About this file

This solicitation is for construction services for a project to upgrade an EHRM server room and site communication infrastructure at the VA Greater Los Angeles Healthcare System. The scope of work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. All work must be performed according to the terms, conditions, specifications and drawings of the solicitation and applicable local and VA building codes. This project is set aside 100% for Service-Disabled Veteran-Owned Small Businesses listed as verified in the Vendor Information Pages database. Interested parties should contact the contracting specialist Steven Covell via email.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PENETRATIONS NOTE

- M -

MAIN CIRCUIT BREAKER

NEUTRAL

MCB

N

- N -

PHASE

POWER

PANEL

PWR

PNL

- R -

- P -

ROOM

RECEPTACLE

RM

RECEPT

- B -

AMPERE

- A -

A

- C -

CIRCUIT

CIRCUIT BREAKER

BUILDING

CONDUIT

BLDG

CKT

C

CB

- E -

EG

- G -

GROUNDG, GND

EQUIPMENT GROUND

ABBREVIATIONS

VOLT OR VOLTAGE

VOLT AMPEREVA

V

- V -

WATTW

- W -

- J -

- K -

KILOVOLT AMPERE

KILOVOLT

JUNCTION BOX

KV

KW

KVA

JB

KILOWATT

ABOVE FINISHED FLOORAFF

UON UNLESS OTHERWISE NOTED

- U -

E1.01

AC

X

MOTOR TYPE

REVISION

RISER TAGPOINT OF CONNECTION

SCHEDULE NUMBER

# LIGHT FIXTURE TYPE

INDICATES DETAIL NUMBER

SHEET NUMBER TO FIND DETAIL

SPECIFIC NOTE/

POINT OF DISCONNECTION

REFERENCE NOTE

ANNOTATIONS

EWC ELECTRIC WATER COOLER

T-001

ABBREVIATIONS VA

EHRM ELECTRONIC HEALTH RECORD MODERNINATION

CERNER INFORMATION TECHNOLOGY COMPANY

CEDT CERNER EHRM DEPLOYMENT TEAM

EUD END USER DEVICE

CIH CERTIFIED INDUSTRIAL HYGIENIST

LBVAMC LONG BEACH VA MEDICAL CENTER

MDF MAIN DISTRIBUTION FRAME

TR TELECOMMUNICATIONS ROOM

OIT OFFICE OF INFORMATION TECHNOLOGY

3D

3D

WALL MTD DATA OUTLET

W/3 CAT 6A DROPS

FLOOR MTD DATA OUTLET

W/3 CAT 6A DROPS

SEE DRAWING T-504

ABBREVIATIONS IT

SM

MM

SFP

ORL

OTDR

UTP

LAN

SINGLE MODE FIBER

MULTI MODE FIBER

SMALL FORM FACTOR PLUGGABLE TRANSCEIVER

OPTICAL RETURN LOSS

OPTICAL TIME DOMAIN REFLECTOMETER

UNSHIELDED TWISTED PAIR

LOCAL AREA NETWORK

EIA

TIA

OS1, OS2

OS2

ELECTRONIC INDUSTRIES ASSOCIATION

TELECOMMUNICATION INDUSTRY ASSOCIATION

TYPE OF SINGLE MODE FIBER

AIR BLOWN SINGLE MODE FIBER

1. PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS IN ACCORDANCE

WITH THE SPECIFICATIONS AND THE PROJECT SCHEDULE. NO INSTALLATION

SHALL PROCEED WITHOUT APPROVAL OF THE SHOP DRAWINGS.

2. MINIMAL STORAGE WILL BE AVAILABLE ON THE CONSTRUCTION SITE. CABLING

CONTRACTOR RESPONSIBLE FOR RECEIVING AND STORING MATERIALS AND

FOR COORDINATING MATERIALS DELIVERY TO THE JOB-SITE.

3. COMMUNICATIONS CABLES INSTALLED SHALL BE INSTALLED IN ACCORDANCE

WITH THE REQUIREMENTS DETAILED HEREIN AND SHALL BE FREE OF KINKS,

TWISTS, SHARP BENDS, UNNECESSARY LOOPS OR WORKMANSHIP DEFECT.

4. PROPERLY SEAL WALL PENETRATIONS THROUGH FIRE RATED WALL & FLOOR

USING EZ PATH DETAILED ON T-504.

5. RUN OPEN CABLE FOR EACH SYSTEM IN SLEEVES, J-HOOKS DEDICATED FOR

THE SYSTEM.

6. SEPARATE AND BUNDLE CABLE BY SYSTEM.

7. MAINTAIN EIA/ TIA RECOMMENDED SEPARATIONS BETWEEN CABLING OF

DIFFERENT SYSTEMS. 6'' FROM LIGHT FIXTURES. 24'' FROM 480V & 12'' FROM

208V.

8. MAINTAIN RECOMMENDED SEPARATIONS BETWEEN CABLING AND

INTERFERENCE PRODUCING ELECTRICAL DEVICES SUCH AS POWER CABLING,

ELECTRICAL PANELS, FLUORESCENT LIGHTS, BALLAST RELAYS, ELECTRIC

MOTORS, MOTOR CONTROLLERS, VFD, TRANSFORMERS AND OTHER

ELECTROMAGNETIC DEVICES. SEE NOTE 7.

9. WHERE CABLE IS OPEN ON J-HOOK SYSTEM, RUN PARALLEL OR

PERPENDICULAR TO WALLS AND SUPPORT A MINIMUM OF EVERY 5 FEET USING

APPROVED J-HOOKS.

10. ALL CABLE HOOKS AND OTHER CABLE SUPPORT DEVICES SHALL BE ATTACHED

TO THE BUILDING STRUCTURE IN ACCORDANCE WITH CODES AND

SPECIFICATIONS.

11. NO OPEN CABLE SHALL BE DRAPED OVER OR SUPPORTED ON PLUMBING,

ELECTRICAL, MEDICAL GAS, FIRE SUPPRESSION, OR OTHER PIPING OR

DUCTWORK.

12. ALL CABLES TO BE PLENUM RATED.

13. THE CABLE LENGTH FROM THE TERMINATION POINT IN TR TO WAO IN THE

WORK AREA SHALL NOT EXCEED 295FEET INDEPENDENT OF MEDIA TYPE.

14. THE 295FEET INCLUDES AN ALLOWANCE OF 10FEET FROM EUD TO DEVICE AND

AN ADDITIONAL 24 FEET FROM PATCH PANEL TO ACTIVE COMPONENTS IN TR.

15. VISUALLY INSPECT CONNECTIONS ON CABLE TO ENSURE PROPER COMPLIANCE

WITH EIA/TIA 568B TERMINATION.

