36C26118B0471-0002010.pdf
PDF 662 KB Posted
- Attached to
- INSTALL CONTINUOUS MONITORING SYSTEM DEVICE Federal contract opportunity
- Solicitation number
- 36C26118B0471
About this file
36C26118B0471 0002 E.10 Attachment # 2 Response RFI #4 ACM 662-18-001 water monitoring.pdf
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Explanation:
Room Number xxx ) Asbestos Sample Location And Number
It
J
UP
UP
,B-4)
1-1
10'
SF VA Medical Center Building : 009
Basement Floor
Asbestos Material Survey
PROJECT No: 09B-2173
SHEET NO: 1
DRAWN BY: S. Rahnnan
ENVIRONMENTAL
1260 45th Street
Emeryville, CA 94608-2907 510.923.1661 calif@ihi-env.com
DATE: 10-06-09
REVISED BY:
DATE:
Ut-servenasbestos\- OuterOfficeCADNEmeniville\2009 \ 09B-2173 \0913-2173 Bldg 009,010,011.dwg, Bldg 9-Sh 1,5/14/2010 9:40:58 AM, sylviar
( XXX )
115-1
118-2 118-1
N/N
116-1
123-2 )
118-3
B-3:
117-2
UP 124-1
DATE:
Asbestos Material Survey
IHI
ENVIRONMENTAL
1260 45th Street Emeryville, CA 94608-2907
510.923.1661 calif@ihkenv.com
PROJECT No: 09B-2173
SHEET NO:
DRAWN BY: S. Rahman
10-06-09
REVISED BY:
DATE:
SF VA Medical Center Building : 010
Basement Floor
Explanation:
Room Number
Asbestos Sample Location And Number
Asbestos Containing Stucco
Asbestos Containing Stair Tread
Asbestos Containing Flooring Mastic
108-4
( 108-2 >\ 108-3
108-7
121-4 1/4
( 108-1
0 10'
\\Ut-server\asbestos\- OuterOfficeCADNEmeryville\2009\09B-2173\09B-2173 Bldg 009,010,011.dwg, Bldg 10-Sh 1,5/14/2010 10:06:01 AM, sylviar
0 10 20'
PROJECT No: 09B-2173 SHEET: Bldg200FPSB ML DRAWN BY: S. Rahman
DATE: 01-29-10
REVISED BY: M. Bishop
PIPE TUNNEL
DATE: 02-09-15
AF-1
I BA-1 I
ELECT. RN.
ENVIRONMENTAL
1260 45th Street Emeryville, CA 94608-2907
510.923,1661 calif@ihi-env.com
MACH, RM,
El
Note: No Asbestos-containing Material
AC-1
Identified.
El
This drawing has been altered based on information provided to IHI by the San Francisco VAMC. Some ACM locations have been removed to reflect conditions following asbestos-abatement projects. IHI did not verify any of the modifications. IHI makes no warrantee regarding the accuracy of any of the modifications on this drawing.
I BA-2 I
P E
T U
N N
E L a t L oc a ti o n
A s b e st o s M
I BA-3 I
I BA-4 j
El
I BA-6 I
I BA-5 I
ELEV. PIT
PIPE TUNNEL
El I_J U L1
PIPE TUNNEL
STAIR
STAIR
#14 MACH. RM. MACH. RM.
#7
El
REVISED BY:
ENVIRON AENTAL
1260 45th Street
Emeryville, CA 94608-2907 510.9211661 calif@ihi-env.com
0 10 20'
I BA-18 1
1BA-16B1
IBA-17A1
1 BA-16 I
IBA-17A1 El 1 BA-BA!
