36C26318B0038-A00004000.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C26318B0038
About this file
36C26318B0038 A00004 36C26318B0038 A00004.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26318C0059-000.docx | DOCX document | |
| 36C26318B0038-A00004001.pdf | ||
| 36C26318B0038-A00004005.pdf | ||
| 36C26318B0038-A00004002.pdf | ||
| 36C26318B0038-A00004003.pdf | ||
| 36C26318B0038-A00004004.pdf | ||
| 36C26318B0038-A00003000.docx | DOCX document | |
| 36C26318B0038-A00002000.docx | DOCX document | |
| 36C26318B0038-A00001001.pdf | ||
| 36C26318B0038-A00001002.pdf | ||
| 36C26318B0038-A00001000.docx | DOCX document | |
| 36C26318B0038-001.docx | DOCX document | |
| 36C26318B0038-002.pdf | ||
| 36C26318B0038-003.pdf | ||
| 36C26318B0038-004.pdf | ||
| 36C26318B0038-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00004 05-01-2018 568-18-3-9977-0001 568-16-101 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 4101 Woolworth Avenue, Bldg C Omaha
NE
68105 36C636 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 4101 Woolworth Ave, Bldg C Omaha
NE
68105 To all Offerors/Bidders
36C26318B0038 03-19-2018
X X May 8, 2018 at 2:00 PM CDT
568-3680162-9977-854200-3220 23NR7WA03
X Project: 568-16-101, Relocate SPS and Endoscopy, VA Black Hills Health Care System, Ft Meade, South Dakota VA Contracting POC: Sharon Spohn, Email: sharon.spohn@va.gov, phone: 402-995-4510
A. This modification extends bid date, adds question/answers, revises specifications, and adds specification sections.
B. The bid date is extended from May 3, 2018 at 1:00 pm to Tuesday, May 8, 2018 at 2:00 pm CDT.
C. Answers to the remaining questions are provided, see attached.
D. Two (2) specification sections are revised: 09 06 00 Schedule Finishes and 09 51 00 Acoustical Ceilings.
E. Three (3) specification sections are added: Sections 01 91 00 General Commissioning, 09 30 13 Ceramic/Porcelain Tiling, and 11 71 02 Laboratory Washing and Sterilizing Equipment, see attached.
F. All other terms and conditions remain unchanged.
Sharon A. Spohn NCO 23 Contracting Officer
NCO2315L3-0644
Solicitation Questions and Answers – 24 April 2018
| # |
| SOW Reference |
| Question |
| Answer |
| 1. |
| Spec 28 23 00 |
1) What is the intent of paragraphs 1.5 number 5, 6, E, F, and H?
2) It appears in the spec that this is a design assist project?
3) Do we need to include an engineer?
4) Who has the existing security system
5) Who has the existing Access control system?
6)Who has the existing PA system?
1)The intent is to define what is required in the submittal.
2)The specification indicates requirements for items to be provided by the contractor.
3)Yes, where required by the specifications.
4)Milestone for CCTV system
5) Johnson Controls, Inc.
6) Dukane 28 23 00, 1.5, E. Modify specification to require one pre-installation review at 100 percent.
| 2. |
| Spec 09 51 00 – 2 |
| 2.2 A.3, Please clarify: RCP’s A211, A212, A213, A221 call out for ACT 1 and ACT 2. The specs give no details of either ACT 1 or ACT 2. |
| A revised Section 09 51 00 has been attached with specifications for each type. A revised Section 09 06 00 has also been reissued to coordinate. |
| 3. |
| Spec 09 51 00 – 2 |
| 2.3A Specs mention heavy grid, supplier questions whether owner needs heavy duty for this project. Intermediate grid is commercial strength. |
| Intermediate grid is acceptable. Section 09 51 00 attached. |
| 4. |
| Spec 09 51 00 - 2 |
| Since there are two types of tile, does there need to be two types of grid? Please specify. |
| No, same grid shall be used. |
5.
| What is the existing tile called out in RCP A211 room #S135 existing? |
| Room S135 shows new ceiling specified. |
| 6. |
| 09 30 00 Ceramic/Porcelain Tile |
| The Specs appear to be missing a specification concerning ceramic/porcelain tile. |
| See Section 09 30 13 attached. |
| 7. |
| Integrated Door Assemblies |
| The government has provided a schedule for the auto door openers (Spec Section 08 17 10) but there is no direction as to where they should go. |
| The “O” modifier on the tags and schedule indicates the doors which receive operators. |
| 8. |
| Door Schedule page A-601 |
| On the door schedule page A-601, “Door Elevations” Doors 1, 2, 3, and 4, they have notes for glazing on the door elevation and Doors 1 & 2, they have type TA or F for these doors. TA is Tempered and F is fire rated. There are 35 doors, but the locations are shown , but does not indicate which doors get what type of glass. Fire rated glass is very expensive. |
Doors 3& 4 have glass types TA and W. There is no listing for a W type glass.
Glazing modifiers T, A, or F indicate the doors that have vision lites. If the modifier is not shown, there is no vision lite on the door.
9.