16. INSPECT ALL EXPOSED PORTIONS OF THE CABLE TO INSURE A MINIMUM OF 4

TIMES THE CABLE DIAMETER BEND RADIUS AT ANY POINT.

17. ENSURE NO CABLE BUNDLES OR TIE POINTS DISPLAY KINKS, SHARP BENDS,

CREASING OR DEFORMATION OF OUTER SHEATH OR SIGNS OF EXCESSIVE

PULLING FORCE.

18. IN TR CABLES SHOULD BE COMBED AND DRESSED UP BEFORE BUDLING AND

USING VELCRO STRAPS. ZIP TIES OR TWIST TIES SHALL NOT BE USED. STRAPS

SHALL BE SPACED AT EVERY (MAX 6" O.C) APART TO ENSURE CABLES ARE HELD

TOGETHER.

19. ON THE RACK THE CABLES SHOULD BE DIVIDED IN THE MIDDLE, WHERE HALF

FLOWS TO THE LEFT AND HALF FLOWS TO THE RIGHT.

20. ALL CABLING SHALL BE INSTALLED BY CABLE MANUFACTURER'S CERTIFIED

INSTALLER.

21. BEFORE ACCEPTANCE OF ANY NEWLY INSTALLED COMMUNICATIONS WIRING,

THE CABLE WILL UNDERGO SEVERAL LEVELS OF TESTING TO ENSURE THAT ALL

MATERIALS AND INSTALLATION CONFORM TO STANDARD INCLUDED IN THE

DRAWINGS AND SPECIFICATIONS. THIS WILL INCLUDE BOTH THE UTP AND FIBER

OPTICS SYSTEMS. FAILURE TO MEET THE DRAWINGS AND SPECIFICATIONS

SHALL CONSTITUTE REASON TO REJECT THE INSTALLATION UNTIL ALL

PROBLEMS ARE SOLVED.

22. ALL RECORDED TESTING RESULTS SHALL REMAIN IN THE APPROPRIATE TR.

TEST BOTH CABLES AND THEIR CORRESPONDING CONNECTING SYSTEMS AS A

WHOLE UNIT TO ENSURE SYSTEM INTEGRITY.

23. TEST ALL FIBER OPTICS CABLE AND COMPONENTS COMPRISING THE

BACKBONE SYSTEM. TEST ALL FIBER STRAND IN BOTH DIRECTION. USE OTDR

OPERATING AT BOTH 1310 AND 1550 NM WAVELENGTHS.

24. PHYSICAL LABELING FOR ALL CABLES AND RELATED COMPONENTS IS

REQUIRED COMPONENTS WILL DEPEND HEAVILY ON ADHERING TO A LOGICAL

LABELING SCHEME TO ENABLE EXPEDIENT PATCH PANEL, DATA JACK AND

SWITCH PORT IDENTIFICATION.

25. PROVIDE ALL NEW CABLING IN THE BUILDINGS WITH AN AS-BUILT,

ELECTRONICALLY AND PAPER, FOR THE CABLE PLANT. EACH TR WIRING

CLOSETS CABLE PLANT AS-BUILT WILL BE INSTALLED IN A FOLDER ON THE

BACK OF THE DOOR SECURED IN A HOLDER ATTACHED TO THE DOOR.

METHOD OF PROCEDUREMOP

SPECIFIC NOTE/

REFERENCE NOTE

SECURITY SYMBOLS

MAGNETIC CONTACTMC

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Upgrade Server Room and Site Communication Infrastructure

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11

11301 WILSHIRE BOULEVARD,WEST LOS ANGELES , CA 90073

16111 PLUMMER STREET SEPULVEDA, CA 91343-2036

351 EAST TEMPLE STREET, LOS ANGELES, CA 90012

20-SCE-06

FIRE PROTECTION WALL SYMBOLS

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

WAO WORK AREA OUTLET

REQUEST TO EXITREX

ELECTRICAL STRIKEEL

STAR - A WIRELESS ACCESS POINT FOR THE CENTRAK

EQUIPMENT

MONITORS

VIRTUAL WALL

DOOR COVERAGE

STUB OUT. TO PoE SWITCH TYPICAL.

CAT 5 - PoE .200" NOMINAL O.D. TO PATIENT WONDER GUARD

SYSTEM CONTROL PANEL LOCATED IN TR ROOM

A

RF

LF

LF READER

RF READER

LF

MAGNETIC LOCK WITH DELAYED EGRESS

TELECOMMUNICATIONS

GENERAL NOTES:

26. CABLING DIAGRAM: SUBMIT, FOR APPROVAL, A COMPLETE CABLING DIAGRAM. THE DIAGRAM SHALL BE BASED ON THE DRAWING INCLUDED IN THE CONSTRUCTION DOCUMENTS. IT SHALL BE UPDATED TO SHOW QUANTITIES AND PART NUMBERS FOR ALL COMPONENTS INCLUDING PATCH PANELS, CABLE, SERVER CABINETS AND EQUIPMENT RACKS AND ALL OTHER ASSOCIATED COMPONENTS. INCLUDE THE

FOLLOW:

1). DETAIL AND ELEVATION DRAWINGS: PROVIDE TR RACK ELEVATION, ENLARGED TR

ROOM LAYOUT.

2). BUILDING COMPOSITE FLOOR PLANS: PROVIDE BUILDING FLOOR PLANS SHOWING WORK AREA OUTLET (WAO) OUTLET LOCATIONS AND CONFIGURATION, TYPES OF JACKS, DISTANCE FOR EACH

CABLE, AND CABLE ROUTING LOCATIONS.

3). FLOOR PLANS TO INCLUDE:

a. FINAL ROOM NUMBERS AND ACTUAL BACKBONE CABLING AND PATHWAY LOCATIONS

(HORIZONTAL AND VERTICAL) AND LABELING.

b. RISER FLOOR PENETRATION / DATA POLE LOCATION AFTER SCANNING THE FLOOR FOR

REBARS.

c. INPUTS AND OUTPUTS OF EQUIPMENT IDENTIFIED ACCORDING TO LABELS INSTALLED ON

CABLES AND EQUIPMENT.

d. DEVICE LOCATIONS WITH LABELS.

e. EZ PATH SLEEVES.

f. WIRING DIAGRAM.

g. LABELING AND ADMINISTRATION DOCUMENTATION.

27. ALL DATA & TELEPHONE CABLES THAT ARE REMOVED WILL BE RECYCLED BY VA.

PLEASE DISPOSE OFF CABLES TO VA PROVIDED DUMPSTERS.

28. THE LOCATION OF END USER DEVICES (EUD) SHOWN ON THESE DRAWINGS ARE

APPROXIMATE AND ARE SUBJECT TO VERIFICATION BY THE CONTRACTOR.

CONTRACTOR SHALL REMOVE EXISTING EUD DATA OUTLETS AND PROVIDE NEW

EUD DATA OUTLETS AT THE SAME LOCATION.

