100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
COVER
11/12/2021 DE BWW
GI001
VICINITY MAP
SHEET INDEX
VETERANS AFFAIRS (VA) MEDICAL CENTER
OKLAHOMA CITY, OK 73104
PROJECT #: 635-22-127 (VEG 21.07)
ASBESTOS ABATEMENT AND REMEDIATION
P l a n
N o r t h
True North
3D AERIAL IMAGE
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
NE 13th STREET
NORTH
KE
LL
Y A
VE
NO
RT
H
KE
LL
EY
A
VE
NE 13th STREET
PROJECT SITE
SHEET
NO.
SHEET NAME
GENERAL
GI001 COVER SHEET
GI002 SYMBOLS, ABBREVIATIONS &
CALL-OUTS
ASBESTOS ABATEMENT
HA001 SUB-BASEMENT ASBESTOS SURVEY
HA002 SUB-BASEMENT ASBESTOS SURVEY
HA003 SUB-BASEMENT ASBESTOS SURVEY
HA004 BASEMENT FLOOR ASBESTOS SURVEY
HA005 BASEMENT FLOOR ASBESTOS SURVEY
HA006 BASEMENT FLOOR ASBESTOS SURVEY
HA007 GROUND FLOOR ASBESTOS SURVEY
HA008 GROUND FLOOR ASBESTOS SURVEY
HA100 FIRST FLOOR ASBESTOS SURVEY
HA101 FIRST FLOOR ASBESTOS SURVEY
HA102 FIRST FLOOR ASBESTOS SURVEY
HA201 SECOND FLOOR ASBESTOS SURVEY
HA202 SECOND FLOOR ASBESTOS SURVEY
HA203 SECOND FLOOR ASBESTOS SURVEY
HA301 THIRD FLOOR ASBESTOS SURVEY
HA302 THIRD FLOOR ASBESTOS SURVEY
HA303 THIRD FLOOR ASBESTOS SURVEY
HA401 FOURTH FLOOR ASBESTOS SURVEY
HA402 FOURTH FLOOR ASBESTOS SURVEY
HA403 FOURTH FLOOR ASBESTOS SURVEY
HA501 FIFTH FLOOR ASBESTOS SURVEY
HA502 FIFTH FLOOR ASBESTOS SURVEY
HA503 FIFTH FLOOR ASBESTOS SURVEY
HA601 SIXTH FLOOR ASBESTOS SURVEY
HA602 SIXTH FLOOR ASBESTOS SURVEY
HA603 SIXTH FLOOR ASBESTOS SURVEY
HA701 SEVENTH FLOOR ASBESTOS SURVEY
HA702 SEVENTH FLOOR ASBESTOS SURVEY
HA703 SEVENTH FLOOR ASBESTOS SURVEY
HA801 EIGHTH FLOOR ASBESTOS SURVEY
HA802 EIGHTH FLOOR ASBESTOS SURVEY
HA803 EIGHTH FLOOR ASBESTOS SURVEY
HA901 NINTH FLOOR ASBESTOS SURVEY
HA902 NINTH FLOOR ASBESTOS SURVEY
HA903 NINTH FLOOR ASBESTOS SURVEY
HA910 PENTHOUSE FLOOR ASBESTOS SURVEY
HA911 PENTHOUSE FLOOR ASBESTOS SURVEY
HA912 PENTHOUSE FLOOR ASBESTOS SURVEY
NE 13th STREET
NO
RT
H
KE
LL
EY
A
VE
NO
RT
H
PH
ILL
IP
S
AV
E.
NE 15th STREET
NE 16th STREET NE 16th STREET
NO
RT
H
PH
ILL
IP
S
AV
E.
