36C25925R0112.docx
DOCX document 348 KB Posted
- Attached to
- Z2DA--OKC Replace Exterior Utility Lines Project 623-24-101 Posted 9-17-25 Closes 10-08-25
- Solicitation number
- 36C25925R0112
About this file
This document is a federal solicitation (Request for Proposal) for a construction project at the Jack C. Montgomery Veteran's Affairs Medical Center in Muskogee, Oklahoma. The project, numbered 623-24-101, involves replacing exterior utility lines to create separate fire protection and domestic water loops, addressing Legionella prevention concerns. The contract is a 100% service-disabled veteran-owned small business (SDVOSB) set-aside with a project magnitude between $2,000,000 and $5,000,000.
Key details include a non-mandatory pre-bid site visit scheduled for November 12, 2025, at 2:00 PM CT, with proposals due by December 3, 2025, at 2:00 PM CT. The construction period is 940 calendar days from notice to proceed, with performance dates from March 2, 2026, to September 27, 2028. The work requires replacing all exterior site water lines, creating new fire hydrants, removing existing lines, and performing necessary abatement. Contractors must be licensed in Oklahoma, provide detailed documentation, and comply with VA security, safety, and information systems requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 10 DIVISION 01 _ GENERAL REQUIREMENTS.docx | DOCX document | |
| Att 9 EOVAHCS ICRA Utility Line replacement.pdf | ||
| 36C25925R0112 0004.docx | DOCX document | |
| Att 7 PreBid Construction Sign In Sheet.pdf | ||
| Att 6 Site Visit Meeting Doc Muskogee.pdf | ||
| Att 5 12424 Details-REV12.18.2025.pdf | ||
| Att 8 Geotechnical Subsurface Investigation.pdf | ||
| 36C25925R0112 0003.docx | DOCX document | |
| 36C25925R0112 0002.docx | DOCX document | |
| 36C25925R0112 0001.docx | DOCX document | |
| Att 3 Past Performance Questionnaire_Blank.docx | DOCX document | |
| Att 1 Drawings CS001 - Replace Exterior Utility Lines.pdf | ||
| Att 4 VAAR 852.219 75 Limitation On Subcontracting Certification.docx | DOCX document | |
| Att 2 Specs 00 01 10 General Requirements Submitted.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25925R0112 36C25925R0112
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25925R0112 X 10-31-2025 623-24-101 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Jesus A. Villegas 303-712-5833 Project Name: 623-24-101 Muskogee VAMC, Replace Exterior Utility Lines
The contractor shall provide all required labor, material, equipment, and site investigations to perform all required project work in accordance with the provided SOW, Specifications, and Drawings. The project is located at the Jack C.
Montgomery Veteran’s Affairs Medical Center Muskogee, OK 1011 Honor Heights Dr, Muskogee, OK 74401.
This is a competitive requirement set aside 100% for Service-Disabled Veteran Owned Small Business (SDVOSB).
Project magnitude: between $2,000,000 and $5,000,000 The NAICS code is 237110 with a - Small Business Size standard $45M
A non-mandatory pre-bid site visit will be held on Nov 12, 2025, at 2:00 PM Central Time (CT). All interested contractors shall meet at the location stated in the Statement of Work, Section II. R. Site Visit Information.
Cut off for submission of RFIs/Questions in relation to this solicitation must be submitted in writing via email to jesus.villegas@va.gov and received no later than Nov 19, 2025, at 2:00 PM CT.
Instructions, Conditions, and Notices to Offerors. All submitted proposals must be received in email by the closing date and time in block 13a below, Dec 3, 2025 @ 2:00 PM CT to Contract Specialist, Jesus Villegas, at jesus.villegas@va.gov Please include the solicitation number 36C25925R0112 in the subject line. Proposals shall be submitted via email in accordance with Part I/Section B, to be considered for this project. Proposals received in any other format will result in the offeror's proposal not receiving further consideration. In accordance with FAR 52.204-7, System for Award Management (SAM), Prospective contractors shall be registered in the SAM database prior to close of solicitation.
All bidders must submit a bid guarantee as part of their bid package. Additionally, the Awardee must be able to obtain the necessary level of Performance and Payment Bonds.