1 BA-5 1
I BA-6 1
I BA-17 I
senicenor-sorms elirJ:a-sslAnsmr-mormieromermlair
“1“11,MIELJELJEI -- -1' 1•11_1111111
1 BA-21 .1
II
I
I I I I I I I I
B ld g
F P
S B
E M
L
1 BA-20 1 BA-19 1
BA-1
IBA-21AI
1 BA-13 I
A sb es to s M at er ia l L oc at io n s IBA-16C1
1 BA-37 1 IBA-37A!
S F
V A
M ed ic al
C en te r IBA-21131
R e f er t o S h ee t
136-1413
IBA-14A1
IBA-10A
BA-381
194-1961
113B-130EI I EEL-I
IBA 38BI BUS-1
BA-11 I
IBA-38DI
1 BA-10 1 BA 38AI
IBB-1321
IBB-moAI
1CBA-9C1
I BA-9B .1
1 BA-31 I
1 BA-451
Explanation:
Friji ACM Floor Tile Mastic
1 BA-30 1
1 BA-US!
ACM Vinyl Floor Tile
ACM Vinyl Sheet Flooring Mastic
ACM Vinyl Floor Tile And Mastic
ETil ACM Vinyl Sheet Flooring And Mastic
ACM Ceramic Floor Tile Adhesive And Grout (Assumed)
ACM Carpet Adhesive
— ACM Ceramic Wall Tile, Adhesive, And Grout (Assumed)
ACM Skim Coat on Concrete
ACM Gypsum Wallboard System
ACM Mirror Adhesive (Assumed) (IM ACM Tank Insulation (Assumed)
0 ACM Black Sink Undercoating
K1 /42c;- 1 BA-51 1 I BA-34 1 I BA-49 I
PROJECT No: 09B-2173 SHEET: Bldg203FPSBW ML
This drawing has been altered based on information provided to IHI by the San Francisco VAMC. Some ACM locations have been removed to reflect conditions following asbestos-abatement projects. IHI did not verify any of the modifications. IHI makes no warrantee regarding the accuracy of any of the modifications on this drawing.
DRAWN BY: S. Rahman
01-07-09 DATE:
REVISED BY: Keith
DATE: 12-10-2012
REVISED BY: M. Bishop
DATE: 02-09-15
ROLL-UP DOOR
PROJECT No: 09B-2173 SHEET: Bldg203FPSBE ML
DRAWN BY: S. Rahman
DATE: 03-02-10
REVISED BY: M. Bishop
DATE: 02-09-15
REVISED BY:
DATE:
This drawing has been altered based on information provided to IHI by the San Francisco VAMC. Some ACM locations have been removed to reflect conditions following asbestos-abatement projects. IHI did not verify any of the modifications. IHI makes no warrantee regarding the accuracy of any of the modifications on this drawing.
PIPE
TUNNEL
TO 200
ENVIRON AENTAL
1260 45th Street
Emeryville, CA 94608-2907 510.923.1661 calif@ihi-env.com
S F
V A
M ed ic a l C en te r
A sb es to s M at e ri l
Lo ca t io n s
II II II II II II II I
80-23
CONCRETE PAVING
Explanation:
j_j-F-1 ACM Floor Tile Mastic
ACM Vinyl Floor Tile
ACM Vinyl Sheet Flooring And Mastic
ACM Vinyl Floor Tile And Mastic
ACM Ceramic Floor Tile Adhesive And Grout (Assumed)
ACM Carpet Adhesive
ACM Ceramic Wall Tile, Adhesive, And Grout --- ACM Skim Coat on Concrete
---- ACM Gypsum Wallboard System
ACM Mirror Adhesive (Assumed) 0 ACM Black Sink Undercoating
I 013-30 r k • 16 •
A s b es to s M at er ia l L oc at io n
IBA-l161
1136-1191 1BA-1001
IBA-182l
1 BA-118J
1 BA-1201
MOE'
1 BA-1071
106-1041
1 BA-110
NNL Nt;
• k a\74̀ski
BA-102
IBA-1061
r-i64-8A41
IBA-103l
T o
B u ild in g
IBA-1184
Explanation:
ACM Ceramic Floor Tile Adhesive And Grout (Assumed) ACM Ceramic Wall Tile And Adhesive And Grout (Assumed)
ACM Mirror Adhesive (Assumed)
1BA-1081
Inaccessible
BA-1011
1 CB-4 1
IBA-1131
1 BA-1151
T
0 10' 20' mml
ENVIRONMENTAL
1260 45th S reel
Emeryville, CA 94608-2907 510.923.1661 calit@ihi-enV.com
MEE
Inaccessible
PROJECT No: 09B-2173 SHEET: Bldg208 FPB1 DRAWN BY: S. Rahman
DATE: 10-12-09
REVISED BY:
DATE:
REVISED BY:
VULservehasbestes - OuterOfficeCADIEmeryville \ 2009 09B-2173109B-2173 Bldg 008,012-014,016,018,030.032,033,203,205,208,209.dwg, 208 FPBI ML, 5/11/2010 1:0320 PM, sylviar
Ground Level Roof Level
5' 10'
3 4 2
CORRIDOR
03- jOOl-2
5-
02-1
02-2
106-2 )
"(5
MAIN 104 2
ENTRANCE
_c71
110-1
CV
‘‘S (13
03-3
104-1
Mech 1
Mech 2
1o8-1 )
106-1
105-1 01-I
( 105-3 Y.
D03-1
SF VA Medical Center Building : 021
Ground And Roof Level Asbestos Sample Location ti to
P.
ENVIRONMENTAL
| ii | 1260 45th Street |
| .5 | Emeryville, CA 94608-2907 |
| Z | 510.923.1661 |
calif@ihi-env.com
PROJECT No: 09B-2173
SHEET NO: 1
DRAWN BY: S. Rahman
DATE: 12-01-09
REVIEWED BY:
2 3 4 5 6 7
2 3 4 5 6 7
VA FORM 08-6231
TOILET
11—ti I
STORAGE
I 81 I
462 SF
5'-o• CLG.
STORAGE
I 53 I
452 SF
8'-0' CLG.
°BASEMENT FLOOR PLAN
1/4=1-0
CONSULTANTS: ARCHTECT/ENGINEERS:
DriviriTte
BASEMENT FLOOR PLAN
PreiretTin UPDATE of AUTOCAD FLOOR
PLANS, SPACE FILES
Project tinter 662'14-207 Office of
Construction and Facilities Management
N
110)E s nuilnp Hurter
9 POLYFECH
ASSOCI
glI.TE,FM
S8A4I5 ES
CAL '1916,1
11`,113-MIIU
| Aptrorert ?mixt Ci | Localton |
| %/AMC SAN FRANCISCO | CA 94121 |
Oriern tinter
Dwg 1 of 1
Dote 3.31-2015
Checked
AK
Own
FM
liecticni Cate
TOttEr
IIIIIEFTA
CRAWLSPACE
- I
126 SF
I. •
ACE
SF
CRAWLSPACE
SF
I
COMMON
2084 SF
BASEMENT
GROSS
2084 SF
cum E
16'
CRAVIISPACE
126 SF
I
| 4 | 5 | |
| 6 | 7 |
8 I 9
1-4
Too-Er 10101
35 SF
8'-0* CLG
TO
35 SF
CRAWLS PACE
CLOSET
CRAWLSPACE
I 83 I
[ BB I
127 SF
26 SF
120 SF
5-0 CLG
CRAWLSPACE
310 SF
STORAGE
I 02 I
447 SF
13?-0' CLG.
STORAGE
E03:1
440 SF
LP
CRAM-SPACE
I 97 I
310 SF
(--.BASEMENT FLOOR PLAN
1 / 4"=1'-o- 0 2' 4' a' IN
TNROU
NOV
_ CONSULTANTS: ARCHITECT/ENGINEERS:
Dritwig The
BASEMENT FLOOR PLAN
Project TO, UPDATE of AUTOCAD FLOOR Pro ject Meter
662-/4-2°7 Office of Construction and Facilities Management cr ' 1,, c.°A, p. D
...1r.". D 11 0
PLAN MEBE ,KEY
PLANS SPACE FILES , Duklig Miler
POLYTECH
ASSOCI ATES
INC
'''.114.64 us MAE ne m lf.1r G,140,2,1,04.
TIMB:11g
Approved Prefect Diecior locerrn
910 SA CA 94121 ,4N FRAWISCO
Drniq Maw
- _ Deo
- 3-312015
Cteeked
Ax
Celem
11%4 Dr5}1 ol 3 s Do.
VA FORM 08-5231
2 3
/22.1
0 ELECTROL
ROM
DOEI
BASEMENT NOT ACCESSIBLE AT TIME OF
SURVEY
MJIG51011
toup•orr u--'
E
4 I 5 I 6 I 7
TRUE
NORTH
°BASEMENT FLOOR PLAN
Scata As Noted
CONSULTANTS: ARCH TECT/ENGINEERS:
Drbriv Tbe
BASEMENT FLOOR FLAN
?robot Toe
UPDATE of AUTOCAD FLOOR PLANS and SPACE FILES
Prcied 944121
66 "4-207 Office of Construction and Facilities Management
N s
• STAMPS MO LIM 121Ar.,1012011 HIV.,,, Dukfrg Nurber
Approved Project Di-ecior Locefen
VAMO SAN FRAMISOD CA 94121
Draft limber
DP31 429
bele
3-31-2015
Shocked
LAP
Drawn
LAP lierebne Defe
VA FORM 0E1-5231
(3
| TA' 32' 0 | 4' | El' °GROUND FLOOR PLAN |
| 1 | I'-o° |
2 3 4 6 7
VA FORM 08-6231
MECH.
