This is a Solicitation, Offer, and Award document (Standard Form 1442) for a firm-fixed-price construction contract with the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 21 (VISN 21), specifically the VA Pacific Islands Health Care System.

The solicitation seeks construction services to correct and upgrade generator fuel lines and delivery systems at two VA medical facilities in California: the VA Martinez Medical Center (150 Muir Rd., Martinez, CA 94553) and the VA Clinic at Mare Island (201 Walnut Avenue, Building 201, Mare Island, CA 94592-1107). Work includes fuel oil piping replacement with excavation and site restoration at Martinez Buildings 19 and 20, and Building 201 at Mare Island; seismic restraint of aboveground piping and equipment; pump and leak detection system replacements; integration with existing building automation systems; ICRA implementation; and system commissioning. The contract is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a NAICS code 236220 (Commercial and Institutional Building Construction) and small business size standard of $45 million. Offerors must be verified in the SBA DSBS at offer submission. Sealed offers are due by 12:00 PM PDT on June 15, 2026, with a 30-day acceptance period. The period of performance is 365 calendar days after Notice to Proceed. Mandatory site visits are scheduled for May 27, 2026, at both locations. Request for Information (RFI) submissions are due June 2, 2026, by 10:00 AM PT. Wage Determinations CA20250018 and CA20260007 apply. Bid Bonds, Payment Bonds, and Performance Bonds are required. Contractors must submit complete documentation including the SF 1442 offer form, supplemental price breakdown, safety and environmental record certification, Experience Modification Rate (EMR) documentation (not exceeding 1.0), and bid bond electronically to jessica.newman2@va.gov and jose.hernandez1@va.gov. All workers require 10-hour OSHA safety certification; General Contractor Competent Person/Superintendent requires 30-hour certification. VA Privacy Training is mandatory post-award. Contract award and NTP issuance will occur after submission and Government approval of Payment and Performance Bonds.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0048 Attachments

36C26126R0048

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26126R0048 X 05-12-2026 612-26-3-6010-0005

36C261-26-AP-3367

612-23-005 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21

Offerors have been authorized and are to be sent by email to Jessica Newman at jessica.newman2@va.gov and to Jose Hernandez at jose.hernandez1@va.gov

Jessica Newman 808-539-1310 A. Project Number: 612-23-005, Project Title: Correct Martinez and Mare Island Generator Fuel Lines NAICS Code: 236220, Commercial and Institutional Building Construction; Small Business Size Standard: $45M.

In accordance with VAAR 36.204(f)(2) -- Disclosure of the magnitude of construction projects:

Between $2,000,000 and $5,000,000.

B. This is a firm-fixed price construction requirement. Offeror shall furnish all labor, material, transportation, required engineering services, and overheadin accordance with SOW, Specifications, and drawings.

C. Place of Performance is at the following locations:

- VA Medical Clinic -- Mare Island - 201 Walnut Avenue, Building 201, Mare Island, CA 94592-1107

- VA Medical Center -- Martinez - 150 Muir Rd. Martinez, CA 94553

D. Period of Performance: 365 calendar days after Notice toProceed (NTP).

E. This procurement is a total Service-Disable Veteran Owned Business (SDVOSB) set-aside. Offerors must be verified in SBA DSBS the time submission of the offer and prior to award. SBA DSBS Link: https://search.certifications.sba.gov/.

SBA DSBS will be used as the official source for the SDVOSB verifications for this solicitation until further notice from the SBA.

F. Site Visit - There are two site visits are scheduled for this requirement.

1. VA Medical Center -- Martinez -Wednesday, May 27th, 2026, at 10:00 AM to 12:00 PM PT.

Meeting Location: 150 Muir Rd. Building 21 Martinez, CA 94553 - Front Lobby

2. VA Medical Clinic -- Mare Island - Wednesday, May 27th, 2026, at 2:00 PM to 4:00 PM PT.

Meeting Location: 201 Walnut Avenue, Building 201, Mare Island , CA 94592 - Meet in Parking Lot

G. RFIs are due on: Tuesday, June 2nd, 2026, by 10:00 AM PT.

H. Wage Determinations - CA20250018 and CA20260007 applies to this requirement.

I. Bid Bonds, Payment Bonds and Performance Bonds are required.

J. Source selection will be IAW RFO FAR 15.103-1 Tradeoff Approach, please see Instruction to Offerors for additional information.

