Specification_Replace Elevators B19_B21_B201.docx
DOCX document 3 MB Posted
- Solicitation number
- 36C26126R0008
About this file
This document is a detailed technical specification for elevator replacement at the Department of Veterans Affairs Northern California Healthcare System (VANCHCS) located in Martinez and Mare Island, California. The project involves replacing five elevator systems across three buildings (B19, B21, and B201) with new traction elevators featuring modern microprocessor control systems, power-operated car and hoistway doors, and various advanced features. The elevators are classified as passenger and service elevators with different load ratings (Class A and Class C3).
The solicitation is planned as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a total contract value between $2-5 million. The North American Industry Classification System (NAICS) code is 238290 with a $22 million size standard. The anticipated solicitation will be issued around November 22, 2025, with a period of performance of approximately 360 calendar days from the Notice to Proceed. The technical specifications provide extensive details on elevator components, performance standards, safety requirements, communication systems, emergency operations, and installation specifications, including requirements for machine rooms, hoistway entrances, car enclosures, and electrical systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Log.jpg | JPG image | |
| EBD Elevator Project ICRA-signed.pdf | ||
| Elevator Cab Interior - Sample 2.pdf | ||
| Elevator Cab Interior - Sample 1.pdf | ||
| 36C26126R0008 0003.docx | DOCX document | |
| 36C26126R0008 0002.pdf | ||
| 36C26126R0008 0001.docx | DOCX document | |
| VAAR 852.219-75.docx | DOCX document | |
| DIVISIONAL COST BREAK-OUT.docx | DOCX document | |
| B19_B21_B201 Elevator Drawing Package .pdf | ||
| 36C26126R0008 Elevators NorCal- Rev1.docx | DOCX document | |
| Wage Determination CA20250018.txt | TXT text file | |
| S02 RFI FORM.docx | DOCX document | |
| SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.docx | DOCX document | |
| 36C26126R0008_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS SPECIFICATIONS
“Replace Elevators Throughout VANCHCS” Project Number 612A4-22-001
Phase 2: Martinez B19, B21, and Mare Island B201
Martinez VA Clinic 150 Muir Road Martinez, CA 94553-4668
Mare Island VA Clinic 201 Walnut Avenue, Building 201 Mare Island, CA 94592-1107
08/22/25
DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS
Specification can be access here https://vatilms.va.gov/vatilms/reports/PG-18-1
TABLE OF CONTENTS
Section 00 01 10
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
DIVISION 00 - SPECIAL SECTIONS
| 00 01 00 |
| Specification Index |
| 07-20 |
DIVISION 01 - GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 11-21 |
| 01 32 16.15 |
| Project Schedules |
| 11-21 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 06-21 |
| 01 35 26 |
| Safety Requirements |
| 11-21 |
| 01 42 19 |
| Reference Standards |
| 11-21 |
| 01 45 00 |
| Quality Control |
| 02-21 |
| 01 57 19 |
| Temporary Environmental Controls |
| 01-21 |
| 01 58 16 |
| Temporary Interior Signage |
| 07-15 |
| 01 74 19 |
| Construction Waste Management |
| 11-21 |
| 01 91 00.01 |
| DVA/USACE Projects General Commissioning Requirements |
| 08-19 |
DIVISION 02 – EXISTING CONDITIONS
| 02 21 13 |
| Site Surveys |
| 01-21 |
| 02 41 00 |
| Demolition |
| 08-17 |
DIVISION 05 – METALS
| 05 12 00 |
| Structural Steel Framing |
| 11-18 |
DIVISION 07 – Thermal Moisture Protection
| 07 84 00 |
| Firestopping |
| 01-21 |
| 07 92 00 |
| Joint Sealants |
| 10-17 |
DIVISION 09 – FINISHES
| 09 06 00 |
| Schedule for Finishes |
| 12-20 |
| 09 65 13 |