29. ALL CAT 6A CABLES TO BE PLENUM AND POE RATED.

THE CONTRACTOR TO COORDINATE WITH VA AND REMOVE ABANDONED SYSTEMS/

ITEM IDENTIFIED BY VA. EXAMPLE INCLUDE OLD FIRE ALARM PANELS, BATTERIES

AND CHARGERS, TELEPHONE EQUIPMENT NOT IN USE, OLD 110 BLOCKS NOT IN

USE, EXISTING FIBERS, EXISTING FIBER DISTRIBUTED LINE MODULE (FOLM).

WHEN RE-CABLING EXISTING SLEEVES SHALL BE REMOVED AND NEW DRY WALL MUST BE INSTALLED

AND FINISHED BEFORE INSTALLING NEW SLEEVES.

ALL UNUSED CABLES IN UNDERGROUND CONDUIT SYSTEM INCLUDING ASSOCIATED MANHOLES SHALL

BE PULLED OUT AND REMOVED BY CONTRACTOR AND TRANSPORTED TO VA SUPPLIED DUMPSTERS

INTENDED FOR RECYCLING BY VA. CONTRACTOR SHALL COORDINATE WITH VA WHO WILL IDENTIFY UNUSED CABLES WITHIN EACH MANHOLE. THERE ARE EXISTING LEAD SHEATHED CABLES THAT WILL

REQUIRE SPECIAL HANDLING AND COORDINATION WITH VA.

CONTRACTOR SHALL CLEAN UP ALL MANHOLES AFTER REMOVING CABLES & BEFORE INSTALLING

TRUNK CELL TUBES.

ALL SIGNAL & TELEPHONE MANHOLES COVER SHALL BE PAINTED IN GREEN COLOR AND NEW LABEL ON BRASS PLATE SHALL BE AFFIXED TO MANHOLE COVER WITH MANHOLE NUMBER ENGRAVED ON IT.

RAISE THE MANHOLE COVER OF MH23 ABOUT 12''-18'' SO IT IS FLUSH WITH FINISH GRADE.

PROVIDE DATA DROP AT EACH NEW HIRSCH PIV CONTROL PANEL.

31.

32.

30.

PATCH CORDS TABLE

CARD READERPIV

33.

34.

35.

36.

ADDENDUM 08-12-2021

AUGUST 12, 2021

T-002

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Upgrade Server Room and Site Communication Infrastructure

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11

11301 WILSHIRE BOULEVARD,WEST LOS ANGELES , CA 90073

16111 PLUMMER STREET SEPULVEDA, CA 91343-2036

351 EAST TEMPLE STREET, LOS ANGELES, CA 90012

20-SCE-06

DRAWING LIST

SHEET INDEX (CONTINUED)

CAMPUS SHEET NUMBER SHEET TITLE

SHEET INDEX (CONTINUED)

CAMPUS SHEET NUMBER SHEET TITLE

SHEET INDEX

CAMPUS SHEET NUMBER SHEET TITLE

SHEET INDEX (CONTINUED)

CAMPUS SHEET NUMBER SHEET TITLE

SHEET INDEX (CONTINUED)

CAMPUS SHEET NUMBER SHEET TITLE

WLA T-001 TELECOMMUNICATIONS SECURITY SYMBOL LIST, GENERAL

NOTES, ABBREVIATIONS

WLA T-002

WLA W.T-001 TELECOMMUNICATIONS SITE PLAN FIBER & CELL TUBE DISTRIBUTION

WLA W.T-002 TELECOMMUNICATIONS SITE PLAN FIBER & CELL TUBE DISTRIBUTION

WLA W.12.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.44.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.46.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.113.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.113.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.113.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.114.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.114.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.115.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.115.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.115.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.117.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.158.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.206.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.206.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.206.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.210.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.210.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.210.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.212.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.212.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.212.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.212.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.213.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.213.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.213.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.213.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.214.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.214.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.214.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.215.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.215.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.215.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.217.T-101 TELECOMMUNICATIONS SECURITY GROUND FLOOR

WLA W.217.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.217.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.217.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.218.T-101 TELECOMMUNICATIONS SECURITY GROUND FLOOR

WLA W.218.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.218.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.218.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.220.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.220.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.220.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.222.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.224.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.224.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.226.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.236.T-111

WLA W.256.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.256.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.256.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.257.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.257.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.257.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.258.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.258.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.258.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.258.T-141 TELECOMMUNICATIONS SECURITY FOURTH FLOOR

WLA W.259.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.295.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.297.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.299.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.300.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.301.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.304.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.304.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.304.T-112 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.304.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.304.T-122 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.305.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.306.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.337.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.345.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

WLA W.401.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.401.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.402.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.402.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.500.T-1B1 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.500.T-1B2 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.500.T-1B3 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

WLA W.500.T-1B4 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.500.T-101 TELECOMMUNICATIONS SECURITY GROUND FLOOR

WLA W.500.T-102 TELECOMMUNICATIONS SECURITY GROUND FLOOR

WLA W.500.T-103 TELECOMMUNICATIONS SECURITY GROUND FLOOR

WLA W.500.T-104 TELECOMMUNICATIONS SECURITY GROUND FLOOR

WLA W.500.T-10I1 TELECOMMUNICATIONS SECURITY GROUND INTERSTITIAL FLOOR

WLA W.500.T-10I2 TELECOMMUNICATIONS SECURITY GROUND INTERSTITIAL FLOOR

WLA W.500.T-10I3 TELECOMMUNICATIONS SECURITY GROUND INTERSTITIAL FLOOR

WLA W.500.T-10I4 TELECOMMUNICATIONS SECURITY GROUND INTERSTITIAL FLOOR

WLA W.500.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.500.T-112 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.500.T-113 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.500.T-114 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.500.T-11I1 TELECOMMUNICATIONS SECURITY FIRST INTERSTITIAL FLOOR

WLA W.500.T-11I2 TELECOMMUNICATIONS SECURITY FIRST INTERSTITIAL FLOOR

WLA W.500.T-11I3 TELECOMMUNICATIONS SECURITY FIRST INTERSTITIAL FLOOR

WLA W.500.T-11I4 TELECOMMUNICATIONS SECURITY FIRST INTERSTITIAL FLOOR

WLA W.500.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.500.T-122 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.500.T-123 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.500.T-124 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.500.T-12I1 TELECOMMUNICATIONS SECURITY SECOND INTERSTITIAL FLOOR

WLA W.500.T-12I2 TELECOMMUNICATIONS SECURITY SECOND INTERSTITIAL FLOOR

WLA W.500.T-12I3 TELECOMMUNICATIONS SECURITY SECOND INTERSTITIAL FLOOR

WLA W.500.T-12I4 TELECOMMUNICATIONS SECURITY SECOND INTERSTITIAL FLOOR

WLA W.500.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.500.T-132 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.500.T-133 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.500.T-134 TELECOMMUNICATIONS SECURITY THIRD FLOOR

