36C26118B0613-029.pdf

PDF 449 KB Posted

Attached to
Install Patient Safety Upgrades and Commission Systems for Building 500
Solicitation number
36C26118B0613
Issued by

About this file

36C26118B0613 AE3.1.1C.pdf

View the file

Other files

File Type Posted
36C26119C0022-000.docx DOCX document
36C26118B0613-0003000.docx DOCX document
36C26118B0613-0002004.pdf PDF
36C26118B0613-0002002.pdf PDF
36C26118B0613-0002003.pdf PDF
36C26118B0613-0002001.pdf PDF
36C26118B0613-0002000.docx DOCX document
36C26118B0613-0001001.pdf PDF
36C26118B0613-0001000.docx DOCX document
36C26118B0613-0001002.pdf PDF
36C26118B0613-016.pdf PDF
36C26118B0613-031.pdf PDF
36C26118B0613-010.pdf PDF
36C26118B0613-045.pdf PDF
36C26118B0613-034.pdf PDF
36C26118B0613-036.pdf PDF
36C26118B0613-002.pdf PDF
36C26118B0613-009.xlsx XLSX spreadsheet
36C26118B0613-011.pdf PDF
36C26118B0613-050.doc DOC document
36C26118B0613-037.pdf PDF
36C26118B0613-019.pdf PDF
36C26118B0613-006.pdf PDF
36C26118B0613-018.pdf PDF
36C26118B0613-008.pdf PDF
36C26118B0613-014.pdf PDF
36C26118B0613-039.pdf PDF
36C26118B0613-001.docx DOCX document
36C26118B0613-003.docx DOCX document
36C26118B0613-038.pdf PDF
36C26118B0613-032.pdf PDF
36C26118B0613-043.pdf PDF
36C26118B0613-007.pdf PDF
36C26118B0613-041.pdf PDF
36C26118B0613-015.pdf PDF
36C26118B0613-025.pdf PDF
36C26118B0613-035.pdf PDF
36C26118B0613-033.pdf PDF
36C26118B0613-004.docx DOCX document
36C26118B0613-049.pdf PDF
36C26118B0613-013.pdf PDF
36C26118B0613-046.pdf PDF
36C26118B0613-022.pdf PDF
36C26118B0613-030.pdf PDF
36C26118B0613-047.pdf PDF
36C26118B0613-042.pdf PDF
36C26118B0613-005.docx DOCX document
36C26118B0613-012.pdf PDF
36C26118B0613-017.pdf PDF
36C26118B0613-027.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CEILING HEIGHTS INDICATED ARE A.F.F., U.O.N.

2. CENTER SUSPENDED CEILING GRID IN ROOM, U.O.N.

3. CENTER CEILING LIGHT FIXTURES IN CEILING AREAS U.O.N.

4. SEE FINISH SCHEDULE FOR CEILING FINISHES

5. SEE AE9.4.1 FOR TYPICAL CEILING DETAILS.

6. SEE EQUIPMENT REPORT FOR ADDITIONAL INFORMATION.

7. PROVIDE APPROPRIATE BACKING, SUPPORT AND LATERAL

BRACING AS REQUIRED ON ALL CEILING MOUNTED

EQUIPMENT

8. ALL CEILINGS ARE 9'-0" ABOVE FINISHED FLOOR, U.O.N.

9. SEE ELECTRICAL DRAWINGS FOR LOCATION OF ALL EXIT

SIGNS.

10. SEE FIRE ALARM DRAWINGS FOR LOCATION OF ALL SMOKE

DETECTORS.

G

J

N

141 3

H

K

M

L

AE3.1.1C

+10' - 9"

+9' - 0"

+9' - 6"

+9' - 6"