| Resilient Base and Accessories |
| 01-21 |
| 09 65 16 |
| Resilient Sheet Flooring |
| 05-18 |
| 09 91 00 |
| Painting |
| 01-21 |
DIVISION 13 – Special Construction
| 13 05 41 |
| Seismic Restraint Requirements for Non-Structural Components |
| 01-21 |
00 01 10-1
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
DIVISION 14– CONVEYING EQUIPEMENT
| 14 21 00 |
| New Traction Elevators |
| 12-20 |
| 14 21 10 |
| Modernization of Traction Elevators |
| 12-20 |
| 14 24 00 |
| New Hydraulic Elevators |
| 12-20 |
| 14 24 10 |
| Modernization of Hydraulic Elevators |
| 12-20 |
DIVISION 21- FIRE SUPPRESSION
| 21 13 13 |
| Wet-Pipe Sprinkler Systems |
| 06-15 |
| 21 30 13 |
| Electric-Driven Fire Pumps |
| 01-15 |
DIVISION 23- HEATING, VENTILATING, and AIR CONDITIONING
| 23 81 46 |
| Water-Source Unitary Heat Pumps |
| 02/23 |
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 01-16 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 01-17 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 01-17 |
| 26 05 33 |
| Raceway and Boxes for Electrical Systems |
| 01-18 |
| 26 05 41 |
| Underground Electrical Construction |
| 11-22 |
| 26 05 73 |
| Overcurrent Protective Device Coordination Study |
| 01-18 |
| 26 08 00.01 |
| DAV/USACE Projects Commissioning of Electrical Systems |
| 11-16 |
| 26 09 23 |
| Lighting Controls |
| 11-22 |
| 26 13 13 |
| Medium-Voltage Circuit Breaker Switchgear |
| 11-22 |
| 26 13 16 |
| Medium-Voltage Fusible Interrupter Switches |
| 11-22 |
| 26 22 00 |
| Low-Voltage Transformers |
| 11-22 |
| 26 23 13 |
| Generator Paralleling Controls |
| 11-22 |
| 26 24 13 |
| Distribution Switchboards |
| 01-18 |
| 26 24 16 |
| Panelboards |
| 01-18 |
| 26 27 26 |
| Wiring Devices |
| 11-22 |
| 26 43 13 |
| Surge Protective Devices |
| 11-22 |
| 26 51 00 |
| Interior Lighting |
| 01-18 |
DIVISION 28 – ELECTRONIC SAFETY AND SUCURITY
| 28 31 00 |
| Fire Detection and Alarm |
| 10-11 |
TABLE OF CONTENTS
| SAFETY REQUIREMENTS | 2 |
| GENERAL INTENTION | 2 |
| STATEMENT OF BID ITEM(S) | 4 |
| SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR | 4 |
| CONSTRUCTION SECURITY REQUIIREMENTS | 4 |
| FIRE SAFETY | 7 |
| OPERATIONS AND STORAGE AREAS | 10 |
| ALTERATIONS | 15 |
| INFECTION PREVENTION MEASURES | 17 |
| DISPOSAL AND RETENTION | 19 |
| PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,UTILITIES, AND IMPROVEMENTS | 20 |
| RESTORATION | 21 |
| PHYSICAL DATA | 22 |
| PROFESSIONAL SURVEYING SERVICES | 22 |
| LAYOUT OF WORK | 23 |
| AS-BUILT DRAWINGS | 23 |
| USE OF ROADWAYS | 23 |
| PRECONSTRUCTION RISK ASSESSMENT | 24 |
| TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT | 24 |
| TEMPORARY USE OF EXISTING ELEVATORS | 25 |
| TEMPORARY USE OF NEW ELEVATORS | 26 |
| AVAILABILITY AND USE OF UTILITY SERVICES | 27 |
| NEW TELEPHONE EQUIPMENT | 28 |
| TESTS | 28 |
| INSTRUCTIONS | 29 |
| GOVERNMENT-FURNISHED PROPERTY | 30 |
| RELOCATED EQUIPMENT OR ITEMS | 31 |
| CONSTRUCTION DIGITAL IMAGES | 32 |
| FINAL ELEVATION Digital Images | 32 |
| HISTORIC PRESERVATION | 33 |
| ID BADGES | 33 |
| RADIOLOGY AND BIOSAFETY | 33 |
| CONSTRUCTION SCHEDULE | 34 |
| DAILY LOGS | 35 |
| CONSTRUCTION SIGN | 35 |
| SAFETY SIGN | 35 |
| REQUIRED USE OF SUBMITTAL EXCHANGE | 36 |
| TB TESTING | 36 |
| SEASONAL INFLUENZA VACCINATION. | 37 |
| COVID-19 POLICY and VACCINATION. | 37 |
SECTION 01 00 00 GENERAL REQUIREMENTS
01 00 00 - 1
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements on VA TIL Website @ https://www.cfm.va.gov/TIL/.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
B. Scope Packages Project Number:612A4-22-001 Project Title: REPLACE ELEVATORS AT VANCHCS STUDY (CLIN 1) Project Location: VANCHCS- MULTIPLE LOCATIONS WITHIN THE NORTHERN CALIFORNIA HEALTHCARE SYSTEM.
