S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.04.pdf

PDF 150 KB Posted

Attached to
Y1DA--640-20-107 MV-HR BMS HVAC CONST
Solicitation number
36C26120B0013
Issued by

About this file

This file contains mechanical engineering drawings and details for the Mountain View Center project located at 1776 Old Middlefield Road in Mountain View, California. The drawings show specifications for fire dampers, air handling unit coil piping, heating coil configurations at VAV boxes, and roof flue details. Relevant details include specifications for fire damper models, insulation requirements, flashing, and notes regarding installation and code compliance.

The related federal contract opportunity is a solicitation for project #640-20-107, the HVAC construction project at the VA Palo Alto Health Care System Mountain View campus. The pre-solicitation was originally published as RFP 36C26120R0012 and has been re-identified as IFB 36C26120B0013. The solicitation is available on SAM.gov. Offerors are instructed not to contact individual VA medical centers directly for more information. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 21. No other details are provided regarding response dates, pricing terms, set-asides, or incumbent contractors.

View the file

Other files

File Type Posted
S02 - SF30 Solicitation Amend P00003 - 36C26120B0013 0003.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.REFLECTED_CEILING_PLAN_LEVEL2.AS6.02.pdf PDF
S02 - SF30 Solicitation Amend P00001 - 36C26120B0013 - MV - HR BMS HVAC CONST.pdf PDF
S02 - SF30 Solicitation Amend P00002 - 36C26120B0013 - MV - HR BMS HVAC CONST.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.REFLECTED_CEILING_PLAN_LEVEL1.AS6.01.pdf PDF
S02 - MV LIGHTING CONTROLS_1.pdf PDF
S02 - RFI Log - MV - HR HVAC BMS.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.05.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL2_PLAN_MECH.MH2.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.ROOF_PLAN_MECH.MH2.03.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.SYMBOL_LIST_GEN_NOTES_SHEET_INDEX_MECH.MHO.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.CONTROL_DIAGRAMS_MECH.MH8.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.03.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL1_PLAN_MECH_PIPING.MH3.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL1_PLAN_MECH.MH2.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.PIPING_DIAGRAMS_MECH.MH7.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.CONTROL_DIAGRAMS_MECH.MH8.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.SCHEDULE_MECH.MH5.01.pdf PDF
S04 - Site Visit Sign-in Sheet - MV - HR BMS_FILLED OUT.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL_2_PLAN_MECH_PIPING.MH3.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.PIPING_DIAGRAMS_MECH.MH7.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.SCHEDULE_MECH.MH5.02.pdf PDF
36C26120B0013-001.docx DOCX document
36C26120B0013-008.pdf PDF
36C26120B0013-009.pdf PDF
36C26120B0013-007.pdf PDF
36C26120B0013-006.pdf PDF
36C26120B0013-010.pdf PDF
36C26120B0013-002.pdf PDF
36C26120B0013-011.pdf PDF
36C26120B0013-004.pdf PDF
36C26120B0013-003.pdf PDF
36C26120B0013-005.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR FLOW

M

1 HEATING COIL AT VAV BOX

NO SCALE (2-WAY CONTROL VALVE)

2 HEATING COIL AT VAV BOX

NO SCALE (3-WAY CONTROL VALVE)

4 FLUE THROUGH ROOF DETAIL

NO SCALE

STATE FIRE MARSHALL/U.L.

APPROVED FIRE DAMPER.

SHT. MTL. SLEEVE

2-HR PARTITION

HINGED INSPECTION DOOR

AS LARGE AS POSSIBLE

TRACK

16 GA. TYP.

METAL STUD

16 GA. TYP.

NOTES:

1. USE "UNITED DUCT SEALER"

OR EQUAL WHERE DUCTS

CONNECT TO SLEEVE.

2. IF ROUND DUCT, PROVIDE

WELDED ROUND DUCT COLLAR

ON BOTH SIDES. SIMILAR TO

HIGH VELOCITY FIRE DAMPER.

OPENING SIZE = DUCT SIZE + 1"

3. MODEL FSD60 MEETS THE

REQUIEREMENT FOR FIRE,

SMOKE AND COMBINATION

FIRE AND SMOKE DAMPERS

ESTABLISHED BY

• NFPA 90A FIRE DAMPER

UL (#555)

4. METHOD OF ACTIVIATION:

ELECTRIC FUSE LINK (EFL) OR

PNEUMATIC FUSE LINK (PFL)

HEAT ACTUATED RELEASE

DEVICES PERMIT CONTROLLED

(RATHER THAN

INSTANTANEOUS) CLOSURE

THROUGH THE DAMPER

ACTUATOR. THE EFL AND PFL

ALLOW THE DAMPER TO

AUTOMATICALLY REOPEN

AFTER A TEST, SMOKE

DETECTION OR POWER

FAILURE CONDITION.

10 GA. ANGLE FRAME SECURED

AT ALL FOUR SIDES OF SLEEVE

W/ 1/4" SMS AT 4"O.C., FRAME

SHALL LAP WALL OPN'G BY 1"

(MIN).

RATED WALL OPENING TO

EXCEED NET O.D. OF SLEEVE BY

1/4" FOR EACH FT. OF WIDTH &

HEIGHT OF DAMPER ASSEMBLY.

GYP.

SEE SCHEDULE.

WATER COIL

VALVE CONTROL TO THERMOSTAT OR DUCT SENSOR.

DRAIN

PLUG

STRAINER

BALL VALVE

BALL VALVE FOR 3" AND SMALLER2

PROVIDE 1/2" VALVE FOR REHEAT COILS.3 5

SEE PLAN DRAWINGS FOR PIPE SIZES.1

NOTES:

WATER COIL

FACILITIES ENGINEER.

