical walls create shipping concerns in CT; the gaps between the walls require fall protection during erection; and vertical litewalls themselves are a safety concern during erection to some precast firms. Is it possible to use horizontal litewall design? General notes for Structural Precast on SI002 state that the precast supplier is responsible for all design and details of the precast members and their connection. Are these details just representative and can the precast supplier utilize their standard details per their design calculations, as long as the function ability and layout of the chute are not impacted?
a. Changes to precast product design are acceptable, provided that formal RFIs are issued for the VA and A/E to determine the full impact of said change on the project. Contractor shall be responsible for all additional costs that their proposed changes to the litewall design incur. GC to coordinate all changes required based on horizontal litewall design. Updated construction documents will not be provided for bidding but changes will be captured in Record Drawings.
13. Specification 09 06 00 - 2.7 Division 09 Finishes and 09 67 23 .30 call for Resinous Urethane & Epoxy Mortar Flooring (Res-6A and Res-6B) w/ integral cove base. We do not find Resinous, Urethane, Res-6A/B flooring, nor cove base on the drawings. Epoxy Flooring is found in Detail 1-/AE401 for elevator cab flooring, and in Detail 13-AE601 which states ”POURED CONCRETE FLOOR SLAB w/ EPOXY FINISH RE:STRUCTURAL”. We do not find any info for Epoxy Finish in the structural drawings. Are there tow (2) flooring types called for and if so where are each of these flooring types used / located?
a. Provide elevator flooring per 09 67 23.60 - Resinous Urethane and Epoxy Mortar Flooring
14. Please provide the geotechnical report that was developed for this project.
a. Provided.
15. Reference 1/AE311. Should the head details for the fall protection be labeled and refer to detail 2/AE501 in lieu of detail 3?
a. Use Detail 3/ae501 if Spot corbels are used. Use detail 2/AE501 if a Precast ledge is used.
16. Under Part 4.16 Clauses Incorporated by Reference, please include / add FAR Clause 52.216-4 for Economic Price Adjustment for Labor & Materials due to the current economic climate.
a. This is a firm fixed price contract.
17. Stainless steel connectors are noted in specification section 03 45 00, but not in 03 41 33 for structural precast. Are stainless steel connectors required in 03 41 33?
a. No, all Precast will fall under 03 41 33.
18. On sheet AE-501 Detail 14 titled “Typical Wire Metal Mesh Fall Deterrent Elevation- Wall Punch Out” chain link fence is shown as the material for these panels. Please clarify the material for the panels at the shear wall punch outs. Chain link or wire metal mesh?
a. Provide Chain link per Spec, 32 31 13 CHAIN LINK FENCES
19. Please provide a specification for the chain link fencing.
a. Provided Spec, 32 31 13 CHAIN LINK FENCES
20. Please indicate on the drawings where both the 07 14 21 – Latex Mastic Deck Covering and the 07 18 13 – Pedestrian Traffic Coatings occurs.
a. Provide 071421 – Latex Mastic Deck Covering as shown on Sheet AE102.
21. Reference sump pump detail 1 on plumbing drawing PP501 and plumbing piping shown on PP101 for the sump pump. Please advise if an oil/water separator is required on the discharge piping? Please confirm that the discharge of the sump pump shall be indirect connection to the storm sewer via a floor drain as shown?
a. Response: (Miller-Remick, Paul D.) Separator is shown on the site civil drawings. The sump pump is discharging to a sanitary floor drain. VA concurs.
22. Reference plumbing drawings PP101 – PP501. Please confirm that there is no requirement for hose bibbs in the parking garage?
a. Response: (Miller-Remick, Paul D.) No internal hose bibbs are to be provided. VA concurs.
23. Reference mechanical drawing MI701, Ductless Split System Schedule, Notes 8, 9, & 10. Reference electrical drawing EI502, Detail 2, BAS Riser Diagram. Please confirm that each of the split systems shall be provided with BACNET Modbus interface and connected to the existing JCI control system in Building 2, Room G100. Please provide information on the existing JCI (BAS) control panel currently installed in Room G100? Please advise if we are to include adding graphics to the existing control system for the new mini splits or just the basic status, i.e., on/off/alarm? Please clarify the thermostats noted on the BAS riser?
a. Response: (Miller-Remick, Michael R.) Yes, each split system shall be provided with BACNET Modbus interface and connected to the existing JCI control system in Building 2, Room G100 via the new control panel. Contractor can inspect existing JCI control panel during pre-bid site visit, no further information is available. Just basic status is required (on/off/alarm). EI502, Detail 2 should show no thermostat in B109, and should show two thermostats in B105. Overall quantities shall remain the same. VA concurs.
24. Reference electrical drawing EP001, room where the new ATS (ATS-10) is noted and electrical drawing EI601, single line distribution drawing for the new ATS-10. Please confirm that it is acceptable to install the new automatic transfer switch in the normal power distribution room? Please provide a sequence of operation for the new automatic transfer switch, i.e., upon loss of normal power the start contacts shall close and start the emergency generators….? Please provide an as-built wiring diagram for the existing emergency generators and the controls currently installed for starting the generators and if the controls have a spare set of contacts for interfacing the ATS-10 into the existing generator system. Please provide a location and floor plan for where the generator controls are located. Please provide information on the manufacturer of the generator control panel which manages and controls the starting of the generator/(s) and the sequencing of each of the ATS(s), i.e., life safety loads – 1st, etc.
a. Response: (Miller-Remick, Manny C.). The start/stop circuit wiring from the ATS shall connect to the existing SCADA system/panel located in the electrical room. The contractor shall procure the services of the site’s preferred SCADA vendor identified on the documents for all work associated with the on-campus SCADA system. The location of the ATS as currently shown on documents is acceptable. VA concurs.
25. My company provides the federal government with offsite group satellite long and short term monthly parking spaces. Will the VA hospital require any offsite parking while construction is taking place?
a. Offsite parking is not part of this solicitation.
26. Are we required to submit hard copies of the Bid Guarantee, or will scanned copies be acceptable with the electronic version of the proposal? If hard copies are required, are they to be received by your office prior to the submission deadline?
a. Scanned copies will satisfy the solicitation requirement. After acceptance of an offer, paper copies will need to be mailed to the office.
Program Contracting Activity Central (PCAC) 6100 Oak Tree Blvd., Suite 490 Independence, OH 44131
27. Concerning Attachment 11 – Breakdown of Division Pricing. Are all sheets of this spreadsheet required to be submitted, or just the Summary Sheet? If all sheets are required, this will put us over the 10 page limit for this volume. Please clarify.
a. The division breakdown of pricing is intended to be completed in its entirety by the contractor. It should be noted that the division pricing breakdown attachment will not be included in the page count limitation referenced in Section 2.8 Proposal Requirements B. c. 1
b. Section 2.8 Proposal Requirements B. c. 1 Is hereby revised to state “Volume II Price shall not exceed a total of TEN (10) pages in Arial size 12 font. Attachment -11 Breakdown of Division Pricing will NOT count towards this page limitation.”
28. Can a very similar version (more user friendly) that we have of the Price Breakdown spreadsheet (attachment 11) be utilized? We have used this spreadsheet on other VA parking garage projects in the past.
a. Please use the Attachment 11 – Breakdown of Division Pricing provided as this will ensure all offerors are using the same document.
29. Will the VA provide a Form CERT-134 to the awarded contractor for sales tax exemptions?
a. No, this project is not tax exempt and the VA will not issue/sign any tax exempt forms. Offerors shall include all taxes in accordance with FAR 52.229-3 “Federal, State and Local Taxes.”
30. Reference Specification Section 01 81 13, Sustainable Construction Requirement. Please clarify the scope of work for sustainable construction for this project, i.e., meeting the recycled material requirement, etc.?
a. The Design Professional has selected materials and utilized integrated design processes that achieve the Government’s objectives. Contractor is responsible to maintain and support these objectives in developing means and methods for performing work and in proposing product substitutions or changes to specified processes. Obtain approval from Contracting Officer for all changes and substitutions to materials or processes. Proposed changes must meet, or exceed, materials or processes specified.