NE 14th STREET
NE 15th STREET
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
H4
H7
A
GENERAL PIPING SYMBOLS
FE
AV
MV
SCH
SH
TH
PS
RC
WB
CSH
SS
* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY STANDARD PRACTICE SP-58
VR
CTPS
CTPD
FWPS
FWPD
CF
FWS
BWS
CBD
BO
TC
A
OFL
HW
SW
CW
FOR
FOS
LPG(I)
G(I)
G
HVAC PIPING SYMBOLS
HPS
HPR
MPS
MPR
LPS
LPR
PC
HWS
HWR
GHS
GHR
V
SWS
SWR
CWR
CHR
GCR
RL
RS
RHG
CWS
CHS
GCS
MW
D
GRR
GRS
X
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
HEATING WATER SUPPLY
HEATING WATER RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
SOLAR WATER SUPPLY
SOLAR WATER RETURN
REFRIGERANT LIQUID
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
CONDENSER WATER SUPPLY (FROM TOWER)
CONDENSER WATER RETURN (TO TOWER)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
CHILLED GLYCOL-WATER RETURN
MAKE-UP WATER
DRAIN LINE
VENT LINE
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURN
EXISTING PIPE TO BE REMOVED
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
CONDENSATE TRANSFER PUMP SUCTION
VACUUM CONDENSATE RETURN
TUBE CLEANER WATER SUPPLY
BOILER BLOWOFF
CONTINUOUS BLOWDOWN
BOILER WATER SAMPLE
FEEDWATER SAMPLE (FROM DE-AERATOR)
CHEMICAL FEED
OVERFLOW
COMPRESSED AIR
NATURAL GAS MAIN FUEL
NATURAL GAS IGNITER FUEL
LIQUEFIED PETROLEUM GAS IGNITER FUEL
FUEL OIL SUPPLY
FUEL OIL RETURN
COLD WATER (CITY WATER)
SOFTENED WATER
HOT WATER
ROLLER-TYPE HANGER
VARIABLE SPRING-TYPE HANGER (TYPE 51)*
SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*
CLEVIS-TYPE HANGER
TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT
TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)
FLOOR-SUPPORTED PIPE STAND
RISER CLAMP (TYPE 42)*
WALL BRACKET (TYPE 31, 32, 33)*
CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*
SLIDING SUPPORTS (TYPE 35)*
RH
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
CLEAN OUT
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAGE
FLOW ELEMENT
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
CONNECT TO EXISTING
LIMIT OF DEMOLITION
AIR SEPARATOR
LC
M
VALVE SYMBOLS
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127 Project Number
Building Number
Drawing Number
Project Title
Drawn
Drawing Title
Approved:
Phase
Project Director
SYMBOLS, ABBREVIATIONS &
11/12/2021 MB RL
GI002
CALL-OUTS
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BT-1
SPM-1
FT-8
GM-1
CTP-1
BI-1
BI-2
DW-3
RR-1
RM-1
DW-1
ST-1
DI-1
LN-2
FT-2
RM-1
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
12" X 12" & 9" X 9" GREEN FLOOR TILE
GASKET MATERIAL
COUNTER TOP
BLOWN IN INSULATION
INSULATION ABOVE REFRIGERATOR - BROWN
DRYWALL JOINT COMPOUND
ROLLED ROOFING, BLACK
ROOFING MASTIC, BLACK
DRYWALL
ROOFING MASTIC, BLACK (F-03-H)
12" X 12" WHITE FLOOR TILE
LINOLEUM FLOORING-GREEN
DUCT INSULATION - CLOTH WRAP, GRAY
VINYL STAIR TREADS & MASTIC - BROWN & BLACK
ASBESTOS CALL-OUTS
INDICATES NEW AREAS OF CONSTRUCTION THAT
SHOULD BE ASBESTOS FREE
INDICATES AREAS WITH CRITICAL
ASBESTOS HAZARDS
VEG 21.07
635-22-127 Project Number
Building Number
Drawing Number
Drawn
Drawing Title
Approved:
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
Project Director
SUB-BASEMENT FLOOR ASBESTOS
11/12/2021 MB RL
HA001
SURVEY
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
KEY NOTES:
KEY PLAN:
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, & RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
KEY NOTES:
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
2PI-1
P l a n
N o r t h
True North
1. REMOVE EXISTING ELBOW, TEES, VALVES, AND ASSOCIATED HANGERS
WHERE NECESSARY.
2. UP TO BA130 COMPRESSOR FOR WALK-IN COOLER.
3. EXISTING 6" DOMESTIC COLD WATER TO PENTHOUSE.
4. EXISTING 4" DHW TO PENTHOUSE.
SEE SHEET HA002
S E
E
S
H E
E T
H
A
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
SUB-BASEMENT FLOOR ASBESTOS SURVEY
(FEEDS CANTEEN)
3/4" CW
3/4" HWR
TO SINK ABV.