REMOVE VALVE HANDLE WHEN WATER BALANCING

IS COMPLETED AND SUBMIT VALVE HANDLES TO

DRAIN 3

PLUG

BALL VALVE

STRAINER

CONNECTION SIZE (TYP)

REDUCE TO COIL

PETE'S PLUG

(TYP)

1/4" GLOBE VALVE

PLUG

UNION (TYP)

OR EQUAL

FOR BALANCING

BALL VALVE

VALVE, CIRCUIT SETTER

CALIBRATED BALANCING

VENT3

COIL BALANCING

BALL VALVE FOR INDIVIDUAL

3-WAY CONTROL VALVE

OF PIPE (TYPICAL)

MANUAL AIR VENT,

LOCATE AT HIGH POINT

PETE'S PLUG

(TYP)

UNION (TYP)

PLUG

1/4" GLOBE VALVE

VENT3

OR EQUAL

VALVE, CIRCUIT SETTER

CALIBRATED BALANCING

OF PIPE (TYPICAL)

MANUAL AIR VENT,

LOCATE AT HIGH POINT

CONNECTION SIZE (TYP)

REDUCE TO COIL

COIL BALANCING

BALL VALVE FOR INDIVIDUAL

VALVE CONTROL TO THERMOSTAT OR DUCT SENSOR.

BALL VALVE FOR 3" AND SMALLER2

PROVIDE 1/2" VALVE FOR REHEAT COILS.3 5

SEE PLAN DRAWINGS FOR PIPE SIZES.1

NOTES:

FACILITIES ENGINEER.

REMOVE VALVE HANDLE WHEN WATER BALANCING

IS COMPLETED AND SUBMIT VALVE HANDLES TO

FLUE CAP "BREIDERT"

TYPE "L" OR EQUAL

MIN. 4'-0" FROM

COUNTERFLASHING

FLASHING SEE SPECS.

MAINTAIN 1" MIN.

CLEARANCE ALL

AROUND

2" WIDE, 20 GA. GALV. SHT.

MTL. STRAP SECURELY

CLAMPED TO FLUE

TYPE "B" FLUE-FOR

SIZE SEE PLANS

24" MIN.

RIGID INSULATION

PLY MEMBRANE WATER-

SEAL EDGE OF SINGLE

2" CONTINUOUS SOLVENT

METAL FLASHING HOOD

ROOFING MEMBRANE

FLASHING MEMBRANE

WELD

TIGHT (TYP.)

STRUCTURE

SECURE STRAP WITH 1/4"0

LAG BOLT, MIN. 1-1/2"

EMBEDMENT

PIPE CLAMP (TYP.)

ISOLATION VALVE (TYP)

MANUAL AIR VENT

UNION AT COIL CONN ON STEEL PIPE ONLY

PETE'S PLUG

AUTOMATIC FLOW CONTROL VALVE (TYP)

PRESSURE GAGE (TYP)

TEMPERATURE GAGE (TYP)

TWO WAY CONTROL VALVE

STRAINER

HWR HWS

NOTE:

1. COIL TRIM IS IDENTICAL FOR BOTH

HEATING HOT WATER AND CHILLED

WATER COILS.

6" DIRT LEG, 3/4" DRAIN VALVE WITH MALE

HOSE ADAPTER AND CAP (TYP)

FLEXIBLE CONNECTION (TYP.)

3 AHU COIL PIPING DIAGRAM

NO SCALE

5 FIRE/SMOKE DAMPER DETAIL

NO SCALE

Office of Construction and Facilities Management

N

E N G I N E E R I N G

I N T E R F A C E

TEL

FAX

PROJECT:

CONTACT:

www.interfaceengineering.com

717 Market Street

Suite 500

San Francisco, CA 94103

415.489.7240

415.489.7289

Date Signed: ----

EFORP

DERET

SI

GE

R

R E

E

NI

GN

E

LA

NOISS

CA L I FO

RN

I AS TA T E OF

Exp. 06-30-2012

No. M29691

M

E C H A N IC A L

G E

OR

GE

L . ARELLA

N O

C o p yr ig h t

S te in b e rg

A rc h it e c ts

A ll R ig h ts

R e s e rv e d

T h e s e

P la n s a n d o r S p e c if ic a ti o n s a re in te n d e d fo r th e s o le b e n e fi t o f S te in b e rg

A rc h it e c ts c lie n t a n d m a y n o t b e u s e d re u s e d ,c o p ie d ,o r re p ro d u c e d in a n y fo rm w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f S te in b e rg

A rc h it e c ts

George Arellano

2010-0410

DATEREV ISSUE

ARCHITECT

PROJECT #:

DATE:

SCALE:

CLIENT

Steinberg Architects 98 Battery Street, Suite 300 San Francisco, CA 94111

02.09.2011 100% Schematic Design

03.16.2011 100% Design Development

05.02.2011 90% Construction Documents

05.31.2011 100% Construction Documents

/2 /2 :2 :4 A M

C R e v it L o c a l\ -0 V a P a lo A lt o \V A P a lo A lt o

J o n e s B ld g E B v .r v t

1776 OLD MIDDLEFIELD

ROAD, MOUNTAIN VIEW, CA

94043

MH6.04

VAPAHCS Mountain View Center - #640-381

DETAILS - MECHANICAL

10037.00 5.31.2011

VA Palo Alto Health Care System 3801 Miranda Ave. Building 6, C360 Palo Alto, CA 94304

100%

CONSTRUCTION

DOCUMENTS

File details come from the government source that posted it. Updated .