Project Scope: The contractor shall perform the construction services on this contract. Construction services shall include the demolition and new construction on several elevator and machine room locations as part of bid package 1 at the VANCHCS-following locations:
Martinez Campus - Building 19 (Elev. P1) Martinez Campus - Building 19 (Elev. S2).
Project Number:612A4-22-001 Project Title: REPLACE ELEVATORS AT VANCHCS STUDY (CLIN 2) Project Location: VANCHCS- MULTIPLE LOCATIONS WITHIN THE NORTHERN CALIFORNIA HEALTHCARE SYSTEM.
Project Scope: The contractor shall perform the construction services on this contract. Construction services shall include the demolition and new construction on an elevator and machine room location as part of bid package 2 at the VANCHCS-following locations:
Martinez Campus - Building 21 (Elev. 1)
Project Number:612A4-22-001 Project Title: REPLACE ELEVATORS AT VANCHCS STUDY (CLIN 3)
SECTION 01 00 00 GENERAL REQUIREMENTS
01 00 00 - 2
Project Location: VANCHCS- MULTIPLE LOCATIONS WITHIN THE NORTHERN CALIFORNIA HEALTHCARE SYSTEM.
Project Scope: The Contractor shall perform the construction services on this contract. Construction services shall include the demolition and new construction on several elevator and machine room locations as part of bid package 3 at the VANCHCS-following locations:
Mare Island Campus – Building 201 (Elev. 1) Mare Island Campus - Building 201 (Elev. 2)
B. Visits to the site by Bidders may be made only by appointment with the Contracting Officer.
C. n/a D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the Contracting Officer’s Representative (COR) in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall not be less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA’s security program and obtain a VA ID badge from VA police.
See paragraph 1.35 below for ID badge process. Along with ID Badges all workers must be able to speak and understand English during construction. Construction areas as defined by the contract documents will be keyed to a construction core when Notice to Proceed is issued. Access to non- construction areas is limited to public areas only. Access needed outside of construction area (i.e., mechanical rooms) will be provided by COR or his/her representative upon written or verbal request.
F. Prior to commencing work, general contractor shall provide proof that an OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.
G. Training:
| 1. | Beginning July 31, 2005, all employees of general contractor or subcontractors shall have the 30-hour OSHA certified Construction Safety course and or other relevant competency training, as determined by VA CP with input from the ICRA team. |
| 2. | In addition to the 30-hours OSHA training, VA will provide site- specific training as determined by VA Competent Person with input from the VA’s Infection Control Risk Assessment team. Coordination of this required training will be accomplished through the COR. This briefing shall include information on the construction limits, VAMC |
01 00 00 - 10 safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. All contractors, subcontractors, and vendors must receive this training in order to work at our facility. Failure to receive this training may cause debarment of contractor’s staff until such training is accomplished.
3. Submit training records of all such employees for approval before the start of work.
1.3 STATEMENT OF BID ITEM(S)
A. See 1.2.A.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, two (2) sets of specifications and drawings will be furnished.
B. Requests for additional sets of drawings will be made by the Contractor’s at their own expense.
1.5 CONSTRUCTION SECURITY REQUIREMENETS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub- contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days’ notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
01 00 00 - 4
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Generally, locking hardware used here must be Class 1 and ADA compliant. Where key locks are required, these locks must conform to the lock cylinders currently in use here; this means that the locks must accept our Best 7-pin interchangeable cores. The industry nomenclature for this would be:
“I/C small format 7 pin core”.
1. Door locks used throughout this installation are of two types: cylindrical and mortise. Cylindrical locks are preferred because they cost less, break down less often, and require a simpler door preparation. In addition, they leave a stronger door after they have been installed.
2. Exit hardware used on this station must also accept the Best cylinders mentioned above. Additionally, it should be surface mounted, and not mortise style. Vertical locking rods, when used, must also be surface mounted. Internal rods are prone to breakage and require door removal to repair.
3. We have found some brands of locks, exit hardware and door closers have proven more trouble-free than others. Following is a list of acceptable locks and functions:
Office Lock: Schlage ND53BD-626-RHO.
Function: Lock is always open on inside, locked by button on inside.
Storeroom Lock: Schlage ND80BD-626-RHO.
Function: always locked on outside, always open inside, key retracts Bolt.
5. Occasionally we install mechanical combination locks. They are:
01 00 00 - 5
Simplex Kaba lock, P/N# 1021B-26D-41. This number ensures that the lock will comply with our 7-pin small format Best cylinders.
6. If we must use mortise locks, we require the Schlage L-series with lever handles, in brushed chrome finish (626). I can supply part numbers and other information upon request.
7. For door closers, I would recommend LCN heavy-duty.
F. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
4. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
5. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
6. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
7. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
8. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
G. Motor Vehicle Restrictions
01 00 00 - 6
1. General Contractor and its employees cannot park in spaces labeled for patient.
1.6 FIRE SAFETY
A. Applicable Publications: Publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.
1. American Society for Testing and Materials (ASTM):
E84-2008.............Surface Burning Characteristics of Building Materials
2. National Fire Protection Association (NFPA):
10-2006..............Standard for Portable Fire Extinguishers 30-2007..............Flammable and Combustible Liquids Code 51B-2003.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work 70-2007..............National Electrical Code 241-2004.............Standard for Safeguarding Construction, Alteration, and Demolition Operations
3. Occupational Safety and Health Administration (OSHA):
29 CFR 1926..........Safety and Health Regulations for Construction
B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.
C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police, and other emergency response forces in accordance with NFPA 241.
01 00 00 - 7
D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).
E. Temporary Construction Partitions:
1. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas the areas that are described in phasing requirements and adjoining areas. Construct partitions of gypsum board or treated plywood (flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire- retardant treated wood or metal steel studs. Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, ¾ hour fire/smoke rated doors with self-closing devices.
2. Install one-hour temporary construction partitions as shown on drawings to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, vertical shafts and openings enclosures.
3. Close openings in smoke barriers and fire-rated construction to maintain fire ratings. Seal penetrations with listed through- penetration firestop materials in accordance with Section 07 84 00, FIRESTOPPING.
F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.
G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR.
H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to COR.
I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.
J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.
K. Standpipes: Install and extend standpipes up with each floor in accordance with 29 CFR 1926 and NFPA 241.
01 00 00 - 8
L. Sprinklers: Install, test and activate new automatic sprinklers prior to removing existing sprinklers.
M. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.
N. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COR.
O. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety through COR at least 24 hours in advance. Designate contractor's responsible project-site fire prevention program manager to permit hot work.
P. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to COR.
Q. Smoking: Smoking is prohibited on the VA campus by VA staff, patients, visitors, contractors, volunteers, and vendors. The policy covers all smoking materials including but not limited to:
· Cigarettes
· Cigars
· Pipes
· Any other combustion of tobacco
· Electronic nicotine delivery systems (ENDS), such as e-cigarettes, vape pens, or e-cigars VA staff, patients, contractors, and visitors are strongly encouraged to leave all smoking materials at home. To reduce the risk of ignition near oxygen or other flammable gases used in our facility, some areas may require materials to be stored during their visit.
R. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.
01 00 00 - 9
S. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.
T. If required, submit documentation to the COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.
U. Above Ceiling Permit: Contractors are restricted from working above ceiling without the required Above Ceiling Permit. This is required when working above any ceilings in the Medical Center outside of contained construction areas.
V. Temporary Electrical: Contractors are not allowed to use power supplied VA unless approved by COR. If approved, use and installations shall be in accordance with 29 CFR 1926, NFPA 241 and NFPA 70. At no time will VA approve temporary power connection from a critical electrical circuit.
1.7 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
01 00 00 - 10
D. Working space and space available for storing materials shall be as shown on the drawings or as determined by the COR.
E. Contractor’s employees are subject to rules of Medical Center applicable to their conduct. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles always.
F. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than four workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Construction Safety Rounds: VA will perform Construction Safety Rounds weekly. Contractor superintendent or Contractor’s Competent Person will be present during these safety inspections. COR will identify the date and time of these weekly inspections.
H. Phasing: To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR three weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor, as follows:
01 00 00 - 11
I. Building(s) No. B19, B21, and 201 will occupied during performance of work.. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Scheduled elevators for replacement work will be shutdown and notice given to staff. The contractor shall provide signage and visible notification for patients and employees that specific said elevator contractor is currently working on is shutdown. Fencing and or barriers shall be placed at each level/floor and door to said elevator being worked on for down period.
J. N/A K. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 11, REQUIREMENTS FOR ELECTRONIC SAFETY AND SECURITY INSTALLATIONS for additional requirements.
01 00 00 - 12
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 3 weeks in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must always be open to traffic.
N. Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
01 00 00 - 13
O. CONTRACT WORK HOURS and FEDERAL HOLIDAYS:
(a). Standard daily contract work hours at the VA Northern California Healthcare System are from 7:00 AM to 4:30 PM, Pacific Standard Time (PST), Monday through Friday, apart from Federal Holidays. The Contractor shall work seven (7) days a week on two shifts or extended long shifts to complete B21 Elevator that only has one elevator. It is critical to complete this elevator as fast as possible. The contractor shall submit to the Contracting Officer (CO) for approval, in writing, a notice of its desire to work during any period/hours other than the standard. Notice shall include a detailed description of the type of work to be performed and its location. These “non-standard” hours are referred to as “WHEN Hours” (Weekend-Holiday-Evening-Night). The notice requesting work during WHEN hours shall be submitted not less than two (2) working days prior to each period of work scheduled at times other than normal duty hours to include Federal holidays. Contractors are reminded that patients are generally asleep after 10:00 PM PST. Therefore, approval is subject to the availability of the project manager/COR, the type of work to be performed, the specific hours requested, and the anticipated noise level that will be generated by contractor activity. Under no circumstance will the contractor proceed without express written approval of the Contracting Officer.
1. Work Phasing/Scheduling: Contractor shall work closely with the COR in developing a work schedule for contract performance. Simultaneous or transitional work on/between multiple facilities may be required. Advance coordination by the contractor is critical and required. Note, Concurrent work performance is anticipated on all line items for this project.
2. The work to be performed on this project will include occupied areas, however arrangements may be made so that the area may be blocked off during performance of work if feasible. The contractor shall notify the COR of intent to start work in any specific assigned area. The contractor shall coordinate the work of all activities whereby both the Government and the contractor can continue operations with the least possible interference and inconvenience.
3. The contractor is required to have a minimum of crews for work covered by this contract and provide additional crew(s) as the work justifies. Each crew shall be capable of operating simultaneously and independently of the other crew(s).
