MMGRA-6001 - Project Document Printed: 20170529 Printed copies are uncontrolled. Consult DMS for up-to-date versions.
Motek Medical bv | Keienbergweg 77 | 1101 GE Amsterdam | The Netherlands
Project Management Plan
GRAIL System
CREATION DATE: 5TH JANUARY 2015
MODIFICATION DATE: 28TH SEPTEMBER 2015
AUTHOR: WOUTER PRAST
FILENAME/VERSION: PROJECT DOCUMENT .DOCX
Revision history
Date Author Version
05-01-2015 Wouter Prast
0.1 Initial version
28-09-2015 Wouter
Prast
1.0 Release version
29-05-2017 Wouter
Prast
2.0 Non-Confidential version
Table of contents
1 Introduction
1.1 Project Document
1.2 Project Description
1.2.1 GRAIL System
1.2.2 Configuration at VA Palo Alto
1.3 Project objectives
1.4 Project organization
2 Project Planning
2.1 Introduction
2.2 Objectives
2.3 Strategies
2.4 Planning
2.4.1 General Milestones
2.4.2 Project Document
2.4.3 System Engineering and Production
3 Checklist
i. Motek share in the project
ii. Client share in the project 4 Declaration of agreement Appendix A: Specifications R-Mill Appendix B: Specifications MIC Appendix C: Specifications of the server rack Appendix D: Power consumption and heat output to ambient surroundings Appendix E: System infrastructure and Cable Routing Appendix F: Transporting the treadmill Appendix G: A-Frame Appendix H: Main package dimensions
1 Introduction
1.1 Project Document
This Project Document describes the organization, planning and project deliverables for the engineering and delivery phase of the project. Project management personnel shall be made thoroughly familiar with the contents of this plan since it provides the construction objectives and strategies, which were established to assure a successful completion of the construction phase.
This Project Document seeks to ensure that consistency, adequate communication, coordination and controls are in place. It is intended to be a guide to all parties. It will enable all parties involved in the project to know how their contribution will fit into the overall plan.
This Project Document is intended to be a living document, which will be developed and improved throughout the course of the project. Therefore constructive comments on its content, interpretation and usage are welcomed for consideration.
1.2 Project Description
1.2.1 GRAIL System
GRAIL is a dedicated solution for gait analysis and gait training from Motek Medical B.V., offering revolutionary techniques to improve any rehabilitation facility into an industry-leading facility.
Improving the quality of rehabilitation due to standardization, optimization and revolutionary techniques is what GRAIL (Gait Real-time Analysis Interactive Lab) offers medical facilities, specialists, researchers and patients.
Each GRAIL system creates a unique virtual environment capable of creating the most realistic situation where researchers can investigate new ways and methods of stimulating patients. Next to this, clinicians can use previously documented techniques to speed recovery, and improve patient capability.
Core of the system are the D-flow software, the motion platform with treadmill and the projection system.
1.2.2 Configuration at VA Palo Alto
The requested configuration for VA is a configuration consisting of the D-flow software, a flat active 3D projection system, belt projection, a dual-belt instrumented treadmill, a motion capture system, a video system, an audio system and all required control computers. Next to the GRAIL, Motek will also be providing a weight bearing system that will need to be installed inside the suspended ceiling.
1.3 Project objectives
The stated objective of the project are:
• to create a suitable space for the GRAIL system
• to install the GRAIL system, complete acceptance and to turn it over to the client
• that it shall be executed within the agreed time schedule and with the highest efficiency without compromises on the standards set for the project with respect to:
• safety
• environment
• quality
The progress in realizing above mentioned objectives will be continuously monitored and reported throughout the project. In case of deficiencies or potential deficiencies in meeting above mentioned objectives the project management will take appropriate action to correct the deficiencies or take measures to minimize the impact.
The Management of Motek is completely committed to the successful execution of all construction related activities in accordance with specifications, safety regulations and with approved time schedule and cost estimates. In their responsibility for the performance of the site staff they delegate authority to implement this plan to the Project manager.
1.4 Project organization
Company Name Role Address E-mail Phone
VA Palo Alto Pawan Galhotra Program Director
VA Palo Alto Health Care System
(90/NCA) 3801
Miranda Ave
Palo Alto CA 94304-
Pawan.Galhotra@v a.gov
Office +01 650-493-5000
VA Palo Alto Alberto Lopez Physical Therapy Supervisor
VA Palo Alto Health Care System
(90/NCA) 3801
Miranda Ave Palo Alto CA 94304-
VA Palo Alto
Deb Pitsch Physical Therapist
VA Palo Alto Health Care System
(90/NCA) 3801
Miranda Ave
Palo Alto CA 94304-
Motek Medical BV Wouter Prast Project Manager Keienbergweg 77
1101 GE
Amsterdam wouter.prast@motek medical.com
Office +31 20 301 3020 Cell: +31 6 3042 1157 mailto:Pawan.Galhotra@va.gov mailto:Pawan.Galhotra@va.gov mailto:wouter.prast@motekmedical.com mailto:wouter.prast@motekmedical.com
2 Project Planning
2.1 Introduction
This section defines the planning, progress measurement and forecasting procedures for the construction, including the interfaces with the client, design, procurement and third parties. All involved parties, including partners and construction contractors will participate in the planning process and are required to prepare and provide detailed planning information for further processing into the integrated construction planning by the client.
