Triennial Electrical Testing - Additional Questions and Answers 7-23-26.pdf.docx

DOCX document 17 KB Posted

Attached to
H261--Triennial Electrical Testing Federal contract opportunity
Solicitation number
36C25926Q0605
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This is a Questions and Answers document providing clarifications on the scope and testing requirements for a Triennial Electrical Testing solicitation at the Rocky Mountain Regional VA Medical Center. The document addresses ambiguities regarding Line Item 0010 (Metering and Instrumentation), confirming that the stated quantity of 107 devices represents the combined total of complete CT/PT sets and metering locations to be inspected and tested. Specifically, this includes 98 meters (31 in substations and 67 in Automatic Transfer Switches), 41 three-phase PT sets (10 in Power Supply Groups/Automatic Transfer Operations and 31 in substations), and 98 three-phase CT sets (67 from ATSs and 31 from substations). The document also clarifies that full NETA testing is not required for this solicitation; however, primary current injection testing is mandatory.

The solicitation, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19, is a small business set-aside (100% set-aside) Request for Quote for commercial services under NAICS code 541350 (Building Inspection Services) with a $11.5 million business size standard. The original question deadline was July 13, 2026, with quote submissions due by email no later than 10:00 AM MT on July 22, 2026. Following this Questions and Answers amendment, the quote deadline was extended to July 28, 2026 at 10:00 AM MT. The government anticipates awarding a firm-fixed price contract resulting from this solicitation and reserves the right to make award solely on initial quotes received.

View the file

Other files for this federal contract opportunity

Other files attached to H261--Triennial Electrical Testing, newest first.
File Type Posted
36C25926Q0605 0002.docx DOCX document
36C25926Q0605 0001.docx DOCX document
Triennial Electrical Testing - Questions and Answers.docx DOCX document
480V Cutoff.pdf PDF
Elect One Line 11x17_2024-04-29.pdf PDF
Statement of Work - Electrical Testing - 07-01-2026.docx DOCX document
Department of Labor Wage Determination - 2015-5419 Rev 32 - 05-13-2026.pdf PDF
36C25926Q0605.docx DOCX document
Conduct Campuswide Electrical Coordination Study.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 10 regarding Line Item 0010 - Metering and Instrumentation.

Based on the quantities provided, we understand the scope to include:

· Meters: 31 in substations and 67 in ATSs, for a total of 98

· PTs: 10 in PSG/ATO and 31 in substations, for a total of 41

· CTs: 67 sets from ATSs and 31 sets from substations, for a total of 98 sets However, these quantities do not appear to correspond with the line-item quantity of 107 devices. To ensure that we accurately understand and price the scope, please clarify the following:

1. Does the quantity of 107 represent individual physical devices, complete CT/PT sets, metering locations, or another unit of measure?

Answer: complete CT/PT sets and metering locations

1. Does each CT “set” represent one complete three-phase set consisting of three individual CTs at one metering location?

Answer: Yes

1. Are the 41 PTs individual transformers, three-phase PT sets, or PT installation locations?

Answer: Three-phase PT sets

1. Please confirm the total number of meters, CT sets, and PTs to be inspected and tested under Line Item 0010 and explain how these quantities reconcile with the stated total of 107.

Answer:107 is the total of all the CT sets, PT Sets, and meters we want tested

Questions regarding the solicitation:

1. Is full NETA testing required for this solicitation?

Answer: No

1. Is primary current injection testing required for this solicitation?

Answer: Yes