4. The contractor shall work 7 days a week and be allowed alternate shifts or long extended shifts as well as Holiday work for completing B21 elevator. This elevator shall be down no longer than 21 days total from demolition to commissioning.
5. The following is a list of Federal Holidays observed by all Federal Installations:
01 00 00 - 14
New Year's Day, January 1 Martin Luther King, Jr, 3rd Monday in January Washington's Birthday, 3rd Monday in February Memorial Day, Last Monday in May Independence Day, July 4 Labor Day, 1st Monday in September Columbus Day, 2nd Monday in September Veterans Day, November 11 Thanksgiving Day, 4th Thursday in November Christmas Day, December 25
NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday. Also included is any date specifically declared by the President of the United States of America as a National Holiday.
1.8 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, of Section 00 72 00, GENERAL CONDITIONS.
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, 01 00 00 - 15 will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's employees in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled, and equipment moved and/or relocated.
3. Protection of interior of existing structures always, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
E. Construction Barriers:
1. Barrier must be erected as a complete continuous system. The system is to extend from the floor to above the ceiling to complete an actual airless barrier.
F. Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
G. Disposal and Retention: Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items which remain property of the Government shall be removed or dislodged from present locationsin such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, 01 00 00 - 16 such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 INFECTION PREVENTION MEASURES
A. Implement the requirements of VAMC’s Infection Control Risk Assessment (ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.
B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group as specified here. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.
1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.
C. Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:
1. The RE and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.
2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.
D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.
01 00 00 - 17
1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by COR. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.
2. Do not perform dust producing tasks within occupied areas without the approval of the COR. For construction in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:
a. Provide metallic construction barriers to separate construction from the operational areas of the hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a self-closing door in a metal frame, commensurate with the partition, to allow worker access. Always maintain negative air. Contractor install use McCain Walls or approved equal in front of every elevator door on the system currently under renovation. Door shall have a push button lock and shall be self-locking.
b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents or building openings. Install HEPA (High Efficiency Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other prefilter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.
c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600mm x 900mm (24” x 36”), shall be used at all interior transitions from the construction area and occupied medical center areas. These mats shall always be changed as often as required to maintain clean work areas directly outside construction area.
d. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently.
01 00 00 - 18
Remove debris as they are created. Transport these outside the construction area in containers with tightly fitting lids.
e. The contractor shall not haul debris through patient-care areas without prior approval of the COR and the Medical Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.
f. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.
g. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
h. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.
E. Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.
3. All new air ducts shall be cleaned prior to final inspection.
1.10 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of
01 00 00 - 19 the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
a. Copies of the following listed CFR titles may be obtained from the Government Printing Office:
40 CFR 261........Identification and Listing of Hazardous Waste 40 CFR 262........Standards Applicable to Generators of Hazardous Waste 40 CFR 263........Standards Applicable to Transporters of Hazardous Waste 40 CFR 761........PCB Manufacturing, Processing, Distribution in Commerce, and use Prohibitions 49 CFR 172........Hazardous Material tables and Hazardous Material Communications Regulations 49 CFR 173........Shippers - General Requirements for Shipments and Packaging 49 CRR 173........Subpart A General 49 CFR 173........Subpart B Preparation of Hazardous Material for Transportation 49 CFR 173........Subpart J Other Regulated Material; Definitions and Preparation TSCA..............Compliance Program Policy Nos. 6-PCB-6 and
6-PCB-7
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor
01 00 00 - 20 shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the COR.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the COR may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. For additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.12 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
01 00 00 - 21
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's employees to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance of Section 00 72 00, GENERAL CONDITIONS.
1.13 PHYSICAL DATA
A. Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.
C. A copy of the soil report will be made available for inspection by bidders upon request to the COR at the VA Medical Center and shall be considered part of the contract documents.
D. Government does not guarantee that other materials will not be encountered, nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.14 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
01 00 00 - 22
1.15 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and benchmarks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer.