This document provides control diagrams and sequence of operation for an HVAC system at the Mountain View Center VA medical facility. It details the control logic and setpoints for modulating dampers, fans, cooling equipment and heating coils to maintain temperature setpoints for various operating modes including warm-up, cool-down, unoccupied override, smoke detection shutdown and economizer-based free cooling. It also lists interface points to be provided by the controls contractor to the building automation system for monitoring and control of unit status, temperatures, pressures, speeds and alarms.

The related federal contract opportunity is a solicitation for HVAC construction services including the building management system and controls work. Offerors are instructed not to contact individual VA medical centers directly for more information and must instead search for solicitation 36C26120B0013 on SAM.gov. The opportunity is being conducted by the Department of Veterans Affairs Veterans Health Administration VISN 21 for Project #640-20-107 at the Mountain View Center VA medical facility.

View the file

Other files

File Type Posted
S02 - SF30 Solicitation Amend P00003 - 36C26120B0013 0003.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.REFLECTED_CEILING_PLAN_LEVEL2.AS6.02.pdf PDF
S02 - SF30 Solicitation Amend P00001 - 36C26120B0013 - MV - HR BMS HVAC CONST.pdf PDF
S02 - SF30 Solicitation Amend P00002 - 36C26120B0013 - MV - HR BMS HVAC CONST.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.REFLECTED_CEILING_PLAN_LEVEL1.AS6.01.pdf PDF
S02 - MV LIGHTING CONTROLS_1.pdf PDF
S02 - RFI Log - MV - HR HVAC BMS.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.05.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL2_PLAN_MECH.MH2.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.ROOF_PLAN_MECH.MH2.03.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.SYMBOL_LIST_GEN_NOTES_SHEET_INDEX_MECH.MHO.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.03.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL1_PLAN_MECH_PIPING.MH3.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL1_PLAN_MECH.MH2.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.PIPING_DIAGRAMS_MECH.MH7.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.04.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.CONTROL_DIAGRAMS_MECH.MH8.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.SCHEDULE_MECH.MH5.01.pdf PDF
S04 - Site Visit Sign-in Sheet - MV - HR BMS_FILLED OUT.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.LEVEL_2_PLAN_MECH_PIPING.MH3.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.DETAILS_MECH.MH6.01.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.PIPING_DIAGRAMS_MECH.MH7.02.pdf PDF
S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.SCHEDULE_MECH.MH5.02.pdf PDF
36C26120B0013-001.docx DOCX document
36C26120B0013-008.pdf PDF
36C26120B0013-009.pdf PDF
36C26120B0013-007.pdf PDF
36C26120B0013-006.pdf PDF
36C26120B0013-010.pdf PDF
36C26120B0013-002.pdf PDF
36C26120B0013-011.pdf PDF
36C26120B0013-004.pdf PDF
36C26120B0013-003.pdf PDF
36C26120B0013-005.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEQUENCE OF OPERATION:

EXHAUST AIR DAMPER

ACTUATOR

RETURN AIR DAMPER

ACTUATOR

OUTSIDE

TEMP.

AIR

TEMP.

D/PT

AIR

MIXED

OUTSIDE AIR DAMPER

ACTUATOR

E R

F

L T

I

SUPPLY FAN

VFD

TEMP.

SUPPLY

AIR

T P

(DIV. 16)

DETECTOR

DUCT SMOKE

SUPPLY AIR

120 VAC

E

SD

DUCT

DIFFERENTIAL

PRESSURE

(LOCATE 3/4

WAY DOWN

LONGEST DUCT)

T

RETURN AIR TEMPERATURE

X

D TO BAS

BACNET

INTERFACE

PANEL

T

T

RETURN FAN

VFD

AC CONTROLLER

(FACTORY

MOUNTED)

NOTE:

AHU MANUFACTURER TO PROVIDE BMS

INTERFACE PANEL AND NECESSARY

START-UP AND PROGRAMMING

T

ZONE TEMP. STPT.

ZONE TEMP.AO

AI

PAI

BUILDING

PRESSURE

CAI

CO2

SENSOR

INPUT TYPE

MIXED AIR TEMPERATURE

OUTDOOR AIR TEMPERATUREAI

AI

RETURN AIR TEMPERATURE

SUPPLY AIR TEMPERATURE

VFD RUN STATUS

VFD FAULT

FILTER STATUS (PER FILTER)

RETURN FAN STATUS

AHU STATUS

COMMUNICATIONS STATUS

DESCRIPTION

DI

DI

AI

AI

DI

DI

DI

DI

VFD SPEED

DUCT DIFFERENTIAL PRESSURE

AHU START/STOP

DUCT DIFFERENTIAL PRESSURE SETPOINT

DO

AO

AO

AI

CO2 LEVEL MONITOR/CONTROLAI

ECONOMIZER

UNOCCUPIED OVERRIDETHE OPERATOR WORKSTATION / NETWORK CONTROLLER, THROUGH A USER

PROGRAMMABLE SCHEDULE, SHALL ENABLE THE OPERATION OF A/C UNITS.