31. Reference Specification Section 01 81 13, Sustainable Construction Requirement. Please advise if we will be required to submit any type of building certification under the Sustainable Construction Requirement?
a. The Design Professional has selected materials and utilized integrated design processes that achieve the Government’s objectives. Contractor is responsible to maintain and support these objectives in developing means and methods for performing work and in proposing product substitutions or changes to specified processes. Obtain approval from Contracting Officer for all changes and substitutions to materials or processes. Proposed changes must meet, or exceed, materials or processes specified.
32. Reference Specification Section 27 05 11 and Drawing EI502. The specification outlines the requirement for a complete communication system and cameras in the emergency call system. The riser diagrams for the support systems on drawing EI502 detail a fiber communication link back to the existing host systems in the existing facility. Please clarify the scope of work for the communication link from the new Parking Garage back to the host equipment. Also, the riser for the emergency call box does not indicate close circuit cameras for the emergency call boxes, please clarify.
a. Response: (Miller-Remick, Manny C.) Coordinate required tie-in location in room G100 along with required system programming with the site’s system integrator. VA Concurs.
33. Reference Specification Section 28 23 00 and Drawing EI502. The specifications outline a requirement for a complete video surveillance system which includes the video assessment and control system for the noted closed circuit camera system. The riser diagram for the CCTV shows a new server rack with network video recorder (NVR) and fiber communication link back to the existing network in building B2. Please clarify if the CCTV system is an expansion of the existing system or a completely new system with the associated hardware and software for managing the video surveillance system.
a. Response: (Miller-Remick, Manny C.) This system is an expansion of the existing system, as shown on EI501, and the JCI contact is listed for coordinated integration into the existing systems on site. VA Concurs.
34. Reference Specification Section 34 71 13, Paragraphs 1.2.F. and G. Please clarify the location of any perimeter security fencing and/or deployable vehicle barriers.
a. Perimeter security fencing and deployable vehicle barriers not needed on this project.
35. Reference Specification Section 10 75 00, Flagpoles. Please clarify the location of any flagpoles.
a. Existing Flagpole to be protected in Place. Specification provided for contractor’s option to remove and replace versus protect in place.
36. Reference Specification Section 11 12 00, Parking Controls and Detail 5 on EI502 and Detail 4 on EI503. Please clarify the required displays at the entrances to the parking garage, i.e., total available spaces plus parking garage full or what information is to be displayed on the counter display(s).
a. Refer to sign Elevation 10/AP511. Contractor to provide submittals with display options for VA review and approval. Displays to include total available spaces, types of spaces, where open spaces are located, what floor, if garage is full, etc.
37. Does Access Control tie into VA Police? Please provide a set of as-built drawings for the existing access control system and note where we are to tie into the existing system.
a. Response: (Miller-Remick, Manny C.) Yes. Integration shall be coordinated with campus systems contractor listed on EI502. VA Concurs.
38. Is the expectation to have CCTV viewable by VA Police? Please provide a set of as-built drawings for the existing closed circuit tv (CCTV) system and note where we are to tie into the existing system.
a. Response: (Miller-Remick, Manny C.) Yes. Integration shall be coordinated with campus systems contractor listed on EI502. VA Concurs.
39. Please provide a set of as-built drawings for the existing fire alarm system and note where we are to tie into the existing system.
a. Response: (Miller-Remick, Manny C.) Integration shall be coordinated with campus systems contractor listed on EI503 and tie-in location is shown on EI503, Detail 3. VA Concurs.
40. Shall the CB 4 phone be Analog or IP? Please provide a set of as-built drawings for the existing emergency call system and note where we are to tie into the existing system.
a. Response: (Miller-Remick, Manny C.) CB 4 phone will be IP. Integration shall be coordinated with campus systems contractor listed on EI502. VA Concurs.
