S02 - 640-381.MVW.6.2011.2011.MOUNTAIN_VIEW_CENTER.CONTROL_DIAGRAMS_MECH.MH8.02.pdf
PDF 138 KB Posted
- Attached to
- Y1DA--640-20-107 MV-HR BMS HVAC CONST
- Solicitation number
- 36C26120B0013
About this file
This document contains control diagrams and sequences of operation for a building automation system at a Department of Veterans Affairs medical facility. The diagrams specify control sequences for air handling units, variable air volume boxes, exhaust fans, pumps, boilers and other mechanical equipment. Sensors, controllers and other control components are shown along with their integration on the network. Points, alarms and interfaces are defined. This level of detail indicates the project involves retrofitting the existing HVAC and controls infrastructure with a new building management system to centralize monitoring and control of mechanical and electrical equipment.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
M
BCU-1
TS
SEQUENCE OF OPERATIONS
THE UNIT SHALL MAINTAIN A COOLING SETPOINT OF 74°F (ADJ.)
ZONE ALARMS SHALL BE PROVIDED AS FOLLOWS:
HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS 5°F GREATER THAN THE COOLING SETPOINT.
LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS 5°F LESS THAN THE HEATING SETPOINT.
RUN CONDITIONS - SCHEDULED:
24 VAC
CONTROLLER
UNIT
PX
TEMP
SENSOR
ZONE TEMPERATURE
AO
SETPOINT
AI AI
T
VAV
AO
TRANSDUCER
PRESSURE
CFM VAV
DAMPER
ACTUATOR
T
AI
AIR
TEMP.
SUPPLY
FURNISHED BY CONTROLS CONTRACTOR,
INSTALLED BY VAV MFR.
AO
24 VAC
CONTROLLER
UNIT
PX
TEMP
SENSOR
ZONE TEMPERATURE
AO
SETPOINT
AI AI
T
VAV
HWS
AO
TRANSDUCER
PRESSURE
CFM VAV
DAMPER
ACTUATOR
HWR
T
AI
M
AIR
TEMP.
SUPPLY
C
H
FURNISHED BY CONTROLS CONTRACTOR,
INSTALLED BY VAV MFR.
ZONE
REHEAT
VALVE
(TWO OR
THREE
WAY AS
SHOWN
ON
PLANS)
SEQUENCE OF OPERATIONS
THE UNIT SHALL MAINTAIN A COOLING SETPOINT OF 74°F (ADJ.)
ZONE ALARMS SHALL BE PROVIDED AS FOLLOWS:
HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS 5°F GREATER THAN THE COOLING SETPOINT.
LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS 5°F LESS THAN THE HEATING SETPOINT.
RUN CONDITIONS - SCHEDULED:
THE GENERAL EXHAUST FAN SHALL RUN WHEN SCHEDULED. IF THE FAN IS COMMANDED
ON BUT STATUS DOES NOT SHOW PROOF OF FAN OPERATION, SEND AN ALARM TO THE
OPERATOR WORKSTATION.
EXHAUST FAN
MS
CS
FAN
STATUS DODI STOP
START/
FAN
(EF-1)
SEQUENCE OF OPERATIONS
COMM LINK
SECOND FLOOR
ROOF
24 VAC
24 VAC 24 VAC 120 VAC
MULTI-
PURPOSE
CONTROLLER
EXHAUST FAN
EF-1
MULTI-
PURPOSE
CONTROLLER
MULTI-
PURPOSE
CONTROLLER
AHU-1
VAV BOX
CONTROLLER
VAV BOX
CONTROL
WORKSTATION
LOCATION:
IT/DATA ROOM
BUILDING CONTROL UNIT
LOCATION: 2ND FLOOR ELECTRICAL ROOM
DEDICATED
120 VAC
24 VAC
VAV BOX
CONTROLLER
VAV BOX
CONTROL
REFERENCE DRAWINGS FOR
QUANTITY AND LOCATION OF VAV
BOXES
24 VAC
VAV BOX
CONTROLLER
VAV BOX
CONTROL
24 VAC
VAV BOX
CONTROLLER
VAV BOX
CONTROL
REFERENCE DRAWINGS FOR
QUANTITY AND LOCATION OF VAV
BOXES
1ST FLOOR
MORNING WARM UP:
VAV DAMPER SHALL BE AT FULLY OPEN WHILE REHEAT COIL CONTROL VALVE AT CLOSED
POSITIONS.
24 VAC
PUMP
CONTROLLER
1 VAV WITH REHEAT CONTROL DIAGRAM
NO SCALE
2 VAV WITH/OUT REHEAT CONTROL DIAGRAM
NO SCALE
3 EXHAUST FAN CONTROL DIAGRAM
NO SCALE
5 CONTROL ARCHITECTURE
NO SCALE
EXHAUST FAN
MS
CS
FAN
STATUS DODI STOP
START/
FAN
(EF-3 & 4)
6 ELECTRICAL ROOM EXHAUST FAN CONTROL DIAGRAM
NO SCALE
THERMOSTAT
24 VAC
LIGHTING
CONTROL
SECONDARY
PUMP
HWP-2
PRIMARY
PUMP
HWP-1
BOILER
EXHAUST FAN
WIRED SWITCH
(EF-2)
4 EXHAUST FAN CONTROL DIAGRAM
Office of Construction and Facilities Management
N
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT:
CONTACT:
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
Date Signed: ----
EFORP
DERET
SI
GE
R
R E
E
NI
GN
E
LA
NOISS
CA L I FO
RN
I AS TA T E OF
Exp. 06-30-2012
No. M29691
M
E C H A N IC A L
G E
OR
GE
L . ARELLA
N O
C o p yr ig h t
S te in b e rg
A rc h it e c ts
A ll R ig h ts
R e s e rv e d
T h e s e
P la n s a n d o r S p e c if ic a ti o n s a re in te n d e d fo r th e s o le b e n e fi t o f S te in b e rg
A rc h it e c ts c lie n t a n d m a y n o t b e u s e d re u s e d ,c o p ie d ,o r re p ro d u c e d in a n y fo rm w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f S te in b e rg
A rc h it e c ts
George Arellano
2010-0410
DATEREV ISSUE
ARCHITECT
PROJECT #:
DATE:
SCALE:
CLIENT
Steinberg Architects 98 Battery Street, Suite 300 San Francisco, CA 94111
02.09.2011 100% Schematic Design
03.16.2011 100% Design Development
05.02.2011 90% Construction Documents
05.31.2011 100% Construction Documents
/2 /2 :2 :5 A M
C R e v it L o c a l\ -0 V a P a lo A lt o \V A P a lo A lt o
J o n e s B ld g E B v .r v t
1776 OLD MIDDLEFIELD
ROAD, MOUNTAIN VIEW, CA
94043
MH8.02
VAPAHCS Mountain View Center - #640-381
CONTROL DIAGRAMS -
MECHANICAL
10037.00 5.31.2011
VA Palo Alto Health Care System 3801 Miranda Ave. Building 6, C360 Palo Alto, CA 94304
100%
CONSTRUCTION
DOCUMENTS