This document contains an amendment to a solicitation for construction services. The Department of Veterans Affairs is seeking bids to renovate training and administrative space at their facility in Hines, Illinois. Key details include responses to contractor questions on specifications, drawings, and clarifications. Topics addressed relate to fire protection, equipment lead times, occupancy during construction, required personnel, asbestos handling, and finishes. The amendment provides additional specification sections. Bids are due by 11:00 AM Eastern Time on September 19, 2022. The award date was not specified.

View the file

Other files

File Type Posted
36C77622B0050 0003.docx DOCX document
36C77622B0050 0002.pdf PDF
36C77622B0050 0001.zip ZIP file
Attachment 10 - Interim Life Safety Measures (ILSM) 02.pdf PDF
Attachment 19 - Hines VA Campus Site Plan.pdf PDF
Attachment 15 - No Smoking Policy 10-1-19.pdf PDF
Attachment 11 - Infection Control Risk Assessment (ICRA).pdf PDF
Attachment 1 - EHRM Upgrade - Phase 2 Construction Drawings - Part 1.pdf PDF
Attachment 8 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
Attachment 3 - EHRM Training and Admin Space Support - Specifications- Rev1.pdf PDF
36C77622B0050_1.docx DOCX document
Attachment 12 - Contractor PIV Instructions and Form.pdf PDF
Attachment 14 - OIT Horizontal Cable Requirements.pdf PDF
Attachment 23 - VHA Supplemental Contract Requirements for Combatting COVID-1912-14-2021.docx DOCX document
Attachment 13 - Contractor Parking.pdf PDF
Attachment 20 - Limitations on Subcontracting.docx DOCX document
Attachment 16 - Infection Control Barrier Sample.pdf PDF
Attachment 00 - SOW 578-21-706 Construction.docx DOCX document
Attachment 17 - Hines COVID-19 Guidelines.pdf PDF
Attachment 9 - Pre-Construction Risk Assessment (PCRA).pdf PDF
Attachment 2 - EHRM Upgrade -Phase 2 Construction Drawings - Part 2.pdf PDF
Attachment 5 - Safety and Health During Construction Activities.pdf PDF
Attachment 4 - Pre-Construction Checklist.pdf PDF
Attachment 21 - Contractor Safety and Environmental Form.docx DOCX document
Attachment 6 - Cutting Welding and Other Hot Work.pdf PDF
Attachment 7 - Dig Permit SOP Form.pdf PDF
Attachment 22 - Hines Construction Wage Rates 6-24-2022 Cook.pdf PDF
Attachment 18 - Hines Underground Utility Plan.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