ROOM
22.5 SF
ELEC.
ROOM
22.5 SF
ANIMAL
QUARTERS
lMSSF
CLG
ANIMAL
OVARTER5
190 SF
CEO
ANIMAL
QUARTERS
190 SF
CLG
ANALAL
QUARTERS
1 4 I
7.W., SAC
OR1.2,
I0C11
190 5F
STORAGE
I 1 7-9' 0.G
434 SF
STORAGE
1 5 1
7"-9" CLO
290 5F
Scab:As Noted
CONSULTANTS: ARCHITECT/ENGINEERS: Office of trilliNi TO
GROUND FLOOR PLAN
ifickeci Tde
UPDATE of AUTOCAD FLOOR
PLANS, SPACE FILES
Proiect tinter 602-14-207
Construction and Facilities Management e '3344,.?4,4r. „D
—JIn 1 01: E tl
| 0 | ° | TE |
| REY_FLAR | s |
larj..18,28 asaiTli, Metro Nurrixs"
>as to lk mo, °"'" POLYFECH
ASSOCIATES
INC ARX0Y03 PKOCI Dirwter Locelico
VAMC SAN FRANCISCO CA 94121
Craft Renter
Checked Drain rD-.3:1-2015 AK ACA Dsql se I IGR0ct Dale
U
2 3 4 5 7 8 9
Sr-ale: As Noted
OBASEMENT FLOOR PLAN — BLDG. 203
2 4 5 6 7 9
VA FORM 08-6231
TRUE
NORTH
CONSULTANTS: ARCHITECT/ENGINEERS:
OrteirOge
BASEMENT FLOOR PLAN
FrOxi TI39
UPDATE OF AUTOCAD FLOOR
PLANS + SPACE FILES
Project Aster
662-14-207 Office of Construction and Facilities Management
N ri rt., ° -SSTA....5 ME MO 13.4,0,535011 1....IN
Buldn9 131arber
4wo934 PrcIeol Dieclor
VAPAHCS FLAMM AM 1343314331W
1.999209
WAG SFOI FRANCISCO CA 94121
Draito tinter
| GS201 | |
| Dwg. 2 | o39 |
N 13 g 0E KEY PLAN 5
| We | Ctoded | Crum |
| 3-31-2015 | ARK | LAP Reyklonc Dnle |
2 3 4 5 7
VA FORM 08-6231
2 3 4 5 6 7 9
:5
P
M V i
-IA
SF
C
FA
R
IA
J
A A
°if
VP E 0 4' 8' 6' 32' W
°BASEMENT FLOOR PLAN — BLDG. 208
RUE
'ORM k OBASEMENT FLOOR PLAN — BLDG 208 — MATCHLINE C—C
4' 8' 16' 32' W
Scott, As Noted
CONSULTANTS: ARCHITECT/ ENGINEERS:
Draft Me
BASEMENT FLOOR PLAN
Prciecrifee
UPDATE OF AUTOCAD FLOOR
PfYloof faster
662-44-207 Office of Construction and Facilities Management
M =; :.' '...',‘' A:• -•:. .
cull:
cin U°n o CI N
KEY PLAN 11031E
PLANS AND SPACE FILES mac Minter
POLYFECH
ASSOCIATES
INC
C TOR
/as MI soder t 71" H il00 It
SAN I.J.S.
C4.0...94101
MilirAillg seeweteteto
App-oroct Project Di
YAPAHCS FLAMM AND ENGIN/36RM
LoosEc0
MAC BAN FRANC16103 CA 94121
CIIRITQ timber
Ode
3-31-2015
(=hooked
Ax Dram
JM
GS201
Doff.1 of 4 ReMono s Bile
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 |
| Page 11 |
| Page 12 |
| Page 13 |
File details come from the government source that posted it.