3/4" DHWR
3/4" DCW
1/2" DHWR
1-1/2" DHWR
1/2" DHWR
3/4" DHWR
3/4" DHW
1/2" DHWR
3/4"
3/4"
3/4" DCW
3/4" 1"
3/4"
1 1/4"
1" 3/4"
1 1/4"
2"
1 1/4"
3/4"
1/2"
2"
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
3/4" DHW
3/4" DHWR
3/4" DHWR 1/2" DHWR
1/2" DHWR1/2" DHWR
1" DHWR
1/2" DHWR
1" DHW
3/4" DHWR
1 ENTIRE FLOOR
X
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3.
SUB-MECHANICAL ROOMS
TIER 1
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
SUB-BASEMENT FLOOR ASBESTOS SURVEY
SUB-BASEMENT FLOOR ASBESTOS
11/12/2021 MB RL
HA002
SURVEY
KEY PLAN:
GENERAL NOTES
KEY NOTES:
SEE SHEET HA001
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
2PI-1
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
1. REMOVE EXISTING ELBOW, TEES, VALVES, AND ASSOCIATED
HANGERS WHERE NECESSARY.
2. VALVES TO BA130 COMPRESSOR FOR WALK-IN COOLER.
3. EXISTING 1 1/4" DOMESTIC HOT WATER
4. EXISTING 2" DOMESTIC HOT WATER RETURN
5. EXISTING 2" DOMESTIC HOT WATER
6. EXISTING 1" DOMESTIC HOT WATER
7. EXISTING 1/2" DOMESTIC HOT WATER RETURN
8. EXISTING 3/4" DOMESTIC HOT WATER RETURN
9. EXISTING 1" ELBOW
DWH
5. HOT WATER CIRCULATING PUMPS
2. COLD WATER PUMP #1
4. HOT WATER HEATER
3. COLD WATER PUMP #2
1. WATER SOFTNER
A. REFER TO GI001 AND GI002 FOR MECHANICAL AND PLUMBING
SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE
PROCEEDING WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS
ABATEMENT WORK, AND RELATED TYPE, QUANTITY, LOCATION, &
COST OF EACH.
BASEMENT FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS
3/4"
1 1/2"
6"
4"
4" 2"
1 1/2"
1 1/4"
1 1/4"
3"
1 1/4"
1"
1"
1 1/4"
3"
6"
4"
RADIATOR IN GAS METER HOUSE
2 1/2" H. P. DRIP RET.
2 1/2" M. P. STEAM
3" H. P. STEAM
PUMP
CONDENSATE
STEAM VENT
2" L. P. STEAM LINE TO 100°
RADIATOR IN GAS METER HOUSE
1 1/4" M. P. DRIP RET.
2 1/2" M. P. STEAM
1 1/4" VACUUM RET.
4" L. P. FREE STEAM
TO 5,000 GAL
TANK UNDER
BLDG 22
DOMESTIC
WATER
DOMESTIC
WATER
5" LOW PRESSURE FREE STEAM
2" VACUUM RETURN
2 1/2" MEDIUM PRESSURE STEAM
TO BLDG 19
3/4" DHW
1/2"
DHWR
1" DHW
1" DCW
3/4"
DHWR
3/4" DCW
(WALL HYDRANT)
1/2" DHWR
TO CANTEEN
3" STEAM
1/2" DHWR
TO SINK
ABOVE
DRAIN
DRAIN
TO
CONDENSATE
PUMP
TO HW
1 ENTIRE FLOOR
TO CONDENSATE
PUMP
P l a n
N o r t h
True North
TIER 1
SUB-MECHANICAL ROOMS
TIER 1
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3.
BOILER
PLANT
BASEMENT
3"3"
SUB
BASMENT
KEY PLAN:KEY PLAN:
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
SUB-BASEMENT FLOOR ASBESTOS SURVEY
SUB-BASEMENT FLOOR ASBESTOS
11/12/2021 MB RL
HA003
SURVEY
KEY PLAN:
GENERAL NOTES
KEY NOTES:
KEY PLAN:
GENERAL NOTES
KEY NOTES:
S E
E
S
H E
E T
H A
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
2PI-1
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
BASEMENT FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS
1-1/2" DHWR
A. REFER TO GI001 AND GI002 FOR MECHANICAL AND PLUMBING
SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE
PROCEEDING WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
1. REMOVE EXISTING ELBOW, TEES, VALVES, AND ASSOCIATED
HANGERS WHERE NECESSARY.
