Pricing Breakdown Solicitation - Correct Martinez and Mare Island Generator Fuel Lines .docx

DOCX document 31 KB Posted

Attached to
Z1DA--Correct Martinez and Mare Island Generator Fuel Lines
Solicitation number
36C26126R0048
Issued by

About this file

This is a Pricing Breakdown template for RFP No. 36C26126R0048, soliciting pricing for the correction and replacement of generator fuel lines at two Department of Veterans Affairs medical facilities in Northern California. The project involves work at the VA Martinez Medical Center (150 Muir Rd., Martinez, CA 94553) and the VA Clinic at Mare Island (201 Walnut Avenue, Building 201, Mare Island, CA 94592-1107).

The pricing breakdown is organized by 12 construction divisions and requires contractors to provide Material, Labor, and Total cost estimates for each line item. Key work areas include: Division 01 (General Requirements including project scheduling, shop drawings, safety, quality control, and construction waste management); Division 02 (Existing Conditions with site surveys and demolition); Division 03 (Concrete); Division 05 (Metal Fabrications); Division 07 (Firestopping and joint sealants); Division 09 (Finishes including gypsum board, acoustical ceilings, and painting); Division 13 (Seismic Restraint Requirements); Division 23 (HVAC systems and facility fuel systems); Division 26 (Electrical installations, grounding, raceways, and commissioning); Division 26 (Communications systems); Division 31 (Earthwork); and Division 32 (Exterior Improvements including asphalt paving). The template requires submission of subtotals for each division, followed by aggregate subtotal, general conditions, overhead, profit, bonds and insurance, and a final total offer price. Contractors may include additional costs as separate line items with specification.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26126R0048

PRICE BREAKDOWN

Correct Martinez and Mare Island Generator Fuel Lines

DESCRIPTION
MATERIAL
LABOR
TOTAL

01. DIVISION 01 - General Requirements

A. General Requirements
$
$
$
B. Project Schedule (Small Projects – Design/Bid/Build
$
$
$
C. Shop Drawings, Product Data, and Samples
$
$
$
D. Safety Requirements for Major Projects
$
$
$
E. Quality Control
$
$
$
F. Special Inspections
$
$
$
G. Temporary Environmental Controls
$
$
$
H. Construction Waste Management
$
$
$
I. General Commission Requirements
$
$
$
01. General Requirements Subtotal
$
$
$

02. DIVISION 02 - Existing Conditions

A. Site Surveys
$
$
$
B. Demolition
$
$
$
02. Existing Conditions Subtotal
$
$
$

03. DIVISION 03 - Concrete

A. Cast-in-Place Concrete
$
$
$
03. Concrete Subtotal
$
$
$

04. DIVISION 05 - Metals

A. Metal Fabrications
$
$
$
04. Metals Subtotal
$
$
$

05. DIVISION 07 - Thermal and Moisture Protection

A. Firestopping
$
$
$
B. Joint Sealants
$
$
$
05. Thermal and Moisture Protection subtotal
$
$
$

06. DIVISION 09 - Finishes

A. Gypsum Board
$
$
$
B. Acoustical Ceilings
$
$
$
C. Paintings
$
$
$
06. Finishes subtotal
$
$
$

07. DIVISION 13 - Special Construction

A. Seismic Restraint Requirements for Non-Structural Components
$
$
$
07. Special Construction subtotal
$
$
$

08. DIVISION 23 - Heating, Ventilating, and Air Conditioning (HVAC)

A. Common Work Results from HVAC
$
$
$
B. General Motors Requirements for HVAC and Steam Generation Equipment
$
$
$
C. Commissioning of HVAC Systems
$
$
$
D. Direct-Digital Control System for HVAC
$
$
$
E. Facility Fuel Systems
$
$
$
08. Heating, Ventilating, and Air Conditioning (HVAC) subtotal
$
$
$

09. DIVISION 26 - Electrical

A. Requirements for Electrical Installations
$
$
$
B. Low-Voltage Electrical Power Conductors and Cables
$
$
$
C. Grounding and Bonding for Electrical Systems
$
$
$
D. Raceway and Boxes for Electrical Systems
$
$
$
E. Underground Electrical Construction
$
$
$
F. Overcurrent Protective Device Coordination Study
$
$
$
G. Commissioning of Electrical Systems
$
$
$
H. Panelboards
$
$
$
I. Surge Protective Devices
$
$
$

09. Electrical Subtotal

10. DIVISION 26- Communications

A. Requirements for Communications Installations
$
$
$
B. Grounding and Bonding for Communications Systems
$
$
$
C. Raceways and Boxes for Communications Systems
$
$
$
D. Commissioning of Communications Systems
$
$
$
E. Control, Communication, and Signal Writing
$
$
$
10. Communications Subtotal
$
$
$

11. DIVISION 31 - Earthwork

A. Earthwork Short Form
$
$
$
11. Earthwork subtotal
$
$
$

12. DIVISION 32 - Exterior Improvements

A. Cement and Concrete for Exterior Improvements

B. Asphalt Paving
$
$
$
12. Exterior Improvements subtotal
$
$
$
SUB TOTAL (Items 1 -12)
$
$
$
Total
$
$
$
General Conditions
$
$
$
Overhead
$
$
$
Profit
$
$
$
Bonds and Insurance
$
$
$
TOTAL OFFER
$
$
$

Note: All other costs maybe included as a separate item and shall be specified in this breakdown.