Attachment WAGE DETERMINATION NV20260038 01-30-2026.pdf
PDF 2 MB Posted
- Solicitation number
- 36C26126R0010
About this file
This is a General Decision wage determination document for building construction projects in Clark County, Nevada, effective January 30, 2026. The determination supersedes General Decision Number NV20250038 and applies to building construction projects exceeding four stories, excluding Nevada Test Site, Tonopah Test Range, and National Test and Training Range.
The document establishes prevailing wage rates and fringe benefits for 28 construction classifications across multiple trade categories. Hourly rates range from $23.30 (Mason - Stone) to $69.43 (Elevator Mechanic), with corresponding fringe benefit percentages between 0.00% and 38.435%. Key classifications include Asbestos Worker/Heat & Frost Insulator ($62.00/hour, 23.48% fringes), Carpenter ($57.69/hour, 21.53% fringes), Electrician ($58.48/hour, 27.62% fringes), and Power Equipment Operator with 23 equipment groups ranging from $60.84 to $72.38 per hour (all at 36.40% fringes). Paid vacation contributions are set at 8% of regular hourly rates for employees with more than 5 years of service and 6% for those with 6 months to 5 years of service. The determination includes notes regarding Executive Order 13706 paid sick leave requirements for federal contractors and Executive Order 13658 minimum wage requirements of $13.30 per hour for 2025. The document provides wage determination appeal procedures directing inquiries to the Department of Labor's Wage and Hour Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment Specifications 02-24-26.pdf | ||
| RFP Amendment 36C26126R0010 0003.docx | DOCX document | |
| RFI Q-A Response 03-02-26 FINAL.pdf | ||
| Attachment BD423 Photos.pdf | ||
| RFP Amendment 36C26126R0010 0002.docx | DOCX document | |
| RFP AMENDMENT 36C26126R0010 0001.docx | DOCX document | |
| SITE VISIT ATTENDEE LIST 02-03-2026.pdf | ||
| 36C26126R0010_2 FINAL.docx | DOCX document | |
| Attachment VAAR 852.219-75 JAN 2023 DEVIATION.pdf | ||
| Attachment REQUEST FOR INFORMATION FORM.docx | DOCX document | |
| Attachment SOW 10-22-25.pdf | ||
| Attachment Pre-solicitation Site Visit Presentation.pptx | PPTX presentation | |
| Attachment Drawings.pdf | ||
| 36C26126R0010_2 FINAL.docx | DOCX document | |
| Attachment Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment Appendix.pdf | ||
| Attachment WAGE DETERMINATION NV20260038 01-02-2026.pdf | ||
| Attachment Specifications.pdf | ||
| Attachment PCRA- Pre-contruction Risk Assessment.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .