About this file

36C26318B0038 A00003 36C26318B0038 A00003.docx

View the file

Other files

File Type Posted
36C26318C0059-000.docx DOCX document
36C26318B0038-A00004000.docx DOCX document
36C26318B0038-A00004001.pdf PDF
36C26318B0038-A00004005.pdf PDF
36C26318B0038-A00004002.pdf PDF
36C26318B0038-A00004003.pdf PDF
36C26318B0038-A00004004.pdf PDF
36C26318B0038-A00002000.docx DOCX document
36C26318B0038-A00001001.pdf PDF
36C26318B0038-A00001002.pdf PDF
36C26318B0038-A00001000.docx DOCX document
36C26318B0038-001.docx DOCX document
36C26318B0038-002.pdf PDF
36C26318B0038-003.pdf PDF
36C26318B0038-004.pdf PDF
36C26318B0038-000.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00003 04-24-2018 568-18-3-9977-0001 568-16-101 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077 36C636 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077 To all Offerors/Bidders

36C26318B0038 03-19-2018

X X X May 3, 2018 at 1:00 PM CDT 568-3680162-9977-854200-3220

23NR7WA03

X Project: 568-16-101, Relocate SPS and Endoscopy, VA Black Hills Health Care System, Ft Meade, South Dakota VA Contracting POC: Sharon Spohn, Email: sharon.spohn@va.gov, phone:

402-995-4510

A. This amendment extends the bid opening date and answers questions.

B. The bid opening date is extended from April 26, 2018 at 2:00 pm until May 3, 2018 at 1:00 pm CDT.

C. Answers to several questions are provided, see attached.

D. All other terms and conditions remain unchanged.

Sharon A. Spohn NCO 23 Contracting Officer

NCO2315L3-0644

Solicitation Questions and Answers – 23 April 2018

#
SOW Reference
Question
Answer
1.
Schedule P 103
In reference to the Plumbing fixture schedule P 103 and Water Closet requires 1,000 lb bariatric carrier. Plumbing piping shown to these fixtures is 3”. A 1,000 lb carrier is not available in 3” size.
Change requirement of 1,000 lb fixture carrier to 750 lbs.

2.

There are numerous floor drains & fixture that are shown on plumbing stack diagrams without proper venting. Is there a reason for this? Are the plans incomplete?
Without specific examples of issues, all floor drains and fixtures are designed to be properly vented per code. Floor drains may be connected to a horizontal vented drain, as a combination waste and vent system.
3.
Steam Piping
In reference to the steam piping, they are shown without locations of anchors or expansion joints. Are these not required?
Expansion of piping is a delegated design, see spec section 23 22 13 for further information. Expansion devices should be evaluated on any steam piping over 40 ft. in length and hot water piping over 100 ft in length.

4.

