This document is an amendment to Solicitation 36C26024R0097 for the Upgrade Boiler System, Bldg. 944 project at the Anchorage VA Medical Center.

The key details are:

  • The purpose of the amendment is to establish evaluation factors for the basis of award, including price and technical/management approach. Both factors are of approximately equal importance.
  • Contractors must provide a technical and management approach demonstrating how the requirements will be met, including transition-in, staffing, training, methodology, and quality assurance.
  • The proposal due date has been extended to July 22, 2024 at 8:00am PST.
  • The contracting agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20.

View the file

Other files

File Type Posted
Attachment 1 - 944 Boiler SOW Rev. 01, 17-18-2024.docx DOCX document
36C26024R0097 0004.docx DOCX document
36C26024R0097 0002.docx DOCX document
SOLICITATION-DESCRIPTION white text.docx DOCX document
36C26024R0097 0001.docx DOCX document
Attachment 2 - Wage Determination Anchorage County 6.14.2024.txt TXT text file
Attachment 3 - Divisional Price Breakout.xlsx XLSX spreadsheet
Attachment 4 - Contractor Rules of Behavior.pdf PDF
Attachment 1 - SOW 944 Boiler 6-11-2024.docx DOCX document
36C26024R0097.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

463-24-LUMPSUM

36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 To all Offerors/Bidders

36C26024R0097 06-26-2024

X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: July 22, 2024, 8:00am PST

Project Title: Upgrade Boiler System, Bldg. 944 Project Location: Anchorage VA Medical Center, Anchorage AK

See Continuation page for details of this amendment.

Susan Howe Contracting Officer 36C26024R0097, Amendment 0003

CONTINUATION PAGE

It has been determined necessary and in the best interest of the Government to make the following clarifications/revisions to solicitation 36C26024R0097.

1. The purpose of this amendment is to establish evaluation factors for the basis of award of this project by adding the following to the solicitation:

EVALUATION FACTORS

Price: The total project price will be evaluated of its value to the Government.

Technical and Management Approach: The Government will evaluate the degree to which the technical and management approach demonstrates a thorough understanding of the requirements and provides a viable plan and means for successful completion, including transition-in, staffing, training, methodology for completion of the work, and quality assurance procedures.

Technical Capability Submission Instructions: The contractor shall provide a Technical and Management Approach clearly demonstrating how the Government’s requirement will be met. This section shall address: transition-in, staffing, training, methodology for completion of the work, and quality assurance procedures.

Both Evaluation Factors are of approximately equal relative importance.

2. This amendment also extends the proposal due date to July 22, 2024 8:00am PST.