This document provides shop drawing and hazardous materials notes for the construction services solicitation to upgrade the server room and site communication infrastructure at the VA Greater Los Angeles Healthcare System. The solicitation seeks a Service-Disabled Veteran-Owned Small Business contractor to perform general construction, alterations, mechanical, electrical and utility work. The contractor must furnish all labor, materials, equipment and transportation to complete the project in accordance with specifications, drawings and applicable codes. The document outlines hazardous materials present in buildings that may impact work, including asbestos, lead and other materials. It also provides notes on contractor shop drawings requirements, including coordination, field verification, dedicated drawings by discipline and ongoing updates.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Campus / Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Upgrade Server Room and Site Communication Infrastructure
691-20-152FINAL CONSTRUCTION
DOCUMENTS
AUGUST 12, 2021 JC WA
FULLY SPRINKLERED
A
ARCHITECT/ENGINEER OF RECORD
C
D
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.11
11301 WILSHIRE BOULEVARD,WEST LOS ANGELES, CA 90073
16111 PLUMMER STREET SEPULVEDA, CA 91343-2036
351 EAST TEMPLE STREET, LOS ANGELES, CA 90012
1 ADDENDUM 8/12/2021
GI007
SHOP DRAWING AND HAZMAT NOTES
CONFIRM EXISTING HAZMAT CONDITIONS AND HAZMAT CLEARANCE REQUIREMENTS
WITH VA PRIOR TO COMMENCING WORK.
ALL HAZMAT PRODUCTS WILL BE STORED IN PROPER CONTAINERS AND CABINETS WITH
SAFETY DATA SHEET (SDS) WHEN ON CONSTRUCTION SITE. ALL HAZMAT PRODUCTS
WILL BE PUT AWAY WHEN NOT BEING UTILIZED.
BASED ON REPORTS PROVIDED BY VA WEST LA AND RECENT SAMPLING AND ANALYSIS,
A SUMMARY OF ASBESTOS CONTAINING MATERIALS NOTED TO BE PRESENT IS
SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE NOTED IN
THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE PRESENT IN OTHER
AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE TREATED AS ASBESTOS.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE DRYWALL OR PLASTER THAT
CONTAIN HAZARDOUS MATERIALS:
· BLDG 44: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS / CEILINGS.
· BLDG 114: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS / CEILINGS.
· BLDG 115: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS/CEILINGS.
· BLDG 158: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COUMPOUND.
LOCATIONS: THROUGHOUT WALLS/CEILINGS.
· BLDG 212: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT
WALLS/CEILINGS.
· BLDG 218: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT
WALLS/CEILINGS.
· BLDG 236: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS/CEILINGS.
· BLDG 306: ASBESTOS IS PRESENT IN THE TEXTURED PAINT ASSOCIATED WITH
PLASTER. LOCATIONS: THROUGHOUT WALLS.
· BLDG 401: ASBESTOS IS PRESENT IN ALL WALLS/CEILINGS (PLASTER/DRYWALL)
· BLDG 500: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS/CEILINGS.
THE JOINT COMPOUND IS ASSOCIATED WITH THE DRYWALL AND CANNOT BE
SEPARATED NOR CAN BE VISIBLY SEEN WHERE THE JOINT COMPOUND IS ON DRYWALL.
