This document is an amendment to Solicitation 36C26024R0097 for the project to Upgrade the Boiler System in Building 944 at the Anchorage VA Medical Center in Anchorage, AK.
The key details are:
- The proposal due date has been extended to July 17, 2024 at 12:00pm PST.
- The existing glycol boiler system must be matched, and the glycol make-up tank must be replaced. The contractor can relocate the boiler within the room for easier installation and maintenance.
- The flue replacement is only required from the existing tee to the boiler, and a flue submittal is not necessary.
- The condensate neutralizer has been removed from the scope of work.
This amendment replaces the previous Amendment 0001, which did not post properly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - 944 Boiler SOW Rev. 01, 17-18-2024.docx | DOCX document | |
| 36C26024R0097 0004.docx | DOCX document | |
| 36C26024R0097 0003.docx | DOCX document | |
| SOLICITATION-DESCRIPTION white text.docx | DOCX document | |
| 36C26024R0097 0001.docx | DOCX document | |
| Attachment 2 - Wage Determination Anchorage County 6.14.2024.txt | TXT text file | |
| Attachment 3 - Divisional Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 4 - Contractor Rules of Behavior.pdf | ||
| Attachment 1 - SOW 944 Boiler 6-11-2024.docx | DOCX document | |
| 36C26024R0097.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
463-24-LUMPSUM
36C260 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver
WA
98661 36C260 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver
WA
98661 To all Offerors/Bidders
36C26024R0097 06-26-2024
X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
Project Title: Upgrade Boiler System, Bldg. 944 Project Location: Anchorage VA Medical Center, Anchorage AK
See Continuation page for details of this amendment.
This amendment replaces amendment 0001 as it did not post properly.
Susan Howe Contracting Officer
CONTINUATION PAGE
36C26024R0097, Amendment 0002
It has been determined necessary and in the best interest of the Government to make the following clarifications/revisions to solicitation 36C26020Q0015.
I. The proposal due date is extended to July 17, 2024, 12:00pm, PST.
II. Questions and Answers:
1. Q: The existing boiler is glycol. Do you want the replacement boiler to be a glycol or a water boiler, like the one in the adjacent tenement? There were past discussions of matching the two boilers for service and maintenance efficiency. If it is decided to match boilers, can you provide the data for the other boiler.
A: Match existing glycol system. This project is independent of other properties.
1. Q: The location of the existing boiler makes it difficult to replace and service. Can the boiler be relocated within the room for ease of installation and maintenance?
A: Yes, the boiler can be relocated for ease of access and maintenance. Coordinate with VA FMS prior to final location determination.
1. Q: Please confirm the intent of the flue replacement is from the existing tee to the boiler.
A: Confirmed. A flue submittal is not necessary.
1. Q: Please confirm that the existing glycol make up tank is to be reused.
A: Replace existing Glycol tank and provide a submittal for review prior to work. Eliminate condensate neutralizer from scope of work.
36C26024R0097, Amendment 0001
It has been determined necessary and in the best interest of the Government to make the following clarifications/revisions to solicitation 36C26020Q0015.
Questions and Answers:
1. Q: The existing boiler is glycol. Do you want the replacement boiler to be a glycol or a water boiler, like the one in the adjacent tenement? There were past discussions of matching the two boilers for service and maintenance efficiency. If it is decided to match boilers, can you provide the data for the other boiler.
A: Match existing glycol system. This project is independent of other properties.
1. Q: The location of the existing boiler makes it difficult to replace and service. Can the boiler be relocated within the room for ease of installation and maintenance?
A: Yes, the boiler can be relocated for ease of access and maintenance. Coordinate with VA FMS prior to final location determination.
1. Q: Please confirm the intent of the flue replacement is from the existing tee to the boiler.
A: Confirmed. A flue submittal is not necessary.
1. Q: Please confirm that the existing glycol make up tank is to be reused.
A: Replace existing Glycol tank and provide a submittal for review prior to work. Eliminate condensate neutralizer from scope of work.