This is Amendment 0003 to Solicitation 36C26126R0008, issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 21 (VANCHCS), Network Contracting Office. The amendment extends the response deadline for offers to February 13, 2026, at 10:00 AM PST and provides answers to 86 Request for Information (RFI) questions and a site visit log submitted by potential offerors.

The solicitation seeks a single firm-fixed-price contract for replacement of five elevator systems across VANCHCS facilities at Martinez and Mare Island, California (Buildings 19, 21, and 201). The work is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 238290, with a size standard of $22 million and estimated contract value between $2,000,000 and $5,000,000. The period of performance is approximately 360 calendar days from Notice to Proceed. Key RFI responses clarify that the Superintendent and Site Safety Health Officer can be the same dual-hatted individual if qualified, must be onsite during work, and do not require direct employment by the prime contractor but must have delegated authority; QA/QC personnel must perform twice-weekly inspections for non-B21 elevators and full-time for B21; auxiliary car operating panels are required; existing guide rails, car sling, platform, and pit channels can be retained; hydraulic cylinders and plunger assemblies must be replaced; elevator phasing allows only one elevator per building to be down at a time with shutdowns coordinated with the Contracting Officer at least three weeks in advance; and Infection Control Risk Assessment (ICRA) Level III requirements apply. The project expects to start within 30-60 days following award, with Building 21 elevator completion requiring only 21 calendar days.

View the file

Other files

File Type Posted
Elevator Cab Interior - Sample 1.pdf PDF
Elevator Cab Interior - Sample 2.pdf PDF
Site Visit Log.jpg JPG image
EBD Elevator Project ICRA-signed.pdf PDF
36C26126R0008 0002.pdf PDF
36C26126R0008 0001.docx DOCX document
S02 RFI FORM.docx DOCX document
SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.docx DOCX document
Wage Determination CA20250018.txt TXT text file
VAAR 852.219-75.docx DOCX document
DIVISIONAL COST BREAK-OUT.docx DOCX document
B19_B21_B201 Elevator Drawing Package .pdf PDF
36C26126R0008 Elevators NorCal- Rev1.docx DOCX document
Specification_Replace Elevators B19_B21_B201.docx DOCX document
36C26126R0008_1.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

01-29-2026

612A4-22-001

612MCP

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21 3237 Peacekeeper Way, Bldg 209 McClellan Park CA 95652

612MCP

Department of Veterans Affairs

Network Contracting Office (NCO) 21 3237 Peacekeeper Way, Bldg 209 McClellan CA 95652 To all Offerors/Bidders

36C26126R0008

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-13-2026 10:00 AM PST

The purpose of this amendment is to post answers to RFIs, post the site visit log and extend the response date to 13 February 2026 at 10:00 am PST

Jose Hernandez

1.Can the VA provide an additional site visit? Answer: the VA does not plan to conduct additional site visits
2.Can the VA provide an additional period for additional RFIs? Answer: No additional time will be given.
3.Could the VA provide an extension to the deadline? Many of our staff are on scheduled vacation ahead of the bid deadline. Answer: Response deadline has been extended, see SF 30
4.Does the Superintendent need to be directly employed by the Prime Contractor? Answer: No, but they need to have the required qualifications and have the necessary authority delegated to them to perform the role.
5.Must the Superintendent be on site at all times while work is commencing? Answer:

Yes, the Superintendent needs to be onsite.

6.Does the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor? Answer: See response to #4. Superintendent can be SSHO if they have necessary qualifications.
7.Must the SSHO be on site at all times while work is commencing? Answer: yes
8.Can the Superintendent & SSHO be a dual-hatted individual assuming that individual is qualified for both roles? Answer: Yes, but must have a separate QA/QC person
9.Must the QA/QC be on site at all times during work? Answer: for B21 yes, other elevators onsite at least twice a week to meet QA/QC plan on contract.
10.Must the QA/QC be directly employed by the Prime Contractor?