FOR THIS FACT, THE DRYWALL AND ASSOCIATED JOINT COMPOUND NEED TO BE
TREATED AS ASBESTOS CONTAINING UNLESS THE CONTRACTOR CAN VISIBLY SEE
WHERE THE JOINT COMPOUND IS LOCATED AND THE PENETRATIONS WILL NOT BE
MADE IN LOCATIONS WHERE THIS IS OBSERVED.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE FLOORING
(TILE/MASTIC/FLOOR SHEETING) THAT CONTAIN ASBESTOS:
· BLDG 44 : THROUGHOUT
· BLDG 46: THROUGHOUT
· BLDG 113: THROUGHOUT
· BLDG 114: ROOM 125B, ROOM 212, ROOM 232, THROUGHOUT
· BLDG 115: THROUGHOUT, ROOM 111, ROOM 217
· BLDG 117: THROUGHOUT
· BLDG 158: MEN'S RESTROOM, ROOM 218, ROOM 7A
· BLDG 206: THROUGHOUT
· BLDG 210: ROOM 122
· BLDG 212: THROUGHOUT
· BLDG 215: ROOM 123, ROOM 233, ROOM 333, & 2ND FLOOR NURSES STATION
· BLDG 218: ROOM 4, ROOM 201, ROOM 302
· BLDG 220: THROUGHOUT
· BLDG 222: THROUGHOUT
· BLDG 224: THROUGHOUT
· BLDG 236: THROUGHOUT
· BLDG 256: THROUGHOUT
· BLDG 257: THROUGHOUT
· BLDG 258: THROUGHOUT, ROOM 136A, ROOM 337 CLOSET
· BLDG 295: THROUGHOUT
· BLDG 297: THROUGHOUT
· BLDG 301: THROUGHOUT, DATA ROOM
· BLDG 304: THROUGHOUT, BASEMENT ROOM
· BLDG 305: BACK CORRIDOR & EXIT CORRIDOR
· BLDG 306: THROUGHOUT
· BLDG 401: THROUGHOUT
· BLDG 500: THROUGHOUT, ROOM 0144, ROOM 0242, ROOM 0652, ROOM 3077
· BLDG 507: THROUGHOUT
HAZMAT NOTES
BLDG 220:
· BLUE WOOD BASEBOARDS. LOCATIONS: STAIRWELL (POTENTIAL
PENETRATIONS)
· BEIGE CONCRETE/DRYWALL WALLS. LOCATIONS: OFFICES (POTENTIAL
PENETRATIONS)
· BLUE CONCRETE WALLS. LOCATIONS: OFFICES (POTENTIAL PENETRATIONS)
· BLUE CERAMIC WALLS. LOCATIONS: RESTROOM (POTENTIAL
PENETRATIONS)
· GREY PLASTER WALLS. LOCATIONS: OFFICES (POTENTIAL PENETRATIONS)
· WHITE DRYWALL/PLASTER WALLS & CEILINGS. LOCATIONS: OFFICES
(POTENTIAL PENETRATIONS)
· BEIGE WOOD CHAIR RAIL. LOCATIONS: OFFICES (POTENTIAL
PENETRATIONS)
· OFF-WHITE WOOD WALL TRIM. LOCATIONS: ROOM 121 (POTENTIAL
PENETRATIONS)
BLDG 236:
· TAN TERRAZZO FLOORING. LOCATIONS: ROOM 24
BLDG 256:
· TAN /BROWN CERAMIC WAINSCOT. LOCATIONS: BATHROOM
107A, 207A AND 242 (POTENTIAL PENETRATIONS)
BLDG 257:
· GREY CERAMIC WALL TILES. LOCATIONS: RESTROOM
(POTENTIAL PENETRATIONS)
· BEIGE CERAMIC WALL TILES. LOCATIONS: ROOM 215 (POTENTIAL
PENETRATIONS)
BLDG 258:
· WHITE PLASTER WALLS. LOCATIONS: RESTROOM (POTENTIAL
PENETRATIONS)
· BEIGE CERAMIC WALL TILES. LOCATIONS: OFFICES (POTENTIAL
PENETRATIONS)
· BEIGE PLASTER WALLS. LOCATIONS: KITCHEN (POTENTIAL
PENETRATIONS)
· YELLOW CERAMIC WALL TILES. LOCATIONS: OFFICES
(POTENTIAL PENETRATIONS)
· RED CERAMIC 9”x9” VINYL FLOOR TILES. LOCATIONS: ROOM 215
(POTENTIAL PENETRATIONS)
BLDG 297:
· GREY METAL SUPPORT BEAMS. LOCATIONS: TR ROOM
BLDG 304:
· WHITE CERAMIC WALL TILES. LOCATIONS: BATHROOM E1-222
(POTENTIAL PENETRATIONS)
· BEIGE CERAMIC WALL TILES. LOCATIONS: OFFICE/STORAGE
E1-103 & RESTROOM E2-206 (POTENTIAL PENETRATIONS)
BLDG 500:
· YELLOW/BEIGE CERAMIC WALL TILES. LOCATIONS:
THROUGHOUT (POTENTIAL PENETRATIONS)
PENETRATIONS ARE PLANNED FOR LEAD CONTAINING MATERIALS
NOTED ABOVE. ANY REMOVAL ACTIVITIES OR PENETRATIONS ARE TO
BE PERFORMED IN COMPLIANCE WITH CALIFORNIA CODE OF
REGULATIONS, TITLE 9, SECTION 1532.1 (LEAD IN CONSTRUCTION
STANDARD).