9-19-2022

578-21-706 36C776 Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

00076 Department of Veterans Affairs Department of Veterans Affairs

6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77622B0050 09-19-2022

X

This amendment is to address additional RFI's - see continuation sheet

All other terms and conditions remain the same

Samantha Mihaila Contracting Officer

RFI
AE Response
SOW states that Edgeguard will be required for IC, Attachment 11 states the IC is a level II. The existing 1st floor isn't a patient occupied area. Can fire resistant poly sheathing be used rather than edgeguard?
Yes
Equipment lead time for this project is between 24-48 weeks, will the VA provide an administrative NTP or increase the POP?
No to both
Will the first-floor space be occupied during construction?
Yes
Will afterhours work be required if first floor space is to be occupied?
No
SOW states RFI questions are due 5 days after site visit, but the RFP states the RFI questions are due 8-25-22, which is correct?
RFP Prevails
Please confirm bid is due at 11:00 MDT and not EST.
BID due in EST – MDT
Spec Section 00 01 15 - 4 calls out electrical drawings but the Electrical drawings cover sheet has a different list of sheets, please confirm if the electrical drawings are missing sheets such as ED104 or E604.
Sheets ED103 and E604 shows up in the Amendment Set posted. The cover sheet and 00 01 15 specifications omitted both of these sheets unintentionally. ED104 is not a document in this set.
01 00 00 - 3 E. - Please confirm what the work hours are - 6:00 - 2:30pm, SOW states M-F 6-4pm.
6-4pm
01 35 26 - 23 I. Final Cleanup: Please confirm all airducts shall be cleaned prior to final inspection.
Yes
Quality Control Specification is missing, please provide a QC spec
QC requirements are provided in each specification. This section will not be provided.
Please confirm SSHO, CQC and a Superintendent will be required full time onsite for the duration of the work.
Due to accelerated timeline the government will allow the site superintendent to also function as the SSHO so long as the contractor can provide supporting documentation the superintendent is qualified to perform the duties of the SSHO. The site superintendent must be onsite at all times whenever construction work is occurring. Neither the contractor’s own workforce nor any subcontractor’s labor are allowed to work onsite unsupervised by the prime contractor. If there is a pause in the construction schedule, the site superintendent is not required to be onsite. It is the contractor’s responsibility to maintain a secure construction site at all times whether they are onsite or not. The government will allow the contractor’s project manager to also function as the QC. The site superintendent will not be allowed to function as the QC.
02-82-11 - 1 B. According to the specification the asbestos abatement is unknown at this time. If Asbestos is encountered will it be treated as a change order to the contract?
During demolition all asbestos was removed however if asbestos is encountered it will be unforeseen.
AE101 - #8 Please provide a section and detail for the ramp. Does the ramp get poured over the existing floor, are we to sawcut and remove existing? Dowel in the concrete ramp to existing.
Note 7 and Note 8 on sheet AE101 will be removed in the ADDENDUM 03. The ramp and infill will not be necessary. However, Door 100 will be changed to be frame Type 2 and the door height will modified to be 7’-4” +/- VIF.
AE102 - GN B - Please clarify, note calls for polished or painted concrete but the flooring schedule calls for sealed concrete.
Follow Room Finish Schedule. General Note B will be removed. Provide two coats of a water-based concrete sealer with matte finish were shown on Room Finish Schedule.
AE102 - GN C - The condition of the concrete on the first floor and the second floor is very poor. Is the intent of GN-C to patch & grind all areas that are to receive sealer? Would it be more cost effective to pour an overlay on all areas?
Contractors shall bid drawings and specs. Alternative methods can be discussed after Award.
AE102 - GN D - STC Testing, is there a specification to follow for the STC testing?
Perform testing in accordance with ASTM E336.
AD101 - GN #6 - Has the concrete column paint been tested for LBP? If not, will testing be required? If LBP is discovered will it be treated as an extra to the contract?
See specification section 02 83 33.13 Lead-based Paint Removal and Disposal, Part 1.1.
AD101 - GN #6 - By stripped, are you requiring a chemical stripping of the paint down to bare concrete? Can we mechanically wire brush the loose paint off?
See specification section 02 83 33.13 Lead-based Paint Removal and Disposal, Parts 2 and 3.
AE311 - #4 - Please provide a spray foam specification, current insulation specification doesn’t address sprayed on foam.
Bid non-expanding spray foam insulation at locations shown in drawings.
AE602 - #1 - Are HMF to be grouted when installed in masonry walls?
Yes
S102 - #6 - Please provide a section of the infill area.
See detail 7/S201.
05 12 00 - Please confirm fabricator must be AISC Certified Plant and Erector must be AISC certified erector.
Yes, per specification Part 1.5
Please provide a specification for the concrete floor sealer.
Provide two coats of a water-based concrete sealer with matte finish were shown on Room Finish Schedule.
10 11 13 Please provide BOD for Markerboards
See Finish Legend on sheet AI800.
AI800 The drawings state to provide shades on classrooms with exterior windows, please confirm which classrooms will require shades.
See note 5 on sheet AC142
12 24 00 Drawings state to install lightproof shades, spec calls for cloth, vertical and venetian, will any of these shades be required and were.
Locations per AC142 and Finish Legend. An Amendment will follow removing the 12 24 00 Window Shade specification. Provide Lightproof Shades only.
Spec: 08 71 00 – It is unclear if door hardware set HW-E4.1 or HW-E4.2 contains the auto door operator. Also, it appears that set HW-SH-4B contains an auto operator. Please confirming which hardware sets contain auto door operators.
HW-E4.1 Contains the Auto Door Operator as it is the Entry door. HW-E4.2 Does not.

HW-SH-4B will not have an auto-operator. Reference to auto-operator at this door will be removed.

Drawing E603 says to “maintain primary feeder” of the existing 4160V, 225kVA, 480/277v transformer being demolished. Drawing E604 shows the new transformer, which is replacing the existing to be removed, without a primary source. The one-line on E604 illustrates a new conduit and feed between the new transformer and the existing transformer immediately adjacent. Why/how are we to maintain the existing primary cable/feeder ? Is the existing to remain transformer currently feeding the transformer which is to be demolished and replaced? Where is the existing primary feed that we are to maintain emanating from?
The primary source for the existing to be removed and the new pad mount transformer is the adjacent transformer’s second set of primary bushings. Both transformers are fed from one primary feeder from transformer TR3 in Building 202 per E604.