WHEN IN OPERATION THE SUPPLY AND RETURN FAN SHALL BE START/STOPPED

BY THE AHU UNITS CONTROLLER. FAN STATUS ON THE SUPPLY AND RETURN

FAN SHALL BE MONITORED. AN ALARM MESSAGE SHALL BE INDICATED WHEN

THE FAN IS NOT CORRECTLY OPERATING AT THE OPERATOR WORKSTATION. A

HIGH LIMIT DUCT PRESSURE SWITCH SHALL DISABLE THE VFD'S THROUGH THE

UNIT CONTROLLER WHEN THE HIGH LIMIT IN THE SUPPLY AIR DUCT IS

REACHED. AN ALARM MESSAGE SHALL BE INDICATED AT THE OPERATOR

WORKSTATION WHEN THIS OCCURS.

THE VFD ON THE SUPPLY FAN SHALL BE USED TO MODULATE THE FAN TO

MAINTAIN SUPPLY DUCT STATIC PRESSURE AND THE RETURN FAN VFD SHALL

MODULATE TO MAINTAIN SPACE PRESSURE. SUPPLY FAN STATIC PRESSURE

SHALL BE RESET BASED ON TERMINAL UNIT DEMAND AS REQUIRED BY

TITLE 24.

THE OUTSIDE AIR AIRFLOW MEASURING STATION SHALL ASSURE THAT THE

MINIMUM AIRFLOW IS PROVIDED BY THE AIRFLOW MEASURING STATION

OUTSIDE AIR DAMPER.

THE DISCHARGE TEMPERATURE SHALL BE MAINTAINED AT AN ADJUSTABLE

SETPOINT THROUGH THE MODULATION OF THE RETURN AIR (RA),

EXHAUST AIR, HOT WATER VALVE, OUTSIDE AIR (OA) DAMPERS, AND DX

SYSTEM IN SEQUENCE.

THE OUTSIDE, DISCHARGE, RETURN, AND MIXED AIR TEMPERATURES SHALL

ALL BE MONITORED THROUGH THE AHU FOR USE IN THE FOLLOWING

ENERGY MANAGEMENT SEQUENCES:

THE OUTSIDE(OA), RETURN(RA) DAMPERS, AND EXHAUST AIR (EA)

DAMPERS SHALL MODULATE TO MAINTAIN THE DESIRED DISCHARGE

TEMPERATURE (55°F-INITIAL). IF ADDITIONAL COOLING IS REQUIRED, THE

DX SYSTEM SHALL BE STAGED AS NECESSARY TO MAINTAIN THE DESIRED

DISCHARGE TEMPERATURE.

WHEN THE OAT >= FREE COOLING ADJUSTABLE SETPOINT, OA, EA

DAMPERS AND RA DAMPERS SHALL BE RESET FOR MINIMUM OUTSIDE AIR,

THE DX SYSTEM SHALL STAGE IN SEQUENCE TO MAINTAIN THE DESIRED

DISCHARGE TEMPERATURE.

WHEN THE OUTSIDE AIR TEMPERATURE (OAT) < FREE COOLING

ADJUSTABLE SETPOINT:

AREA WARM-UP OR COOL-DOWN TWO HOURS PRIOR TO OCCUPANCY.

DURING WARM-UP, THE OA DAMPER SHALL BE DRIVEN TO MINIMUM OUTSIDE

AIR POSITION AND THE MA DAMPER SHALL BE DRIVEN TO MINIMUM OUTSIDE

AIR POSITION AND EA DAMPER DRIVEN CLOSED. THE MORNING WARM-UP

HEATING COIL VALVE SHALL BE DRIVEN 100% OPEN FOR MAXIMUM

HEATING. THIS WILL CONTINUE UNTIL THE SPACE TEMPERATURE IS AT THE

ADJUSTABLE SETPOINT (68 DEG. F). THE SYSTEM AT THIS POINT SHALL

RETURN TO NORMAL OCCUPIED OPERATION. SCHEDULE TITLE 24

PRE-OCCUPANCY PURGE AND VENTILATION FOR 1 HOUR PRIOR TO MORNING WARM-UP

SEQUENCE.

DURING COOL-DOWN, IF OAT < RAT, THE OA DAMPER AND EA DAMPER SHALL

BE FULLY OPENED AND THE MA DAMPER SHALL BE CLOSED. THE SUPPLY FAN

AND RETURN FAN SHALL BE STARTED. THE DX SYSTEM SHALL BE STAGED AS

NECESSARY TO ACHIEVE BUILDING COOL DOWN. WHEN THE SPACE

TEMPERATURE < ADJUSTABLE SETPOINT, THE SYSTEM SHALL RETURN TO

NORMAL OPERATION. PROVIDE TITLE 24 PRE-OCCUPANCY AND VENTILATION.