There is a clarification needed with the engineered fill under the floor slab. Detail 1/S-300 clearly shows there being 12” of engineered fill under the floor slab. This will require about 6” of existing material to be excavated out of the entire 1st floor area. Specification 03 30 00 3.3 Vapor Barrier, says there is to be a continuous 10mil vapor barrier with 4” of fine granular fill on top of the vapor barrier. This detail and the vapor barrier specifications do not mesh. Are we to put the 4” of granular fines on top of the engineered fill making it 16” of fill? Please clarify with either a revised detail or a revision to the vapor barrier specification.
The finished earthwork was designed at 12” below top of existing floor (99’). This will allow 8” of granular fill and 4” of cast-in-place concrete. Contractor shall field-verify existing elevations.
Detail 1/S-300 shall be changed to 8” engineered fill and 4” cast-in-place concrete. Also, in Specification 03 30 00, 3.3 Vapor Barrier, remove A.1.
| 10. |
| Section 11 71 02 -11 |
| Paragraph 2.4 Cage, Utensil & Cart Washer: |
A. Interior – What will be the size of the chamber?
B. Doors – Will the unit be single door or pass through operation?
C. Heat Source – Will the unit be steam or Electric?
D. Electrical Requirements – What is the facility’s electric supply?
E. Installation – Will it be floor mounted or pit mounted?
See Revised Section 11 71 02.
| 11. |
| Section 11 71 02 – 11 |
| Paragraph 2.5 Animal Water Bottle Filler: |
A. What is the bottle configuration 4x6 or 5x5?
B. Electrical – What is the facility’s electric supply?
Strike Paragraphs 2.5, 2.13, 2.14 and 2.18. Revised Section 11 71 02 is attached.
| 12. |
| Section 11 71 02 |
| Paragraph 2.13 Bedding Dispenser – |
Will this be a stand alone unit or integrated on the unload end of the Tunnel washer?
See Revised Section 11 71 02.
| 13. |
| Section 11 71 02 |
| Paragraph 2.14 Bedding Disposal Unit – |
Will this be a stand alone unit or integrated on the load end of the tunnel washer?
See Revised Section 11 71 02.
| 14. |
| Section 11 71 02 |
| Paragraph 2.18 Tunnel Washer – |
A. Heat Source: Will the unit be steam or electric?
B. Electrical Requirements: What is the facility’s electric supply?
C. Accessories: These accessories do not apply to a tunnel washer.
D. Options: Unload Gravity Roller Conveyor: What will the length of the conveyor?
E. Options: Powered Unload Section: What will be the length of the Powered Unload Section?
F. Option: Low Pressure Steam Piping? What is the facility’s steam pressure?
See Revised Section 11 71 02.
| 15. |
| Submittal Exchange |
| Is the use of Submittal Exchange to transmit submittals, RFIs, etc. acceptable on this contract? If so, would the costs of this service be borne on Contractor? |
| The VA VISN 23 has a contract with Tempura for Submittal Exchange. The cost of submittal exchange will be paid by the VA. |
| 16. |
| Section 08 80 00 & 08 80 00 |
| Section 088000- Glazing and 085619 Pass Windows: We have been asked by a general contractor if we are including the 242 Resinous Panels (RESW1) as shown on detail E1, Pg. A510 of the Architectural drawings. They are not specified in the Glazing section 088000 and cannot find them specified in any other bid sections, nor can I find them specified in any finish or equipment schedules. If you could please clarify as to where I might be able to find the specification for them as possibly I have just overlooked it. |
See attached specification 09 06 00, 2.2, A.
| 17. |
| Sheet P-221 |
| On sheet P-221, Soiled Utility Rm 218 has a ‘GFCI-2’ shown. This is not shown on the government furnished equipment schedule on P-500. Please clarify what this is. |
| Unit is a waste management docking station (Stryker Neptune 2). Provide ¾” CW & 1-1/2” trap as noted in P19. |
| 18. |
| Glycol |
| If I understand the attached specification section properly, there is to be 50% inhibited glycol in all the “run-around coil systems” piping. This would lead one to believe the existing closed loops in the facility have 50% glycol mix also. I would like to clarify that and would also like to know what brand & type of glycol is in the existing system. |
| The existing closed loop systems shall be 30% inhibited glycol based on ambient temperatures. The existing system uses Rhomar propylene glycol. |
| 19. |
| Fireproofing |
| There is no location on the drawings that show where the fireproofing is to be installed. |
| Sheet S-121, Keyed Note 2: Add sentence to the end of the note, “SPRAY APPLY FIREPROOFING TO UNDERSIDE OF DECK AND EXPOSED PORTIONS OF STRUCTURAL STEEL SUPPORTS TO ACHIEVE A 2-HOUR FLOOR TO FLOOR SEPARATION.” |
20.
| Is there a pathway from the existing second floor remodel area to the accessible ceiling on first that can access the communications closet TCS103? |
| The pathway reaches the second floor corridor ceiling in the new surgery addition. |
See attached document: 09 06 00 (Revised).
See attached document: 09 51 00 (Revised).
See attached document: 01 91 00.
See attached document: 09 30 13.
See attached document: 11 71 02.