Attachment 5 - Task Order Pricing.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Z1DA--SATOC IDIQ Construction Contract Base Plus 4: Roseburg
Solicitation number
36C26026R0048
Issued by

About this file

This is a Task Order Pricing template for construction work under a VA SATOC (Simplified Acquisition Task Order Contract) IDIQ contract. The form is designed for the prime contractor to submit pricing for the Roseburg Health Care System project (Project No. 653) located within the Department of Veterans Affairs Veterans Health Administration. The template provides a structured format for documenting costs associated with proposed construction task orders, including sections for subcontractor proposals, prime contractor fees calculated on tiered brackets (first $20,000, next $30,000, and balance over $50,000), and direct costs for labor, materials, and equipment rental. The pricing structure incorporates overhead and profit calculations applied to the direct costs using the same tiered bracket methodology, along with insurance, taxes, and equipment taxes. The form requires identification of the contract number, prime contractor name, work description, and proposal request number, with columns designated for omitted work (credits) and added work (costs). The document includes a note indicating the sheet is password-protected with the password "va" for the VA system user "vhalonmachc." This is a blank template with all cost fields showing $0, indicating it has not yet been completed with actual pricing data for a specific task order.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-3385a - For Prime Contractor Department of Veterans Affairs vhalonmachc: Password to Unprotect Sheet: va

CONSTRUCTION SATOC ORDER COST SUMMARY

(PRIME CONTRACTOR)

PROJECT NO.PROJECT NAME
653 SATOC
PROJECT LOCATION
Roseburg Health Care System
CONTRACT NO.NAME OF PRIME CONTRACTOR

DESCRIPTION OF WORK

PROPOSAL REQUEST NO. VA PROCEED ORDER NO. VA CHANGE ORDER NO.

LINE
NO.ITEM
(A)OMITTED WORK (CREDIT)
(B)ADDED WORK (COST)

(C)

1ASUBCONTRACTOR PROPOSAL
$ - 0
1B$ - 0$ - 0
1C
1D
1E$ - 0$ - 0
2TOTAL ►$ - 0$ - 0
2.5NET COST (Line 2, Col.C - Col.B) ►$ - 0
3APRIME CONTRACTOR FEEON FIRST $20,000$ - 0$ - 0
3BON NEXT $30,000$ - 0$ - 0
3CON BALANCE OVER $50,000$ - 0$ - 0
4TOTAL SUBCONTRACTOR COST ►$ - 0$ - 0
5PRIME CONTRACTOR DIRECT LABOR
6PRIME CONTRACTOR DIRECT MATERIAL$ - 0
7PRIME CONTRACTOR EQUIPMENT RENTAL$ - 0$ - 0
8TOTAL DIRECT COST ►$ - 0$ - 0
9NET DIRECT COST (Line 8, Col.C - Col.B) ►$ - 0
10ADIRECT OVERHEADON FIRST $20,000$ - 0(Line 8)$ - 0
10BON NEXT $30,000$ - 0(Line 8)$ - 0
10CON BALANCE OVER $50,000$ - 0(Line 8)$ - 0
11APROFITON FIRST $20,000$ - 0(Line 8)$ - 0
11BON NEXT $30,000$ - 0(Line 8)$ - 0
11CON BALANCE OVER $50,000$ - 0(Line 8)$ - 0
12INSURANCE AND TAXES(Line 5)$ - 0$ - 0
13TAXES ON MATERIAL AND EQUIPMENT(Line 6 and 7)$ - 0$ - 0
14TOTAL PRIME CONTRACTOR COST ►$ - 0$ - 0
15TOTAL PRIME + SUBCONTRACTOR COST (Line 4 + 14) ►$ - 0$ - 0
16TOTAL SATOC ORDER COST (Column B, line 15 + Column C, line 15) ►$ - 0
ESTIMATORDATE

File details come from the government source that posted it. Updated .