K. All documentation must be submitted electronically to Jessica.newman2@va.gov and Jose.Hernandez1@va.gov.

X X X

- 1 -

12:00 PM

PDT

06-15-2026 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C261 Department of Veterans Affairs Network Contracting Office 21 (NCO 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813 36C261 Department of Veterans Affairs FMS VA-9(101) Financial Services Center PO Box 149971 Austin TX 78714-9971 866-372-1141 vafscenterprisesupport@va Jose Hernandez Contracting Officer

Table of Contents

INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO BIDDERS/OFFERORS5
BASIS FOR AWARD6
STATEMENT OF WORK11
A.3 PRICE/COST SCHEDULE17
ITEM INFORMATION17
A.4 DELIVERY SCHEDULE17
A.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)17
A.6 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)19
A.7 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)19
A.8 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)20
A.9 52.233-2 SERVICE OF PROTEST (SEP 2006)21
A.10 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)21
A.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)25
A.12 52.228-1 BID GUARANTEE (SEP 1996)26
A.13 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)26
A.14 SUPPLEMENTAL INSURANCE REQUIREMENTS27
A.15 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (DEVIATION NOV 2025)27
A.16 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION)28
A.17 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION)30
A.18 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV 2025) (DEVIATION)33
A.20 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025)34
A.21 52.237-1 SITE VISIT (APR 1984)39
A.22 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)39
A.23 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)48
A.24 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)49
A.25 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)49
A.26 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (DEVIATION) (MAR 2026)50
A.27 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)53
A.28 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)53
A.29 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)53
A.30 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)55

INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO BIDDERS/OFFERORS

OFFER SUBMISSION:

The following documents are to be included in the solicitation submission:

1. One fully completed and signed SF 1442 Offer page, completed offer amount entered in block 17, acknowledgment of all amendments either via entering data in block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the SF 1442 Offer page.

2. One fully completed Supplemental Price Breakdown by Division Sheet

3. One Documentation of Safety & Environmental Record and Documentation of Experience Modification Rate (EMR) (See below instructions).

4. Bid Bond

5. Completed Certificate 852.219-75

Offerors are responsible for ensuring and verifying their price and all required documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Any exception to the terms and conditions of this request for proposal will result in a nonresponsive proposal.

PROPOSALS ARE TO BE SENT TO:

One electronic copy via email of the price offer is to be sent to arrive on or before the due date/time at the following email address: jessica.newman2@va.gov and jose.hernandez1@va.gov with solicitation number and title in the subject. Faxed proposals are not permitted under any circumstances.

PLANS/SPECIFICATIONS/DRAWINGS:

Drawings and specifications are attached in electronic format to this solicitation. Contractors are responsible for downloading and printing their own plan sets. The VA will not provide hard copies of the drawings and specifications to any Contractor. Contractors are responsible for ensuring that any construction document package used for their proposal or construction is complete and up to date.

QUESTIONS AND ANSWERS:

Submit a question via the Questions Form (included in this Solicitation), via email to jessica.newman2@va.gov and jose.hernandez1@va.gov.

RFI/Questions for this solicitation are due Tuesday, June 2nd, 2026, at 9:00 AM PT. No questions will be answered after this date/time unless determined to be in the best interest of the Government as determined by the Contracting Officer.

OFFER DUE DATE SCHEDULE:

Offers received after date and time in Block 13 of SF 1442 may be rejected.

Proposal(s) are due by the date and time shown in Block 13 of the SF 1442. Offers received after this date and time may be rejected unless considered beneficial to the government.

INSTRUCTIONS TO OFFERORS:

The apparent successful offeror must be determined as “responsible” by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications.

SITE VISIT:

Potential Offerors are strongly urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing construction services. Failure to inspect the site shall not constitute grounds for a claim after contract award.

See Provision 52.236-27 for specific information regarding the project pre-offer site visit, which will be the only opportunity for potential Offerors to visit the site. All potential Offerors, subcontractors, and suppliers are strongly encouraged and expected to attend the pre-offer site visit.

BASIS FOR AWARD

1. INTRODUCTION:

This is a price-only selection conducted in accordance with Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) Part 15 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-15

EVALUATION:

Price Only -- The Government will evaluate the lowest price offer to determine if the price is fair and reasonable for the work to be performed. To be considered fair and reasonable for the work performed, the evaluators will also check for appearance of unbalanced line-item prices. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluation described above. Offers that are materially unbalanced as to prices for the basic requirement and the option quantities are not fair and reasonable. An Offer is unbalanced when it is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work.