Answer: see answer to #4

11.Are there any other mandatory on-site roles required in this contract? Answer: Reference Specs for all required roles.
12.When does the VA expect the project to start following the award? Answer: Within 30-60 days based on contractor submittals.
13.Are there any concerns for Asbestos Containing Material or Lead in the areas being worked in? Answer: There are no reports of ACM or lead in the buildings mentioned. Contractors can perform any test for their own safety checks to protect themselves and staff if they encounter something they suspect may be. If anything is found it would be treated as unforeseen condition. VA does not have a report or reason to believe there is at this time, however
14.Are there any ICRA requirements for this project? Answer: Yes, see attachment.
a.What Class is required in the affected areas? Answer: Level III - See attached ICRA snap shot.
b.Are hardwall containments with negative air pressure required in all working areas? Answer – see 14 a requirement for Level III.
c.Can the VA provide an ICRA plan/layout for bidding purposes? Answer: Contractor to provide own plan based on ICRA Level III requirements.
d.What are the fire ratings and earthquake requirements for the containment walls? Answer: see 14 a requirements for Level III.
15.For technical factor 1 specialized experience, will the VA consider elevator installations larger than $10m? Answer: Yes, Elevator installation of over $10M will be considered.
16.Who is the existing maintenance provider of these elevators? Answer: Elevated Technologies Inc. (ETI)
17.Who is the existing maintenance provider/vendor of the fire alarm system? Answer: Low Voltage Specialty
18.Please provide site visit sign in sheet. Answer: See attachment.
19.All tbar ceilings, will contractor be responsible to open and close ceilings as needed to do our work? Answer: Yes. Any damage ceilings during installation are contractor’s responsibility for replacement.
a.Please confirm ceiling material types and design for opening and closing. Answer: see attached Interior Shop Drawings PRRC 1 &2
20.What will be the working hours? All work is mostly in open spaces accessible to the patients. Answer: Please review SOW and specs 01 00 00
21.What type of BMS system does the VA have? Answer: JCI
22.For the mechanical scope, will we need to provide coring and wall penetrations? Answer: yes
a.Please confirm wall material types and design for this work. Answer: Contractor to survey the site and coordinate with COR before start of work performance.
23.No support details provided for the CU on the side of B21, assume it would need a cantilever supports. Please advise support details. Answer: Contractor to propose design supports necessary for VA approval.
24.No support details provided for the CU on the side of B19. Both are in the courtyard and assume they would need to be set/anchored to a concrete pad. Is contractor responsible for anchoring? Answer: Yes.
25.Hoistway Section –
a.Please confirm if the existing main guide rails can be retained. The drawings calls for “Replace main guide rails and supports w/ (N)”. This is not standard and would be more of a rip and replace elevator project. Answer: Confirmed, yes.
i.Word Doc specs call to retain the guide rails
26.Elevator Section –
a.Please confirm if the car sling and platform can be retained. Drawing description calls to “Replace car sling and platform w/(n)”. This can and should be retained. Answer: Confirmed, can retain and reuse.
27.Lobbies Section –
a.Please confirm what the “Lobby Panel” is. There was no existing lobby panels based on site survey. Based on the pictures it appears they are referring to the car operating panel. The button panel inside the elevator. Please confirm. Answer: Pic 2 (E) Lobby Control Panel on drawing 019.A502 is referencing replacement of operating panel inside elevator.
b.Picture 1 references the replacement of the steel outer door entrance frame. Please confirm if this can be retained. The actual elevator door can be replaced if required. Answer: Actual elevator door panels shall be replaced, retain steel outer door frame.
28.Pit Section –
a.Can the pit channels be retained? These are existing good condition and are typically only replaced the entire jack cylinder is being replaced which based on drawings that is not the case. Answer: Confirmed, yes they can be retained if jack cylinder is retained Recommend existing retained be scraped and painted.
29.The spec nor the drawings clarify the type of equipment required to be installed. Is TK Elevator/OEM equipment acceptable to replace with?

Answer: See modernization and elevator specifications for requirements. VA design standard is to utilize MCE Controller or other approved 3rd party control system.

30. Do the elevators currently run on generator power? The VA Mare Island has existing battery lowering devices in the machine room.

Answer: The elevators in building 19 and 21 are on gen power.

The elevators in Mare Island are on gen power. Both elevators have battery lowering devices and are in use. And shall remain in operation after retrofit is complete.