WLA W.500.T-13I1 TELECOMMUNICATIONS SECURITY THIRD INTERSTITIAL FLOOR

WLA W.500.T-13I2 TELECOMMUNICATIONS SECURITY THIRD INTERSTITIAL FLOOR

WLA W.500.T-13I3 TELECOMMUNICATIONS SECURITY THIRD INTERSTITIAL FLOOR

WLA W.500.T-13I4 TELECOMMUNICATIONS SECURITY THIRD INTERSTITIAL FLOOR

WLA W.500.T-141 TELECOMMUNICATIONS SECURITY FOURTH FLOOR

WLA W.500.T-142 TELECOMMUNICATIONS SECURITY FOURTH FLOOR

WLA W.500.T-143 TELECOMMUNICATIONS SECURITY FOURTH FLOOR

WLA W.500.T-144 TELECOMMUNICATIONS SECURITY FOURTH FLOOR

WLA W.500.T-14I1 TELECOMMUNICATIONS SECURITY FOURTH INTERSTITIAL FLOOR

WLA W.500.T-14I2 TELECOMMUNICATIONS SECURITY FOURTH INTERSTITIAL FLOOR

WLA W.500.T-14I3 TELECOMMUNICATIONS SECURITY FOURTH INTERSTITIAL FLOOR

WLA W.500.T-14I4 TELECOMMUNICATIONS SECURITY FOURTH INTERSTITIAL FLOOR

WLA W.500.T-151 TELECOMMUNICATIONS SECURITY FIFTH FLOOR

WLA W.500.T-152 TELECOMMUNICATIONS SECURITY FIFTH FLOOR

WLA W.500.T-153 TELECOMMUNICATIONS SECURITY FIFTH FLOOR

WLA W.500.T-154 TELECOMMUNICATIONS SECURITY FIFTH FLOOR

WLA W.500.T-15I1 TELECOMMUNICATIONS SECURITY FIFTH INTERSTITIAL FLOOR

WLA W.500.T-15I2 TELECOMMUNICATIONS SECURITY FIFTH INTERSTITIAL FLOOR

WLA W.500.T-15I3 TELECOMMUNICATIONS SECURITY FIFTH INTERSTITIAL FLOOR

WLA W.500.T-15I4 TELECOMMUNICATIONS SECURITY FIFTH INTERSTITIAL FLOOR

WLA W.500.T-161 TELECOMMUNICATIONS SECURITY SIXTH FLOOR

WLA W.500.T-162 TELECOMMUNICATIONS SECURITY SIXTH FLOOR

WLA W.500.T-163 TELECOMMUNICATIONS SECURITY SIXTH FLOOR

WLA W.500.T-164 TELECOMMUNICATIONS SECURITY SIXTH FLOOR

WLA W.500.T-16I1 TELECOMMUNICATIONS SECURITY SIXTH INTERSTITIAL FLOOR

WLA W.500.T-16I2 TELECOMMUNICATIONS SECURITY SIXTH INTERSTITIAL FLOOR

WLA W.500.T-16I3 TELECOMMUNICATIONS SECURITY SIXTH INTERSTITIAL FLOOR

WLA W.500.T-16I4 TELECOMMUNICATIONS SECURITY SIXTH INTERSTITIAL FLOOR

WLA W.500.T-174 TELECOMMUNICATIONS SECURITY PENTHOUSE INTERSTITIAL FLOOR

WLA W.501.T-111 TELECOMMUNICATIONS SECURITY LOWER LEVEL FLOOR

WLA W.506.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.508.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.509.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.523.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA

W.525.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.44.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 7A

WLA W.46.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN -

LIGHTING ROOM

WLA W.115.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - FIRE ALARM

ROOM, IT ROOM, 304A

WLA W.158.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR ROOM 008/7A

WLA W.206.T-401

WLA W.212.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 21, 128, 229, 330

WLA W.215.T-401

WLA W.217.T-401

WLA W.218.T-401

WLA W.220.T-401

WLA W.222.T-401

WLA W.224.T-401

WLA W.226.T-401

WLA W.236.T-401

WLA W.256.T-401

WLA W.257.T-401

WLA W.258.T-401

WLA W.259.T-401

WLA W.295.T-401

WLA W.297.T-401

WLA W.300.T-401

WLA W.301.T-401 ELECTRICAL ENLARGED FIRST FLOOR PLAN (PARTIAL DEMO)

WLA W.301.T-402 TELECOMMUNICATIONS SECURITY PHOTO

WLA W.301.T-403 ELECTRICAL ENLARGED FIRST FLOOR - MODIFIED DATA AND

LADDER RACK PLAN

WLA W.304.T-401

WLA W.305.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM LADIES LOUNGE

WLA W.306.T-401

WLA W.337.T-401

WLA W.345.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 29 AND 39A

WLA W.401.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM A100G AND A239

WLA W.402.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

1409 & TR 2413

WLA W.500.T-401 TELECOMMUNICATIONS ENLARGED PLAN - MPOE

WLA W.500.T-402

WLA W.500.T-403

W.500.T-404 TELECOMMUNICATIONS ENLARGED PLAN - MCR AND OFFICES

WLA W.500.T-405

WLA W.500.T-405A TELECOMMUNICATIONS ELEVATION - RACKS AND SERVER

CABINETS - MCR

WLA W.500.T-405B TELECOMMUNICATIONS ELEVATION - RACKS AND SERVER

CABINETS - MCR

WLA W.500.T-406 TELECOMMUNICATIONS ENLARGED PLAN - MCR - CABLE

TRAY - NEW

WLA W.500.T-407

WLA W.500.T-408

WLA W.500.T-409

WLA W.500.T-410 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 13SE, 13SA, 13IN, 13IS

WLA W.500.T-411

WLA W.500.T-412

WLA W.501.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - AREA

WLA W.506.T-401

WLA W.508.T-401

WLA W.523.T-401

WLA W.525.T-401

S S.62.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

S S.63.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.99.TD-101 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

DEMO - PATIENT WONDER GUARD SYSTEM

S S.99.TD-102 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

DEMO - PATIENT WONDER GUARD SYSTEM

S S.99.TD-103 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

DEMO - PATIENT WONDER GUARD SYSTEM

S S.99.TD-104 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

DEMO - PATIENT WONDER GUARD SYSTEM

S S.99.T-101 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

NEW WORK - PATIENT WONDER GUARD SYSTEM

S S.99.T-102 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

NEW WORK - PATIENT WONDER GUARD SYSTEM

S S.99.T-103 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

NEW WORK - PATIENT WONDER GUARD SYSTEM

S S.99.T-104 TELECOMMUNICATIONS SECURITY GROUND FLOOR PLAN -

NEW WORK - PATIENT WONDER GUARD SYSTEM

S S.201.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

S S.1.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM A154 AND B-120A

S S.10.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM B-B110, C-1A, A29B, C-00A