41. Please advise on the color for the emergency call box system
a. Response: (Miller-Remick, Manny C.) Per specification 27 05 11, section 1.5.A.23, emergency call telephones shall have blue strobe. Contractor shall coordinate with the systems integrator to match the existing emergency call boxes located on site. VA Concurs.
42. Please provide a set of as-built drawings for the existing building automation (BAS/DDC) system and note where we are to tie into the existing system.
a. Response: (Miller-Remick, Michael R.) See EI502 for tie-in location and campus systems integrator contact information for coordination. VA Concurs.
43. Please provide a set of as-built drawings for the existing energy metering system and note where we are to tie into the existing system.
a. Response: (Miller-Remick, Manny C.) Refer to SCADA system notes on EI601. VA Concurs.
44. Please provide a set of as-built drawings for the existing intercom system and note where we are to tie into the existing system.
a. Response: (Miller-Remick, Manny C.) Integration shall be coordinated with campus systems contractor listed on EI503 and tie-in location is shown on EI503, Detail 3. VA Concurs.
45. Will the VA's Telecom Support Staff make the final connections to the VA's existing network for each of the support systems that require a connection to the VA's Network?
a. Response: (Miller-Remick, Manny C.) Contractor is required to make the final connections but shall coordinate all work with the VA support staff prior to any work. VA Concurs.
46. The detail labeled “CONCRETE BOLLARD” on sheet CS502 illustrates a removable bollard. We cannot locate any of these on the site plan sheet CS101. Are any required for this project?
a. No removeable bollards required for this project.
47. Should detail 9/AP501 be utilized for the interior bollards on grade level in lieu of the detail on CS502?
a. Detail 9/AP501 is acceptable.
48. Detail 10/AP501 illustrates a bolted bollard. We cannot locate any of these on the floor plans. Are any required for this project?
a. No Bolted Bollards are identified.
49. Reference 1, 2 and 3/SF402. The decking on the canopies just says 3", 20GA, but doesn't give a type. The only types that fit that size are Composite, which is floor decking, and Type N which is typically for acoustic purposes. Is this correct and if so, which type is desired?
a. Use 1 ½” 20 Ga. Metal Roof deck in lieu of composite deck. See amendment 1.
50. Reference Instructions, Conditions and Other Statements to Bidder/Offerors, Part 2.8.D.1 Volume 1, Factor 1, Prior Experience. Can the past performance time frame be extended to 6 years in lieu of 5 years?
a. The Past performance time frame remains the 5-year period.
51. Reference Instructions, Conditions and Other Statements to Bidder/Offerors, Part 2.8.B.b.1. Volume 1 Technical. Can the page limit for Volume 1 be expanded some from the listed 20 page limit?
a. Section 2.8 Proposal Requirements B. b. 1 Is hereby revised to state: The offer, including title page, detailed table of contents, preface, for Volume I Technical shall not exceed a total of Twenty-Five (25) pages in Microsoft Arial size 12 font.
52. Reference CS101. Where does Note 23 occur concerning stainless steel handrail? We cannot locate this note designation on this site plan.
a. Handrail is located on both sides of stairs near SE pedestrian entrance to garage.
53. Reference CS502. One of the stair rail details states ‘galvanized rail’ while others call for stainless steel. Which is correct?
a. Stainless steel handrail is intended. Base plate and concrete anchors may be galvanized.
54. Reference CS502, Handrail Connection detail. Can the mounting method be core drill / grouted if so desired, or does it have to be bolted down with a plate as shown here?
a. Handrail shall be bolted with base plate as shown.
55. Reference spec section 14 24 00. Will the VA accept an elevator manufacturer's standard elevator fixtures, i.e., car operating panel, call buttons, rails, guides, etc. in lieu of the custom elevator package indicated in the specifications?
a. Elevator package shall be as required/indicated in the specifications.
56. Reference spec section 14 24 00. Will the VA accept an elevator manufacturer's standard elevator controller, or do we have to provide one which provides a custom machine room monitoring package?
a. Elevator package shall be as required/indicated in the specifications.