HAZMAT NOTES
HAZMAT NOTES
HAZMAT NOTES HAZMAT NOTES
REPORTS AND RECENT SAMPLING INDICATE THE FOLLOWING BUILDINGS HAVE
FRIABLE ASBESTOS:
· BLDG 44: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 215: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 218: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 220: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 256: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 257: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 258: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 301: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 304: / THERMAL SYSTEM INSULATION MAY BE PRESENT
CONTRACTOR SHOULD BE AWARE THAT 'THERMAL SYSTEM INSULATION' MAY BE
ENCOUNTERED IN CEILING PLENUM LOCATIONS. IF THE MATERIAL IS OBSERVED TO
BE DAMAGED INCLUDING THE PRESENCE OF SUSPECT INSULATION DEBRIS, WORK
SHOULD BE IMMEDIATELY STOP AT THIS LOCATION. AN ASBESTOS CONSULTANT
SHOULD ACCESS THE WORK LOCATION AND PROVIDE APPROPRIATE RESPONSE
ACTIONS FOR SAMPLING AND ANALYSIS, CLEAN-UP, REPAIR, AND POTENTIAL
ABATEMENT NEEDS.
PENETRATIONS ARE PLANNED FOR ASBESTOS CONTAINING MATERIALS NOTED
ABOVE. WORKERS CAN BE UTILIZED WITH APPROPRIATE ASBESTOS TRAINING.
EXPOSURE ASSESSMENTS SHOULD BE PERFORMED FOR THE WORKERS
PERFORMING THESE PENETRATIONS IN ORDER TO DETERMINE THE APPROPRIATE
PERSONNEL PROTECTIVE EQUIPMENT REQUIRED FOR THESE TASKS.
BASED ON REPORTS PROVIDED BY VA WEST LA AND RECENT SAMPLING AND
ANALYSIS, A SUMMARY OF LEAD CONTAINING MATERIALS NOTED TO BE PRESENT
IS SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE
NOTED IN THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE
PRESENT IN OTHER AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE
TREATED AS LEAD PAINT.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE LEAD PAINT:
BLDG 115:
· OFF WHITE PLASTER WALLS AND CEILINGS. LOCATIONS: ROOM 218A.
· PINK PLASTER WALLS. LOCATIONS: ROOM 304A
BLDG 158:
· TAN & WHITE PLASTER WALLS. LOCATIONS: HALLWAYS/CORRIDORS,
CEILINGS, AND OFFICES. (POTENTIAL PENETRATIONS)
· BEIGE CERAMIC WALL TILES. LOCATIONS: 2ND FLOOR RESTROOMS
· BEIGE PLASTER CEILINGS LOCATIONS: 2ND FLOOR STARIWELL
BLDG 206:
· WHITE PLASTER/ DRYWALL WALLS. LOCATIONS: THROUGHOUT. (POTENTIAL
PENETRATIONS)
BLDG 210:
· CLUE PLASTER WALLS/CEILINGS. LOCATIONS: HALLWAYS/CORRIDORS.
(POTENTIAL PENETRATIONS)
· BEIGE WOOD CEILINGS. LOCATIONS: HALLWAYS/CORRIDORS. (POTENTIAL
PENETRATIONS)
· BEIGE CERAMIC WALL TILES. LOCATIONS: RESTROOM
· WHITE CERAMIC WALL TILES. LOCATIONS: OFFICE
· PINK DRYWALL WALLS. LOCATIONS: OFFICE
· BEIGE PLASTER WALLS. LOCATIONS: HALLWAY/CORRIDOR
BLDG 213:
· WHITE WOOD BASEBOARDS. LOCATIONS: STAIRWELL. (POTENTIAL
PENETRATIONS)
BLDG 214:
· BLUE CERAMIC WALL TILES. LOCATIONS: RESTROOM (POTENTIAL
PENETRATIONS)
· BEIGE CERAMIC WALL TILES. LOCATIONS: RESTROOM (POTENTIAL
PENETRATIONS)
· WHITE WOOD BASEBOARDS. LOCATIONS: STAIRWELL. (POTENTIAL
PENETRATIONS)
BLDG 215:
· BLUE WOOD CASEWORK. LOCATIONS: HALLWAY/CORRIDOR.
(INFORMATIONAL PURPOSES)
· BEIGE WOOD CASEWORK. LOCATIONS: STAIRWELL. (INFORMATIONAL
PURPOSES)
BLDG 217:
· WHITE WOOD BASEBOARDS. LOCATIONS: STAIRWELL (POTENTIAL
PENETRATIONS)
· PINK CERAMIC WALL TILES. LOCATIONS: RESTROOM (POTENTIAL
PENETRATIONS)
BLDG 218:
· TAN CERAMIC WALL TILES. LOCATIONS: 3RD FLOOR BY ROOMS 306A & 306B
(POTENTIAL PENETRATIONS)
· BEIGE CERAMIC WALL TILES. LOCATIONS: ROOM 115B (POTENTIAL
PENETRATIONS)
· PINK WOOD BASEBOARD. LOCATIONS: ROOM 326, GROUND FLOOR
STAIRWELL (POTENTIAL PENETRATIONS)
· BLUE PLASTER WALLS. LOCATIONS: ROOM 32 (POTENTIAL PENETRATIONS)
· RUST 9”x9” VINYL FLOOR TILES. LOCATIONS: ROOMS 4, 201, & 304
(POTENTIAL RENOVATIONS)
WLA
WLA (CONTINUED) WLA (CONTINUED)
CONFIRM EXISTING HAZMAT CONDITIONS AND HAZMAT CLEARANCE REQUIREMENTS
WITH VA PRIOR TO COMMENCING WORK.
ALL HAZMAT PRODUCTS WILL BE STORED IN PROPER CONTAINERS AND CABINETS WITH
SAFETY DATA SHEET (SDS) WHEN ON CONSTRUCTION SITE. ALL HAZMAT PRODUCTS
WILL BE PUT AWAY WHEN NOT BEING UTILIZED.
BASED ON REPORTS PROVIDED BY VA SEPULVEDA AND RECENT SAMPLING AND
ANALYSIS, A SUMMARY OF ASBESTOS CONTAINING MATERIALS NOTED TO BE PRESENT
IS SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE NOTED IN
THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE PRESENT IN OTHER
AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE TREATED AS ASBESTOS.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE DRYWALL OR PLASTER THAT
CONTAIN HAZARDOUS MATERIALS:
· BLDG 1: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND. LOCATIONS:
THROUGHOUT WALLS / CEILINGS.
· BLDG 22: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS / CEILINGS.
· BLDG 23: ASBESTOS IS PRESENT IN THE TEXTURED COATING ASSOCIATED WITH
PLASTER WALLS. LOCATIONS: THROUGHOUT WALLS.
· BLDG 24: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT
WALLS AND CEILINGS.
· BLDG 44: ASBESTOS IS PRESENT IN THE PLASTER. LOCATIONS: THROUGHOUT
WALLS.
· BLDG 46: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS / CEILINGS.
· BLDG 99: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND.
LOCATIONS: THROUGHOUT WALLS.
THE JOINT COMPOUND IS ASSOCIATED WITH THE DRYWALL AND CANNOT BE
SEPARATED NOR CAN BE VISIBLY SEEN WHERE THE JOINT COMPOUND IS ON DRYWALL.