In accordance with P.L. 116-283, this acquisition is 100% set aside for Service-Disabled Veteran Owned Small Business concerns. See VAAR 852.219-73, VA Notice of Total Set-Aside for Verified Service-Disabled Veteran-Owned Small Business for information in regards to requirements in order to be considered. Offerors must be both VISIBLE and VERIFIED by the Small Business Administration (SBA) prior to proposal receipt. Failure to be both VERIFIED, and VISIBLE by the SBA prior to contract award will result in the offerors proposal being deemed non-compliant. All offerors are urged to contact the SBA and submit the aforementioned required documents to obtain SBA (VetCert) verification of their SDVOSB status if they have not already done so. To avoid proposal rejection, proposal packages shall include signed VAAR 852.219-75 LOS certification, pricing, past performance, and bid bond. Proposals from non-verified SDVOSB contractors will also be rejected.
X X 52.211-10 X
2:00 PM
CST
12-03-2025 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971 Angela Waalkes
VA-VHA-RPOW-2024-0081
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 STATEMENT OF WORK | 6 |
| A.4 PRICE/COST SCHEDULE | 13 |
| ITEM INFORMATION | 13 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 14 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 22 |
| 2.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 22 |
| 2.2 52.216-1 TYPE OF CONTRACT (APR 1984) | 23 |
| 2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 23 |
| 2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 23 |
| 2.5 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) | 24 |
| 2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 26 |
| 2.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 26 |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 26 |
| 2.9 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 27 |
| REPRESENTATIONS AND CERTIFICATIONS | 28 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025) | 28 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 32 |
| 3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 34 |
| GENERAL CONDITIONS | 37 |
| 4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) | 37 |
| 4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) | 38 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) | 40 |
| 4.4 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018) (DEVIATION FEB 2025) | 44 |
| 4.5 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) (DEVIATION FEB 2025) | 46 |
| 4.6 52.222-12 CONTRACT TERMINATION—DEBARMENT (MAY 2014) (DEVIATION FEB 2025) | 48 |
| 4.7 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (MAY 2024) (DEVIATION FEB 2025) | 48 |
| 4.8 52.223-10 WASTE REDUCTION PROGRAM (MAY 2024) (DEVIATION FEB 2025) | 49 |
| 4.9 52.223-20 AEROSOLS (MAY 2024) | 49 |
| 4.10 52.223-21 FOAMS (MAY 2024) | 50 |
| 4.11 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024) (DEVIATION FEB 2025) | 50 |
| 4.12 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 52 |
| 4.13 52.236-2 Differing Site Conditions (DEVIATION AUG 2025) | 57 |
| 4.14 52.236-3 Site Investigation and Conditions Affecting the Work (DEVIATION AUG 2025) | 57 |
| 4.15 52.236-5 Material and Workmanship (DEVIATION AUG 2025) | 58 |
| 4.16 52.236-6 Superintendence by the Contractor (DEVIATION AUG 2025) | 59 |
| 4.17 52.236-7 Permits and Responsibilities (DEVIATION AUG 2025) | 59 |
| 4.18 52.236-8 Other Contracts (DEVIATION AUG 2025) | 59 |
| 4.19 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (DEVIATION AUG 2025) | 60 |
| 4.20 52.236-10 Operations and Storage Areas (DEVIATION AUG 2025) | 60 |
| 4.21 52.236-11 Use and Possession Prior to Completion (DEVIATION AUG 2025) | 61 |
| 4.22 52.236-12 Cleaning Up (DEVIATION AUG 2025) | 62 |
| 4.23 52.236-13 Accident Prevention (DEVIATION AUG 2025) | 62 |
| 4.24 52.236-14 Availability and Use of Utility Services (DEVIATION AUG 2025) | 63 |
| 4.25 52.236-15 Schedules for Construction Contracts (DEVIATION AUG 2025) | 64 |
| 4.26 52.236-17 Layout of Work (DEVIATION AUG 2025) | 65 |
| 4.27 52.236-21 Specifications and Drawings for Construction (DEVIATION AUG 2025) | 65 |
| 4.28 52.243-4 Changes (DEVIATION JUL 2025) | 67 |
| 4.29 52.244-6DEV SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) (DEVIATION FEB 2025) | 68 |
| 4.30 SUPPLEMENTAL INSURANCE REQUIREMENTS | 71 |
| 4.31 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 71 |
| 4.32 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 71 |
| 4.33 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 74 |
| 4.34 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 74 |
| 4.35 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 74 |
| 4.36 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023) | 74 |
| 4.37 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 83 |
| 4.38 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 86 |
| 4.39 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025) | 88 |
| 4.40 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 88 |
| 4.41 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 88 |
| 4.42 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 91 |
| 4.43 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 92 |
| 4.44 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 93 |
| 4.45 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 94 |
| 4.46 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 94 |
| 4.47 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 95 |
| 4.48 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 96 |
| 4.49 Wage Determination | 97 |
| 4.50 Specifications, Drawings and Attachments | 106 |
A.3 STATEMENT OF WORK
Jack C. Montgomery Veteran’s Affairs Medical Center
(MUS VAMC)
Statement of Work Replace Exterior Utility Lines Construction Project
Project Number: 623-24-101 Project Name: Replace Exterior Utility Lines
I. OVERVIEW
Request Contractor firm provide all required labor, material, equipment, and site investigations to perform construction on the Jack C. Montgomery Veteran’s Affairs Medical Center (VAMC Muskogee) water loop. The Muskogee VAMC currently has fire water and domestic water system supplied from a single loop.