NOTICE TO PROCEED (NTP):

A notice to proceed shall be issued after the award of a fully executed contract. The NTP date and time are “to be determined” after the award to a successful contractor. The primary factor in the determination to issue NTP shall be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents.

PERFORMANCE & PAYMENT BONDS:

In accordance with FAR 28.102-1 and Contract Clause 52.228-15, offerors are reminded that any award amount over $35,000 shall require a Payment Bond (or other acceptable protection – see clause FAR 52.228-13), and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 calendar days after award.

LIQUIDATED DAMAGES: N/A

WAGE DETERMINATION APPLICABLE TO THIS PROJECT:

General Decision Number: Davis-Bacon Act WD CA20250018 and Davis-Bacon Act WD CA20260007

BRAND NAME OR EQUAL:

The RFP may include the salient characteristics of the “or equal” aspect for the determination of what is equal to any cited brand name. Wherever a brand name is cited, the contractor shall ensure, in any resultant contract, that any equal has the salient characteristics of the brand name. Lack of confirmation shall be grounds for Government direction to replace materials or equipment by the Contractor at no additional cost or extension of the period of performance.

SYSTEM FOR AWARD MANAGEMENT (SAM):

Federal Acquisition Regulations require that federal contractors shall register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system.

PER VHA DIRECTIVE 7715 (06 April 2017) SAFETY & ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE (EMR):

To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an EMR of equal to or less than 1.0.

All contractors shall submit the following information pertaining to their past Safety & Environmental Record and EMR with their VASFHCS Station.

1. SAFETY & ENVIRONMENTAL RECORD: A self-certification on company letterhead that the contractor has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.

1. EMR: All contractors shall submit information regarding their current EMR. This information shall be obtained from the contractor’s insurance carrier and be furnished on the insurance carrier’s letterhead. Must have an EMR of equal to or less than 1.0.

PRIVACY TRAINING:

All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the Contracting Officer’s Representative (COR).

TRAINING:

All employees of the general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or other relevant competency training, as determined by the COR with input from the ICRA (Infection Control Risk Assessment) team. The General Contractor’s Competent Person/Superintendent shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the Contracting Officer for review and approval prior to any work being performed. No ID badge will be issued to an employee who does not provide this documentation. There shall be no exceptions to this requirement.

PRIVACY AND CONFIDENTIALITY:

Contractors to the Department of Veteran Affairs may be unintentionally exposed to sensitive information. Information may be overheard, seen on documents or electronic devices, or observed that could potentially violate the privacy and confidentiality of our veterans, employees, volunteers, and their families. Regulations such as, but not limited to the Health Insurance Portability and Accountability Act of 1996 (HIPAA), Freedom of Information Act (FOIA) and Privacy Act of 1974 have been enacted to protect sensitive information from being improperly disclosed. Information should not be divulged or released to anyone unless specifically authorized by this contract or its’ attached documents in accordance with the contracted services. Failure to comply with applicable statutes and regulation can result in the termination of this contract and civil and criminal penalties, including fines and imprisonment. All suspected or actual breeches of privacy and confidentiality should be reported immediately to the Contracting Officer, Contracting Officer’s Representative (COR) or the Facility Privacy Officer.

The C&A requirements do not apply, and a Security Accreditation Package is not required. If the contractor opts to use a computer or computer system for processing contract documents, the requirements of FIPS 140-2 for encryption of contract documents must be met.

ADDITIONAL SBA DSBS INFORMATION:

1. Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs.

2. At the time of submission of offer, the offeror must represent to the contracting officer that it is an:

a. SDVOSB concern

b. Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and

c. Verified for eligibility in the SBA DSBS database.

3. A joint venture may be considered an SDVOSB or VOSB concern if:

a. At least one member of the joint venture is an SDVOSB or VOSB concern, and makes the representations in paragraph (b) of this section

b. Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement.

c. The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and

d. The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to SDVOSB concerns.

4. Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.

RESPONSIBILITY REQUIREMENTS:

A responsibility check will be accomplished for the apparent awardee prior to award. Checks of the SBA DSBS database (to insure apparently successful offeror is a verified Service-Disabled Veteran Owned Small Business), System for Award Management (SAM) database (Central Contractor Registration, Online Representations and Certifications, and Excluded Parties List System to ensure registrations are current, valid, and no debarment records exist). Any information retrieved or received by the Government that would be cause for negative or unsatisfactory responsibility rating may result in the offeror being determined ineligible for award.

CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS:

The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for your contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.

All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting Officer’s Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.

SMOKE AND CARBON MONOXIDE MONITORING REQUIREMENTS:

Contractor, his employees, his subcontractors, and their employees shall adhere to VA, VHA, and VANCHCS Policies for smoke and carbon monoxide monitoring requirements. They are available upon request from COR.

Page 1 of Page 1 of

STATEMENT OF WORK

Correct Martinez and Mare Island Generator Fuel Lines 612 – 23 – 005

1. General Information A. This Statement of Work covers the furnishing of labor, material, supervision and necessary engineering for upgrading the Martinez and Mare Island Generator Fuel Lines and delivery systems.

Martinez Location - VA Martinez Medical Center 150 Muir Rd. Martinez, CA 94553 Mare Island Location - VA Clinic 201 Walnut Avenue, Building 201 Mare Island, CA 94592-1107

Contractor shall completely prepare sites for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the replacement of fuel oil piping at both the Martinez and Mare Island VA Medical Center campuses as required by drawings and specifications. The Martinez campus fuel oil piping replacement shall occur for fuel oil piping at buildings 19 and 20. The required work located at building 19 of the Martinez campus shall include but is not limited to the following:

· Fuel oil piping replacement (including excavation, backfill and site restoration for existing underground piping replacement)

· Seismic restraint of aboveground piping and equipment,

· Traffic control during trenching operations near parking lot at Building 19

· Fuel oil transfer pump replacement

· Replacement of the leak detection system (including re-use of existing leak detection as noted)

· Integration of new fuel management system with existing facility building automation system

· Implementation of ICRA requirements

· Replacement of valving, pipe supports controls, and associated electrical wiring

· Commissioning of new systems as required by drawings and specifications The required work located at building 20 of the Martinez campus shall include but is not limited to the following:

· Fuel oil piping replacement (including excavation, backfill and site restoration for underground piping replacement).

· Incidental architectural work involving removal and replacement of existing indoor ceilings for piping replacement).

· Seismic restraint of aboveground piping and equipment, pump replacement, replacement of the leak detection system (including re-use of existing leak detection sensors and wiring as noted).

· Integration of new fuel management system with existing facility building automation system.

· Implementation of ICRA requirements.

· The addition of a fuel polisher into the fuel oil system.

· Commissioning of all of the new systems.

· The replacement of valving, pipe supports, controls, commissioning of new systems, and associated electrical wiring as required by drawings and specifications.

· The required work located at building 201 on the Mare Island campus shall include but is not limited to the following:

· Replacement of fuel oil piping.

· Fuel oil transfer pumps.

· Seismic restraint of aboveground piping and equipment

· Replacement of the leak detection systems (including re-use of existing leak detection sensors and wiring as noted)

· Integration of new fuel management system with existing facility building automation system, valving, pipe supports, controls, commissioning of new systems and associated electrical wiring as required by drawings and specifications Contractor will be responsible for returning any damaged landscape/hardscape/roads/curbs to its existing conditions prior to the closing out of the project.

B. Background: The purpose of this project is to upgrade the generator fuel lines and delivery systems at both the Martinez and Mare Island campuses. This includes the following areas: Martinez campus Building 19 fuel delivery system, Martinez campus Building 20 fuel delivery system, and Building 201 Mare Island campus fuel line replacement.

C. Scope of Work: A site visit and/or survey is highly recommended for all bidders prior to submitting a bid for project 612–23–005.

Complete work as detailed in the attached Specifications and Drawings for project. Project Specifications include requirements for all products, materials, equipment, installation methods, testing and verification of systems shown on the construction Drawings. Contractor is advised to review all contract documents (Specifications, Drawings, Narrative, etc.) carefully. Upon issuance of the NTP for Construction, it will be the expectation of VA that the Contractor knows the contract requirements in detail. If there are any discrepancies between the Specifications and Drawings, the Contractor shall bring that to the attention of the Contracting Officer immediately. Hierarchy of VA provided documentation is (1) Specifications; (2) Drawings; (3) Project Narrative. All notes on the Drawings are in place to support the Specifications of the project and assist the General Contractor in build out of the intended design. Project Specifications shall be strictly adhered to. Upon project award, General Contractor is affirming that they have read and understand the project Specifications.

1. Notice to Proceed for Construction shall be issued to the Contractor no more than 90 days from the date of award. Once NTP is issued, Contractor shall obtain VA approval on all submittals prior to ‘breaking ground’ for construction work. Submitted project schedule shall show expected submittal period. General Contractor shall note that it will generally take 14 days for an AE submittal review, followed by an additional 14 to 21 days for VA to review and approve submittals, depending on the content.

D. Below is a summary of the work that will be required in this project: (For detailed instructions and guidance, Contractor is to reference the project Specifications and Drawings)

Martinez Campus Building 19 work summary:

Required work to remediate existing shortcomings:

1. Remove and replace appropriate portions of the fuel leak detection system related to replacement equipment ensure leak detection system is tied into existing building management system (BMS) system.

2. Ensure pump controls are integrated with existing BMS system and day tank/fuel tank level controls to remain.

3. Excavate and replace underground fuel piping.

4. Remove and replace pump assembly and controller for 6,000-gallon fuel tank.

5. Remove sump basin and leak detection float switch.

6. Remove capped piping which previously lead to a boiler.

7. Ensure all materials and fuel are properly disposed of as required.

8. Provided replacement fuel piping shall be double wall containment with line leak detection.

9. Remove and replace above grade fuel piping.

10. Remove and replace all systems valving, ensuring a fully operational system is installed.

Martinez Campus Building 20 work summary:

Required work to remediate existing shortcomings:

1. Remove and replace appropriate portions of the fuel leak detection system related to replacement equipment ensure leak detection system is tied into existing BMS system.

2. Ensure pump controls are integrated with existing BMS system and day tank/fuel tank level controls to remain.

3. Excavate and replace underground fuel piping.

4. Remove and replace pump assembly and controller for 6,000-gallon fuel tank.

5. Remove and replace the leak detection system.

6. Dispose of all materials and waste fuel in accordance with all VA, local, state, and federal guidelines.

7. Provided replacement fuel piping shall be double wall containment with line leak detection.

8. Remove and replace above grade fuel piping.

9. Remove and replace all system valving ensuring a fully operational system is installed.

10. Provide fuel-polishing system to ensure contaminant free fuel supply.

11. Remove sump basin and leak detection float switch.

Mare Island Campus work summary:

Required work to remediate existing shortcomings:

1. Remove and replace existing 3” and 1” double wall containment fuel piping.

2. Where double-wall containment cannot be installed, a containment pan will be provided under single-wall piping.

3. Dispose of all materials and waste fuel in accordance with all VA, local, state, and federal guidelines.

4. Remove and replace all system valving ensuring a fully operational system is installed.

5. Remove and replace duplex supply pumps.

6. Remove and replace the return pump and provide a proper NEMA enclosure to protect it from the elements.

*Prior to final acceptance, Contractor shall thoroughly clean provided equipment, entire project area and surrounding project area (as directed by the Contracting Officers’ Representative, COR) of grease, oil, plaster, dust, stains and/or other debris.

E. Submittal Exchange (web based application): The Contractor shall coordinate and utilize Submittal Exchange to manage construction documents and submissions. The intent is to use Submittal Exchange as a secure online collaboration tool for sharing documents and information during the construction phase of this project. Common types of information and documents shared with this tool include drawings, specifications, BIM files and models, meeting minutes, budgets, schedules, photos and any other contract collaboration documents. Contractor shall coordinate directly with Submittal Exchange representatives to ensure the project folder is up and running prior to the start of submittal process. Any start up fees shall be part of the based bid.

Contractor Responsibilities

1. The Contractor shall provide a list of personnel to the COR prior to the start of work and after award of the service contract. The list shall contain the full names of employees and telephone numbers and identify the individual(s) who will act/serve as leads or acting in a manager/supervisor role.

2. ID BADGES: All Contractors shall clearly display an identification badge while on VA premises. The badge shall be displayed on the upper torso at all times.

3. Contractor Security Requirements: Office of Information and Technology (OI&T) certification and accreditation requirements do not apply for this contract and therefore a Security Accreditation Package is not required. At no time will the vendor be in contact or have access to OI&T systems, the VA OI&T network, and/or VA sensitive information.