S S.20.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN ER ROOM

1-A-115, 2-A115

S S.22.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM 103 AND 202

S S.23.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM 106

S S.25.T-401

S S.45.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM 105

S S.63.T-401

S S.201.T-401

LAACC L.ACC.T-141 TELECOMMUNICATIONS SECURITY FOURTH FLOOR

LAACC L.ACC.T-142 TELECOMMUNICATIONS SECURITY FOURTH FLOOR

LAACC L.ACC.T-151 TELECOMMUNICATIONS SECURITY FIFTH FLOOR

LAACC L.ACC.T-152 TELECOMMUNICATIONS SECURITY FIFTH FLOOR

LAACC L.ACC.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM A114

LAACC L.ACC.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOMS

T-501 TELECOMMUNICATIONS DETAILS

T-502 T-503 T-504

T-601 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

LAACC L.ACC.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

LAACC L.ACC.T-122 TELECOMMUNICATIONS SECURITY SECOND FLOOR

TELECOMMUNICATIONS DETAILS

TELECOMMUNICATIONS DETAILS

TELECOMMUNICATIONS DETAILS

T-505 TELECOMMUNICATIONS DETAILS

T-506 TELECOMMUNICATIONS DETAILS

T-507 TELECOMMUNICATIONS MANHOLE FOLDOUTS

T-508 T-509 T-510 T-511 T-512 T-513 T-514

T-515 TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDA

T-516 T-517 T-518 T-519

TELECOMMUNICATIONS MANHOLE FOLDOUTS

TELECOMMUNICATIONS MANHOLE FOLDOUTS

TELECOMMUNICATIONS MANHOLE FOLDOUTS

TELECOMMUNICATIONS MANHOLE FOLDOUTS

TELECOMMUNICATIONS MANHOLE FOLDOUTS

TELECOMMUNICATIONS MANHOLE FOLDOUTS

TELECOMMUNICATIONS MANHOLE FOLDOUTS

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDA

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDA

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDA

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDA

T-602 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-603 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-604 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-605 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-606 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-607 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-608 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-609 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-610 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-611 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-612 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER WEST LA

T-613 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER SEPULVEDA

T-614 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER SEPULVEDA

T-615 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER SEPULVEDA

T-616 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER SEPULVEDA

T-617 SINGLE MODE FIBER OPTIC BACKBONE HORIZONTAL AND

VERTICAL RISER SEPULVEDA

T-701 PIV ACCESS RISER DIAGRAM WEST LA

T-702 T-703 T-704 T-705

T-706 PIV ACCESS RISER BUILDING 500 (WLA) NW, NE, SW, SE

T-707 PIV ACCESS RISER - SEPULVEDA BLDG. 1,10,20,22,23,24,25,45

T-708

T-710

PIV ACCESS RISER - SEPULVEDA BLDG. 46,47,52.62,63,70,99,7

PIV ACCESS RISER DIAGRAM LAACC

PIV ACCESS RISER DIAGRAM WEST LA

PIV ACCESS RISER DIAGRAM WEST LA

PIV ACCESS RISER DIAGRAM WEST LA

PIV ACCESS RISER DIAGRAM WEST LA

DRAWING LIST

LAACC L.ACC.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

S S.201.T-401A ELEVATION - RACKS 5 AND 6 (EXISTING)

S S.201.T-402 ELECTRICAL ENLARGED PLAN - TR ROOM 115 (MODIFIED)

S S.201.T-402A RACK ELEVATION - TR ROOM 115 (MODIFIED)

S S.201.T-402B RACK ELEVATION - TR ROOM 115 (MODIFIED)

WLA W.214.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR

TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.300.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

WLA W.500.T-173 TELECOMMUNICATIONS SECURITY PENTHOUSE INTERSTITIAL FLOOR

WLA W.500.T-172 TELECOMMUNICATIONS SECURITY PENTHOUSE INTERSTITIAL FLOOR

WLA W.500.T-171 TELECOMMUNICATIONS SECURITY PENTHOUSE INTERSTITIAL FLOOR

WLA W.210.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR ROOM 9, 122C

AND 221K

WLA W.213.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM B09, 103, 201, 301

WLA W.214.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM B01,105, 205 AND 306

WLA W.301.T-403A TELECOMMUNICATIONS RACK ELEVATION

WLA W.527.T-401

W.527.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA

WLA W.113.T-401

WLA W.114.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR ROOM

125B, 219D

WLA W.500.T-403A TELECOMMUNICATIONS ELEVATION-RACKS SERVER

CABINET - MCR

S S.99.T-401

S S.T-001 TELECOMMUNICATIONS SECURITY SITE PLAN

S S.1.T-112 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.10.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR PLAN

S S.10.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.10.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR PLAN

S S.20.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.20.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR PLAN

S S.22.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.22.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR PLAN

S S.23.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.25.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

S S.44.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

S S.45.T-101 TELECOMMUNICATIONS SECURITY BASEMENT PLAN

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 124A, 212A, 388

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM B7, 123, 233, 333

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 002,107, 202,302

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 4,101, 201, 302

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 014, 121, 225, 332

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 7K, 135, 215

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 1, 102, 226

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 104A, 120, 215, 210A, 335 AND 404

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 106, 206B

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 2-2, 2-106B, 2-223A, 1-224

TELECOMMUNICATIONS ENLARGED PLAN - MCR - SERVER

CABINET & DATA RACK

WLA W.500.T-405C TELECOMMUNICATIONS SCHEDULE

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 10SJ, 10SO, 10SA, 10IN, 10IS

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 11SH, 11SO, 11SN, 11SE, 11IN, 11IS

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 12SE, 12SA, 12IN, 12IS

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 14SE, 14SA, 14IN, 14IS

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOM 15SE, 15SA, 15IN, 15IS

WLA W.500.T-413 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM 16SE, 16SA, 16IN, 16IS

TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR

ROOMS 22 AND 23

WLA W.117.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN - TR ROOM

WLA

WLA W.215.T-101 TELECOMMUNICATIONS SECURITY GROUND FLOOR

LAACC L.ACC.T-112 TELECOMMUNICATIONS SECURITY FIRST FLOOR

S S.10.T-122 TELECOMMUNICATIONS SECURITY SECOND FLOOR PLAN

S S.44.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM 7A

S S.62.T-401

S S.99.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

WLA W.507.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

WLA W.507.T-401

S S.24.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.70.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.24.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM 102A