2.2 Objectives
The objectives of these procedures are to support the construction organization in completing the project within the agreed timetable in a most safe and efficient cost saving manner, performed with a highest possible standard of quality. In doing this to provide construction management with relevant information to monitor construction progress, identify deviations, determine level of urgency and develop corrective actions.
2.3 Strategies
Pay special attention to integrated planning, tying together the discipline phases as well as parties on organizational level. As a result all planning output should be consistent, authorized and recognizable as the common planning.
Create awareness and acceptance, within all involved parties, for the common planning. Provide the organization of clear and easily accessible overviews of all formal planning issues, inclusive date, status and validness. Planning employees have to play an active and prominent role, forcing the organization to recognize them as being the focal point for all planning related matters.
Planning employees should inform themselves on all matters, which could have an impact on planning and act pro-active when required. Therefore communication lines should be established and maintained with all involved parties. As a result occurrences with unidentified and so unplanned scope and interfaces should be prevented.
2.4 Planning
2.4.1 General Milestones
Motek will assemble the components of the GRAIL system, whilst the Client prepares its site for the installation of the system. The final installation of the system will be done by Motek Medical staff with local assistance.
The following milestones are defined:
2.4.2 Project Document
To enable a smooth continuation of the project, it is important that both parties agree on what their responsibilities are within the project. Therefore both parties sign the declaration of agreement, agreeing on the project deliverables and work to be done by each party as described in this Project Document.
2.4.3 System Engineering and Production
When the Project Document is signed, Motek Medical will start the detail engineering and production of the system.
Milestone Date [dd/mm/yy]
Responsible
Approval Project Document (Basic Engineering) October 9th 2015 VA Palo Alto
Detail Engineering Finished October 16th 2015 Motek
Production Finished December 1st 2015 Motek
Room Preparation Finished and ready for inspection December 1st 2015 VA Palo Alto
Shipping December 11th 2015 Motek/VA Palo Alto
Start Installation August 2017 Motek/VA Palo Alto
Acceptance Test TBD Motek/VA Palo Alto
Start Training TBD Motek/VA Palo Alto
3 Checklist
i. Motek share in the project
The section below is a technical list of equipment for the GRAIL of Motek Medical for the project.
ii. Client share in the project
This section is a checklist containing the material and labor deliverables of the client for the project.
Note: due to possible dependencies it must be assured that all elements are not only completed, but also completed in the right timeframe. When these requirements are not met upon arrival of the installation team, additional costs for another visit could apply.
□ Signed Project Document
□ Building requirements
□ sufficient large room
□ sufficient room entrance according to max crate size (239x77x200cm)
□ Cable trays
□ Cable tray (150x50mm trays, preferably flush) with a removable lid, running from
MIC to underneath the treadmill
□ Power supply
□ power infrastructure installation according to specifications and drawing
□ Main switch providing 208V or 480V output for isolated transformer
□ Connection of main switch and electrical cable of transformer to be done by certified electrician
□ Lighting
□ Two lighting zones: zone 1 over treadmill and screen, zone 2 over the control desk (note: in the platform room dimmable lights are preferred)
□ optional: window shutters
□ Environment requirements
□ Climate control the system produces a lot of heat, mainly by the projectors and the server rack. Specifications can be found in appendix A
□ Vibration free Dual Belt Instrumented Treadmills are purposefully designed that the right and left forceplate are mechanically isolated from each other to prevent transmission of impact forces between the two forceplates. However, structurally weak floors might cause unwanted vibrations that affect treadmill operation. Floor vibration, especially in the upper stories of the buildings, is a common occurrence.
Therefore, it is strongly recommended that the treadmill be installed in the building at the entrance level with no basement underneath, or at the basement level. Otherwise, it is the customer’s responsibility to make sure that floor vibration is not going to affect operation of the treadmill.
□ Shielded against incoming light during operation it must be possible to completely darken the room
□ Reflection free finish
□ Noise free
□ Low EMC level the system should not be under the influence of large EMC emitting sources such as elevators, air conditioners, etc.
□ Stable power no power surges or drops of more than 10% are allowed
□ Operator desk suitable for 3 monitors (typical size is 1.6x0.8m)
Shipment of components
□ Mail address for shipment (incl. contact person and contact data)
□ Clearing customs / importing components
□ Storage facility on site
□ Dry and safe room with sufficient entrance
□ Handling equipment
□ Insurance
□ Receiving personnel
□ Facilities during installation period
□ Contact person
□ Handling equipment (2 pallet jacks, dolly)
□ Loading dock or forklift available during delivery to unload the truck
□ Motek personnel access
□ Personnel restriction
□ Cleaning crew
□ Sanitary facilities
□ Wireless or wired internet connection
□ 2 10-12 ft ladders
□ Trash disposal of crates in which the equipment will be delivered
□ Treadmill installation
□ hoisting crew
□ hoisting equipment (A-Frame or electric stacker)
□ SDS-Hammer drill
□ technician who is allowed to drill holes onsite
□ No floor heating or pipes underneath the treadmill, as 4x 12cm deep holes need to be drilled for the anchors (12mm)
□ Acceptance test
4 Declaration of agreement
Hereby VA Palo Alto approves the content of this Project Document:
Date: (dd/mm/yyyy)
Place:
Signature:
Name/function:
On behalf of Motek Medical:
Date: (dd/mm/yyyy)
Place:
Signature:
Name/function:
MMGRA-6001 - Project Document / 20170529 / Printed: 20170529
Form: QMS-00f007 / 20110809
Keienbergweg 77 | 1101 GE | Amsterdam | The Netherlands T: +031(0)20 301 30 20 | F: +31(0)20 301 30 21 | www.motekmedical.com
Appendix A: Specifications R-Mill
Both belts of the treadmill can be controlled separately. The R-Mill has two degrees of freedom: a pitch
(rotation) and a sway (translation).
Dual belts with 3D ground reaction force measurement per belt walking area per belt: 2.2×0.5 m (length x width) belt speed range: 0 – 5 m/s speed accuracy: =<1% Pitch: ±10 deg
Sway: ±5 cm
Payload capacity: 130 kg Footprint: 3.6m2
Weight: 784KG Dimensions: 220cm x 182cm x 48cm (length x width x height)
Figure 2 R-Mill Figure 3 R-Mill http://www.motekmedical.com/
Appendix B: Specifications MIC
The MIC controls the instrumented treadmill and runs the safety circuits. The main characteristics of the
MIC are:
• dimensions (L×W×H): 1×0.4×1.4 m
• weight: 150 kg
• Power input of isolated transformer: 208V(48A)/400V(25A)/480V(21A)
Figure 1 MIC
Note: the isolated transformer is delivered with a CEE32A 5-pin plug, the female counterplug is to be provided by the customer. It is also an option to cut the plug off and connect the wires directly into a main switch. Please note that the client needs to hire a certified electrician for this work.
Figure 4; Male CEE plug 32A (5-pin) as delivered with the transformer
Appendix C: Specifications of the server rack
The server rack houses the following components:
• 1 D-Flow computer
• 1 Video computer
• 1 Image generator
• 1 Mocap computer
• 1 MX giganet Lab
• 1 KVM
• 1 16-port network switch
• 1 8-port network switch
• 1 audio amplifier
The main characteristics of the server rack are:
• dimensions (L×W×H): 0.6×0.8×2 m
• gross weight: 100 kg max (empty)
• power input: 4 × 120 VAC/16A each
Figure 6 Server-rack
Appendix D: Power consumption and heat output to ambient surroundings
The table below lists the maximum current that can be used by the equipment. The value given for the heat output is at maximum use.
USA
Item Units Location in Room Voltage
Max Curr/unit
Current Total
Max Power/unit
Max Power total
Max Heat disp/Unit
Max Heat total
Max Heat/unit
Max Heat total
Comments
[PCS] [VAC] [A] [A] [W] [W] [W] [W] [BTU/h] [BTU/h]
Treadmill control (MIC) 1 Grail room 400 25 25 17320 17320 1200 1200 4096 4096 3-phase
Computers 7 Server rack 110 8 56 920 6440 872 6103 2975 20825
KVM 1 Server rack 110 2 2 230 230 235 235 805 805
Switch 1 Server rack 110 2 2 230 230 235 235 805 805
Amplifier 1 Server rack 110 3 3 345 345 359 359 1225 1225
Monitors, etc. 3 Desk 110 1 3 69 230 41 123 140 420
Projectors 4 Grail room 110 4 16 460 1840 483 1932 1650 6600
Subject 1 Grail room 440 440 1500 1500
Operator 1 Grail room 205 205 700 700
Totals 107 26635 10832 36976
Notes:
1. the power supply needs to be stable and free of surges or drops of more than 10% nominal; if this cannot be guaranteed, UPS’s must be installed
2. Cooling is often underestimated, especially when the room is small
MMGRA-6001 - Project Document Printed: 20170529
Appendix E: System infrastructure and Cable Routing
Figure 7 System infrastructure and overview
Appendix F: Transporting the treadmill
In order to get the crate with the treadmill into the room, please note the minimal door measurements below.
Figure 8 Minimal door dimensions.
Appendix G: A-Frame
In order to lift the treadmill upright and into place, an A-frame/gantry is to be delivered by the client. It needs to be able to fit the crate containing the treadmill (200cm high) underneath it. The inner width also needs to be at least 200cm for when the treadmill is lowered into a flat position.
Figure 9 A-Frame/Gantry
Appendix H: Main package dimensions
The GRAIL system is shipped in packages. It must be assured that these packages can be handled and stored on site. The estimated properties of the main packages are listed below.
Main packages
Package name Dimensions (L×W×H) [cm] Bruto Weight [kg]
Treadmill 239x77x200cm 1042
Server rack, truss, stairs 398x148x182cm 1258
MIC and other equipment 208x138x172cm 516