This is a Questions and Answers document for RFQ 36C26226Q0884, addressing contractor inquiries regarding fire sprinkler inspection services at the San Diego VA Medical Center. The document clarifies key operational and technical requirements for the solicitation. Annual inspections must be conducted on a quarterly basis (broken across three months) to minimize disruption to construction operations supporting patient care. The facility contains 98 tamper switches (plus Building 26), 69 flow switches (plus Building 26), approximately 3 pressure switches, 3 Fire Department Connections (FDCs) in Building 1 and 1 in other buildings, and 12 main drains (plus Building 26). There are no hose racks to inspect. The contract requires inspections based on NFPA 25 standards. The VA will accommodate a pre-bid site visit to allow contractors to assess existing conditions. Additionally, 12 hydrants on campus require annual flow inspections due in September. Contractors seeking historical data from the previous five-year contract should reference Contract No. 36C26223P2537 on SAM.gov for the total contract amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26226Q0884 0002_1.docx | DOCX document | |
| 36C26226Q0884 0001.docx | DOCX document | |
| P0001 - Site Visit Announcement - Fire Sprinkler.docx | DOCX document | |
| VA10091.pdf | ||
| W-9 Form.pdf | ||
| FMS Vendor File Update Request Form.pdf | ||
| 36C26226Q0884_1.docx | DOCX document | |
| S02 - RFQ - 36C26226Q0821 - Fire Sprinkler.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire Sprinkler Inspections 36C26226Q0884 Questions & Answers
1. PG. 37 has the annual broken up over three months. This job should not take three months for annuals, can we do all the annuals in one month?
Unfortunately, not, quarterly is required to minimize impact to construction operations in support of patient care.
1. How many tamper switches are there? 98 + Bldg. 26
1. How many flow switches are there? 69 + Bldg. 26
1. How many pressure switches are there? Approximately 3
1. How many FDCs are there and how many outlets per? 3 for Bldg. 1, 1 for the other bldgs.
1. Number of main drains? 12 + Bldg. 26
1. Can we get a copy of previous reports? What are trying to pull from the old reports?
1. Page 36 states there are 12 hydrants on the campus, but page 38 does not have us inspecting them. Are we doing annual flow on the hydrants? If so what month are they due? Yes. September.
1. How many hose racks are there to inspect? 0
1. Can the VA provide a pre-bid site visit for this project so we can see all existing conditions? Yes.
1. Do you want your inspections based on NFPA 25? Yes
1. What is the total contract amount for the previous 5-year contract? Contract Number? Reference Contract No. 36C26223P2537. Requested information can be found on SAM.gov.
File details come from the government source that posted it. Updated .