UPON SMOKE DETECTION IN THE SUPPLY AIR DUCT, THE SUPPLY AND

RETURN FAN SHALL BE STOPPED THROUGH THE DDC CONTROLLERS. SYSTEM

WILL OPERATE IN SHUT DOWN MODE.

RESET STRATEGIES DUCT STATIC RESET: RESET DUCT STATIC PRESSURE TO

MINIMUM REQUIRED TO MAINTAIN ZONE TERMINAL UNIT SETPOINTS. SUPPLY

AIR TEMPERATURE RESET: RESET SUPPLY AIR TEMPERATURE TO MAXIMIZE

ECONOMIZER USE AND MINIMIZE DX SYSTEM USE WITHOUT COMPROMISING

SPACE TEMPERATURE.

AIR POSITION AND THE MA DAMPER SHALL BE DRIVEN TO MINIMUM OUTSIDE

HW CONTROL VALVE OF ALL VAV TERMINAL UNITS WITH REHEAT CONTROL VALVE

SHALL BE SET AT CLOSED POSITION DURING MORNING WARM UP. AFTER MORNING

WARM UP MODE, HW CONTROL VALVE AT AHU SHALL CLOSE WHILE CONTROL VALVES

AT VAV WITH REHEAT SHALL RESET TO NORMAL OPERATION.

SMOKE DETECTION

DUCT STATIC RESET

SUMMER NIGHT PURGE MODE SHALL BE SCHEDULED AT DDC CONTROLLER.

WHEN ENABLED, PURGING SHALL COMMENCE WHEN OAT IS AT LEAST 50°F

(ADJUSTABLE) LESS THAN INDOOR TEMPERATURE (750°F ROOM TEMPERATURE,

NIGHT PURGE

ADJUSTABLE). OA AND EA DAMPERS SHALL OPEN AT 100% POSITION WHILE

RAD WILL BE AT MINIMUM. UPON PROOF OF DAMPER OPERATION POSITION,

SUPPLY AND RETURN FANS SHALL RUN AT FULL SPEED (ADJUSTABLE).

ALL TERMINAL UNITS SHALL BE ENABLED AND INLET DAMPERS AT FULLY OPEN

POSITION. DX REFRIGERATION COOLING SHALL BE DISABLED DURING NIGHT

PURGE MODE.

DDC

INTERFACE POINTS LIST (POINTS LISTED

BELOW, NOT AVAILABLE THROUGH MFR.

CONTROLLERS, SHALL BE PROVIDED

SEPARATELY BY CONTROLS

CONTRACTOR)

1 AHU-1 CONTROL DIAGRAM

NO SCALE

(DIV. 16)

DETECTOR

DUCT SMOKE

RETURN AIR

120 VAC

E

SD

Office of Construction and Facilities Management

N

E N G I N E E R I N G

I N T E R F A C E

TEL

FAX

PROJECT:

CONTACT:

www.interfaceengineering.com

717 Market Street

Suite 500

San Francisco, CA 94103

415.489.7240

415.489.7289

Date Signed: ----

EFORP

DERET

SI

GE

R

R E

E

NI

GN

E

LA

NOISS

CA L I FO

RN

I AS TA T E OF

Exp. 06-30-2012

No. M29691

M

E C H A N IC A L

G E

OR

GE

L . ARELLA

N O

C o p yr ig h t

S te in b e rg

A rc h it e c ts

A ll R ig h ts

R e s e rv e d

T h e s e

P la n s a n d o r S p e c if ic a ti o n s a re in te n d e d fo r th e s o le b e n e fi t o f S te in b e rg

A rc h it e c ts c lie n t a n d m a y n o t b e u s e d re u s e d ,c o p ie d ,o r re p ro d u c e d in a n y fo rm w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f S te in b e rg

A rc h it e c ts

George Arellano

2010-0410

DATEREV ISSUE

ARCHITECT

PROJECT #:

DATE:

SCALE:

CLIENT

Steinberg Architects 98 Battery Street, Suite 300 San Francisco, CA 94111

02.09.2011 100% Schematic Design

03.16.2011 100% Design Development

05.02.2011 90% Construction Documents

05.31.2011 100% Construction Documents

/2 /2 :2 :5 A M

C R e v it L o c a l\ -0 V a P a lo A lt o \V A P a lo A lt o

J o n e s B ld g E B v .r v t

1776 OLD MIDDLEFIELD

ROAD, MOUNTAIN VIEW, CA

94043

MH8.01

VAPAHCS Mountain View Center - #640-381

CONTROL DIAGRAMS -

MECHANICAL

10037.00 5.31.2011

VA Palo Alto Health Care System 3801 Miranda Ave. Building 6, C360 Palo Alto, CA 94304

100%

CONSTRUCTION

DOCUMENTS

File details come from the government source that posted it. Updated .