About this file

This document provides shop drawing and hazardous materials notes for the construction services solicitation to upgrade the server room and site communication infrastructure at the VA Greater Los Angeles Healthcare System. The solicitation seeks a Service-Disabled Veteran-Owned Small Business contractor to perform general construction, alterations, mechanical, electrical and utility work. The contractor must furnish all labor, materials, equipment and transportation to complete the project in accordance with specifications, drawings and applicable codes. The document outlines hazardous materials present in buildings that may impact work, including asbestos, lead and other materials. It also provides notes on contractor shop drawings requirements, including coordination, field verification, dedicated drawings by discipline and ongoing updates.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Upgrade Server Room and Site Communication Infrastructure

691-20-152FINAL CONSTRUCTION

DOCUMENTS

AUGUST 12, 2021 JC WA

FULLY SPRINKLERED

A

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.11

11301 WILSHIRE BOULEVARD,WEST LOS ANGELES, CA 90073

16111 PLUMMER STREET SEPULVEDA, CA 91343-2036

351 EAST TEMPLE STREET, LOS ANGELES, CA 90012

1 ADDENDUM 8/12/2021

GI007

SHOP DRAWING AND HAZMAT NOTES

CONFIRM EXISTING HAZMAT CONDITIONS AND HAZMAT CLEARANCE REQUIREMENTS

WITH VA PRIOR TO COMMENCING WORK.

ALL HAZMAT PRODUCTS WILL BE STORED IN PROPER CONTAINERS AND CABINETS WITH

SAFETY DATA SHEET (SDS) WHEN ON CONSTRUCTION SITE. ALL HAZMAT PRODUCTS

WILL BE PUT AWAY WHEN NOT BEING UTILIZED.

BASED ON REPORTS PROVIDED BY VA WEST LA AND RECENT SAMPLING AND ANALYSIS,

A SUMMARY OF ASBESTOS CONTAINING MATERIALS NOTED TO BE PRESENT IS

SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE NOTED IN

THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE PRESENT IN OTHER

AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE TREATED AS ASBESTOS.

REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE DRYWALL OR PLASTER THAT

CONTAIN HAZARDOUS MATERIALS:

· BLDG 44: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS / CEILINGS.

· BLDG 114: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS / CEILINGS.

· BLDG 115: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS/CEILINGS.

· BLDG 158: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COUMPOUND.

LOCATIONS: THROUGHOUT WALLS/CEILINGS.

· BLDG 212: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT

WALLS/CEILINGS.

· BLDG 218: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT

WALLS/CEILINGS.

· BLDG 236: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS/CEILINGS.

· BLDG 306: ASBESTOS IS PRESENT IN THE TEXTURED PAINT ASSOCIATED WITH

PLASTER. LOCATIONS: THROUGHOUT WALLS.

· BLDG 401: ASBESTOS IS PRESENT IN ALL WALLS/CEILINGS (PLASTER/DRYWALL)

· BLDG 500: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS/CEILINGS.

THE JOINT COMPOUND IS ASSOCIATED WITH THE DRYWALL AND CANNOT BE

SEPARATED NOR CAN BE VISIBLY SEEN WHERE THE JOINT COMPOUND IS ON DRYWALL.

FOR THIS FACT, THE DRYWALL AND ASSOCIATED JOINT COMPOUND NEED TO BE

TREATED AS ASBESTOS CONTAINING UNLESS THE CONTRACTOR CAN VISIBLY SEE

WHERE THE JOINT COMPOUND IS LOCATED AND THE PENETRATIONS WILL NOT BE

MADE IN LOCATIONS WHERE THIS IS OBSERVED.

REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE FLOORING

(TILE/MASTIC/FLOOR SHEETING) THAT CONTAIN ASBESTOS:

· BLDG 44 : THROUGHOUT

· BLDG 46: THROUGHOUT

· BLDG 113: THROUGHOUT

· BLDG 114: ROOM 125B, ROOM 212, ROOM 232, THROUGHOUT

· BLDG 115: THROUGHOUT, ROOM 111, ROOM 217

· BLDG 117: THROUGHOUT

· BLDG 158: MEN'S RESTROOM, ROOM 218, ROOM 7A

· BLDG 206: THROUGHOUT

· BLDG 210: ROOM 122

· BLDG 212: THROUGHOUT

· BLDG 215: ROOM 123, ROOM 233, ROOM 333, & 2ND FLOOR NURSES STATION

· BLDG 218: ROOM 4, ROOM 201, ROOM 302

· BLDG 220: THROUGHOUT

· BLDG 222: THROUGHOUT

· BLDG 224: THROUGHOUT

· BLDG 236: THROUGHOUT

· BLDG 256: THROUGHOUT

· BLDG 257: THROUGHOUT

· BLDG 258: THROUGHOUT, ROOM 136A, ROOM 337 CLOSET

· BLDG 295: THROUGHOUT

· BLDG 297: THROUGHOUT

· BLDG 301: THROUGHOUT, DATA ROOM

· BLDG 304: THROUGHOUT, BASEMENT ROOM

· BLDG 305: BACK CORRIDOR & EXIT CORRIDOR

· BLDG 306: THROUGHOUT

· BLDG 401: THROUGHOUT

· BLDG 500: THROUGHOUT, ROOM 0144, ROOM 0242, ROOM 0652, ROOM 3077

· BLDG 507: THROUGHOUT

HAZMAT NOTES

BLDG 220:

· BLUE WOOD BASEBOARDS. LOCATIONS: STAIRWELL (POTENTIAL

PENETRATIONS)

· BEIGE CONCRETE/DRYWALL WALLS. LOCATIONS: OFFICES (POTENTIAL

PENETRATIONS)

· BLUE CONCRETE WALLS. LOCATIONS: OFFICES (POTENTIAL PENETRATIONS)

· BLUE CERAMIC WALLS. LOCATIONS: RESTROOM (POTENTIAL

PENETRATIONS)

· GREY PLASTER WALLS. LOCATIONS: OFFICES (POTENTIAL PENETRATIONS)

· WHITE DRYWALL/PLASTER WALLS & CEILINGS. LOCATIONS: OFFICES

(POTENTIAL PENETRATIONS)

· BEIGE WOOD CHAIR RAIL. LOCATIONS: OFFICES (POTENTIAL

PENETRATIONS)

· OFF-WHITE WOOD WALL TRIM. LOCATIONS: ROOM 121 (POTENTIAL

PENETRATIONS)

BLDG 236:

· TAN TERRAZZO FLOORING. LOCATIONS: ROOM 24

BLDG 256:

· TAN /BROWN CERAMIC WAINSCOT. LOCATIONS: BATHROOM

107A, 207A AND 242 (POTENTIAL PENETRATIONS)

BLDG 257:

· GREY CERAMIC WALL TILES. LOCATIONS: RESTROOM

(POTENTIAL PENETRATIONS)

· BEIGE CERAMIC WALL TILES. LOCATIONS: ROOM 215 (POTENTIAL

PENETRATIONS)

BLDG 258:

· WHITE PLASTER WALLS. LOCATIONS: RESTROOM (POTENTIAL

PENETRATIONS)

· BEIGE CERAMIC WALL TILES. LOCATIONS: OFFICES (POTENTIAL

PENETRATIONS)

· BEIGE PLASTER WALLS. LOCATIONS: KITCHEN (POTENTIAL

PENETRATIONS)

· YELLOW CERAMIC WALL TILES. LOCATIONS: OFFICES

(POTENTIAL PENETRATIONS)

· RED CERAMIC 9”x9” VINYL FLOOR TILES. LOCATIONS: ROOM 215

(POTENTIAL PENETRATIONS)

BLDG 297:

· GREY METAL SUPPORT BEAMS. LOCATIONS: TR ROOM

BLDG 304:

· WHITE CERAMIC WALL TILES. LOCATIONS: BATHROOM E1-222

(POTENTIAL PENETRATIONS)