57. Reference SI002, note under FOUNDATIONS states that “Per Geotech Report, top 5 to 7 feet of fill must be removed from within and 5 feet beyond construction limits”. Please define whether 5 or 7 feet of undercut and backfill should be calculated.
a. Remove 5 to 7 feet of fill as required within excavation limits. Excavation limits are the construction limits plus an additional 5 feet beyond.
58. Reference sheet SB101. At the intersection of column lines 6-B, shouldn’t the lite wall be closed off at this point considering the plan east direction is backfilled earth ramp with a SOG?
a. Yes. Provide 10” infill panel at this location. See amendment 1.
59. Will fall protection fencing be required along the top of the lite wall (column line B) between columns lines 2 and 5?
a. Fall Deterrent is not required at the top level of the lite wall above 42” above finished floor surfaces, where used as a pedestrian guardrail.
60. 6/SF502 illustrates a rod hung style canopy. The architectural drawings do not indicate a rod hung canopy for this location. Please clarify the correct mounting application for this canopy.
a. Maintain rod hung style canopy as shown on 6/SF502
61. Are the interior stair railings unpainted galvanized? Please verify.
a. Stair railing are to be Galvanized as finish.
62. Reference details on AE501 for the Fall Deterrent. Please verify that it is the intent that all structural components / members be fabricated of aluminum and that the wire mesh is a vinyl coated galvanized steel? On the details, most of the members are labeled as anodized, so just confirming.
a. Anodized Aluminum is the basis of design. A fully galvanized steel and powder coated assembly is acceptable.
63. Reference RFP Pg. 9 - B. Proposal Format. Can the cover page, title page, and detailed table of contents be excluded from any page counts listed in the RFP so all designated page limits may be dedicated to the content required for evaluation?
a. Addressed in answers for #27 and #51, the revised format is below:
Section 2.8 Proposal Requirements B. b. 1 Is hereby revised to state: The offer, including title page, detailed table of contents, preface, for Volume I Technical shall not exceed a total of Twenty-Five (25) pages in Microsoft Arial size 12 font
Section 2.8 Proposal Requirements B. c. 1 Is hereby revised to state: Volume II Price shall not exceed a total of TEN (10) pages in Arial size 12 font. Attachment -11 Breakdown of Division Pricing will NOT count towards this page limitation.
64. Reference RFP Pg. 10 - B.8. Attachment 5 provided by the government for this solicitation is the "Design Phase (100% CD) Commissioning Plan". Please confirm that Attachment 9 is the correct Safety and Environmental Information Form.
a. Attachment 9 is the correct form. The incorrect solicitation number is removed from the Attachment 9 contained in with amendment 0006.
65. Reference RFP Pg. 10 - B.8. Attachment 9, "Contractor Safety and Environmental Record Evaluation Form" requests data for 2022. This information is not yet available. Please advise on how the government would like contractors to respond to this portion of the form.
a. Provide the most recent data available for the Contractor Safety and Environmental Record form.
66. Reference RFP Pg. 11 - B.8.a. Please confirm if offerors are to include a copy of their OSHA 300 Logs to satisfy the requirements of RFP section B. Proposal Format: D, 8. a. If YES, please clarify what years are to be included.
a. Most recent three years are to be included
67. Reference RFP Pg. 12 - D.2.A. Other than the page size of the schedule being 11" x 17", and the project being completed within the period of performance, are there any other specific requirements for the proposal schedule?
a. The stated requirements are as follows: A. To construct garage within period of performance. B. Phasing plan following project solicitation plans, and specifications demonstrating ability to follow documents and mitigate major impacts to patient care, pedestrian travel, vehicular traffic, and manage offsite storage as well as limited onsite storage. C. Understanding of site constraints and working within those constraints outlined in the plans and specifications.
Acceptable is defined as the Offeror demonstrated the ability to meet all of the Government’s minimum requirements as identified in the solicitation. Unacceptable is defined as the Offeror failed to demonstrate the ability to meet all of the Government’s minimum requirements as identified in the solicitation.
68. Reference RFP Pg. 13 - E. Volume II - Price Proposal Requirement. In VOL II Price, we are required to submit the Price Breakdown provided in Attachment 11 plus the SF 1442 (2 pages), Bid Bond (3 pages), A.3 Price/Cost Schedule (1-page). All these items together will exceed the 10-page limit given for VOL II as Attachment 11 is 25 pages long. Will the Government adjust or eliminate the maximum page limit for this volume given that all the information is required?
a. Section 2.8 Proposal Requirements B. c. 1 Is hereby revised to state “Volume II Price shall not exceed a total of TEN (10) pages in Arial size 12 font. Attachment -11 Breakdown of Division Pricing will NOT count towards this page limitation.”
69. Reference RFP Pg. 59- Attachment 7. Attachment 7 provides VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR CONSTRUCTION. This same text is also provided on pages 59-61 of 72 in the RFP (duplicate material). Are we required to complete both Attachment 7 and VAAR 852.219-77 from the RFP, though they are duplicate items?
a. Please ensure that information is submitted from either Attachment 7 or VAAR 852.219-77 from the RFP with any offer submitted.
70. Reference sheet SI002 – Shop Drawing Submittals, note 4 Precast concrete components to be submitted. Erection drawings, layouts, elevations, sections, and design calculations are typically all that is submitted for precast drawing submittals. Do individual piece drawings require submittal?
a. Individual piece drawings do not need to be submitted, provided the erection drawings/calculations have sufficient information for review.
71. Reference sheet SI002 – Concrete: Reference for cement to conform to ASTM C150, Type 1, UNO. Does this note apply to the cement used for the structural precast also? If so, is Cement Type III acceptable in all precast components?
a. Reference Specification 03 41 33, Section 2.1-A: Portland cement ASTM C150, Type I or Type III
72. Reference sheet SB502 – Details 2 & 3: Please confirm that a baseplate and anchor bolt connection is acceptable for connection of columns to the foundation in lieu of the insert/dowel connection shown?
a. Precast connection by manufacturer. Submit all relevant information alongside erection drawings. GC to ensure coordination between occurs between foundations and precast
73. Reference sheet SB502 – Detail 4: Please confirm that a rebar/sleeve grouted connection is acceptable for connection of precast walls to the foundation in lieu of the insert/dowel connection shown?
a. Precast connection by manufacturer. Submit all relevant information alongside erection drawings. GC to ensure coordination between occurs between foundations and precast
74. Reference sheets SF101-SF105 – Framing Plans. Drainage slopes shown on the plans result in a 0.5% slope, which is much less than typically found in the Northeast. Drainage is typically established during the precast engineering and design shop drawing phase of the project. Desired slopes for the NE should be 1.0% - 1.5%. Please confirm that this can be addressed during this phase?
a. Changes to precast details and product sizes are acceptable, provided that formal RFIs are issued for the VA and A/E to determine the full impact of said change on the project. Contractor shall be responsible for all additional costs that their proposed changes to the design incur. GC to coordinate all changes required based on design. Updated construction documents will not be provided for bidding but changes will be captured in Record Drawings.
75. Reference sheet SF203 – Shearwall Elevation @ Gridline B: 14’ wide vertical shearwall / litewalls exceed manufacturers standard component sizes and cause additional costs, as well as transportation and safety concerns during erection. Can manufacturer’s standard horizontal shearwall / litewalls be provided in lieu of the vertical shearwall / litewalls shown? If no to horizontal shearwall / litewalls, can manufacturer’s standard 8’/12’ wide vertical shearwall litewalls be provided?
a. Changes to precast details and product sizes are acceptable, provided that formal RFIs are issued for the VA and A/E to determine the full impact of said change on the project. Contractor shall be responsible for all additional costs that their proposed changes to the design incur. GC to coordinate all changes required based on design. Updated construction documents will not be provided for bidding but changes will be captured in Record Drawings.
76. Reference sheet SF501 – Details 12 & 13: Please confirm that a rebar/sleeve grouted connection is acceptable for connection of precast walls to the foundation in lieu of the welded base connection shown?
a. Precast connection by manufacturer. Submit all relevant information alongside erection drawings. GC to ensure coordination between occurs between foundations and precast
77. Reference sheets AE320 & AE323 – Precast Stairs: The precast stairs and landings appear to be shown as separate pieces. Are switch back type stairs (stairs with integral landings, treads, risers) acceptable?