31.Do these facilities fall under HCAI/OSHPD regulations? If so, additional engineering will be required for the new equipment. Would the VA-A/E provide the additional engineering, or contractor? Answer: No they do not fall under HCAI/OSHPD.
32.Please confirm full layouts are required. These are hydraulic elevators, and we would be following the existing footprint. We can provide fixture and cab drawings for sign off, however full layouts is typically aggressive especially if these don’t fall under HCAI.

Answer: The car and main rails are remaining. Interior and other layouts needed to fully modernize and upgrade the elevator, its system, and its components are required.

33. On the drawings is the language stating to “add auxiliary car operating panel”. Only elevator P1 in Building 19 has an existing auxiliary panel that needs to be replaced. Adding one to the other elevators refenced is not available or applicable to do so. My assumption is this is a mistype on the picture and drawings sets. Please advise. Answer: Contractor shall add auxiliary car operating panels.

33. Why should we replace sling & platform? This is specified on all cars and even if we were replacing the jacks we would not need to do this. During the survey there was no account of damage noticed to the sling and platform. Answer: See response to #26.

34. Why should we replace pit channels? It has not been specified to replace the jacks/cylinders. The jacks/cylinders for Bldg. 19, 20 and 201 are originally installed in 1992, 2009 and 1984. The one from 1984 should be considered for a jack replacement given the age, but we would advise checking on the most recent “pressure/load test” results for these jacks to confirm if they are required (especially on the one from 2009). Answer: See response to #28. – VDA: See Response to # 76

35. Do we need to replace the buffers? Since the buffers are attached to the pit-channels. We would replace the buffers too if the pit-channels are being required to be replaced.

Answer: Buffers should only be replaced if hydraulic cylinders are being replaced as part of the scope.

36.Why is an auxiliary car-operating-panel (COP) specified? We typically modernize like for like. All cars currently only have a single main COP. Please confirm if an auxiliary COP is required. Answer: Yes auxiliary COP is required. – Horizontally mounted side wall adjacent to car door strike side opening per VA specifications on side opening entrances. Where center opening entrances are utilized, Auxiliary car operating panels should be in front return.
37.We need another site survey for electrical & FLS that are needed for code compliance. Answer: The VA does not plan to conduct another pre- proposal site visit. The awardee may conduct site surveys before physical work starts.
38.Do we need sprinkler removal from the shaft overhead spaces? From the site survey pictures I could not make out if this applies. I am meeting my surveyor at another site-walk this morning.

Answer: Keep sprinklers in place if they exist.

39. We would need an extension on the bid deadline. We will not be able to provide accurate pricing by 01/02/2026. Answer: See SF30 for new response date.

40. Will the VA allow advanced payments (Down Payments) for any materials or equipment to be procured under this project, or will invoicing be restricted to when the physical materials and/or equipment have been delivered to the project site? Answer: Only progress payments will be authorized under the resulting contract. See FAR 52.232-16

41. Will an asbestos and lead pre-alteration survey be a requirement of this project and will the contractors be responsible for including those costs in their bid? Answer: No survey required. No documentation identifying asbestos or lead. Contractor can test anything they find they believe may have asbestos or lead containing material and notify COR.

42. Will any temporary barriers be required at the modernization locations? If so, what are they to be constructed of? A) Are any negative air machines required? Answer: see answer to 14b

43. Please clarify when the warranty period is effective, After the completion of each elevator, or after the completion of the project in its entirety. Answer: after VA takes ownership of the elevator/beneficial occupancy and all testing is accepted for operation.

44. While working on the 1st elevator, who is responsible for the O&M of the other elevators? Are we, the Prime contractor, required to handle the interim maintenance during the POP? Answer: there is a current contract for maintenance of the elevators, that contract will cover O&M of the elevators before they are turned over to the Prime contractor for replacements. After the work is completed and accepted, the work will be covered by the Warranty of Construction FAR 52.246-21

45. Is a QCM required on this project? The Solicitation lists personnel requirements for the Project Manager, Superintendent and Safety Officer. There is no mention of a required QCM other than the last sentence of that section stating, "The superintendent cannot be the QA/QC officer.? A) can any of the above individuals double or triple hat? B) Can any of the above individuals be an employee of a subcontractor, or will the VA require the above individuals to be a full-time employee of the Prime Contractor? Answer: see answers to #4 & #8

46. Will Microsoft Project be an acceptable scheduling tool for the project? Answer: yes

47. What software will be utilized on the project for submittal transfers? Will the Prime contractor be responsible for purchasing and maintaining? Answer: VA typically uses Procore for many projects. Contractor responsible for providing software.

48. Will the VA require any construction management software to be utilized on the project? Will the Prime contractor be responsible for purchasing and maintaining? Answer: see answer #47

49. Can the VA please provide contact information for the building's existing Fire Alarm Vendor? Answer: Trent Hershey Low Voltage Specialty 1485 Salmon Falls Rd, El Dorado Hills, CA. TrentHershey@aol.com

50. Can the VA please provide contact information for the existing building sprinkler vendor? Answer: Current Fire sprinkler vendor on contract is Tru Vantage Solutions Inc. They use JCI as their sub to perform the work.

51. Can the VA please provide contact information for the building's existing BAS/BMS controls Vendor? Answer: JCI

52. Per confirm that the HVAC subcontractor will need to provide permit drawings, stamped by a licensed engineer to the government prior to commencing work? Answer: HVAC contractor shall provide complete drawings for approval.

53. Mechanical - HVAC keynote 2 shows condensate drain line being run through corridors 1177, 1139. 1004, 1122. will this work be required to be completed after hours? Answer: not required but can be after hours for less impact and traffic to patient care in B19

54. There does not appear to be a mechanical schedule specifying what manufacture and model number to price for the 3-ton mini splits, can the VA please provide approved manufacturer and model number for pricing purposes? Answer: No recommended manufacturer.

55. Will the feeder from EHDP (main electrical switch room 1191) to MDP (room 1190/1191) need to be run after hours? Answer: Yes

56. Can the VA confirm the Prime contractor is to carry design build services for all Fire Alarm scope? Answer: Yes, and work with our vendor Low Voltage.

57. Can the Government please confirm that the Division 14 24 00 "New" specifications are not part of this scope and scope is only related to the DIV 14 24 10 "Modernization" Specifications? Answer: yes, see provided DIV 14 24 10

58. Can the Government please confirm the bid document drawings that are noted "Bridging Documents Not for Construction” are the desired pricing documents for the project at this time? Answer: These documents were put together for bidding purposes and to show amount of elevators to work on. We do not have an AE firm on retainer, and the contract is a performance-based construction scope of work using all materials given such as the documents and specs.

59. Can the government please confirm the door complexity (opening) on the S2 elevator as two speed side slide, in lieu of drawn as center opening?

Answer: Building 19 service elevator is a side slide and this is acceptable.

60. Can the government please confirm that Building 21 elevator #1 construction duration is only 21Calander days for completion? Answer: Yes.

61. Can the government please confirm the existing main and counterweight guide rails and brackets will be retained? The summarized scope on the drawing calls for new guide rails. Please confirm which requirement governs pricing and scope inclusion.

Answer: See response to #25.

62. Can the Government confirm that all new communication lines shall be CAT 6A? Answer: yes

63. Can the Government confirm that the existing cab enclosure and finishes are to remain?

Answer: New Finishes will be required

64. If new cab finishes are required, can the government provide more specifics and confirm that a full size "mock up" is not required for cab finishes? Answer: Elevator submittal with 3D drawings showing the cab finishes is required.

See attached Elevator Cab Interior - Sample 1 and Sample 2 for reference only. Final finishes selection will take place during the submittal process.

65. Can the government confirm the elevators are currently on emergency power? If so, are the existing ATS feeders and auxiliary contacts in place? Answer: Contractor responsible for providing all pathways and wire from elevator controllers to ATSs.

66. Can the government confirm emergency power selector switch locations/functionality per each building? Specifications are conflicting about the selector switch requirements. Answer: Elevators are on emergency power and selector switch is required.

67. Can the Government please confirm if (Code Blue) Medical Emergency service is required on all elevators?

Answer: See VA specifications. Medical Emergency Call Button is required in VA now.

68. Can the Government please confirm if Seismic provisions are required? Answer: yes

69. Can the Government confirm that auxiliary car operating panels are required in all elevators?

Answer: Based on drawing/photos, we assume within side wall on Bldg 19 (1 & 2) (strike side of entrance) and within Front Return on B21. For Mare Island, would be in side wall at strike side of entrance like typical VA design standard and B21 are Martinez.