The steam drip locations on the steam main are not quantified. Does engineer have a quantity for bidding purposes?
Steam drips are required at all low points and every 200 ft. for horizontal main lines per spec section 23 22 13.
5.
Incumbent Elevator Maintenance Service Provider
Spec Section 14 24 00-2 Paragraph 1.3-B states "Approval of Elevator Contractor’s equipment will be contingent upon their identifying an elevator maintenance service provider that shall render services within two hours of receipt of notification". Can you please provide the manufacture of the existing elevators in service at the VAMC? In addition, is there an existing maintenance service provider at the VA that will be required to render service for the new elevator? This information is required in order to meet this portion of the specification.
Using the current maintenance service provider is not a requirement. Kone is the current elevator maintenance service provider.
6.
Non Satisfactory Performance of Elevator Installations
Spec Section 14 24 00 Paragraph 1.3-C states: "Approval will not be given to elevator contractors and manufacturers who have established on prior projects, either government, municipal, or commercial, a record for unsatisfactory elevator installations, have failed to complete awarded contracts within the contract period, and does not have the requisite record of satisfactorily performing elevator installations of similar type and magnitude." Because contractor performance on previous government contracts is unavailable to the public, unsatisfactory performance is not a determination we can make. Can you please provide a list of Unsatisfactory elevator contractors not eligible for performance under this contract?
Delete paragraph C.
7.
Sole Source Elevator Determination
Spec Section 14 24 00 Paragraph 1.3-D States: "Equipment within a group of electric hydraulic elevators shall be the product of the same manufacturer." Does this include elevators currently in service at the VA? If so, can you please provide this manufacturer? In addition, will the VA be providing a determination of sole source manufacture for this portion of work?
Delete paragraph D entirely.
8.
Elevator Performance Standards – Elevator Speed
Spec Section 14 24 00 Paragraph 1.9 - A.1 states: "Contract speed is high speed in either direction of travel with rated capacity load in the elevator. Speed variation under all load conditions, regardless of direction of travel, shall not vary more than five (5) percent." Industry standard is a variation of (10) percent, not the (5) percent required by this spec. Please confirm the industry standard variation of (10) percent is acceptable. Elevators with not more than (5) percent variation are significantly more in cost.
Agree that 10% variation is standard and acceptable.
9.
Elevator Door Operation Speed
Spec Section 14 24 00 - 1.9 B calls for the doors to "2.5-feet per second and close at 1-foot per second". Each elevator manufacturer has performance times based upon industry standard. Please confirm "industry standard" performance times are acceptable.
Industry standards may be acceptable. Provide deviation from specified speed for approval.
10.
Elevator Fluid System Components
14 24 00 - 1.9C does not exist. Please confirm there is no 14 24 00 – 1.9C spec.
That is correct. The information referenced in C is actually under B.
11.
Elevator Floor level stopping accuracy
14 24 00 - 1.9B calls for floor level stopping to be within 3 mm above or below the floor. In lieu of 3mm, please confirm compliance with national code regarding leveling is adequate.
Code maximum will be acceptable.
12.
Elevator Noise and Sound Isolation
14 24 00 - 1.9 D-F calls for specific isolation and noise levels on all components. Please confirm Industry standard Isolation and noise levels are acceptable in lieu of the specifics call out in 14 24 00 - 1.9 D-F. The stringent nature of this isolation dramatically increases the cost of the elevators.
The requirements specified are feasible and critical to the areas they serve. No changes to the specifications are needed.
13.
Elevator Materials – Stainless Steel
14 24 00 - 2.1A-B calls for "corrosion resisting steel complying with Fed. Spec. QQ-S-766, Class 302 or 304, Condition A with Number 4 finish on exposed surfaces. Stainless steel shall have the grain of belting in the direction of the longest dimension and surfaces shall be smooth and without waves." Class 304 SS is typically reserved for Chemical Equipment, Food Handling Equipment, Nuclear Vessels, Marine applications, etc. Utilization of this grade Stainless Steel would significantly increase the cost of the elevators. Industry standard SS for use in elevators is 441. Please confirm use of 441 grade stainless steel or better is approved for use on the elevators.
441 type stainless is acceptable.
14.
Pump Unit Assembly – Acoustic Insulation
14 24 00 - 2.14-B requires 1" rigid acoustical insulation board around the pump unit. Please confirm acoustic insulation is required, as this does not meet industry standard.
Confirmed that acoustic insulation is required.
15.
Elevator – Crosshead Data Plate
14 24 00 - 2.21 calls for a non-corrosive metal data plate. Please confirm a polyester non-corrosive plate is acceptable.
Vendor standard is acceptable
16.
Elevator – Car Leveling Device
14 24 00 - 2.24. Please confirm compliance with the national code in regards to leveling is acceptable. Paragraph 2.24 calls for specific leveling that would significantly increase the cost for the elevator.
Code max. is acceptable
17.
Elevator – Cart Top Inspection station
14 24 00 - 2.23.F calls for the Top of Car Operating device to be “permanently attached to the elevator crosshead on the side of the elevator nearest to the hoistway doors used for accessing the top of the car.” Industry standard is for the car top inspection station to be integral with the door operator. Please confirm this is acceptable.
Comply with specification requirements.
18.
Elevator – Audio Voice System
14 24 00 - 2.29 calls for "Special messages as directed by Resident Engineer". Each special message will be an additional cost. Please provide a comprehensive list of special messages, and when they should indicate. This is required for pricing.
No special messages are required.
19.
Elevator – Hoistway Entrances
14 24 00 - 2.34-D calls for structural steel angles extending from top of still to bottom of floor beam above. Please confirm industry standard "formed sill supports" are acceptable in lieu of as described in 2.34-D
What is required is a standard VA detail. No change in the spec or detail is needed.
20.
Elevator – James and Head soffit welded construction
14 24 00 - 2.34-E Calls for Jambs and Head soffits to be welded construction with side jambs to be curved radius and head jamb to be of square type. Radius frames cannot be welded to a square header, therefore this type of construction is not feasible. Please provide alternative construction detail.
What is required is a standard VA detail. No change in the spec or detail is needed.
21.
Elevator Cladding Wrap – BOCA label
14 24 00 - 2.34H calls for cladding to wrap around leading and trailing edges of the door panels. Standard manufacturing does not allow for this type of construction. Please confirm wrap around leading edge of door only is acceptable. In addition, paragraph 2.37G calls for BOCA label, UL label, etc. However, industry standard is for the Warnock Hersey label to fastened to elevator entrances. Please confirm this is acceptable.
What is required is a standard VA detail. No change in the spec or detail is needed.

Warnock Hersey label is acceptable.

22.
Elevator Hoistway roller/ball bearings
14 24 00 2.34H calls for the up-thrust rollers to have ball or roller bearings. Please confirm industry standard needle bearings are also acceptable.
Needle bearings are acceptable
23.
Elevator – car enclosure
14 24 00 - 2.34 calls for two speed doors, metal cladding on leading and trailing edges, and sound deadening materials on panels. These items all dramatically increase the manufacturing cost of the elevator. Please confirm single speed side opening doors, metal cladding around leading edge only, and doors without sound deadening materials are acceptable.
Single speed doors are acceptable.
24.
Elevator – Door nudging
14 24 00 - 2.38D states "do not provide door nudging". Door nudging is required per code. Please confirm door nudging is acceptable.
Door nudging is required.
25.
Elevator
Ref take off and spec pp 1.1.C. – Exception to holeless application. Cannot provide C3 loading with holeless application. Even if we got to Class A – elevator E2 exceeds the weights for 2 stage telescoping jack. Will VA approve conventional (in ground) jacks with C3 loading? Please clarify.
In ground jack could be use if that is physically possible. Slightly lower load capacity might be acceptable. Contractors would need to propose a load limit for the hole less application.
26.
Elevator
Ref Spec pp 2.1.A Our elevator subcontractor does not offer type 301/304 stainless steel. Is 316 stainless acceptable?
Yes, 316 stainless steel is acceptable to use.
27.
Elevator
Per weight load/size requirements 105 FPS is required. Is this acceptable?
125 FPM is the minimum required.
28.
Spec 27 52 23 Nurse Call
Section 2.4, B: Features: The spec mentions integration into pagers. There are no pagers in the facility. Please clarify.
Correct. There are no pagers in the facility. Remove this requirement.

29.

What is the design steam load for the steam humidification on this project?
The humidifier heating load for AHU-03 is approximately 250 lbs/hr.

30.

On the equipment schedule for the Electrosurgical Units (ME-30) it comes up with a model number that does not exist.
Change ME-30 from Contractor Furnish & Install to VA Furnish & Install. For the record, the model number will be changed from M3185 to M3175.
31.
Table 2.3
In table 2.3, it states in E. All PoE switches must provide 25.5 watts to all ports. Cisco doesn’t have a 2960 with that kind of power. See data sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-2960-x-series-switches/data_sheet_c78-728232.html

To meet the 25.5 power requirement on all ports, Provide Cisco model number WS-C3650-24PS with (1) PWR-C2-1025WAC or (2) PWR-C2-640WAC. This combination will provide 30w. per port for all ports.

32.
General
Will the Contractor be compensated for work not completed due to a scheduled or unscheduled surgery?
No. The Contactor assumes all costs related to a shutdown or stop work due to patient surgeries. There are other areas or tasks that the Contractor may perform that will not affect surgery operations during these times. Noise and vibrations are largest factors in stopping work.
33.
Spec 01 00 00 – Photographic Documentation
Does the Contractor need to hire a professional photographer and index the photos using AutoCAD and BIM modeling?
Remove entire Sections 1.30 PHOTOGRAPHIC DOCUMENTATION and 1.31 FINAL ELEVATION DIGITAL IMAGES in this specification.