· BEIGE CERAMIC WALL TILES. LOCATIONS: OFFICE/STORAGE

E1-103 & RESTROOM E2-206 (POTENTIAL PENETRATIONS)

BLDG 500:

· YELLOW/BEIGE CERAMIC WALL TILES. LOCATIONS:

THROUGHOUT (POTENTIAL PENETRATIONS)

PENETRATIONS ARE PLANNED FOR LEAD CONTAINING MATERIALS

NOTED ABOVE. ANY REMOVAL ACTIVITIES OR PENETRATIONS ARE TO

BE PERFORMED IN COMPLIANCE WITH CALIFORNIA CODE OF

REGULATIONS, TITLE 9, SECTION 1532.1 (LEAD IN CONSTRUCTION

STANDARD).

HAZMAT NOTES

HAZMAT NOTES

HAZMAT NOTES HAZMAT NOTES

REPORTS AND RECENT SAMPLING INDICATE THE FOLLOWING BUILDINGS HAVE

FRIABLE ASBESTOS:

· BLDG 44: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 215: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 218: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 220: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 256: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 257: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 258: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 301: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 304: / THERMAL SYSTEM INSULATION MAY BE PRESENT

CONTRACTOR SHOULD BE AWARE THAT 'THERMAL SYSTEM INSULATION' MAY BE

ENCOUNTERED IN CEILING PLENUM LOCATIONS. IF THE MATERIAL IS OBSERVED TO

BE DAMAGED INCLUDING THE PRESENCE OF SUSPECT INSULATION DEBRIS, WORK

SHOULD BE IMMEDIATELY STOP AT THIS LOCATION. AN ASBESTOS CONSULTANT

SHOULD ACCESS THE WORK LOCATION AND PROVIDE APPROPRIATE RESPONSE

ACTIONS FOR SAMPLING AND ANALYSIS, CLEAN-UP, REPAIR, AND POTENTIAL

ABATEMENT NEEDS.

PENETRATIONS ARE PLANNED FOR ASBESTOS CONTAINING MATERIALS NOTED

ABOVE. WORKERS CAN BE UTILIZED WITH APPROPRIATE ASBESTOS TRAINING.

EXPOSURE ASSESSMENTS SHOULD BE PERFORMED FOR THE WORKERS

PERFORMING THESE PENETRATIONS IN ORDER TO DETERMINE THE APPROPRIATE

PERSONNEL PROTECTIVE EQUIPMENT REQUIRED FOR THESE TASKS.

BASED ON REPORTS PROVIDED BY VA WEST LA AND RECENT SAMPLING AND

ANALYSIS, A SUMMARY OF LEAD CONTAINING MATERIALS NOTED TO BE PRESENT

IS SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE

NOTED IN THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE

PRESENT IN OTHER AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE

TREATED AS LEAD PAINT.

REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE LEAD PAINT:

BLDG 115:

· OFF WHITE PLASTER WALLS AND CEILINGS. LOCATIONS: ROOM 218A.

· PINK PLASTER WALLS. LOCATIONS: ROOM 304A

BLDG 158:

· TAN & WHITE PLASTER WALLS. LOCATIONS: HALLWAYS/CORRIDORS,

CEILINGS, AND OFFICES. (POTENTIAL PENETRATIONS)

· BEIGE CERAMIC WALL TILES. LOCATIONS: 2ND FLOOR RESTROOMS

· BEIGE PLASTER CEILINGS LOCATIONS: 2ND FLOOR STARIWELL

BLDG 206:

· WHITE PLASTER/ DRYWALL WALLS. LOCATIONS: THROUGHOUT. (POTENTIAL

PENETRATIONS)

BLDG 210:

· CLUE PLASTER WALLS/CEILINGS. LOCATIONS: HALLWAYS/CORRIDORS.