S S.70.T-401

T-709 PIV ACCESS RISER - SEPULVEDA BLDG. 40

ADDENDUM 08-12-2021

AUGUST 12, 2021

LAACC L.ACC.T-403 ELECTRICAL ENLARGED PLAN TR ROOMS A-312, B122,

B444A AND A502

WLA W.222.T-121 TELECOMMUNICATIONS SECURITY SECOND FLOOR

LAACC L.ACC.T-131 TELECOMMUNICATIONS SECURITY THIRD FLOOR

LAACC L.ACC.T-132 TELECOMMUNICATIONS SECURITY THIRD FLOOR

S S.7.T-101 TELECOMMUNICATIONS SECURITY BASEMENT FLOOR PLAN

S S.7.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR PLAN

S S.40.T-111 TELECOMMUNICATIONS SECURITY FIRST FLOOR

S S.7.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM B30 AND C-102

S S.40.T-401 TELECOMMUNICATIONS SECURITY ENLARGED PLAN TR

ROOM

TELECOMMUNICATIONS SITE PLAN (REFERENCE ONLY)

SCALE: 1/128" = 1' - 0"

W.T-001

TELECOMMUNICATIONS SITE PLAN

FIBER & CELL TUBE DISTRIBUTION

LEGEND

R

EF

ER

T

O W

.T -0

F

O R

C O

N

TI

N U

AT

IO

N

EXISTING

DUCT BANK

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

EXISTING PULL BOX

IN PARKING LOT

NORTHWEST LA CAMPUS

MHW 21

MHD 22

MHD 23

MH 4

MHD 15

MHD 19

MHD 16

MHD 10

MHD 3

MHD 2

MHD 4MHD 5

MHD 6

MHD 13

MHD 14

MHD 12

MHD 8

MHD 30

MHD 8

MHD 9

MHD 41

MHD 42

MHD 43

MH 22

MHD 44

MH 24

MHD 43

MHD 43

MHN 1

MHN 2

MH 401.5

MHN 4

MHN 5

MHN 10

MHN 9

MHN 11

MHN 17

PROPOSED INSTALLATION OF NEW CELL TUBES FROM

PEDESTAL TDU TO RELATED BUILDINGS.

STEP 1 IN COORDINATION WITH VA IDENTIFY ALL

UNUSED COPPER CABLES IN EACH MANHOLE

AND DUCT BANK.

STEP 2 PULL OUT ALL EXISTING UNUSED COPPER

CABLES AND DISPOSE OFF SITE.

STEP 3 MANDRELL EXISTING SPARE CONDUIT AND

CONDUITS FROM WHICH COPPER HAS BEEN

PULLED OUT. MANDRELL SHALL BE DONE

MANHOLE TO RESPECTIVE BUILDING.

STEP 4 BLOW PULL WIRE THROUGH THE CONDUIT

DUCT BANK.

STEP 5 REPEAT STEP 1 THROUGH STEP 4 UNTIL

RELATED MANHOLES ARE COMPLETE.

THE FOLLOWING STEP WILL OCCUR ONLY AFTER NEW

MCR CONSTRUCTION IS COMPLETE AND AT START OF

CABLING MCR

STEP 6 PULL CELL TUBE IN EXISTING CONDUITS/

FROM MANHOLE TO RESPECTIVE BUILDING

AS SHOWN ON PLANS.

STEP 7 TEST CELL TUBE FROM MCR TO EACH

RESPECTIVE BUILDING TO MAKE SURE

THERE IS NO OBSTRUCTION. LABEL EACH

TUBE CELL “FROM TO”.

STEP 7 INSTALL AIR BLOWN FIBERS FORM MCR TO

EACH BUILDING AS SPECIFIED IN THE PLANS.

STEP 8 INSTALL FIBER TO EACH TR WITHIN THE

BUILDING PER FIBER RISER DIAGRAM.

STEP 9 TERMINATE FIBER ON FIBER PATCH PANEL IN

EACH TR AND MCR.

STEP 10 LABEL FIBER/TUBE CELL AS PER LABELING

REQUIREMENTS.

STEP 11 TEST ALL FIBERS USING OTDR EQUIPMENT.

STEP 12 REPLACE ALL FIBER THAT FAILED THE TEST.

1 NEW CELL TUBE IN EXISTING U/G CONDUIT PER

TABLE ON W.T-002

FOR EXISTING MANHOLE FOLDOUT SEE SHEETS

T-507 THROUGH T-519.

SEE DETAIL 1 SHEET T-505.

TDU PEDESTAL.

TYPICAL2

KEY NOTES

MHD 21

MHD 2

MHD 11

MHD 5

MHD 25

MHD 31

MHD 32

MHD 37

MHD 26

MHD 43

MHD 46

MHD 30

MHN 2

MHN 14

MHN 6

MHN 7

MHN 8

MHN 9

4 3

ALL UNDERGROUND CELL TUBE TRUNK LINES

FROM NEW MCR IN BUILDING 500 TO EACH

PEDESTAL MOUNTED TDU AND MANHOLES HAS

BEEN INSTALLED UNDER ANOTHER PROJECT.

REQUIRED NUMBER OF CELL TUBE (PER TABLE)

HAS BEEN INSTALLED IN EACH PEDESTAL TDU.

THIS CONTRACTOR SHALL INSTALL REQUIRED

NUMBER OF CELL TUBE FROM PEDESTAL TDU TO

BUILDINGS UNDER THIS PROJECT THROUGH

EXISTING UNDERGROUND CONDUIT.

INSTALL CELL TUBE COUPLERS TO CONNECT NEW

CELL TUBE WITH ALREADY INSTALLED CELL TUBE

WITHIN PEDESTAL TDU.

ONCE THE INSTALLATION OF CELL TUBE TO EACH

BUILDING FROM RESPECTIVE PEDESTAL TDU IS

COMPLETED THIS CONTRACTOR SHALL TEST EACH

CELL TUBE ORIGINATING IN NEW MCR BUILDING

500 TO EACH BUILDING.

ONCE IT IS ESTABLISHED THAT THE TUBE IS CLEAR

END TO END THE CONTRACTOR SHALL START

INSTALLATION OF REQUIRED NUMBER OF AIR

BLOWN SM FIBER FROM NEW MCR BUILDING 500

TO EACH BUILDING UNDER THIS PROJECT.

FIBER WILL BE TESTED (USING OTDR) AND REPORT

SUBMITTED TO VA FOR APPROVAL. THE FIBER

SHALL BE TERMINATED, USING LC CONNECTORS,

ON FIBER PATCH PANEL AT EACH END.

1.

2.

3.

4.

5.

6.