4. Smoking is prohibited inside all buildings. Cellular phones and two-way radios are not to be used in emergency rooms, surgical and recovery suites, and within six feet of any medical equipment. Possession of weapons is prohibited. All enclosed containers, including tool kits, shall be subject to search by VA Police. Violators of VA rules and regulations may result in a citation (answerable in the United States Federal Court District, not necessarily local district state or municipal court), and/or removal and/or expulsion from VA property.

5. Contractor shall comply with the Federal and State OSHA Blood Borne Pathogens Standard(s). The Contractor shall ensure:

a. Methods are in place by which all employees are educated as to the risks associated with blood borne pathogens in Health Care facilities.

b. Have policies and procedures in place which reduce the risk of employee exposure to blood borne pathogens.

c. Have mechanisms for employee counseling and treatment following exposure to blood borne pathogens.

d. Provide employees with appropriate personal protective equipment (PPE) and/or clothing such as gloves, caps, gowns, masks, and protective eyewear throughout the performance of this contract.

6. Upon completion of the project the COR will complete a Contractor’s Performance Evaluation and forward it to the Contracting officer. A sample blank form can be provided to the Contractor upon request. The project COR may elect to issue intermediate evaluations, as necessary, throughout the course of the project.

Government Additional Requirements F. The Contracting Officer Representative (COR) will be appointed by the Contracting Officer who will provide technical guidance and clarifications to the Contractor. It shall be noted that interpretation of contractual terms and/or financial matters is the responsibility of the Contracting Officer.

G. The COR will monitor the Contractors performance to assure that services provided and the standards of performance are met in accordance with this Statement of Work and the QAQC Plan. In accordance with FAR 52.212-4 (a) “Inspection/Acceptance” the Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of non-conforming supplies or re-work of non-conforming services at no additional cost to the Government.

H. All services provided at VANCHCS are performed during normal working hours of 8:00 a.m. to 4:00 p.m., Monday through Friday, except holidays.Period of Performance-365 days from NTP.

I. Federal holidays observed are the following: New Year’s Day; Martin Luther King Jr. Day; President’s Day; Memorial Day; Juneteenth, Independence Day; Labor Day; Columbus Day; Veteran’s Day; Thanksgiving Day; Christmas Day;

J. Payment: The Contractor shall coordinate with the COR prior to submitting monthly invoices to Tungsten. The COR will verify services rendered and authenticate the invoice via Online Certification System (OLCS). Note, pay request(s) may be submitted outside of the typical monthly submission schedule by mutual agreement of the VA and Contractor.

K. Records Management Requirements: The following standard items relate to records generated in executing the contract and should be included in a typical Electronic Information Systems (EIS) procurement contract:

1. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.

2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

6. The Government Agency owns the rights to all data/records produced as part of this contract.

7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].

9. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its Contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

10. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (Subcontractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any Subcontractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

Attachments L. 612-23-005 Specifications M. 612-23-005 Construction Drawings

- - - END OF STATEMENT OF WORK - - -

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

To procure construction to correct Martinez and Mare Island Generator Fuel Lines. See Statement of Work (SOW) loaded to FORCE AP for complete details. This is for the construction phase. * Contract Period: Base POP Begin: 07-10-2026 POP End: 07-10-2027

GRAND TOTAL
__________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE

1.00

A.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)

(a) This provision does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial products and commercial services as defined in Federal Acquisition Regulation 2.101.

(b) Certification. [Offeror shall check either (1) or (2).] _____ (1) The Offeror certifies that—

(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; and

(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; or

(2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.

(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.

(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.

(2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of noncompliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation:

(i) An inability to certify compliance.

(ii) An inability to conclude compliance.

(iii) A statement about compliance concerns.

(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns.

(4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days.

(d) Do not submit an offer unless—

(1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or

(2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has—

(i) Waived application under U.S.C. 2593e(d) or (e); or

(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).

(e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly submitted a false certification, in addition to other remedies available to the Government, such as suspension or debarment, the Contracting Officer may terminate any contract resulting from the false certification.

(End of Provision)

A.6 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision) A.7 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) (a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision) A.8 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

A.9 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Jessica Newman jessica.newman2@va.gov Hand-Carried Address:

Department of Veterans Affairs Acquisition Operations Service (049A3)

810 Vermont Avenue, NW Washington DC 20420 Mailing Address:

Department of Veterans Affairs Acquisition Operations Services (049A3)

810 Vermont Ave, NW Washington DC 20420

(b) The copy of any protest shall be received in the office designated above…