Switch back type stairs are acceptable.
78. Reference sheet SF105 – Precast inverted tee along grid ‘B, between grids (1-2) at Level 5 (ROOF) Issue: Inverted tee beam does not close off the deck. Request: Please confirm a typical load-bearing spandrel beam similar as shown in detail 18 on drawing SF501 should replace the specified precast inverted tee beam.
a. Use of a standard spandrel beam is acceptable.
79. Reference sheets SF101 thru SF105 – Precast Shearwalls at Ends of garage lines ‘1’ & ‘8’: The shearwall does not currently indicate a concrete pilaster built in to the shearwall where the inverted tee girder frames into the shearwall. Can concrete pilaster be built-in to the shearwall at the grid ‘B’?
a. Contractor to match design intent as shown on drawings.
80. Reference sheets SF101 thru SF105 – West Stair: 8” thick stair wall may not be able to support load-bearing spandrels and double tee framing members. Can a concrete column & supporting column pilaster be added adjacent to the east end of the stair wall to support the load-bearing spandrel in lieu of trying to support the load-bearing spandrel off the stair wall?
a. Contractor to match design intent as shown on drawings.
81. Reference sheets SF101 thru SF105 – Double Tees between Grids 7-8: The drawing indicates two (2) double tees between grid ‘7’ and the west end of the east stair wall; however, the space between grid ‘7’ and the west end of the stair tower is 27’-6” which exceeds the width of two (2) - 12’-0” nominal tees. Please confirm three (3) double tees acceptable at this location.
a. Use of smaller tees is acceptable, provided no changes are made to the design intent of the stair tower.
82. Reference structural and architectural elevation drawings. Panel joints are not shown on drawings. Please confirm it is acceptable to provide panel joints where necessary.
a. Panel joints are at the discretion of the precaster and will be reviewed in the shop drawings.
83. Reference Specification 03 41 33 Page 2, paragraph 1.4B.2. – Production drawings: Production shop drawings are not generally submitted as part of the shop drawing package. Can this requirement be removed from specifications.
a. Submit production drawings as specified.
84. Reference Specification 03 41 33 Page 6, paragraph 2.1C. – Lightweight Coarse Aggregate: Typically parking garages in New England do not use lightweight aggregate due to durability concerns. Is the lightweight aggregate applicable to the precast concrete garage components for this project?
a. Use of lightweight aggregate is not required, provided contractor submitted mix designs meet the design intent outlined in the drawings and specifications.
85. Reference Specification 03 41 33 Page 8, paragraph 2.3E. – Epoxy-coated reinforcing steel: Is the specified use of epoxy coated reinforcing steel intended to include welded wire mesh reinforcing and prestressing strand, or is it only applicable to reinforcing bars?
a. Epoxy coating in referenced spec section is only applicable to reinforcing bars.
86. Reference Specification 03 45 00 Page 1, paragraph 1.3A. – Fabricator Qualifications: Reference is made to PCI MNL 117 in this paragraph and many other paragraphs of this specification section. Please confirm that the precast products for this project are structural precast concrete components and are to be governed by PCI MNL 116 in lieu of PCI MNL 117.
a. All Precast will fall under 03 41 33.
87. Reference Specification 03 45 00 Page 7, paragraph 1.7D. – Product Delivery, Storage and Handling: Please confirm providing detailed drawings locating connection hardware and anchorage items to be embedded in or attached to other construction in lieu of templates is acceptable.
a. Precast Detailed drawings are acceptable.
88. Reference Specification 03 45 00 Page 11, paragraph 2.1B. – Mold Materials: Is a formliner finish required for this project, or this only applicable say if thin brick are being utilized? If ‘Form Liner’ is applicable to the precast concrete garage components provide manufacturer of liner, liner type and locations where liner is required.
a. Form liner is not required per precast design.