BUILDING IN SCOPE

FOR CELL TUBE &

FIBER

BUILDING IN SCOPE

FOR PIV

MHN 18

MHN 21 1

TELECOMMUNICATIONS SITE PLAN (REFERENCE ONLY)

SCALE: 1/128" = 1' - 0"

W.T-002

TELECOMMUNICATIONS SITE PLAN

FIBER & CELL TUBE DISTRIBUTION

R

EF

ER

T

O W

.T -0

F

O R

C O

N

TI

N U

AT

IO

N

VIA TUNNEL

MH

W16b

MH W16f

MH

W16a

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

NORTHWEST LA CAMPUS

MHW 19MHW 20

KEY NOTES

EXISTING 4-4"C TO

DEMARC

NEW DUCT BANK 2-4"C1

GENERAL NOTE

MHW16c

MH

W16e

MHW 17

MHW 18

MHW 164

4 3

MHW16d

ALL UNDERGROUND CELL TUBE TRUNK LINES

FROM NEW MCR IN BUILDING 500 TO EACH

PEDESTAL MOUNTED TDU AND MANHOLES HAS

BEEN INSTALLED UNDER ANOTHER PROJECT.

REQUIRED NUMBER OF CELL TUBE (PER TABLE)

HAS BEEN INSTALLED IN EACH PEDESTAL TDU.

THIS CONTRACTOR SHALL INSTALL REQUIRED

NUMBER OF CELL TUBE FROM PEDESTAL TDU TO

BUILDINGS UNDER THIS PROJECT THROUGH

EXISTING UNDERGROUND CONDUIT.

INSTALL CELL TUBE COUPLERS TO CONNECT NEW

CELL TUBE WITH ALREADY INSTALLED CELL TUBE

WITHIN PEDESTAL TDU.

ONCE THE INSTALLATION OF CELL TUBE TO EACH

BUILDING FROM RESPECTIVE PEDESTAL TDU IS

COMPLETED THIS CONTRACTOR SHALL TEST EACH

CELL TUBE ORIGINATING IN NEW MCR BUILDING

500 TO EACH BUILDING.

ONCE IT IS ESTABLISHED THAT THE TUBE IS CLEAR

END TO END THE CONTRACTOR SHALL START

INSTALLATION OF REQUIRED NUMBER OF AIR

BLOWN SM FIBER FROM NEW MCR BUILDING 500

TO EACH BUILDING UNDER THIS PROJECT.

FIBER WILL BE TESTED (USING OTDR) AND REPORT

SUBMITTED TO VA FOR APPROVAL. THE FIBER

SHALL BE TERMINATED, USING LC CONNECTORS,

ON FIBER PATCH PANEL AT EACH END.

1.

2.

3.

4.

5.

6.

LEGEND

BUILDING IN SCOPE

FOR CELL TUBE &

FIBER

BUILDING IN SCOPE

FOR PIV

1 NEW CELL TUBE IN EXISTING U/G CONDUIT PER

TABLE ON W.T-002

FOR EXISTING MANHOLE FOLDOUT SEE SHEETS

T-507 THROUGH T-519.

SEE DETAIL 1 SHEET T-505.

TDU PEDESTAL.

ELECTRIC RM

LAB

004E 004B

OFFICE

004C

OFFICE

004D

STORAGE

004F

LABORATORY

004 STORAGE

004G

OFFICE

ELECTRONICS

SHOP

002 OFFICE

002A

LOBBY

001A ELEV JAN.

STORAGE

001C

STORAGE

001B

CORRIDOR

TEL. RM.

STORAGE

OFFICE

OFFICE

008C

OFFICE

008D

OFFICE

008E

OFFICE

008F

OPEN TO

MECHANICAL

RM. BELOW

OFFICE

008G

WOMEN MEN OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

015A

OFFICE

015B

OFFICE

015C OFFICE OFFICE

GROUP RM.

018OFFICE

OFFICE

019AOFFICE

OFFICE

019B

OFFICE

EXAM

ROOM

MACHINE SHOP

SCALE: 3/32" = 1' - 0"

NORTH

W.210.T-101

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 16' 24'2' 8'

SCALE: 3/32" = 1'-0"

FOR ENLARGED

PLAN SEE

W.210.T-401

ADDENDUM 08-12-2021

AUGUST 12, 2021

J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

3/4"C WITH PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING). DOOR

CONTROL CABLING AND TERMINATION BY

SECURITY CONTRACTOR.

2H R

2HR

2H R

2HR

2HR

2H R

2H R

2H R

2HR

2H R

2H R

2HR

2H R

2H R

2HR

2H R

2H R

2HR

2H R

2H R

2HR

2H R

2H R

2HR

STORAGE

B46

STORAGE

B45

OFFICE

B86

NURSING

SUPPLIES

B51

WATER

TREATMENT

B50

ACID

ROOM

B46

LOCKERS

B40

SOILED

UTILITY

B39

OFFICE

B7

ELEC

B3

STORAGE

B6

LINEN

B5

BIOHAZARD

WASTE STOR.

B4

TRANSFORMER

ROOM

B11

MECHANICAL

ROOM

B13

DENTIST

B24

CLEAN

SUPPLY

B22A

CLEAN

SUPPLY

B22

DENTAL

LAB

B21A

DENTAL

LAB

B21

DENTIST

B20

ANTE-ROOM

B24A

DENTAL

X-RAY

B19ELEC.

B20A

DENTIST

B26

LOUNGE

B25

DENTIST

B29

RECPTION

B30

PHARMACY

B31

OFFICE

B14

STORAGE

B15

OFFICE

B17B

OFFICE

B17A

OFFICE

B17C

TOILET

B17

HAC

B16

CL

CL

SOILED

UTILITY

B28

LOCKER

ROOM

B47

O2 STORAGE/

SUPPLIES

B41

KITCHEN

B42

ELEC

B43B

TOILET

B43A

DIALYSIS EQUIP.

ROOM

HAC

B37

ELEVATOR

EQUIP. RM.

B08

STORAGE

ROOM

B1

ELEV. MACH.

ROOM

PHARMACY

B31

MEN

B34

WOMEN

B32

TOILET

DRESSING ROOM

DRESSING ROOM

BREAK

ROOM

OFFICE

2HR

DIALYSIS

B44

TOILET

MED

ROOM

WAITING

ROOM

1H R

1HR

1H R

1H R

TELEPHONE

ROOM

B09

SCALE: 3/32" = 1' - 0" NORTH

W.213.T-101

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 16' 24'2' 8'

SCALE: 3/32" = 1'-0"

FOR ENLARGED

PLAN SEE

W.213.E-401

J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

3/4"C WITH PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING). DOOR

CONTROL CABLING AND TERMINATION BY

SECURITY CONTRACTOR.

B06

B02

B03

2H R 2H

R

2H R

2H R

2HR

2H R

2H R

2HR

2H R

2H R

W.214.T-101

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 16' 24'2' 8'

SCALE: 3/32" = 1'-0"

SCALE: 3/32" = 1' - 0"

FOR ENLARGED

PLAN SEE

W.214.T-401

NORTH

J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

3/4"C WITH PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING). DOOR

CONTROL CABLING AND TERMINATION BY

SECURITY CONTRACTOR.