This arrangement leads to stagnant water from the fire water system having an increased risk to contaminate domestic water with Legionella. The water loop and sewer system have degraded over time and are hard to maintain due inadequate isolations and access points. We are in need of a contractor to replace all exterior site water lines and create a separate fire protection and domestic exterior water loop as called out in the design drawings and specifications provided. The firm shall provide acceptable electronic services for submittal and document exchange for both design and construction, i.e. “Submittal Exchange”. Work includes construction period services, site visits, and acceptance inspections by a qualified inspector. Construction includes the following items:
Firms shall be properly licensed and bonded to perform general contracting work in the State of Oklahoma or have equivalent licensing and be approved for such work by the Veteran’s Administration.
This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop Shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary.
Contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop.
Contractor shall store all material offsite and only bring in up to 3 days’ worth of material on site.
It is to be documented in the construction documents, the prime construction contractor shall provide engineering and technical support, all manuals, wiring diagrams, and tools necessary for adjusting, maintaining, repairing, and testing of equipment for use by VA engineering staff or VA’s designated Maintenance Provider.
The above requirements for design will also apply to construction and shall be in accordance with ADA, OSHA, and NFPA requirements. It is to be documented in the construction documents that the prime construction contractor shall provide engineering and technical support, all manuals, wiring diagrams, and tools necessary for adjusting, maintaining, repairing, and testing of equipment for use by VA Engineering staff or VA’s designated Maintenance Provider. Construction Prime Contractor shall provide one year of maintenance and inspection service following beneficial use as specified and required within the specifications of this project. The space conditions and the execution of this project shall proceed with minor interference to the operation of the medical center and shall comply with all requirements for infection control, utility interruptions, fire protection, and all other safety requirements of the contract.
II. Contractor Access and Activities
A. Contractor must comply with the VA security management program.
B. Contractors must not enter the work site without VA issued identity Badge. Contractors can be subject to inspection of personal effects when entering or leaving the project site and VA property. Contractor superintendent must escort Contractor employees to Engineering (Building 18) to obtain badge(s). The Contractor must maintain a log of Employee Names, Badge ID Numbers, Start Date(s), Departure Date(s), ID Lost Date(s), and ID Return Date(s). Updated Badge log must be given to the COR weekly or as directed by COR. Contractor’s superintendent must return all badges on day of departure of employee from contract to COR. Contractor’s superintendent must return all remaining badges at contract closeout to COR. Lost Badges must be reported immediately to the COR and documented on badge log. Contractor is responsible for a $100.00 fee for each lost or unreturned badge to VA.
C. The C&A requirements do not apply; A Security Accreditation Package is not required.
D. Property Access Regular Business Hours: PM must be scheduled during normal business hours, 8:00 am to 4:00 pm, Monday through Friday, excluding the following Federal holidays:
The following Federal legal holidays are observed by this facility:
| New Year’s Day |
| January 1 |
| Martin Luther King’s Birthday |
| Third Monday in January |
| President’s Day |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Juneteenth |
| June 19 |
| Independence Day |
| July 4 |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in November |
| Veteran’s Day |
| November 11 |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas Day |
| December 25 |
E. COR must be informed in the following situations:
1. To schedule any work.
2. After arriving on site but before any work is started.
3. To provide an approximate timeframe for the work.
4. As soon as it is known that the work will take longer than expected.
5. At completion of work prior to leaving the facility.
6. To report any incomplete aspects of the work or issues that could not be corrected during the visit.
7. To furnish a written plan for corrective action for any work that cannot be completed within 24 hours. Plan must be furnished to and approved by the COR.
F. Safety must be the Contractor’s highest priority. The Contractor must be in accordance with Federal, State, Local OSHA regulations, latest edition of NEC, latest edition of NFPA 70E, and 01 35 26 Safety Requirements specification. The Contractor must furnish and have in place Personal Protective Equipment (PPE) including, but not limited to, safety signage, cones, and barricades, to protect the safety of VA patients, employees, visitors, volunteers, tenants and others. Contractor must not be permitted to work without proper PPE and can be directed to leave job site. Contractor must furnish required safety items and wear required PPE. Work must be conducted in a manner and at times which would present the least amount of disruption to the VA healthcare facility.
G. Contractors must not leave or unattended out-of-service any utility, fire protection, or security system without written permission of the COR. If a utility, fire protection, or security system is not functioning at the end of a work period without written permission of the COR, then the Contractor must restore the system(s) to working order prior to leaving the jobsite or must furnish an around-the-clock watch until the system is functioning properly. If the Contractor fails to do so, the Contractor must reimburse the Government for any costs incurred by the VA to furnish around-the-clock watch and/or repair the system(s).
H. Vehicles and Construction equipment: Contractors’ keys to unattended vehicles and equipment must be removed and vehicles locked.
I. Unloading and Parking: No materials or equipment are permitted through the front entry. Use loading dock entrance – only for loading and unloading, do not leave vehicle(s) unattended. Contractor parking on VA property is limited to availability of designated Contractor parking. Contractor must have prior written approval of on-site Contractor parking from COR. Contractor parking shall be in lot 4 or at the Hatbox and ride the shuttle up. No parking space shall be reserved for the contractor.
J. Elevators: Contractor must use COR designated elevators and must protect elevator cabs and controls during periods of use. The Contractor must not exceed elevator weight limits. Designated elevator(s) and usage times are not to interfere with VA activities.
K. Radios and Mobile Devices: Contractor must use mobile devices at low volume or outside. The Contractor must not carry on conversations in hallways or near any patient areas. AM/FM radios and other media producing devices must not be used in the buildings.
L. Noise: Contractor must coordinate and schedule noise making activities with the COR. For any noise making work activities, the Contractor must furnish a written request to the COR for COR approval a minimum of seven (7) business days prior to noise making activities. The COR will schedule and provide written authorization to proceed three (3) business days in advance of the proposed activity.
M. Disposal: The Contractor must submit a written request(s) for disposal of any government owned materials, equipment, or property in advance to the COR for COR written approval. Contractor must remove and properly dispose construction debris, materials, equipment, and substances from VA property daily into the Contractor supplied containers. Contractor’s supplied dumpsters shall be always covered. Construction debris created from the contract shall not be disposed of at the job site, in VA dumpsters, or on VA property. Disposal of construction debris, materials, equipment, and substances from the contract must be in accordance with applicable Federal, State, Local and environmental laws, rules or regulations.
The Contractor must ensure and furnish appropriate documentation to the CO that all hazardous waste handlers, haulers, and disposal facilities are properly licensed. The Contractor must furnish shipping manifest and documentation of proper disposal of any construction debris, materials, equipment, and substances from the contract work prior to final payment. Contractor must return the work site to the condition in which it was found at the Contractor’s expense.
N. Warranty: Contractor must guarantee workmanship for a period of one (1) year after COR written acceptance of work. Contractor must furnish a minimum 1-year parts and labor warranty on materials, equipment, parts and components furnished and any manufacturer’s warranty greater than one (1) year.
1. In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (m) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
2. This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
3. The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-
a. The Contractor’s failure to conform to contract requirements; or
b. Any defect of equipment, material, workmanship, or design furnished.
4. The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
5. The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
6. If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.
7. With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall-
a. Obtain all warranties that would be given in normal commercial practice.
b. Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
c. Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
8. In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty.
9. Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
10. This warranty shall not limit the Government’s rights under the Inspection and acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
O. Photography: Contractor must not photograph any patients, personnel, visitors, and others on VA property. Contractor must be escorted by VA personnel to take jobsite related photos and be coordinated by COR.