(POTENTIAL PENETRATIONS)

· BEIGE WOOD CEILINGS. LOCATIONS: HALLWAYS/CORRIDORS. (POTENTIAL

PENETRATIONS)

· BEIGE CERAMIC WALL TILES. LOCATIONS: RESTROOM

· WHITE CERAMIC WALL TILES. LOCATIONS: OFFICE

· PINK DRYWALL WALLS. LOCATIONS: OFFICE

· BEIGE PLASTER WALLS. LOCATIONS: HALLWAY/CORRIDOR

BLDG 213:

· WHITE WOOD BASEBOARDS. LOCATIONS: STAIRWELL. (POTENTIAL

PENETRATIONS)

BLDG 214:

· BLUE CERAMIC WALL TILES. LOCATIONS: RESTROOM (POTENTIAL

PENETRATIONS)

· BEIGE CERAMIC WALL TILES. LOCATIONS: RESTROOM (POTENTIAL

PENETRATIONS)

· WHITE WOOD BASEBOARDS. LOCATIONS: STAIRWELL. (POTENTIAL

PENETRATIONS)

BLDG 215:

· BLUE WOOD CASEWORK. LOCATIONS: HALLWAY/CORRIDOR.

(INFORMATIONAL PURPOSES)

· BEIGE WOOD CASEWORK. LOCATIONS: STAIRWELL. (INFORMATIONAL

PURPOSES)

BLDG 217:

· WHITE WOOD BASEBOARDS. LOCATIONS: STAIRWELL (POTENTIAL

PENETRATIONS)

· PINK CERAMIC WALL TILES. LOCATIONS: RESTROOM (POTENTIAL

PENETRATIONS)

BLDG 218:

· TAN CERAMIC WALL TILES. LOCATIONS: 3RD FLOOR BY ROOMS 306A & 306B

(POTENTIAL PENETRATIONS)

· BEIGE CERAMIC WALL TILES. LOCATIONS: ROOM 115B (POTENTIAL

PENETRATIONS)

· PINK WOOD BASEBOARD. LOCATIONS: ROOM 326, GROUND FLOOR

STAIRWELL (POTENTIAL PENETRATIONS)

· BLUE PLASTER WALLS. LOCATIONS: ROOM 32 (POTENTIAL PENETRATIONS)

· RUST 9”x9” VINYL FLOOR TILES. LOCATIONS: ROOMS 4, 201, & 304

(POTENTIAL RENOVATIONS)

WLA

WLA (CONTINUED) WLA (CONTINUED)

CONFIRM EXISTING HAZMAT CONDITIONS AND HAZMAT CLEARANCE REQUIREMENTS

WITH VA PRIOR TO COMMENCING WORK.

ALL HAZMAT PRODUCTS WILL BE STORED IN PROPER CONTAINERS AND CABINETS WITH

SAFETY DATA SHEET (SDS) WHEN ON CONSTRUCTION SITE. ALL HAZMAT PRODUCTS

WILL BE PUT AWAY WHEN NOT BEING UTILIZED.

BASED ON REPORTS PROVIDED BY VA SEPULVEDA AND RECENT SAMPLING AND

ANALYSIS, A SUMMARY OF ASBESTOS CONTAINING MATERIALS NOTED TO BE PRESENT

IS SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE NOTED IN

THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE PRESENT IN OTHER

AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE TREATED AS ASBESTOS.

REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE DRYWALL OR PLASTER THAT

CONTAIN HAZARDOUS MATERIALS:

· BLDG 1: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND. LOCATIONS:

THROUGHOUT WALLS / CEILINGS.

· BLDG 22: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS / CEILINGS.

· BLDG 23: ASBESTOS IS PRESENT IN THE TEXTURED COATING ASSOCIATED WITH

PLASTER WALLS. LOCATIONS: THROUGHOUT WALLS.

· BLDG 24: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT

WALLS AND CEILINGS.

· BLDG 44: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT

WALLS.

· BLDG 46: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS / CEILINGS.

· BLDG 99: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.

LOCATIONS: THROUGHOUT WALLS.

THE JOINT COMPOUND IS ASSOCIATED WITH THE DRYWALL AND CANNOT BE

SEPARATED NOR CAN BE VISIBLY SEEN WHERE THE JOINT COMPOUND IS ON DRYWALL.

FOR THIS FACT, THE DRYWALL AND ASSOCIATED JOINT COMPOUND NEED TO BE

TREATED AS ASBESTOS CONTAINING UNLESS THE CONTRACTOR CAN VISIBLY SEE WHERE

THE JOINT COMPOUND IS LOCATED AND THE PENETRATIONS WILL NOT BE MADE IN

LOCATIONS WHERE THIS IS OBSERVED.

REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE FLOORING

(TILE/MASTIC/FLOOR SHEETING) THAT CONTAIN ASBESTOS:

· BLDG 1 : SERVER ROOM A154

· BLDG 22: THROUGHOUT

· BLDG 44: THROUGHOUT

· BLDG 45: TR ROOM, ROOM 201, ROOM 203

· BLDG 62: THROUGHOUT

· BLDG 63: THROUGHOUT

REPORTS AND RECENT SAMPLING INDICATE THE FOLLOWING BUILDINGS HAVE

FRIABLE ASBESTOS:

· BLDG 1: / THERMAL SYSTEM INSULATION MAY BE PRESENT

· BLDG 44: / THERMAL SYSTEM INSULATION MAY BE PRESENT

CONTRACTOR SHOULD BE AWARE THAT 'THERMAL SYSTEM INSULATION' MAY BE

ENCOUNTERED IN CEILING PLENUM LOCATIONS. IF THE MATERIAL IS OBSERVED TO BE

DAMAGED INCLUDING THE PRESENCE OF SUSPECT INSULATION DEBRIS, WORK SHOULD

BE IMMEDIATELY STOP AT THIS LOCATION. AN ASBESTOS CONSULTANT SHOULD ACCESS

THE WORK LOCATION AND PROVIDE APPROPRIATE RESPONSE ACTIONS FOR SAMPLING

AND ANALYSIS, CLEAN-UP, REPAIR, AND POTENTIAL ABATEMENT NEEDS.

PENETRATIONS ARE PLANNED FOR ASBESTOS CONTAINING MATERIALS NOTED ABOVE.

WORKERS CAN BE UTILIZED WITH APPROPRIATE ASBESTOS TRAINING. EXPOSURE

ASSESSMENTS SHOULD BE PERFORMED FOR THE WORKERS PERFORMING THESE

PENETRATIONS IN ORDER TO DETERMINE THE APPROPRIATE PERSONNEL PROTECTIVE

EQUIPMENT REQUIRED FOR THESE TASKS.

BASED ON REPORTS PROVIDED BY VA SEPULVEDA AND RECENT SAMPLING AND

ANALYSIS, A SUMMARY OF LEAD CONTAINING MATERIALS NOTED TO BE PRESENT IS

SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE NOTED IN

THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE PRESENT IN OTHER

AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE TREATED AS LEAD PAINT.

REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE LEAD PAINT:

· BLDG 1: GREEN CERAMIC WALL TILES. LOCATIONS: THROUGHOUT OFFICES.

· BLDG 7: ORANGE CONCRETE CEILING. LOCATIONS: ROOM B-30.

· BLDG 20: GRAY WOOD BASEBOARD. LOCATIONS: THROUGHOUT

HALLWAYS/CORRIDORS

· BLDG 22: BLUE CONCRETE WALLS. LOCATIONS: THROUGHOUT OFFICES.

· BLDG 23: BEIGE METAL BASEBOARDS. LOCATIONS: GYM.

· BLDG 24: BEIGE WOOD HORIZONTAL BEAM. LOCATIONS: OFFICES.

· BLDG 25: GRAY VINYL COVE BASE. LOCATIONS: ROOM A109. (PLANNED FOR

REMOVAL)

· BLDG 99: BROWN 12-INCH X 12 INCH CERAMIC FLOORING. LOCATIONS: ROOM

102A & 100 CLOSET

PENETRATIONS ARE PLANNED FOR LEAD CONTAINING MATERIALS NOTED ABOVE. ANY

REMOVAL ACTIVITIES OR PENETRATIONS ARE TO BE PERFORMED IN COMPLIANCE WITH

CALIFORNIA CODE OF REGULATIONS, TITLE 9, SECTION 1532.1 (LEAD IN CONSTRUCTION

STANDARD).