X
SUB-MECHANICAL ROOMS
TIER 1
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3.
BASEMENT FLOOR ASBESTOS
11/12/2021 DE BWW
HA004
KEY PLAN:KEY PLAN:
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
BASEMENT FLOOR ASBESTOS SURVEY
BASEMENT FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLOWN IN INSULATION 1 (BB105-1, BB105A-1, BB106-1)
STAIRWELLS ARE KNOWN TO HAVE ASBESTOS-CONTAINING VINYL
STAIR TREAD AND MASTIC (BROWN/BLACK)(STAIRWELL 8)
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
BI-1
WHITE DUCT SEALANT
BLOWN IN INSULATION
1,2,3
1,2,3 1,3
1,3
1,3
1,3 122 1,5
2,3
1,3
1,3
1,2
1,3
1,3
3 3
1,3
1,2
1,3
5BT-1TAR SEALANT - BLACK (PIPES/DUCT)
INDICATES NEWLY REMODELED AREAS THAT ARE SHOULD BE ASBESTOS FREE.
BF118 HAS DAMAGED PIPE FITTINGS (PF-1) ON SHEET 4 OF THE TITAN PHOTO LOG
INDICATES NEW AREAS OF CONSTRUCTION THAT SHOULD BE
ASBESTOS FREE
INDICATES AREAS WITH CRITICAL ASBESTOS HAZARDS
P l a n
N o r t h
True North
STR #1
STR #2STR #7
STR #6
STR #10
STR #15
STR #8
CHASE
BF129
BF129a
BF125
BF128
BF127a
BF127
BF125b
BF153
BF130
BF112
BF135
BF136
CBF 9
BF138BF137
BF134
BF133
BF132
BF139
CBF 8
BF155BF140BF113
CBF 10
BF149
BF131
CBF 12
BF146
CBF 11 BF147
BF143b
BF148
CBF 14
BF150
BF145m
CBF 2
BF124 CBF1
BF123
BF121
BF119
BF120
BF154 BF145j
CBF 3
BF145l BF145p
CBF 5
BF116
BF145f
BE102a
BE102b
BE102d
BE100c
BE100BE101
BE100d BE100a
BA119g
BA121
BA119f BA115b
CBA 2CBA 1
BA119c
BF115
BF114
CBF 7
BF145q BF141
BF142
BF143a
BF144CBF 13
BF108
BE102e
BE102
CBF 4
BF145e
BF145dCBF 15
BF145c
BF145
BF145o
BF145n
BE100b BE
2c
BF117
BF145gBF145i BF145h
BF111
BF118aBF118
BA115a
BA116
BA123
BF144a
BA125
BA124 BA126
BA128
BA127
BA118
BA119b
BA119
BA119a BA116a
BA117
BA130a
BA130
BA130b1
BB130b BB107 BB106
BB105
BA131
BB103
CBA 4
CBA 3
BA114BA115 BA111
BB135
BB104
BF145b
BF145a
BF
BA
BF106
BA112e1
BA112b
BA112d
BA112c
BA112
BA112a
BA108
BA109
BA110
BA107
BF144b BF144c
BF144d
BF128
BF128a
BF126
BA100
BA101
CBA 5
BA103
BA104
BB105a
BA113
BA112e
CBB 3
BA102
BB102
BF144e
BF151
BF153a
BF145k
SEE SHEET
HA005
S E
E
S
H E
E T
H A
BF122
BF145g1
ELEV
P-12
ELEV
P-11
ELEV
P-9
ELEV
P-10
ELEV
P-8
ELEV
P-7
ELEV
P-2
ELEV
P-3
ELEV
P-4
ELEV
P-5
ELEV
P-6
BA116a1
TIER 1
TIER 1
TIER 1
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 2.
SURVEY
CBB 1
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
BASEMENT FLOOR ASBESTOS SURVEY
BASEMENT FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLOWN IN INSULATION 1 (BB105-1, BB105A-1, BB106-1)
5. BLOWN IN INSULATION 2 - BROWN (ABOVE REFRIGERATORS) (BB108,
BB108A, BB108C, BB108D)
STAIRWELLS ARE KNOWN TO HAVE ASBESTOS-CONTAINING VINYL
STAIR TREAD AND MASTIC (BROWN/BLACK)(STAIRWELL 8)
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
BASEMENT FOOR ASBESTOS
11/12/2021 DE BWW
HA005
BUILDING 5
UPSTAIRS
OFFICE
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BI-1
BI-2
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
BLOWN IN INSULATION
INSULATION ABOVE REFRIGERATOR - BROWN
1 1,2
1,3
1,3
1,3
1,3
1,3
1,3
31,3
1 1
16 16
3,16
P l a n
N o r t h
True North
CO
NC
. R
AM
P
AREAWAY
AREAWAY
AREAWAYAREAWAY AREAWAY
PI
PE
C
HA
SE
STR #3
STR #4
102b
101a
102a1a
102a 102a1
BD100n BD
0l
BD100j
BB116
BC100b
BC100a
CB
C
1- 1A
BC100
BB119
BB118
BB
8a
BB115
BB120 CBB 6
BB108a BB108c BB109
BB110
CBB 4
BB122
BB121
BB121a
BB126
BB130
BB132a
BB133
BB132
BB131
BB124
BB129
BB128
CBB 8
BB107a
BB108
BB108d
CBB 2
BB101
CBB 3 BB102
BB134
CBB 1BA130b
BB106
BB107
BB100
BB133
CBB 1
BB110a BB110a1
BB111
BB123
BB127
CBB 7
BD100m
BD107
BD100k
BD100o
BD100e BD100f
BD100
BD100h
CBD 2-1
BD100cBD100a
BB112
CBB 5
BB
BB113
CBD 1-1
BD
0i
BD
0g BD100b
BD100d
BB117
SEE SHEET
HA004
101a1
KEY PLAN:
ELEV
P-1
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 2.
SURVEY
ROOM NO. ROOM NAME ROOM NO. ROOM NAME
BA100 TOILET 100 BUILDING 5 BOILER PLANT
BA101 TELE/DATA CLOSET 100 BUILDING 18 CHILLER PLANT
BA102 ELECTRICAL CLOSET 100a OFFICE BA103 EMS STORAGE 100a CONTROL ROOM BA104 EMS CLEAN LINEN 100a1a TOILET
BA105 ENGINEERING STORAGE 101 OFFICE
BA105a ENGINEERING STORAGE 102 EMERGENCY GENERATOR BA105b ENGINEERING STORAGE BA130b EMS TRASH CART WASH ROOM BA105c ENGINEERING STORAGE BB100 ENG MECHANICAL BA105d ENGINEERING STORAGE BB101 AFGE STORAGE
BA106 SOILED LINEN BB102 CANTEEN STORAGE
BA107 CANTEEN STORAGE BB106 FOOD SVC WALK-IN FREEZER
BA107a TELE/DATA CLOSET BB107 ACQUISITIONS SUPPLY RECEIVING
BA107 TELE/DATA CLOSET BB107a WAREHOUSE LOADING DOCK
BA108 IM OFFICE BB108 FOOD SVC KITCHEN MISC.