A

1 2 3 4 5 6

B

C

D

E

BREAK

ROOM

IT

ROOM

200A

TRAINING

ROOM

MEN'S

RESTROOM

WOMEN'S

RESTROOM

LOBBY

HALL

MECH

ROOM

OFFICE

OFFICE

1 2

SCALE: 1/8" = 1' - 0"

NORTH

W.222.T-121

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED

PLAN SEE

W.222.T-401

J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

3/4"C WITH PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING). DOOR

CONTROL CABLING AND TERMINATION BY

SECURITY CONTRACTOR.

ELEV.

STAIR

HALL

STAIR

HALL

XEROX RM. 1 BED

RM.

STAFF

W.T.

1 BED

RM.

OFFICE

MEETING ROOM

PATIENT

BMS

OFFICE OFFICE

OFFICEOFFICE

OFFICE OFFICE

OFFICE

COMMUNICATION

CENTER

MEN'S

TOILET

PIPE SPACE

OCCUPATIONAL

THERAPY

INTERVIEW

ROOM

LIBRARY

DAY ROOM

OFFICE OFFICE

EXAM

ROOM

OFFICEOFFICE

OFFICE

STAFF T.

OFFICE

NIGHT SUPER

2 BED

RM.

3 BED

RM.

2 BED

RM.

3 BED

RM.

4 BED ROOM

DAY ROOM

PIPE SPACE

PIPE SPACE

TELECOMM

ROOM 226

MEETING RM.

MEETING

RM.

PIPE SPACE

PIPE SPACE

MEN'S

TOILET

WASHER & DRYER

LINEN

BMS

ELEV.

LOBBY

2 BED

RM.

2 BED

RM.

2 BED

RM.

4 BED ROOM

2 BED

RM.

STAFF

226.1

SCALE: 1/8" = 1' - 0"

NORTH

W.256.T-121

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

3/4"C WITH PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING). DOOR

CONTROL CABLING AND TERMINATION BY

SECURITY CONTRACTOR.

DOWN TO HIRSCH

PANEL BELOW

FOR ENLARGED

PLAN SEE

W.256.T-401

UP TO CEILING OF

FLOOR ABOVE & OVER

TO NEXT TR ROOM

DOOR CONTROL BOX

J

J

J

J

SCALE: 1/8" = 1' - 0"

W.258.T-111

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

3/4''C W/PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING) DOOR CONTROL

CABLING BY SECURITY CONTRACTOR.

FOR ENLARGED PLAN

SEE W.258.T-401

FOR ENLARGED

PLAN SEE

W.258.T-401

NORTH

1.

2.

XXXXXX

XXXXXX

X X

X

1 2

PAINT SHOP

12K SWGR (EX)

SWGR.

ROOM

1500KW

12KV

GENERATOR

SCALE: 1/4" = 1' - 0"

NORTH

W.299.T-111

TELECOMMUNICATIONS

SECURITY FIRST FLOOR PLAN

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

1 NEW TDU WITH CELL TUBE FROM MANHOLE AND

24 STRAND SM FIBER FROM MCR BUILDING 500.

FIBER PATCH PANEL. TERMINATE ALL STRAND

OF FIBER USING LC CONNECTOR.

2-2'' CONDUIT FOR FIRE LOOP & DATA FIBER

(EXISTING).

2-4'' CONDUIT STUB UP NEW TDU GOES ON THIS WALL12KV SWITCH GEAR

OFFICE

CONFERENCE ROOM

MAIN TELECOM

DISTRIBUTION HUB

NIC

OFFICE

OFFICE

CONFERENCE ROOM

NIC

LOUNGE

OFFICE

NIC

RESTROOM 1

NIC

OFFICE

NIC

RESTROOM 2

DN

SCALE: 1/8" = 1' - 0" NORTH

W.301.T-111

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED

PLAN SEE

W.301.T-401

NEW J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

NEW 3/4"C WITH PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING). DOOR

CONTROL CABLING AND TERMINATION BY

SECURITY CONTRACTOR.

NEW HIRSCH CONTROL PANEL.

J J

SCALE: 1/8" = 1' - 0"

NORTH

W.345.T-111

FOR ENLARGED

PLAN SEE

W.345.T-401

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

KEY NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED

PLAN SEE

W.345.T-401

J-BOX ABOVE DOOR SEE DETAIL 2 DRAWING

T-503.

3/4''C W/PULL STRING BY ELECTRICAL

CONTRACTOR (ABOVE CEILING) DOOR CONTROL

CABLING BY SECURITY CONTRACTOR.

X.E

J.2

J.2.1

J.1

XD

J

X.C

H

X.B

X.A

G

G.1

F

E.1

E.2

E

D.1

D.2

B.1

C

D

B

A

X.10 X.917 1516 14.1 14 13.4 13.213.3 13.1 13 12 11.1 11 1018 9.4 9.3 9.25 X.5X.6X.8

EXISTING 12''W X 6'' CABLE TRAY

(TYPICAL)

SCALE: 3/32" = 1' - 0"

NORTH

W.500.T-10I1

R

EF

ER

T

O W

.5

.T -1

0I

FO

R

C O

N

TI

N U

AT

IO

N

REFER TO W.500.T-10I3 FOR CONTINUATION

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11 20-SCE-06

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

0' 4' 16' 24'2' 8'

SCALE: 3/32" = 1'-0"

FOR 10IN

ENLARGED PLAN

SEE W.500.T-407

1. HORIZONTAL AND VERTICAL RUN OF ACCESS

CONTROL CONDUITS SHALL BE ROUTED THROUGH

AND ON INTERSTITIAL LEVEL. SEE PIV ACCESS

CONTROL RISER DIAGRAM ON T-616.

TR 10SJ

Q.1

Q

S

O.2

O.1

O

N.7

N.4

N.3 N.2

N.1

N

M

X.K

L.1

L

X.J

X.G K

X.H

X.F

J.4

P

J.3

X.10 X.9 X.8

X.7

X.6 X.5

16.1

14.1 13.4 13.213.3 13.1 11.1 9.4 9.3 9.2518 17 16 15 14 13 12 11 10

RAMP DOWNRAMP DOWN

SCALE: 3/32" = 1' - 0"

NORTH

W.500.T-10I3

R

EF

ER

T

O W

.5

.T -1

0I

FO

R

C O

N

TI

N U

AT

IO

N

REFER TO W.500.T-10I1 FOR CONTINUATION

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

JULY 13, 2021 PM EW/JB

FULLY SPRINKLERED

A

GENERAL NOTES

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .