36C26118B0613-0002000.docx

DOCX document 25 KB Posted

Attached to
Install Patient Safety Upgrades and Commission Systems for Building 500
Solicitation number
36C26118B0613
Issued by

About this file

36C26118B0613 0002 36C26118B0613 0002.docx

View the file

Other files

File Type Posted
36C26119C0022-000.docx DOCX document
36C26118B0613-0003000.docx DOCX document
36C26118B0613-0002004.pdf PDF
36C26118B0613-0002002.pdf PDF
36C26118B0613-0002003.pdf PDF
36C26118B0613-0002001.pdf PDF
36C26118B0613-0001001.pdf PDF
36C26118B0613-0001000.docx DOCX document
36C26118B0613-0001002.pdf PDF
36C26118B0613-016.pdf PDF
36C26118B0613-031.pdf PDF
36C26118B0613-010.pdf PDF
36C26118B0613-045.pdf PDF
36C26118B0613-034.pdf PDF
36C26118B0613-036.pdf PDF
36C26118B0613-002.pdf PDF
36C26118B0613-009.xlsx XLSX spreadsheet
36C26118B0613-011.pdf PDF
36C26118B0613-050.doc DOC document
36C26118B0613-037.pdf PDF
36C26118B0613-019.pdf PDF
36C26118B0613-006.pdf PDF
36C26118B0613-018.pdf PDF
36C26118B0613-008.pdf PDF
36C26118B0613-014.pdf PDF
36C26118B0613-039.pdf PDF
36C26118B0613-001.docx DOCX document
36C26118B0613-003.docx DOCX document
36C26118B0613-038.pdf PDF
36C26118B0613-032.pdf PDF
36C26118B0613-043.pdf PDF
36C26118B0613-007.pdf PDF
36C26118B0613-041.pdf PDF
36C26118B0613-029.pdf PDF
36C26118B0613-015.pdf PDF
36C26118B0613-025.pdf PDF
36C26118B0613-035.pdf PDF
36C26118B0613-033.pdf PDF
36C26118B0613-004.docx DOCX document
36C26118B0613-049.pdf PDF
36C26118B0613-013.pdf PDF
36C26118B0613-046.pdf PDF
36C26118B0613-022.pdf PDF
36C26118B0613-030.pdf PDF
36C26118B0613-047.pdf PDF
36C26118B0613-042.pdf PDF
36C26118B0613-005.docx DOCX document
36C26118B0613-012.pdf PDF
36C26118B0613-017.pdf PDF
36C26118B0613-027.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 09-28-2018 640-18-156 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders

36C26118B0613 09-28-2018

X x x The purpose of this amendment is to clarify questions that came up during the site visit.

Special Conditions:

• Contractor shall complete task 1, 2, 3, 4, 5(Second Floor), 8, 9, 11, 12, 13, 14(Second Floor), 15(Second Floor), 16 17(Second Floor), 18(Second Floor), 19(Second Floor), 21 and 22(Second Floor) must be completed by January 31st, 2019.

Contractor shall complete task 5(First and Third Floor), 14(First and Third Floor), 17(First and Third Floor), 18(First and Third Floor) and 22(First and Third Floor) by February 28th, 2019.

14. Provide and install wall mount ed anchor for Metro Racks, Refrigerators, Omnicell and AcuDose

14.1 Contractor must provide install anchorage hardware base on the OSHPD details and photos provided by the VA for 130 units of Metro Rack, 30 units of Refrigerator, 20 units of Omnicell, and 10 units of AcuDose.

14.6 Refer to: Specs, IS080219-0-ACD0916 Approved Docs.pdf, Eqpt Seismic 1.pdf, Eqpt Seismic 2.pdf, Eqpt Seismic 3.pdf, Eqpt Seismic 4.pdf

15. Provide and Install Floor Anchorage for Gym Equipment and Ice Makers

15.1 Contractor must provide and install floor anchorage hardware to 20 units of therapy gym equipment in A1-800, B1-120, A2-120, and A3-140.

16. Install Gait Lab Motek Grail Equipment

16.1 Contractor must coordinate directly with Motek Medical Grail System and execute all works according to the Motek Medical Grail System tasks shown in attachment MMGRA-6001 – Project Document -29-15-17 – Non-Confidential.PDF. VAPAHCS will coordinate the delivery of the equipment from our activation contractor to Building 500 Loading Dock.

16.5 Contractor must provide forklift during delivery to unload the truck and move all equipment and material from the Building 500 Loading Dock into B1-135.

ATTACHMENTS:

See attached document: Eqpt Seismic 1.

See attached document: Eqpt Seismic 2.

See attached document: Eqpt Seismic 3.

See attached document: Eqpt Seismic 4.

File details come from the government source that posted it.