P. Hatbox parking can be located at: 504 S Hatbox Rd, Muskogee, OK 74401
Q. Other requirements:
| 1. | Anything remaining in place that is damaged or defaced by the Contractor must be restored by the Contractor to the existing condition, at no additional expense to the Government. |
| 2. | The Contractor must furnish adequate protection to VA property and personnel prior to work activities. Contractor moved items must be put back by the Contractor to original locations and conditions as work is completed, at no additional expense to the Government. |
| 3. | No unauthorized work to be initiated without the prior written approval of the CO. |
| 4. | Work required for the project must be in accordance with the best practices and in accordance with the intent of the SOW, drawings, and specifications. |
| 5. | Utilities and work areas may not be immediately available, and the Contractor must be flexible in the inspections schedule at no additional cost to VA. |
| 6. | All OEM recommended safety aspects of the equipment being serviced must be adhered to. |
R. Site Visit Information:
1. Contractors will meet at the following location before starting the site visit. It is marked in red below at 1011 Honor Heights Drive Muskogee, OK 74401, meeting in room number 08-18.
2. For parking at Muskogee, OK VA parking should be at lot 14 marked in blue below.
Should that parking lot be full, parking is also available at the Hat Box located at: 504 S Hatbox Rd, Muskogee, OK 74401.
3. There is a shuttle that runs back and forth between the parking lot and the hospital, from 7:00 am to 6:00 pm.
4. There will be no equipment provided, i.e., a ladder to get on the roof, light for the basement, etc. If the contractor needs anything, the contractor will have to provide it
Construction is to be completed in 940 calendar days from notice to proceed.
A.4 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Full construction services for the replacement of the exterior utility line under Project: 623-24-101
PoP Dates are estimates Contract Period: Base POP Begin: 03-02-2026 POP End: 09-27-2028 PRINCIPAL NAICS CODE: 237110 - Water and Sewer Line and Related Structures Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries
| GRAND TOTAL |
| __________________ |
Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
PART I - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
PART I/SECTION A – REQUEST FOR PROPOSAL
I.1A JOINT VENTURES
If submitting an offer as a joint venture as defined by P.L. 109-461 AND Department of Veterans Affairs I.L. 049-06-4. Certified SDVOSB/VOSB listed in the SBA certification database at https://veterans.certify.sba.gov/ (see 13 CFR 128). A joint venture may be considered eligible if it meets the requirements in 13 CFR part 128, and the managing joint venture partner makes the representations under VAAR 819.7003 paragraph (b). An offeror must provide a copy of the joint venture agreement specific to the project that is consistent with the percentage of required work and net proceed. Additionally, the offeror must provide a breakdown or labor of which is to be performed by the SDVOSB firm and that which is performed by the small business joint venture firm and that which is sub-contracted. All Joint Ventures will be required to be registered and verified as an entity in VETCERT.
I.2A SELECTION PROCEDURES
This acquisition will be a competitive acquisition utilizing FAR Part 15 source selection employing tradeoff source selection procedures. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations, and certifications. All such offers shall be treated equally except for their prices and performance records. Failure to meet a requirement may result in an offer being determined non-compliant. It is the intent of the Government to award without discussions; however, the Government will reserve the right to have discussions if such are needed.
I.3A PRE-PROPOSAL SITE VISIT
See SF 1442, Block 10 and FAR Provision 52.236-27, Site Visit (Construction) of this solicitation. Please leave extra time to complete COVID-19 screening process if applicable when entering the building. Masks are required to be worn by all employees and contractors while on VA property in some locations.
I.4A SELECTION CRITERIA
This acquisition will utilize the tradeoff process in accordance with FAR 15.101-1. This process permits tradeoffs between non-cost factors and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest rated proposal to achieve a best value contract award based on established evaluation criteria. Inherent in this process is the necessity to make tradeoffs considering the non-cost strengths and weaknesses, risks, and the cost (or price) offered in each proposal.
The source selection process will be conducted utilizing FAR part 15.101-1 Trade-off Process Source Selection Procedures with Special Standards of Responsibility. Offers will be evaluated using the following evaluation factors:
Factor 1 – Past Performance Factor 2 – Price
In addition to the general standards of responsibility found at FAR 9.104-1, in accordance with FAR 9.104-2, the special standards of responsibility described below apply to this procurement. Offerors who fail to meet any special standard of responsibility may not be eligible to receive a contract award.
Past performance will be evaluated on a basis of significantly more important than cost or price.
Past Performance Evaluation
For Factor 1, based on the evaluation of all recent and relevant past performance for an offeror, an overall performance confidence rating shall be assigned. The performance confidence ratings are defined below:
| ASSESSMENT |
| DESCRIPTION |
| Substantial Confidence | |
| Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. |
| Limited Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort. |
| No Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort. |
| Unknown Confidence (Neutral) |
| No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. |
Note: In the case of an offeror without a record of past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall receive an unknown confidence (neutral) performance confidence rating.
a. Aspects of Past Performance Evaluation. The past performance evaluation is an assessment based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements. There are two aspects of the past performance evaluation.
1. The first is to evaluate whether the offeror’s present/past performance is relevant or not relevant to the effort to be acquired. The criteria to establish what is relevant is unique to each source selection.
2. The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts. In addition, the Government reserves the right to obtain information for use in the evaluation of past performance from all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
b. Source Selection Evaluation Board (SSEB) members will review past performance information to determine the quality and usefulness as it applies to the performance confidence assessment.
Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system.
Factor 1-Past Performance
a. Solicitation Submittal Requirements:
Offerors shall provide a minimum of two (2) and maximum of five (5) recent and relevant projects (as defined below) to demonstrate their ability to perform the proposed work identified within the Specifications, drawings, and Statement of Work. If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted. The Government will evaluate past performance based upon sources available to the contracting officer that may include Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS) and Electronic Subcontract Reporting System (eSRS). IF THERE IS NOT A PAST PERFORMANCE EVALUATION IN PPIRS or FAPPIIS, then the offeror shall submit Past Performance Questionnaires (PPQ) for each project. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, offerors should follow up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Jesus A. Villegas through email at jesus.villegas@va.gov.
Recency – a recent project is defined as being completed within five years of the due date of this solicitation.
Relevant – includes performance of efforts in a project of renovation or remodeling that include similar project construction in an active medical facility that are similar or greater in scope, magnitude, and complexity than the effort described in this solicitation.
Offerors are cautioned to submit enough information in the format specified in the solicitation. Offerors may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system. Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.
b. Basis of Evaluation:
The contracting officer shall review recent and relevant performance information on each offeror based on past efforts provided by the offeror and may obtain data independently from other government and commercial sources. Past performance regarding predecessor companies, key personnel who have relevant experience, or sub-contractors that will perform major or critical aspects of the requirement will not be considered as highly as past performance information for the principal offeror. Offerors with no past performance history or the offeror’s performance record is so limited that no confidence assessment rating can be reasonably assigned shall receive the rating "Unknown Confidence," meaning the rating is treated neither favorably nor unfavorably.
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the offeror’s past performance will be used as a means of evaluating the offeror’s probability to successfully meet the requirements of the RFP.
Initially offers shall be ranked according to price, including any option prices if applicable. The lowest price offer’s past performance shall be evaluated to determine its performance confidence rating.
If the lowest priced evaluated offer is judged to have a Substantial Confidence performance assessment, that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.
If the lowest price offer does not receive a Substantial Confidence performance confidence rating, the past performance evaluation continues until an offeror’s past performance is judged to have a Substantial Confidence performance rating. The Government reserves the right to award a contract to other than the lowest priced offeror if the lowest priced offeror is judged to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision.
Factor 2 – Price:
a. Solicitation Submittal Requirements:
1. Standard Form 1442, Solicitation Offer and Award
2. All pages of the SF1442 Continuation Sheet
b. Basis of Evaluation: The Government will evaluate price based on the total price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
1. Comparison of proposed prices received in response to the RFP
2. Comparison of proposed prices with the IGCE.
3. Comparison of proposed prices with available historical information.
Special Standard of Responsibility
Solicitation Submittal Requirements:
The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)
1. OSHA or EPA Violation(s):
Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years.
2. Experience Modification Rate (EMR):
Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0. If an offeror’s EMR is above 1.0, the offeror must submit a written explanation of the EMR from its insurance carrier on the insurance carrier’s letterhead, describing the reasons for the EMR and the anticipated date the EMR may be reduced to 1.0 or below.
Offerors who fail to meet any special standard of responsibility may not be eligible to receive a contract award.
PART I/SECTION B - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
I.1B COST RANGE: Between $2,000,000.00 and $5,000,000.00
I.2B GENDER: Wherever the masculine gender is used in this solicitation and contract documents, it shall be considered to include both masculine and feminine.
I.3B METRIC PRODUCTS:
Products manufactured to metric dimensions will be considered on an equal basis with those manufactured using inch-pound units, providing they fall within the tolerance specified using conversion tables contained in the latest revision of Federal Standard No. 376, and all other requirements of this document are met.
