This document is a Price Schedule Breakdown for the "Upgrade Boiler System, Building 944" project at the Anchorage VA Medical Center. It provides detailed pricing instructions and a line-item price breakdown for the project, which is structured according to the Construction Specification Institute (CSI) divisions. The pricing breakdown includes categories such as General Requirements, HVAC, Plumbing, and Electrical, among others. The document specifies that the pricing is fixed-price, and that field office overhead and general conditions will be applied only once to the contract and any changes. It also provides instructions for completing the Price Schedule Breakdown, including calculating subtotals and the contract total, as well as requirements for mobilization/demobilization, insurance/bonds, taxes/fees, and O&M manuals. The related federal contract opportunity is for Solicitation Number 36C26024R0097, titled "Z1FZ--Service 463-24-LUMPSUM 944 Boiler Replacement", issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - 944 Boiler SOW Rev. 01, 17-18-2024.docx | DOCX document | |
| 36C26024R0097 0004.docx | DOCX document | |
| 36C26024R0097 0003.docx | DOCX document | |
| 36C26024R0097 0002.docx | DOCX document | |
| SOLICITATION-DESCRIPTION white text.docx | DOCX document | |
| 36C26024R0097 0001.docx | DOCX document | |
| Attachment 2 - Wage Determination Anchorage County 6.14.2024.txt | TXT text file | |
| Attachment 4 - Contractor Rules of Behavior.pdf | ||
| Attachment 1 - SOW 944 Boiler 6-11-2024.docx | DOCX document | |
| 36C26024R0097.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| RFQ: 463-24-LUMPSUM |
Project Number / Title: Upgrade Boiler System, Building 944 Project Location: Anchoage VA Medical Center
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | ||
| Division 2 Existing Conditions | ||
| Division 3 Concrete | ||
| Division 4 Masonry | ||
| Division 5 Metals | ||
| Division 6 Woods, Plastic and Composites | ||
| Division 7 Thermal and Moisture Protection | ||
| Division 8 Openings | ||
| Division 9 Finishes | ||
| Division 10 Specialties | ||
| Division 11 Equipment | ||
| Division 12 Furnishings | ||
| Division 13 Special Construction | ||
| Division 14 Conveying Equipment | ||
| Division 21 Fire Suppression | ||
| Division 22 Plumbing | ||
| Division 23 HVAC | ||
| Division 25 Integrated Automation | ||
| Divison 26 Electrical | ||
| Division 27 Communications | ||
| Divison 28 Electronic Safety and Security | ||
| Division 31 Earthwork | ||
| Division 32 Exterior Improvements | ||
| Division Item 33 Utilities |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | ||
| Insurance / Bonds | ||
| Taxes / Other Fees (provide itemized list) | ||
| O&M Manuals and Red Line Drawings | ||
| Overhead | Rate _______% | |
| Overhead (daily rate) | Per Day $0.00 | |
| SubContract Mark-Up | Rate _______% | |
| Profit | Rate _______% | |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00