FOR THIS FACT, THE DRYWALL AND ASSOCIATED JOINT COMPOUND NEED TO BE
TREATED AS ASBESTOS CONTAINING UNLESS THE CONTRACTOR CAN VISIBLY SEE WHERE
THE JOINT COMPOUND IS LOCATED AND THE PENETRATIONS WILL NOT BE MADE IN
LOCATIONS WHERE THIS IS OBSERVED.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE FLOORING
(TILE/MASTIC/FLOOR SHEETING) THAT CONTAIN ASBESTOS:
· BLDG 1 : SERVER ROOM A154
· BLDG 22: THROUGHOUT
· BLDG 44: THROUGHOUT
· BLDG 45: TR ROOM, ROOM 201, ROOM 203
· BLDG 62: THROUGHOUT
· BLDG 63: THROUGHOUT
REPORTS AND RECENT SAMPLING INDICATE THE FOLLOWING BUILDINGS HAVE
FRIABLE ASBESTOS:
· BLDG 1: / THERMAL SYSTEM INSULATION MAY BE PRESENT
· BLDG 44: / THERMAL SYSTEM INSULATION MAY BE PRESENT
CONTRACTOR SHOULD BE AWARE THAT 'THERMAL SYSTEM INSULATION' MAY BE
ENCOUNTERED IN CEILING PLENUM LOCATIONS. IF THE MATERIAL IS OBSERVED TO BE
DAMAGED INCLUDING THE PRESENCE OF SUSPECT INSULATION DEBRIS, WORK SHOULD
BE IMMEDIATELY STOP AT THIS LOCATION. AN ASBESTOS CONSULTANT SHOULD ACCESS
THE WORK LOCATION AND PROVIDE APPROPRIATE RESPONSE ACTIONS FOR SAMPLING
AND ANALYSIS, CLEAN-UP, REPAIR, AND POTENTIAL ABATEMENT NEEDS.
PENETRATIONS ARE PLANNED FOR ASBESTOS CONTAINING MATERIALS NOTED ABOVE.
WORKERS CAN BE UTILIZED WITH APPROPRIATE ASBESTOS TRAINING. EXPOSURE
ASSESSMENTS SHOULD BE PERFORMED FOR THE WORKERS PERFORMING THESE
PENETRATIONS IN ORDER TO DETERMINE THE APPROPRIATE PERSONNEL PROTECTIVE
EQUIPMENT REQUIRED FOR THESE TASKS.
BASED ON REPORTS PROVIDED BY VA SEPULVEDA AND RECENT SAMPLING AND
ANALYSIS, A SUMMARY OF LEAD CONTAINING MATERIALS NOTED TO BE PRESENT IS
SUMMARIZED IN THESE NOTES. SPECIFIC LOCATIONS AND MATERIALS ARE NOTED IN
THE SPECIFICATIONS, BUT IF THE SAME MATERIAL IS FOUND TO BE PRESENT IN OTHER
AREAS OF THE SAME BUILDINGS, IT IS REQUIRED TO BE TREATED AS LEAD PAINT.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE LEAD PAINT:
· BLDG 1: GREEN CERAMIC WALL TILES. LOCATIONS: THROUGHOUT OFFICES.
· BLDG 7: ORANGE CONCRETE CEILING. LOCATIONS: ROOM B-30.
· BLDG 20: GRAY WOOD BASEBOARD. LOCATIONS: THROUGHOUT
HALLWAYS/CORRIDORS
· BLDG 22: BLUE CONCRETE WALLS. LOCATIONS: THROUGHOUT OFFICES.
· BLDG 23: BEIGE METAL BASEBOARDS. LOCATIONS: GYM.
· BLDG 24: BEIGE WOOD HORIZONTAL BEAM. LOCATIONS: OFFICES.
