The file's text, extracted by GovTribe without its formatting.
RFP No. 36C26126R0048
PRICE BREAKDOWN
Correct Martinez and Mare Island Generator Fuel Lines
| DESCRIPTION |
| MATERIAL |
| LABOR |
| TOTAL |
01. DIVISION 01 - General Requirements
| A. General Requirements |
| $ |
| $ |
| $ |
| B. Project Schedule (Small Projects – Design/Bid/Build |
| $ |
| $ |
| $ |
| C. Shop Drawings, Product Data, and Samples |
| $ |
| $ |
| $ |
| D. Safety Requirements for Major Projects |
| $ |
| $ |
| $ |
| F. Special Inspections |
| $ |
| $ |
| $ |
| G. Temporary Environmental Controls |
| $ |
| $ |
| $ |
| H. Construction Waste Management |
| $ |
| $ |
| $ |
| I. General Commission Requirements |
| $ |
| $ |
| $ |
| 01. General Requirements Subtotal |
| $ |
| $ |
| $ |
02. DIVISION 02 - Existing Conditions
| 02. Existing Conditions Subtotal |
| $ |
| $ |
| $ |
03. DIVISION 03 - Concrete
| A. Cast-in-Place Concrete |
| $ |
| $ |
| $ |
| 03. Concrete Subtotal |
| $ |
| $ |
| $ |
04. DIVISION 05 - Metals
| A. Metal Fabrications |
| $ |
| $ |
| $ |
| 04. Metals Subtotal |
| $ |
| $ |
| $ |
05. DIVISION 07 - Thermal and Moisture Protection
| 05. Thermal and Moisture Protection subtotal |
| $ |
| $ |
| $ |
06. DIVISION 09 - Finishes
| B. Acoustical Ceilings |
| $ |
| $ |
| $ |
| 06. Finishes subtotal |
| $ |
| $ |
| $ |
07. DIVISION 13 - Special Construction
| A. Seismic Restraint Requirements for Non-Structural Components |
| $ |
| $ |
| $ |
| 07. Special Construction subtotal |
| $ |
| $ |
| $ |
08. DIVISION 23 - Heating, Ventilating, and Air Conditioning (HVAC)
| A. Common Work Results from HVAC |
| $ |
| $ |
| $ |
| B. General Motors Requirements for HVAC and Steam Generation Equipment |
| $ |
| $ |
| $ |
| C. Commissioning of HVAC Systems |
| $ |
| $ |
| $ |
| D. Direct-Digital Control System for HVAC |
| $ |
| $ |
| $ |
| E. Facility Fuel Systems |
| $ |
| $ |
| $ |
| 08. Heating, Ventilating, and Air Conditioning (HVAC) subtotal |
| $ |
| $ |
| $ |
09. DIVISION 26 - Electrical
| A. Requirements for Electrical Installations |
| $ |
| $ |
| $ |
| B. Low-Voltage Electrical Power Conductors and Cables |
| $ |
| $ |
| $ |
| C. Grounding and Bonding for Electrical Systems |
| $ |
| $ |
| $ |
| D. Raceway and Boxes for Electrical Systems |
| $ |
| $ |
| $ |
| E. Underground Electrical Construction |
| $ |
| $ |
| $ |
| F. Overcurrent Protective Device Coordination Study |
| $ |
| $ |
| $ |
| G. Commissioning of Electrical Systems |
| $ |
| $ |
| $ |
| I. Surge Protective Devices |
| $ |
| $ |
| $ |
09. Electrical Subtotal
10. DIVISION 26- Communications
| A. Requirements for Communications Installations |
| $ |
| $ |
| $ |
| B. Grounding and Bonding for Communications Systems |
| $ |
| $ |
| $ |
| C. Raceways and Boxes for Communications Systems |
| $ |
| $ |
| $ |
| D. Commissioning of Communications Systems |
| $ |
| $ |
| $ |
| E. Control, Communication, and Signal Writing |
| $ |
| $ |
| $ |
| 10. Communications Subtotal |
| $ |
| $ |
| $ |
11. DIVISION 31 - Earthwork
| A. Earthwork Short Form |
| $ |
| $ |
| $ |
| 11. Earthwork subtotal |
| $ |
| $ |
| $ |
12. DIVISION 32 - Exterior Improvements
A. Cement and Concrete for Exterior Improvements
| 12. Exterior Improvements subtotal |
| $ |
| $ |
| $ |
| SUB TOTAL (Items 1 -12) |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
Note: All other costs maybe included as a separate item and shall be specified in this breakdown.