CONFIRM EXISTING HAZMAT CONDITIONS AND HAZMAT CLEARANCE REQUIREMENTS

WITH VA PRIOR TO COMMENCING WORK.

BASED ON RECENT SAMPLING AND ANALYSIS, THE BUILDING MATERIALS PLANNED

TO BE IMPACTED BY THIS PROJECT HAVE BEEN FOUND TO BE NON-ASBESTOS AND

NON-LEAD CONTAINING. NORMAL DUST CONTROL MEASURES SHOULD BE

UTILIZED FOR ANY DISTURBANCES TO WALLS, FLOORS, OR CEILINGS.

ALL HAZMAT PRODUCTS WILL BE STORED IN PROPER CONTAINERS AND CABINETS

WITH SAFETY DATA SHEET (SDS) WHEN ON CONSTRUCTION SITE. ALL HAZMAT

PRODUCTS WILL BE PUT AWAY WHEN NOT BEING UTILIZED.

SACC LAACCSHOP DRAWING NOTES

1. CONTRACTOR SHALL PERFORM FIELD SURVEY FOR AREAS THAT WORK IS PERFORMED PRIOR

TO PREPARATION OF CONTRACTOR'S SHOP DRAWINGS.

2. PROCEED WITH THE PREPARATION OF COMPREHENSIVE CONTRACTOR'S SHOP DRAWINGS

UPON RECEIPT OF NOTICE TO PROCEED (NTP) FOR THE PROJECT. SHOP DRAWINGS SHALL BE

ORIGINALLY PREPARED BY THE CONTRACTOR, BASED UPON CONTRACTOR'S FIELD SURVEY,

FOR AREAS THAT WORK IS PERFORMED. PROVIDE SCALABLE PLANS COMPLETED WITH

AUTOCAD PROGRAM WITHIN 60 DAYS.

3. COORDINATE WITH EXISTING CONDITIONS AND OTHER TRADES INCLUDING, BUT NOT LIMITED

TO ARCHITECTURAL, STRUCTURAL, SEISMIC, MECHANICAL, CONTROL SYSTEMS, ELECTRICAL

POWER AND LIGHTING SYSTEMS, COMMUNICATIONS AND DATA SYSTEMS, ELECTRONIC

SAFETY AND SECURITY SYSTEMS, FIRE SUPPRESSION SYSTEMS, PLUMBING, SITE UTILITY

DISTRIBUTION SYSTEMS, AND OTHER WORK REQUIRED UNDER THIS PROJECT.

4. PROVIDE DEDICATED CONTRACTOR'S SHOP DRAWINGS FOR EACH DISCIPLINE INCLUDING, BUT

NOT LIMITED TO: ARCHITECTURAL, STRUCTURAL, SEISMIC, MECHANICAL, CONTROL SYSTEMS,

ELECTRICAL POWER AND LIGHTING SYSTEMS, COMMUNICATIONS AND DATA SYSTEMS,

ELECTRONIC SAFETY AND SECURITY SYSTEMS, FIRE SUPPRESSION SYSTEMS, PLUMBING, SITE

UTILITY DISTRIBUTION SYSTEMS, AND OTHER WORK REQUIRED UNDER THIS PROJECT.

5. CONTRACTOR'S SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE

CONTRACTOR'S CONSTRUCTION QUALITY CONTROL (CQC) SYSTEM MANAGER PRIOR TO

SUBMITTAL TO THE VA TO ASSURE CONTRACTIBILITY AND COMPLIANCE WITH THE DESIGN

INTENT.

6. INCLUDE SIGNATURES ON COVER SHEET OF THE CONTRACTOR'S SHOP DRAWINGS FROM ALL

APPLICABLE TRADES AND CONTRACTOR'S CQC SYSTEM MANAGER CONFIRMING ALL

COORDINATION HAS OCCURRED AND THE SUBMITTED CONTRACTOR'S SHOP DRAWINGS ARE

FREE OF CONFLICTS.

7. OBTAIN UPDATED ROOM NAME DESIGNATIONS FROM THE VA. INDICATE ROOM NAME

DESIGNATIONS ON AREAS OF WORK UNDER THIS CONTRACT ON CONTRACTOR'S SHOP

DRAWINGS.

8. CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND CERTIFYING THAT ALL SUBMITTALS ARE

IN COMPLIANCE WITH CONTRACT REQUIREMENTS BEFORE SUBMITTING FOR VA REVIEW.

SUBMIT A COMPLETE AND COMPREHENSIVE SET OF CONTRACTOR'S SHOP DRAWINGS IN ONE

PACKAGE FOR REVIEW BY THE VA PRIOR TO MATERIAL PROCUREMENT, FABRICATION, OR

INSTALLATION. CONTINUOUS UPDATING OF CONTRACTOR'S SHOP DRAWINGS SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE UTILIZED FOR PREPARATION OF

CONTRACTOR'S RECORD DRAWINGS.

9. CONTRACTOR'S SHOP DRAWINGS SHALL REFLECT THE WORK REQUIRED UNDER THIS

PROJECT INCLUDING BUT NOT LIMITED TO THE FOLLOWING:

A. PIPING DUCTWORK, AIR INLETS, AIR OUTLETS, SENSORS, AND CONTROLLERS.

B. ELEVATIONS OF RACKS IN TELECOMMUNICATIONS ROOMS AND MAIN COMPUTER ROOMS,

INCLUDING LABELING AND DETAILS.

C. LOCATION OF COMMUNICATION, DATA, AND POWER OUTLETS, SWITCHES, AND JACKS,

LIGHTING, PANELS, DATA, AND EQUIPMENT RACKS. INDICATE THE LOCATION OF ORIGIN

AND TERMINATION FOR EACH POWER, DATA, AND COMMUNICATION CIRCUIT. INCLUDE

CONNECTIONS TO EQUIPMENT.

D. POINT OF CONNECTION TO UTILITIES AND TELECOMMUNICATIONS NODES OUTSIDE THE

BUILDINGS, INCLUDING BUT NOT LIMITED TO THE LOCATIONS OF MANHOLES, TUBE

DISTRIBUTION UNITS, AND SITE UTILITY DISTRIBUTION.

E. HANGERS AND SUPPORTS, INCLUDING METHODS FOR BUILDING ATTACHMENTS, SEISMIC

RESTRAINTS, AND VIBRATION ISOLATION.

F. LOCATIONS OF STRUCTURAL PENETRATIONS INCLUDING BUT NOT LIMITED TO

PENETRATIONS OF WALLS, FLOORS, ROOFS, AND STRUCTURAL ELEMENTS.

G. ACCESS PANELS INCLUDING CEILING AND WALL PANELS.

H. LOCATION OF EXISTING WALLS NOT IDENTIFIED ON THE PLANS AND DESIGNATION OF

FIRE RATING AND TYPES OF WALLS AFFECTED UNDER THIS CONTRACT. PROVIDE A LOG

OF ALL FIRE PENETRATIONS THAT OCCURRED AS PART OF THE CONSTRUCTION AS A

DELIVERABLE AT THE COMPLETION OF THE PROJECT.

I. EXISTING BUILDING SYSTEMS AND UTILITIES BEING RELOCATED TO ACCOMMODATE

DESIGN.

J. DIMENSIONS OF ACTUAL PURCHASED EQUIPMENT.

K. ACCESS CLEARANCE FOR EQUIPMENT SERVICE.

L. LABEL AND TAG SCHEDULE FOR EQUIPMENT.

M. BUILDING GRIDLINES AND NORTH ARROWS.

APPLIES TO ALL DISCIPLINES UNDER THIS CONTRACT.

VAGLA