70. Can the government please advise if any non -standard key-cores or keys are required for car operating panel operating switches?

Answer: Medeco key system. Housings are seven pin Small Format Interchangeable Core (SFIC). Coordinate with COR before installing housings for VA locksmith to install cores. The VA will not be touching any fire department key cores.

71. Can the government confirm if the existing Hoistway access switches are mounted in the entrance frame jambs, or will new penetrations be required?

Answer: For buildings 19 and 21 these are mounted in the jambs Mare Island has these mounted on the wall next to the call button.

72. Can the government confirm if the existing car sling, platform and car enclosure can be retained?

Answer: Yes.

73. Can the government please confirm that the specifications referencing “new traction and traction mod” are not part of this solicitation? Answer: correct, new traction are not a part of this solicitation

74. Please confirm whether machine room monitoring is required as part of this modernization scope. Except (1) elevator in building 21, all other elevators are 2 stop simplex hydraulic elevators.

Answer: Monitoring is not required.

75. The Mare Island elevators are currently equipped with a battery lowering device. According to the engineer, the current backup power is currently inoperable, and they do not know when they are going to install a new transfer switch. Please clarify whether the intended scope is to: A) Provide a new transfer switch in anticipation of future backup power restoration? Or B) Provide a battery lowering device in lieu of emergency power?

Answer: ATS already exists and new lowering device shall be installed.

76. This section appears to require replacement of the hydraulic plunger assembly, whereas the summarized scope on the drawing does not include this requirement. Please confirm whether replacement of the hydraulic cylinder/plunger assembly is required as part of this project?

Answer: Yes, replacement of the hydraulic cylinder and plunger assemblies are required.

77. The summarized scope on the drawing does not identify replacement of car buffers; however, this section includes replacement requirements. Please confirm which scope governs and whether new car buffers are required.

Answer: See answer to question # 35.

78. Please confirm if the existing main guide rails can be retained. The drawings call for “Replace main guide rails and supports with (N)”.

Answer: This is not standard and would be more of a rip and replace elevator project.

• specs call to retain the guide rail

79. Please confirm if the car sling and platform can be retained. Drawing description calls to “Replace car sling and platform with (n)”.

Answer: This can and should be retained.

80. Can the pit channels be retained? These exist in good condition and are typically only replaced when the entire jack cylinder is being replaced, which based on drawings that is not the case. Answer: See response to #28.

81. Please confirm what the “Lobby Panel” is. There was no existing lobby panels based on site survey. Based on the pictures it appears they are referring to the car operating panel. The button panel inside the elevator. Answer: See response to #27.

Additional RFIs:

82 – Elevator Phasing Please confirm whether elevator modernization is anticipated to be performed sequentially, with one elevator removed from service at a time per building, unless otherwise coordinated and approved by VANCHCS.

Answer: Confirmed no more than one elevator per building can be down.

83 – Shutdown Windows Please advise whether there are preferred shutdown windows (e.g., nights, weekends, or low-traffic periods) or restrictions on elevator outages that proposers should assume for pricing and scheduling.

Answer: Please review SOW Section 2 C & P. Shutdowns will need to be coordinated with COR at least three weeks in advance.

84 – Temporary Access / Operational Constraints Are there any anticipated requirements for temporary access, special routing, or operational accommodations during elevator outages that proposers should include in their technical approach or pricing?

Answer: No

85 – Infection Control Expectations Please confirm whether project-specific Infection Control Risk Assessment (ICRA) and Interim Life Safety Measures (ILSM) requirements will be provided by VANCHCS, or if proposers should assume responsibility for developing site-specific plans subject to VA approval.

Answer: See answer to #14

86 – Existing Conditions Will updated as-built drawings or recent condition assessments of the existing elevator systems and hoistways be provided, or should proposers assume field verification of existing conditions as part of their scope?

Answer: Contractor shall always field verify and use drawings provided.

-------------------Last Item------------------------

See attached document: Site Visit Log.

See attached document: EBD Elevator Project ICRA-signed.

See attached document: Elevator Cab Interior - Sample 1.

See attached document: Elevator Cab Interior - Sample 2.