BA109 IM OFFICE BB108a FOOD SVC STORAGE BA110 ENG SHOP BB108c FOOD SVC WALK-IN REFRIGERATOR BA111 ENG OFFICE BB108d FOOD SVC STORAGE
BA112 IM FOYER BB109 NUTRITION & FOOD SERVICE WAREHOUSE
BA112a OFFICE BB110 SPS MEDICAL STORAGE BA112b TELEPHONE OPERATORS BB110a FOOD SVC WAREHOUSE BA112c BREAK ROOM BB110a1 FOOD SVC WALK-IN REFRIGERATOR BA112d RESTROOM BB111 IM MULTIPURPOSE BA112e TELEPHONE EQUIPMENT BB112 FEC BA112e1 TELEPHONE EQUIPMENT STORAGE BB113 EMS EQUEPMENT STORAGE
BA113 ACQUISITIONS OFFICE BB114 ELECTRICAL CLOSET
BA114 ACQUISITIONS OFFICE BB115 EMS STORAGE
BA115 ACQUISITIONS GENERAL STORAGE BB116 EMS WAREHOUSE
BA110 ENG SHOP BB117 EMS STORAGE
BA111 ENG OFFICE BB118 EMS STORAGE
BA112 IM FOYER BB118a DRESSING ROOM BA112a OFFICE BB119 EMS STORAGE BA112b TELEPHONE OPERATORS BB120 EMS OFFICE BA112c BREAK ROOM BB121 IM STORAGE BA112d RESTROOM BB121a CLOSET BA112e TELEPHONE EQUIPMENT BB122 EMS STORAGE BA112e1 TELEPHONE EQUIPMENT STORAGE BB123 ELECTRICAL CLOSET
BA113 ACQUISITIONS OFFICE BB124 TELE/DATA CLOSET
BA114 ACQUISITIONS OFFICE BB126 LOCK SMITH
BA115 ACQUISITIONS GENERAL STORAGE BB127 MEN'S RESTROOM
BA116a EMS SOILED LINEN BB128 ENG AC SHOP BA116a ELECTRICAL CLOSET BB129 ENG OFFICE
BA117 NURSING OFFICE BB130 EMS TRASHCART WASH ROOM
BA118 EMS H.A.C. BB131 EMS LINEN CHUTE
BA119 IV STORAGE BB132 ENG EQUIPMENT STORAGE
BA119b LOGISTIC STORAGE BB133 IM STORAGE BA119c PATHOLOGY COOLER BB133 ENG ELECTRICAL SUB-STATION 2 BA119f EOC STORAGE BB134 ENG STORAGE BA119g EOC STORAGE BC100 EMS LAUNDRY BA121 PATHOLOGY STORAGE BC100a EMS OFFICE BA122 OFFICE BC101b EMS SOILED LINEN
BA123 ER BREAKROOM BD100 ENG OFFICE
BA124 EXIT BD100a ENG OFFICE BA125 MEDICAL GAS STORAGE BD100b ENG OFFICE BA126 HAZARDOUS WASTE STORAGE BD100c ENG OFFICE BA127 MEDICAL GAS STORAGE BD100d ENG BREAK ROOM BA128 EXIT BD100g OFFICE BA130 EMS TRASHCART WASH ROOM BD100h ENG ELECTRICAL SHOP BA130a EMS WALK-IN REFRIG. BD100i ENG STORAGE BA130b1 STORAGE BD100j ENG PAINT SHOP BA131 MECHANICAL EQUIPMENT ROOM BD100k ENG CARPENTER SHOP BB102 CANTEEN STORAGE BD100l CLOSET BB103 FOOD SVC STORAGE BD100m TOILET BB104 FOOD SVC DUMBWAITER BD100n ENG OFFICE BB105 FOOD SVC WALK-IN REFRIGERATOR BD100o ENG OFFICE BB105a FOOD SVC WALK-IN FREEZER BD107 SWITCHGEAR ROOM #1
BB106 FOOD SVC WALK-IN FREEZER CBB 1 CORRIDOR
BB107 ACQUISITIONS SUPPLY RECEIVING CBB 1 CORRIDOR
BB130b EMS RED BAG CBB 2 CORRIDOR
BB135 ENG PAINT SHOP CBB 3 CORRIDOR
BE100 BIO MED SHOP CBB 3 CORRIDOR
BE100a BIO MED OFFICE CBB 4 CORRIDOR BE100b X-RAY MAINT CBB 5 CORRIDOR BE100c BIO MED OFFICE CBB 6 CORRIDOR BE100d ELEC. CLO. CBB 6 CORRIDOR
BE101 BIO MED SHOP CBB 7 CORRIDOR
BE102 MAIL ROOM CBB 8 CORRIDOR
BE102a OFFICE CBD 1-1 CORRIDOR BE102b MAIL ROOM CBD 2-1 CORRIDOR BE102c ELEC. CLO. CBC 1-1A CORRIDOR BE102d MECHANICAL ROOM BE102e MAIL ROOM
BF106 H.A.C.
BF107 EMS CLEAN LINEN
BF108 EMS STORAGE
BF111 MECH.
BF112 SUBSTATION #3
BF113 FIRE PUMP
BF114 ELEVATOR ROOM
BF115 EMERGENCY GENERATOR
BF116 MECHANICAL ROOM
BF117 TELE/DATA CLOSET
BF118 MECHANICAL ROOM
BF118a AREAWAY
BF119 CANTEEN STORAGE
BF120 SMOKING ROOM
BF121 TOILET FEMALE
BF122 H.A.C.
BF123 TOILET MALE
BF124 WHEEL CHAIR/STRETCHER
BF125 POLICE
BF125b HOLDING
BF126 POLICE
BF127 LOCKERS
BF127a AMMO STORAGE
BF128 PATIENT RECEIVING
BF128 WAITING
BF128a STORAGE
BF129 DECONTAMINATION
BF129a TOILET
BF130 EXAM ROOM 7
BF131 EXAM ROOM 8
BF132 EXAM ROOM 9 (INFECT. ISOL.)
BF133 EXAM ROOM 10 (INFECT. ISOL.)
BF134 CLEAN LINEN
BF135 X-RAY ROOM
BF136 PSYCH. OBSERVATION
BF137 PSYCH. OBSERVATION
BF138 MEDS.
BF139 EXAM ROOM 6
BF140 EXAM ROOM 5
BF141 SPS STORAGE
BF142 SOILED HOLDING
BF143a STORAGE BF143b STORAGE
BF144 FAST TRACK
BF144a EXAM ROOM BF144b EXAM ROOM BF144c EXAM ROOM BF144d MEDS.
BF144e EXAM ROOM
BF145 TREATMENT ROOM 1
BF145a TREATMENT ROOM 1 BF145a TOILET BF145b TRAUMA ROOM BF145c TREATMENT ROOM 2 BF145d TREATMENT ROOM 3 BF145e NURSE STATION BF145f EXAM ROOM 5 BF145g SLEEP ROOM BF145g1 RESTROOM/SHOWER BF145h TOILET BF145i TREATMENT ROOM 6 BF145j TREATMENT ROOM 7 BF145k H.A.C.
BF145l STORAGE BF145m BREAKROOM/LOCKERS BF145n MEDS.
BF145p OFFICE BF145q STORAGE
BF146 EXAM ROOM 4
BF147 EXAM ROOM 3
BF148 EXAM ROOM 2
BF149 NURSE STATION
BF150 TELE/DATA CLOSET
BF151 ELECTRICAL CLOSET
BF153 ELECTRICAL CLOSET
BF153 INTRTVIEW (TRIAGE)
BF154 FAMILY ROOM
BF155 MECHANICAL ROOM
CBA 1 CORRIDOR
CBA 2 CORRIDOR
CBA 3 CORRIDOR
CBA 4 CORRIDOR
CBA 5 CORRIDOR
CBB 3 CORRIDOR
CBF 1 CORRIDOR
CBF 2 CORRIDOR
CBF 3 CORRIDOR
CBF 4 CORRIDOR
CBF 5 CORRIDOR
CBF 7 CORRIDOR
CBF 8 CORRIDOR
CBF 9 CORRIDOR
CBF 10 CORRIDOR
CBF 11 CORRIDOR
CBF 12 CORRIDOR
CBF 12 CORRIDOR
CBF 13 CORRIDOR
CBF 14 CORRIDOR
CBF 15 CORRIDOR
BA106
BA107a
BA105a
BA105 BA105d
BA105b
BA105c
KEY PLAN:KEY PLAN:
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
BASEMENT FLOOR ASBESTOS SURVEY
P l a n
N o r t h
True North
BASEMENT FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
BASEMENT FLOOR ASBESTOS
11/12/2021 DE BWW
HA006
SR
S E
E
S
H E
E T
H A
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1WHITE DUCT SEALANT
1,2
1 1
BA107
1,3
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 2.