· BLDG 25: GRAY VINYL COVE BASE. LOCATIONS: ROOM A109. (PLANNED FOR
REMOVAL)
· BLDG 99: BROWN 12-INCH X 12 INCH CERAMIC FLOORING. LOCATIONS: ROOM
102A & 100 CLOSET
PENETRATIONS ARE PLANNED FOR LEAD CONTAINING MATERIALS NOTED ABOVE. ANY
REMOVAL ACTIVITIES OR PENETRATIONS ARE TO BE PERFORMED IN COMPLIANCE WITH
CALIFORNIA CODE OF REGULATIONS, TITLE 9, SECTION 1532.1 (LEAD IN CONSTRUCTION
STANDARD).
CONFIRM EXISTING HAZMAT CONDITIONS AND HAZMAT CLEARANCE REQUIREMENTS
WITH VA PRIOR TO COMMENCING WORK.
BASED ON RECENT SAMPLING AND ANALYSIS, THE BUILDING MATERIALS PLANNED
TO BE IMPACTED BY THIS PROJECT HAVE BEEN FOUND TO BE NON-ASBESTOS AND
NON-LEAD CONTAINING. NORMAL DUST CONTROL MEASURES SHOULD BE
UTILIZED FOR ANY DISTURBANCES TO WALLS, FLOORS, OR CEILINGS.
ALL HAZMAT PRODUCTS WILL BE STORED IN PROPER CONTAINERS AND CABINETS
WITH SAFETY DATA SHEET (SDS) WHEN ON CONSTRUCTION SITE. ALL HAZMAT
PRODUCTS WILL BE PUT AWAY WHEN NOT BEING UTILIZED.
SACC LAACCSHOP DRAWING NOTES
1. CONTRACTOR SHALL PERFORM FIELD SURVEY FOR AREAS THAT WORK IS PERFORMED PRIOR
TO PREPARATION OF CONTRACTOR'S SHOP DRAWINGS.
2. PROCEED WITH THE PREPARATION OF COMPREHENSIVE CONTRACTOR'S SHOP DRAWINGS
UPON RECEIPT OF NOTICE TO PROCEED (NTP) FOR THE PROJECT. SHOP DRAWINGS SHALL BE
ORIGINALLY PREPARED BY THE CONTRACTOR, BASED UPON CONTRACTOR'S FIELD SURVEY,
FOR AREAS THAT WORK IS PERFORMED. PROVIDE SCALABLE PLANS COMPLETED WITH
AUTOCAD PROGRAM WITHIN 60 DAYS.
3. COORDINATE WITH EXISTING CONDITIONS AND OTHER TRADES INCLUDING, BUT NOT LIMITED
TO ARCHITECTURAL, STRUCTURAL, SEISMIC, MECHANICAL, CONTROL SYSTEMS, ELECTRICAL
POWER AND LIGHTING SYSTEMS, COMMUNICATIONS AND DATA SYSTEMS, ELECTRONIC
SAFETY AND SECURITY SYSTEMS, FIRE SUPPRESSION SYSTEMS, PLUMBING, SITE UTILITY
DISTRIBUTION SYSTEMS, AND OTHER WORK REQUIRED UNDER THIS PROJECT.
4. PROVIDE DEDICATED CONTRACTOR'S SHOP DRAWINGS FOR EACH DISCIPLINE INCLUDING, BUT
NOT LIMITED TO: ARCHITECTURAL, STRUCTURAL, SEISMIC, MECHANICAL, CONTROL SYSTEMS,
ELECTRICAL POWER AND LIGHTING SYSTEMS, COMMUNICATIONS AND DATA SYSTEMS,
ELECTRONIC SAFETY AND SECURITY SYSTEMS, FIRE SUPPRESSION SYSTEMS, PLUMBING, SITE
UTILITY DISTRIBUTION SYSTEMS, AND OTHER WORK REQUIRED UNDER THIS PROJECT.
5. CONTRACTOR'S SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE
CONTRACTOR'S CONSTRUCTION QUALITY CONTROL (CQC) SYSTEM MANAGER PRIOR TO
SUBMITTAL TO THE VA TO ASSURE CONTRACTIBILITY AND COMPLIANCE WITH THE DESIGN
INTENT.
