This document includes structural drawings and specifications for construction services required for the EHRM Upgrade Server Room and Site Communication Infrastructure project at the VA Greater Los Angeles Healthcare System. Work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses listed as verified in the Vendor Information Pages database. The point of contact for questions is Steven J. Covell, Contracting Specialist, Network Contracting Office 22 Long Beach. Email inquiries should be directed to steve.covell@va.gov. Construction services required include upgrading the server room, site communication infrastructure, and related structural, mechanical and electrical work.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D5

S-003

(N) DRAN PER PLUMBING

SEE FOR SLAB

ON GRADE

REPAIR

B5

S-003

D1

S-002

TYP @ RACKS

(N) OR (E) SERVERS

(N) RACKS / UPS ON

RAISED FLOOR, TYP

SEE ELECT DWGS

F7

S-003

TYP

D5

S-002

TYP

D5

S-002

TYP (N) CRAC UNIT

WT= 3,465 LBS

(N) CRAC UNIT

WT= 3,465 LBS

(N) CRAC UNIT

WT= 2,200 LBS

(N) CRAC UNIT

WT= 2,200 LBS

(N) WALLS

PER ARCH

SLAB ON GRADE RAISED FLOOR

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

BS JM

FULLY SPRINKLERED

A

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333 20801.11

5550 Baltimore Dr., Suite 100

La Mesa, CA 91942

T: (619) 687-3810 miyamotointernational.com

MI2010376.00

GENERAL NOTES

KEY NOTES-

AUGUST 12, 2021

1 ADDENDUM 8/12/2021

S.201.S-411

SACC / 201

AREA OF WORKSTRUCTURAL FIRST FLOOR ENLARGED PLAN

1/4" = 1'-0"

1. DUCT/PIPE/CONDUIT SUPPORT IS DESIGN BUILD BY CONTRACTOR

TO IBC AND SMACNA.

(N) OPENINGS

W x1

W x1

W12x14

W12x14

W x1

W x1

W12x14

W12x14

(E) 3 1/4" LWC OVER

3" STEEL DECK

(N) OPENING PER

MECH (NOTE 1,2)

W x1

W12x14

W x1

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E

W x5

(2 6)

(E) W16x26 (13) (E) W16x26 (13) (E) W16x26 (13)

(E) W16x26 (13) (E) W16x26 (13) (E) W16x26 (13)

(E) W16x26 (13) (E) W16x26 (13) (E) W16x26 (13)

(E) W16x26 (13) (E) W16x26 (13) (E) W16x26 (13)

WT=1,767 LBS

WT=1,767 LBS WT=1,270 LBS

COND

WT=1,270 LBS

COND

D3

S-005

COND

COND

(N) PUMP

WT = 350 LBS

D7

S-004

TYP

(N) PUMP WT = 340 LBS

(E) W16x26 (VIF)

D7

S-004

TYP

(E) W16x26 (13) (E) W16x26 (13)(E) W16x26 (13)

E Q

E Q

E Q

TEMP HVAC UNIT

WT=4000 LBS

TEMP FENCE

ENCLOSURE PER

D1

S-003

TYP

CONC CURB PER

(NOTE 4)

B3

S-005 B3

S-005

(N) PUMP

WT = 350 LBS

8'-0" MAXGATE

TYP

(E) OPENING

(VIF)

CONC CURB, TYP

(NOTE 4)

CURB PER D3/S-005

TYP @ PUMPS

(NOTE 4)

CURB PER TYP

(NOTE 4)

D3

S-005

(NOTE 2, TYP)

(NOTE 3)

(NOTE 3)

'-0

'-0

9"

E.1

E

D

C.5

C

25'-0" 25'-0" 25'-0"

2 3 4 5

Project Number

Campus / Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

Upgrade Server Room and Site Communication Infrastructure

11301 WILSHIRE BOULEVARD,

WEST LOS ANGELES, CA 90073

691-20-152FINAL CONSTRUCTION

DOCUMENTS

BS JM

FULLY SPRINKLERED

A

ARCHITECT/ENGINEER OF RECORD

C

D

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333 20801.11

5550 Baltimore Dr., Suite 100

La Mesa, CA 91942

T: (619) 687-3810 miyamotointernational.com

MI2010376.00

GENERAL NOTES

KEY NOTES-

AUGUST 12, 2021

1 ADDENDUM 8/12/2021

S.201.S-421

SACC / 201

AREA OF WORKSTRUCTURAL ROOF ENLARGED PLAN

1/4" = 1'-0"

1. MECH CONTRACTOR TO PROVIDE SIZE AND LOCATION OF NEW OPENING

BASED ON FINAL LAYOUT

2. REPAIR (E) FIRE PROOFING AS REQUIRED.

3. PROVIDE 8'' WIDE GAP IN CURB AT EXISTING ROOF VALLEY TO ALLOW FOR

DRAINAGE.

4. COORDINATE FINAL CURB LAYOUT WITH EQUIPMENT SUPPORT

LOCATIONS PRIOR TO START OF CONSTRUCTION.