OFFICE

B1-140A

OFFICE

B1-508

OFFICE

B1-524

OFFICE

B1-526

EMS

OFFICE

B1-535

OFFICE

B1-522

OFFICE

B1-528

OFFICE

B1-510

OFFICE

B1-502

EMS EQUIP

B1-536

TOILET

B1-501

OFFICE

B1-531

OFFICE

B1-533

OFFICE

B1-506

OFFICE

B1-504

TCOM

B1-TC1

BED

STORAGE

B1-542

ELECTRICAL

B1-EC2A

QT

B1-140B

EMS

LOUNGE

B1-537

MECHANICAL

ROOM

B1-ME2

SIGNAL

B1-SC1

STUDENT

WORK

ROOM

B1-511

OFFICE

B1-512

OFFICE

B1-520

EMS

SUPPLY

B1-539

TOILET

B1-120F

STAFF SUITE

B1-120G

OUTPATIENT

THERAPY

GYM

B1-120

ASSISTIVE

TECHNOLOGY

B1-130

GAIT STUDY

B1-135

DRIVER

TRAINING

B1-140

COPY ROOM

B1-527

BREAK

ROOM

B1-525

CONFERENCE

ROOM

B1-530

PERSONAL

EFFECTS

B1-507

TOILET

B1-503

EMS

RECEIVING

B1-540

STORAGE

B1-ME1

THERAPY

STORAGE

B1-505

STAIR 3

B1-ST3

COURTYARD

A1-CY1

STORAGE

B1-130C

SOILED

HOLDING

B1-543

QUIET

THERAPY

B1-130B

EMERGENCY

ELECTRICAL

B1-EC2

CORRIDOR

CA1-19

CORRIDOR

CB1-15

CORRIDOR

CB1-16

CORRIDOR

CB1-17

CORRIDOR

CB1-14

GAIT

DRESSING

B1-135A

STORAGE

B1-120D

STORAGE

B1-120E

SYRE300

AE3.1.1A

AE

3.1

.1D

+10' - 0"

3.24

3.08

3.08

3.08

3.08

3.08

AE

3.1

.1C

3.08

7 10

STORAGE

B1-534

AE7.1.11

H.7

TRCE300-

ALCOVE

B1-115A

3.24

+9' - 0"

+9' - 0"

AE7.1.11

3.08

3.08

1/ 2"

11' - 7 1/2"

/2

19' - 11"

EQ EQ

EQ

4'

5"

3.13

3.13

3.13

3.13

3.13

3.13

3.13

AT STAFF

SUITE

B1-130A

AE7.1.10

54+10' - 9"

3.13

3.11

3.11

3.11

CORRIDOR

CB1-10

3.39

1' - 3"1'

0"1' - 6"

1'

3"

2'

0"

9' - 0"

AL

IG

N

2'

1/

2"

+9' - 6"

ALIGN3'

0"

2' - 5 1/2"

AL

IG

N

2'

1/

2"

AE9.4.5

+8' - 0"

+10' - 9"

2 2 2 2 22

2 HR HORIZONTAL EXIT / SMOKE BARRIER

2 HR OCCUPANCY SEPARATION

1 HR RATED

1/2 HR SMOKE PARTITION

SMOKE PREVENTIVE PARTITION

RATED CONSTRUCTION

CEILINGS

SUSPENDED LINEAR WOOD PLANK SYSTEM

2 X 2 SUSPENDED LAY-IN CEILING, SEE

50/AE9.4.1

FRAMED CEILING - FLAT GYPSUM BOARD, SEE

52/AE9.4.1

FRAMED CEILING ABOVE - FLAT GYPSUM

BOARD, 1 HR FIRE RATED, SEE 30/AE9.4.2

GRAPHIC SCALE:

0'

1/8" = 1'-0"

8' 8' 16'

TRUE

NORTH

PROJ. NORTH

34°

3801 Miranda Ave., Palo Alto CA

CENTERS FOR AMBULATORY CARE,

POLYTRAUMA AND BLIND REHABILITATION

Polytrauma and Blind Rehabilitation Center

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Seals and Signatures on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

301 BATTERY STREET, 7TH FLOOR

SAN FRANCISCO, CA 94111

T 415.227.0100 F 415.908.0862 www.smithgroup.com

The Design Partnership LLP Architects + Planners

1412 VAN NESS AVE., 2ND FLOOR

SAN FRANCISCO, CA 94109

T 415.777.3737 F 415.777.3476 www.dpsf.com Department of

Veterans Affairs

SHEET NOTES

KEYNOTES

Associate Architect:

PR

IN

TE

D

ON

:8

/1 2/

:1

4:

P M

RCP LEVEL 1 AREA C

AE3.1.1C

JG NW25 MARCH 2011

640-424

3.08 EXPOSED STRUCTURE

3.11 WALL MOUNTED CASEWORK

3.12 EXPANSION / SEISMIC JOINT

3.13 ROLL DOWN SHADE TYPICAL, SEE SPECIFICATIONS FOR

TYPE. COORDINATE SHADE PULLS FOR ACCESSIBILITY

WITH BRACED FRAMES WHERE APPLICABLE

3.23 ROLL-UP FIRE DOOR, SEE AE9.3.8 FOR DETAILS

3.24 1HR SHAFT BOTTOM ENCLOSURE ABOVE

3.38 ACCESS PANEL, 24" X 30"

3.39 ACCESS PANEL, 30" X 30"

SCALE: 1/8" = 1'-0"54

REFLECTED CEILING PLAN LEVEL 1

AREA C

1 ASI-050 06/27/2013

2 ASI-066 07/31/2013

File details come from the government source that posted it.