89. Reference Specification 03 45 00 Page 12, paragraph 2.3A.1. – Use gray and/or white: Provide the percentage of gray versus white cement for surfaces exposed to view for the exterior finished surfaces.
a. Wall panels visible from the exterior to have PCI 228 Color. Double tees and lite walls panels may be Precasters standard concrete mix.
90. Reference Specification 03 45 00 Page 13, paragraph 2.3C.2.b. – White Sand: Confirm the intent for the exterior precast concrete garage components is to have white stone & white sand (the same white stone aggregate crushed into sand)
a. Wall panels visible from the exterior to have PCI 228 Color. Double tees and lite walls panels may be Precasters standard concrete mix.
91. Reference Specification 03 45 00 Page 13, paragraph 2.3D. – Lightweight Coarse Aggregate Is lightweight aggregate applicable to the precast concrete garage components for this project?
a. All Precast will fall under 03 41 33.
92. Reference Specification 03 45 00 Page 13, paragraph 2.3F.1 – Coloring Admixture. Is this required? If so, provide coloring admixture (color pigment) dosage to use in the exterior precast concrete garage component mix.
a. All Precast will fall under 03 41 33.
93. Reference Specification 03 45 00 Page 14, paragraph 2.5 – Stainless-Steel Connection Materials Are stainless-steel connection material applicable to this project? If so, where are they required?
a. All Precast will fall under 03 41 33.
94. Reference Specification 03 45 00 Page 16, paragraph 2.8 – Stone Material and Accessories Please confirm this paragraph is not applicable to the precaster’s scope of work.
a. All Precast will fall under 03 41 33.
95. Reference Specification 03 45 00 Page 17, paragraph 2.9E. – Lightweight Concrete Back-Up Mixes Is lightweight concrete back-up mixes applicable to the precast concrete garage components for this project?
a. All Precast will fall under 03 41 33.
96. Reference Specification 03 45 00 Page 18, paragraph 3.2 Stone Veneer Facings Please confirm Stone Veneer Facings not applicable to this project scope of work.
a. All Precast will fall under 03 41 33.
97. Reference Specification 03 45 00 Pages 22 & 23, paragraph 3.5 Finishes Please confirm finishes 3.5A.4, 3.5A.5, 3.5A.7, 3.5A.8, 3.5A.9 or 3.5A.10 are not applicable to this project scope of work.
a. All Precast will fall under 03 41 33.
98. Reference Specification 03 45 00 Page 23, paragraph 3.6A. – Erection Preparation: Please confirm providing detailed drawings locating connection hardware and anchorage items to be embedded in or attached to other construction in lieu of templates is acceptable.
a. All Precast will fall under 03 41 33.
99. Referencing Drawing AE501. The fall deterrent mesh panel calls for galvanized steel vinyl covered wire mesh with aluminum trim on perimeter and anodized aluminum tube frame. Having dissimilar materials within the same panel assembly will greatly hinder the fabrication process. In lieu of aluminum with vinyl covered wire mesh would the design team accept a complete steel assembly that would be fully galvanized and then receive a powder coated finish? Will other Value Engineering options for the fall deterrent system be entertained for review?
a. Yes, Fully galvanized steel and powder coated assembly is acceptable.
100. Reference specification 07 13 52 – Waterproofing. Unable to locate on the drawings where this scope of work is to be applied. Please indicate where the waterproofing is to go.
a. Provide 071421 – Latex Mastic Deck Covering as shown on revised Sheet AE102.
101. Reference specification 03 30 00 2.2.P – Moisture Vapor Emissions & Alkalinity Control Sealer. Where is this product to be applied?
a. Contractor to apply where below grade concrete surfaces are in contact with contaminated soil.
102. Reference specification 03 30 00 2.2.Q – Penetrating Sealer. Where is this product to be applied? Is it to be applied on both on-grade and elevated horizontal concrete decks of the parking garage, except where traffic coating is located (once it is defined where it goes)?
a. Apply to on-grade and elevated horizontal concrete decks except where traffic coating is located.