36C26026R0048 0001.docx

DOCX document 30 KB Posted

Attached to
Z1DA--SATOC IDIQ Construction Contract Base Plus 4: Roseburg
Solicitation number
36C26026R0048
Issued by

About this file

This is Amendment 0001 to the solicitation for the 653 SATOC IDIQ Construction Contract Base Plus 4 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20, National Contracting Office located in Vancouver, Washington. The amendment was issued on April 24, 2026, and serves to disseminate site visit sign-in sheets from April 13, 2026, and questions and answers received from interested parties. The Government has made several substantive changes to the original solicitation, including updates to Statement of Work 653 SATOC reflecting revised task order ordering procedures, updates to proposal instructions and requirements, addition of drawings and specifications for the seed project, and addition of task order pricing correlating with the updated proposal instructions. The amendment extends the RFP due date to May 15, 2026, at 12:00 PM Pacific Time. Offerors must acknowledge receipt of this amendment prior to the submission deadline through completion of items on the form, acknowledgment on each copy of the offer submitted, or separate letter or electronic communication referencing the solicitation and amendment number. All other terms and conditions of the original solicitation remain in full force and effect.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26026R0048 Amendment 0001

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-24 -2026

SATOC 2025

36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 To all Offerors/Bidders

36C26026R0048 04-01-2026

X X X X 653 SATOC, Roseburg VAMC See continuation page for full details of this Amendment.

SF30 Block 14, Continuation:

1. The purpose of the amendment is to:

a. Disseminate the sign-in sheets from the site visit held on 4/13/2026. See Attachment 6.

b. Disseminate all questions and answers received from interested parties relevant to the solicitation. See Attachment 7.

2. The Government has determined the following changes to the subject solicitation are in its best interest and supersede prior documentation issued relative to the same.

a. Updated SOW 653 SATOC to reflect updated task order Ordering procedures. All changes are in red. See Attachment 1.

b. Updated Proposal Instructions and Requirements – all changes are in red. See Attachment 2.

c. Add drawings and specifications for the seed project. See Attachments 3 and 4.

d. Add Attachment 5 – Task Order pricing to correlate with the updated Proposal Instructions and Requirements.

3. The RFP due date has been extended to May 15, 2026 by 12:00PM Pacific.

4. All other terms and conditions of the original solicitation remain in full force and effect.

Attachments:

See attached document: Attachment 1 - SOW 653 SATOC 4.9.26.

See attached document: Attachment 2 - Proposal Materials and Instructions 4.7.26.

See attached document: Attachment 3 - SATOC Seed Project Combined Drawings.

See attached document: Attachment 4 - SATOC Seed Project Combined Specifications.

See attached document: Attachment 5 - Task Order Pricing.

See attached document: Attachment 6 - Sign In sheet.

See attached document: Attachment 7 - 653 SATOC RFI.

See attached document: Attachment 8 - SOW - SATOC Seed Project 4.20.26.

File details come from the government source that posted it. Updated .