6. INCLUDE SIGNATURES ON COVER SHEET OF THE CONTRACTOR'S SHOP DRAWINGS FROM ALL
APPLICABLE TRADES AND CONTRACTOR'S CQC SYSTEM MANAGER CONFIRMING ALL
COORDINATION HAS OCCURRED AND THE SUBMITTED CONTRACTOR'S SHOP DRAWINGS ARE
FREE OF CONFLICTS.
7. OBTAIN UPDATED ROOM NAME DESIGNATIONS FROM THE VA. INDICATE ROOM NAME
DESIGNATIONS ON AREAS OF WORK UNDER THIS CONTRACT ON CONTRACTOR'S SHOP
DRAWINGS.
8. CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND CERTIFYING THAT ALL SUBMITTALS ARE
IN COMPLIANCE WITH CONTRACT REQUIREMENTS BEFORE SUBMITTING FOR VA REVIEW.
SUBMIT A COMPLETE AND COMPREHENSIVE SET OF CONTRACTOR'S SHOP DRAWINGS IN ONE
PACKAGE FOR REVIEW BY THE VA PRIOR TO MATERIAL PROCUREMENT, FABRICATION, OR
INSTALLATION. CONTINUOUS UPDATING OF CONTRACTOR'S SHOP DRAWINGS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE UTILIZED FOR PREPARATION OF
CONTRACTOR'S RECORD DRAWINGS.
9. CONTRACTOR'S SHOP DRAWINGS SHALL REFLECT THE WORK REQUIRED UNDER THIS
PROJECT INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
A. PIPING DUCTWORK, AIR INLETS, AIR OUTLETS, SENSORS, AND CONTROLLERS.
B. ELEVATIONS OF RACKS IN TELECOMMUNICATIONS ROOMS AND MAIN COMPUTER ROOMS,
INCLUDING LABELING AND DETAILS.
C. LOCATION OF COMMUNICATION, DATA, AND POWER OUTLETS, SWITCHES, AND JACKS,
LIGHTING, PANELS, DATA, AND EQUIPMENT RACKS. INDICATE THE LOCATION OF ORIGIN
AND TERMINATION FOR EACH POWER, DATA, AND COMMUNICATION CIRCUIT. INCLUDE
CONNECTIONS TO EQUIPMENT.
D. POINT OF CONNECTION TO UTILITIES AND TELECOMMUNICATIONS NODES OUTSIDE THE
BUILDINGS, INCLUDING BUT NOT LIMITED TO THE LOCATIONS OF MANHOLES, TUBE
DISTRIBUTION UNITS, AND SITE UTILITY DISTRIBUTION.
E. HANGERS AND SUPPORTS, INCLUDING METHODS FOR BUILDING ATTACHMENTS, SEISMIC
RESTRAINTS, AND VIBRATION ISOLATION.
F. LOCATIONS OF STRUCTURAL PENETRATIONS INCLUDING BUT NOT LIMITED TO
PENETRATIONS OF WALLS, FLOORS, ROOFS, AND STRUCTURAL ELEMENTS.
G. ACCESS PANELS INCLUDING CEILING AND WALL PANELS.
H. LOCATION OF EXISTING WALLS NOT IDENTIFIED ON THE PLANS AND DESIGNATION OF
FIRE RATING AND TYPES OF WALLS AFFECTED UNDER THIS CONTRACT. PROVIDE A LOG
OF ALL FIRE PENETRATIONS THAT OCCURRED AS PART OF THE CONSTRUCTION AS A
DELIVERABLE AT THE COMPLETION OF THE PROJECT.
I. EXISTING BUILDING SYSTEMS AND UTILITIES BEING RELOCATED TO ACCOMMODATE
DESIGN.
J. DIMENSIONS OF ACTUAL PURCHASED EQUIPMENT.
K. ACCESS CLEARANCE FOR EQUIPMENT SERVICE.
L. LABEL AND TAG SCHEDULE FOR EQUIPMENT.
M. BUILDING GRIDLINES AND NORTH ARROWS.
APPLIES TO ALL DISCIPLINES UNDER THIS CONTRACT.
VAGLA