Attachment 1 - SOW 944 Boiler 6-11-2024.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C26024R0097
About this file
This document is a Request for Proposal (RFP) for contractor services to replace the 944 boiler located in Anchorage, Alaska. The project involves the removal and disposal of the current boiler and the installation of a new cast iron boiler with a minimum net output of 199 MBH. The contractor is responsible for the demolition, disposal, and replacement of the boiler, expansion tank, pump, flue, zone valves, piping header, and other appurtenances. The contractor must provide submittals for review and approval prior to purchasing any major equipment and is required to provide a project schedule and daily updates. The contractor will be responsible for a 1-year warranty on the system and installation. The period of performance is 60 days. The related federal contract opportunity is Solicitation Number 36C26024R0097, with the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20 as the federal agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - 944 Boiler SOW Rev. 01, 17-18-2024.docx | DOCX document | |
| 36C26024R0097 0004.docx | DOCX document | |
| 36C26024R0097 0003.docx | DOCX document | |
| 36C26024R0097 0002.docx | DOCX document | |
| SOLICITATION-DESCRIPTION white text.docx | DOCX document | |
| 36C26024R0097 0001.docx | DOCX document | |
| Attachment 2 - Wage Determination Anchorage County 6.14.2024.txt | TXT text file | |
| Attachment 3 - Divisional Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 4 - Contractor Rules of Behavior.pdf | ||
| 36C26024R0097.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL FOR CONTRACTOR SERVICES
Project No. 463-24-LUMPSUM
REPLACE 944 BOILER
Upgrade boiler system located at 944 East 12th Ave., Anchorage, Alaska 99501
OVERVIEW
Remove and dispose of current boiler. Provide Hydronic plumbing services to replace the existing cast iron boiler with a new cast iron boiler sized for a minimum of 199 MBH net output. Contractor is responsible for demolition, disposal, and replacement of the boiler, expansion tank, pump, flue, zone valves, piping header and appurtenances. All new equipment must be installed per manufacturers’ recommendations. Existing flue is joined with water heater and should be reused for new boiler.
The contractor is required to provide submittals for review and approval, prior to purchasing any major equipment for the project. Submittals should include the boiler, expansion tank, pump, Natural Gas Piping, Hydronic piping, piping joints for all types, solder, flux, ball valves, check valves, strainers, zone valves, visual pressure/temperature gauges, condensate neutralizer, flue system and any other necessary appurtenances. The contractor will be required to provide a project schedule, and daily updates as work proceeds. Contractor will be responsible for 1 yr warranty on system and system install.
Period of Performance is 60 days.