This document is an amendment to solicitation 36C26023R0017 for the replacement of doors at various locations. The purpose of the amendment is to provide answers to remaining questions received by the deadline. Clarification is given that doors and adjoining areas at locations 3 and 5 are to be clear anodized as specified. Additionally, confirmation is provided that attachment 4 from a previous amendment remains the original version and was incorrectly listed in the amendment index. The related federal contract opportunity shows this is solicitation number 36C26023R0017 for project Y1DA-653-21-104 to replace doors 3, issued by the Department of Veterans Affairs Veterans Health Administration VISN 20. The response deadline and additional details are not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2- 653-21-104 Specs Book Revision 2 - Revised Section 08 71 00 only.pdf | ||
| 36C26023R0017 0004.docx | DOCX document | |
| Attachment 3 Replace Doors 3 Schedule Revision 1.pdf | ||
| Attachment 2- 653-21-104 Specs Book Revision 1 - Revised Section 01 00 00 only.pdf | ||
| 36C26023R0017 0002.docx | DOCX document | |
| Attachment 5 653-21-104 Replace Doors 3 Site Plan.pdf | ||
| Attachment 1 653-21-104 SOW Replace Doors 3 Revision 1.pdf | ||
| 36C26023R0017 0001.docx | DOCX document | |
| Attachment 4 Wage Determination OR20230036 6.02.2023.pdf | ||
| Attachment 2- 653-21-104 Specs Book.pdf | ||
| Attachment 3 Replace Doors 3 Schedule.pdf | ||
| Attachment 1 - 653-21-104 SOW Replace Doors 3.pdf | ||
| 36C26023R0017.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 653-21-104 36C260 NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
To all Offerors/Bidders
36C26023R0017 06-30-2023
X x x x The purpose of this amendment is to provide answers to remaining questions received by the questions submission deadline for this solicitation.
See continuation page for details.
Karen Rhodes
CONTINUATION PAGE
Question: At Door 5, door/transom/sidelights are white, as is interior entry and section of curtainwall which adjoins at the corner. I believe specs are calling for clear anodized. Is that correct?
Answer: Clear anodized is correct.
Question: Door 3, currently white. Confirm going to clear anodized.
Answer: Clear anodized is correct.
Question: Company has noticed that there may be an attachment (#4) missing from the Amendment posted 7-19-23 (Company identifying information removed)
Answer: No. Attachment 4 remains the version provided in the original posting, so was not attached again in amendment 002. For clarity, attachment 4 was skipped in the list for amendment 002 as a result.