Attachment 10 - RFI list.docx

DOCX document 16 KB Posted

Attached to
Y1DA--CON NRM 668-21-102 UPGRADE AHU-1/4 Mechanical Systems - SBA
Solicitation number
36C26024R0106
Issued by

About this file

This document is a Request for Information (RFI) related to Solicitation Number 36C26024R0106 for the 668-21-102 Upgrade AHU-1 and AHU-4 Mechanical Systems project issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

The RFI addresses several key details about the project, including inquiries about an asbestos survey, asbestos abatement quantities and locations, potential impacts to the project timeline due to longer than expected air handling unit lead times, and the need for temporary air service during the upgrades. The RFI also seeks clarification on any preferred work sequencing or phasing. The solicitation indicates a 214 calendar day period of performance from the notice to proceed, though the RFI raises concerns about whether this timeline will need to be extended to allow for the air handling unit manufacturing and installation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26024R0106 668-21-102 Upgrade AHU-1 and AHU-4 Mechanical Systems RFI List

1. On Drawing Sheet GI101, Sheet Note 1 mentions an Asbestos Survey was performed, with updated information from 2021. Please advise if this survey data will be available for viewing to bidding contractors, as part of the solicitation documents. All available reports are provided (attached)

1. Specification 02 82 11 / Para 1.1.B.2 lists quantities for Asbestos Abatement. Please clarify if these quantities are within Rooms A017B and C005A. Please advise where the quantified asbestos items in the specifications are located on the drawings and if abatement drawings will be provided for bidding. Bid in accordance with Drawing GI101 and Specification section 02 82 11.

1. If asbestos containing materials beyond the indicated quantities (more than 10%) listed in Spec 02 82 11 / Para 1.1.B.2 are found to be present, where ACM removal is first required before proceeding with the other scope of work illustrated, please clarify how the contractor is to proceed. If the abatement activities are in the critical path, and must occur before progressing on the project, please advise if the VA will extend the contract completion date. Follow contract requirements regarding Requests for Information and Change Order procedures. Reasonable accommodation will be considered.

1. The solicitation documents indicate a completion period of 214 calendar days from the notice to proceed. The basis of design Air Handling Unit manufacturer is indicating a lead time of 20-30 weeks (140-210 days) for manufacturing the units. Please advise when the NTP is intended to be issued. Please advise if the contract completion period for the project will be extended to allow enough time for the manufacturing and installation of the Air Handling Units as needed. Follow contract requirements regarding Requests for Information and Change Order procedures. Reasonable accommodation will be considered.

1. Please advise if the VA has any phasing or preferred sequencing of work on the Air Handling Units. None currently identified.

1. Please clarify if one or both Air Handling Units are required to have temporary air service while the unit is being replaced. Some method of maintaining healthy work conditions for kitchen and scullery workers shall be provided.

· Please advise the name of the Fire Alarm contractor servicing the VA. Fire Systems West