36C26226Q0884 0002_1.docx
DOCX document 30 KB Posted
- Attached to
- R425--RFQ | SBAR APPROVED | Fire Sprinkler Inspection, Maintenance & Repairs WD REQUIRED
- Solicitation number
- 36C26226Q0884
About this file
This is a Combined Synopsis/Solicitation and Request for Quotations (RFQ) issued by the Department of Veterans Affairs Network Contracting Office 22 for fire sprinkler inspection, maintenance, and repair services at the San Diego VA Medical Center in San Diego, California. The solicitation is numbered 36C26226Q0884 and was posted on May 29, 2026. The procurement falls under NAICS code 238220 (Fire Sprinkler System Installation) with a small business size standard of $19 million. This is a commercial item procurement utilizing streamlined procedures under FAR subpart 12.6, and no separate written solicitation document will be issued; this announcement serves as the only solicitation.
All written questions regarding the RFQ must be submitted by email to Charity.Cazee@va.gov no later than June 4, 2026, at 12:00 AM PST/MST. Quotations must be submitted in writing via email to the same address and received no later than June 12, 2026, at 12:00 AM PST/MST. The contracting office is located at NCO 22, Department of Veterans Affairs, 3601 S. 6th Avenue, Building 45, Tucson, Arizona 85723. Vendors are explicitly prohibited from contacting VA Medical Center employees regarding this RFQ during the solicitation process. The RFQ incorporates provisions and clauses effective through Federal Acquisition Circular 2026-01 dated March 13, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26226Q0884 - Questions and Answers.docx | DOCX document | |
| 36C26226Q0884 0001.docx | DOCX document | |
| P0001 - Site Visit Announcement - Fire Sprinkler.docx | DOCX document | |
| FMS Vendor File Update Request Form.pdf | ||
| W-9 Form.pdf | ||
| VA10091.pdf | ||
| 36C26226Q0884_1.docx | DOCX document | |
| S02 - RFQ - 36C26226Q0821 - Fire Sprinkler.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire Sprinkler Inspections 36C26226Q0884 Questions & Answers
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-09-2026 None 36C262
NCO 22
Department of Veterans Affairs NCO 22 - Networking Contracting 3601 S. 6th Avenue Tucson AZ 85723 36C262
NCO 22
Department of Veterans Affairs O 22 - Networking Contracting 3601 S. 6th Avenue Tucson AZ 85723 To all Offerors/Bidders
36C26226Q0884
X X X X Purpose for this amendment is to respond to questions.
Offers Due 7/10/2026 at 12:00 PM (PST) to Charity Cazee by email at charity.Cazee@va.gov.
Period of Performance Base: 08/01/2026 – 07/31/2027
OY1: 08/01/2027 – 07/31/2028
OY2: 08/01/2028 – 07/31/2029
OY3: 08/01/2029 – 07/31/2030
OY4: 08/01/2030 – 07/31/2031
CONTINUATION PAGE
1. PG. 37 has the annual broken up over three months. This job should not take three months for annuals, can we do all the annuals in one month?
Unfortunately, not, quarterly is required to minimize impact to construction operations in support of patient care.
1. How many tamper switches are there? 98 + Bldg. 26
1. How many flow switches are there? 69 + Bldg. 26
1. How many pressure switches are there? Approximately 3
1. How many FDCs are there and how many outlets per? 3 for Bldg. 1, 1 for the other bldgs.
1. Number of main drains? 12 + Bldg. 26
1. Can we get a copy of previous reports? What are trying to pull from the old reports?
1. Page 36 states there are 12 hydrants on the campus, but page 38 does not have us inspecting them. Are we doing annual flow on the hydrants? If so what month are they due? Yes. September.
1. How many hose racks are there to inspect? 0
1. Can the VA provide a pre-bid site visit for this project so we can see all existing conditions? Yes.
1. Do you want your inspections based on NFPA 25? Yes
1. What is the total contract amount for the previous 5-year contract? Contract Number? Reference Contract No. 36C26223P2537. Requested information can be found on SAM.gov.
1. When are the 5-year sprinkler/standpipe inspections due? What year and month? 9/1/2030. Are all buildings on the campus on the same 5-year schedule cycle? Yes.
1. If a vendor is already an EST certified vendor/distributor do you still have to use the pre-approved fire alarm companies to assist with panel support including Everon, HCI, and TRL? No if EST 3 cert provided.
1. When referring to page 35, will fire sprinkler heads need to be pulled for lab testing every annual inspection even if they haven’t reached their respective 20, 25, or 50-year threshold? Or can we lab tested heads when each head is due? Do not include lab testing in proposal. Annual testing identifies. Repairs are separate.
1. The main hospital (Building #1) is not listed on page 36 under the building list. Will Building #1 be included in the contract? Also will the new building #26 be included in the contract even though it is not finished? Bldg 1 and 26 will be included. All campus buildings.
1. Does the vendor need to provide a full itemized list of material/parts with individual line items for any invoice? Or total fixed cost price will suffice? Per contract requirements.
1. Will the vendor be required to submit all required reports to the San Diego Compliance Engine including the associated fees? What do you mean by fees? Reports are required to be submitted per the contract.
1. Since the “annual” sprinkler/standpipe inspections will be divided up into quarterlies scattered across 12-months, will all testing occur in the same quarter or take place in portions across each quarterly? Same thing with the sprinkler head visuals, will all of these occur during one quarter or divided up amongst the 4 quarters? The solicitation does not specify. Please, state in your proposal how you will achieve the requirements.
AMENDMENT TWO RESPONDS
File details come from the government source that posted it. Updated .