If a product is manufactured to metric dimensions and those dimensions exceed the tolerance specified in the inch-pound units, a request should be made to the Contracting Officer to determine if the product is acceptable. The Contracting Officer, in concert with the Contracting Officer’s Representative (COR), will accept or reject the product.
I.4B REQUESTS FOR INFORMATION: All requests for information must be submitted in writing to the Contracting Officer for action no later than the date shown in Block 10 of the Standard Form 1442, Solicitation, Offer and Award.
I.5B PROPOSAL REQUIREMENTS
General – Both past performance information and price proposal shall be submitted in response to this solicitation. Proposals shall be submitted via email to jesus.villegas@va.gov. Emails are limited to 15 MB. The proposal, in its entirety, shall be one email (one attachment for price proposal, one attachment for LOS certification, and one attachment for past performance information) not to exceed 15MB. Failure to submit in the format required and clearly address those factors may result in rejection of the offer. A digital bid bond with wet signature, in the amount of twenty (20%) percent (but not to exceed $3,000,000) of the bid price shall be included with the proposal and be received no later than the closing date and time. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for due date, will require rejection of the proposal in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. SEE FAR Provision 52.228-1, Bid Guarantee, of this Solicitation. Electronic copies of the proposals will be time/date stamped by Microsoft Outlook upon receipt of email. Further details on electronic submission are outlined below.
Proposals shall be received by 2:00 P.M. Central Time on December 3, 2025. There will be no public opening of the proposals. Submit proposals to: jesus.villegas@va.gov.
Past performance information and price sections of the offeror’s proposal will be evaluated independently. Offerors shall include all required Representations and Certifications and complete their registration in System for Award Management (SAM). See FAR 52.204-7 and 52.204-8 of this solicitation.
Important Notice: Apparent successful offerors must apply for and receive verification from the Small Business Administration (SBA) through the SBA certification database via 13 CFR Part 128, VAAR 819.7011, and VAAR 819.7003 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the SBA certification database at the time of offer submission. Failure to be both VERIFIED by SBA and VISIBLE on the SBA certification database at the time of offer submission and contract award will result in the offeror’s proposal being deemed non-compliant. All offerors are urged to contact the SBA and submit the required documents to obtain verification of their SDVOSB status if they have not already done so.
Or
Meet Federal Acquisition Regulation (FAR) class deviation regarding certification of Service-Disabled Veteran Owned Small Business concerns as per CAAC Letter 2024-02, effective January 1, 2024, until SAM.gov is updated to reflect the SBA’s certification or otherwise rescinded.
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals – Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications – Commercial Products and Commercial Services. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
I.6B PROPOSAL REVISIONS: If it is determined to be necessary, proposal revisions will be requested from the offers received. The Contracting Officer may identify those offerors whose proposals are within the competitive range based upon the selection criteria identified in this solicitation. Negotiations may be conducted with those firms falling within the competitive range, after which proposal revisions may be requested. Offerors submitting proposal revisions will not be required to re-submit any documents which are unchanged from their proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with the Table of Contents that clarifies where within the initial proposal the additional information and/or changed document would be placed. A new bid bond shall be submitted only if the final cost proposal revisions are greater than its initial cost proposal.
1.7B REQUIREMENTS FOR ELECTRONIC SUBMISSION OF OFFER
Unless paper offers are specifically authorized in an individual solicitation, all responses to solicitations must be submitted electronically as described below. Responses submitted in a paper form are unacceptable. Failure to comply with this requirement may jeopardize the possibility of receiving an award for the contract due to noncompliance with the terms of the solicitation. You must submit your electronic offer, and any supplemental information (such as spreadsheets, backup data, technical information), using any of the electronic formats and media described below.
In addition, contractors are notified of the award via an electronic Notice of Award e-mail. The award document will be attached to the Notice of Award e-mail.
Acceptable Electronic Formats (Software) for Submission of Offers
1. Files readable using the current Microsoft© Office version Products: Word, Excel, PowerPoint, or Access. Please see the security note below for caution regarding the use of macros. When submitting construction drawings contractors are required to submit one set in AutoCAD and one set in Adobe PDF. (Purpose: contracting can open the PDF version, and engineering can open AutoCAD files).
2. Files in Adobe© PDF (Portable Document Format) Files: When scanning documents scanner resolution should be set to 200 dots per inch, or greater.
3. Another electronic format.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .