36C26023R0017 0002.docx
DOCX document 1 MB Posted
- Attached to
- Y1DA--653-21-104 Replace Doors 3 Federal contract opportunity
- Solicitation number
- 36C26023R0017
About this file
This document is an amendment to a solicitation for replacing doors at a Department of Veterans Affairs facility. The amendment provides revisions to specifications, schedules, and site plans attached as numbered attachments. It answers questions received, clarifying that doors 10, 11, 12, and 13 are all within scope. Subcontracting limitations require at least 85% of work to be performed by SDVOSBs and VOSBs. The related solicitation is for project Y1DA-653-21-104 to replace three doors at a Veterans Health Administration location under Veterans Integrated Service Network 20. Responses are due by June 30, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2- 653-21-104 Specs Book Revision 2 - Revised Section 08 71 00 only.pdf | ||
| 36C26023R0017 0004.docx | DOCX document | |
| 36C26023R0017 0003.docx | DOCX document | |
| Attachment 3 Replace Doors 3 Schedule Revision 1.pdf | ||
| Attachment 2- 653-21-104 Specs Book Revision 1 - Revised Section 01 00 00 only.pdf | ||
| Attachment 5 653-21-104 Replace Doors 3 Site Plan.pdf | ||
| Attachment 1 653-21-104 SOW Replace Doors 3 Revision 1.pdf | ||
| 36C26023R0017 0001.docx | DOCX document | |
| Attachment 3 Replace Doors 3 Schedule.pdf | ||
| Attachment 1 - 653-21-104 SOW Replace Doors 3.pdf | ||
| 36C26023R0017.docx | DOCX document | |
| Attachment 4 Wage Determination OR20230036 6.02.2023.pdf | ||
| Attachment 2- 653-21-104 Specs Book.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 653-21-104 36C260 NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 To all Offerors/Bidders
36C26023R0017 06-30-2023
X x x x The purpose of this amendment to the solicitation is as follows:
1- Provide revisions to the attached documents. The documents attached to this amendment supersede versions previously provided for this solicitation and adds Attachment 5.
2- Provide answers to more questions received.
See continuation page(s) and attachments for more details.
Karen Rhodes
CONTINUATION PAGE
1. Question: On the job-walk it was mentioned that Door No’s. 11,12 and 13 being demo’d and infilled with windows might get removed from scope of work. Will there be an amendment coming out to clarify if these are staying or being removed from the scope of the project.
Answer: Please see the contents of this amendment, amendment 0002.
2. On the job-walk it was mentioned that Door No. 10 has already been replaced and might get removed from scope of work on this project. Will there be an amendment coming out to clarify if this door needs replaced still. Also, there was some confusion on the drawings/map if we were looking at the correct door or not. Please clarify.
Answer: Please see the contents of this amendment, amendment 0002.
3. On page 42 and page 43 of the solicitation the verbiage indicates that supplies/products, general construction, special trade construction contractors, and subcontractors need to meet the SDVOSB percentage requirements, but on page 44 these requirements are brought up again, but the boxes are not checked. Being the boxes are not checked, we are under the impression that subcontractors, special trade construction contractors and suppliers do not need to be SDVOSB or certified VOSB. Also, this would eliminate us from filling out certification on page 45. Please advise if we are interpreting this information correctly.
Answer: Please see pages 3 and 4 of this amendment for clarification.
4.17 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)
(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—
(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.]
(i) [ ] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.
(ii) [X ] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(iii) [ ] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.
(3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:
(i) Referral to the VA Suspension and Debarment Committee;
(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and
(iii) Prosecution for violating 18 U.S.C. 1001.
(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.
(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.
(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.
Certification:
I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].
Printed Name of Signee: ________________________________________ Printed Title of Signee: _________________________________________ Signature: ___________________________________________________ Date: _____________________ Company Name and Address: ______________________________________ (End of Clause)
SITE VISIT SIGN IN LOG AND NOTES TAKEN DURING SITE VISIT BY FACILITY
See attached document: Attachment 1 653-21-104 SOW Replace Doors 3 Revision 1.
See attached document: Attachment 2- 653-21-104 Specs Book Revision 1 - Revised Section 01 00 00 only.
See attached document: Attachment 3 Replace Doors 3 Schedule Revision 1.
See attached document: Attachment 5 653-21-104 Replace Doors 3 Site Plan.
image1.jpeg
File details come from the government source that posted it. Updated .