SURVEY
BA104
1,2
B C
D
E
F
KEY PLAN:KEY PLAN:
GROUND FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION (ABATED)
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS (ABATED)
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLACK SPRAY-ON MASTIC (WALLS)
5. BLACK MASTIC BENEATH FLOOR TILES
6. BLACK TAR SEALANT (PIPES/DUCTS)
7. DRYWALL JOINT COMPOUND
STAIRWELLS ARE KNOWN TO HAVE ASBESTOS-CONTAINING VINYL
STAIR TREAD AND MASTIC (BROWN/BLACK)(STAIRWELL 8)
GF182
GF163a
CG
F
CG
F
CGF 9
CGF 7
CGF 6
GF118
CG
F
CGF 4
GF105
CGF 3
CGF 10
CG
F
GF Hallway 4
GF218
CGF 12
CGF 13
CGF 16
CGF 18
GF HALL 5
GF202d
GF202g
GF213
CGF 19
GF202a
GF205
GF202a1
GF206
CGF 2
CG
F
3A
CGE 6CGF 1
CGA 6
GA143d
GA143f
CGB 3
CGA 1
CGE 2
GA
9a
CGA 3
GB121a
CG
A
CGE 1
CG-7E
CG-8E
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
CGA 2
GF224
GROUND FLOOR ASBESTOS
11/12/2021 DE BWW
HA007
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
GROUND FLOOR ASBESTOS SURVEY
SEE SHEET
HA008
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BT-1
SPM-1
DW-3
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
DRYWALL JOINT COMPOUND
2,3,4
GA116
2,4
GA115
2,4
GA114
2,4
GA113
2,4
GA112
GA111GA110
GA109
GA109A GA111A
GA107
GA105
GA106
GA104
2,4
GA117
2,4
GA118
2,3,4
GA119
3,4
GA120
1,3,6
GA121
1,3,6
GA122
1,3,6
GA123
GA124
GA124A
GA125
GA126
GA126A
GA127
GA127A
GA128
GA129
GA130A
GA130
GA128A
GE100
GA131
GA132
GA133
GA134GA135GA136
GA139
GA140
GA140A
GA141GA141A
GA141C GA141F
GA141D GA141E
GA141BGA143B
GE101A
GE101B
GA146 GA145
GA144GA147
GA143C1
GA143C
GA143AGA148GA148AGA148BGA148CGA148DGA148E
GE101IGE101HGE101G
GE101F
GE101D
GE104
GE101E GE103
GE
1C
GE102
GE101C
GF206
GF205
GF204
GF203
GF202
GF199GF200
GF201GF217GF218GF219GF220
GF221
GF222
GF216
GF215
GF214
GF213 GF212
GF209
GF210
GF211
GF208
GF207
GF101A GF101B
GF101
GF101C
GF111 GF110 GF109 GF108 GF107 GF106 GF104 GF103C GF103AGF103B
GF122GF121GF120GF119 GF123
GF124BGF124CGF124D GF124A
GF124GF124E
GF124F GF124G GF125
GF
4H
GF102
GF103D
GF103
GF116
GF117
GF118C
GF118A
GF118B
GF112
GF113
GF114
GF115
GF126
GF127
GF128
GF143
GF144
GF145
GF146
GF159
GF160
GF161
GF162
GF183 GF184 GF185 GF186 GF187 GF188 GF189 GF190 GF191 GF192 GF193 GF194
GF195A
GF195
GF163
GF164
GF165
GF166
GF147
GF148
GF149
GF150
GF142
GF129
GF141 GF140 GF139 GF138
GF130 GF131
GF132 GF133 GF134
GF135 GF136
GF137
GF155GF151
GF154GF153GF152
GF158
GF157 GF156
GF181A
GF172G
GF
2F
GF
2E
GF
2D
GF169 GF170 GF171GF168GF167
GF181 GF172
GF172BGF172C
GF172AGF180
GF179 GF178
GF177
GF176
GF173
GF175
GF173A GF174
GF197
GF196 GF198
GF230
GF229 GF228
GF227
GF226
GF231 GF225
GF226A
GF232
GF233
GF234
GF235
GF236
GF239
GF240
GF238
GF237 GF241
GF242GF243
GF244
GF245GF246GF247
GA131A
GE105
GF100
GA103
GA102
GA101
GA100
GA142B GA142A
GA142
GA142B1
GA142A1
GA143
GB102
GA108
4,10
2,3,4
GA104A
3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
3,6
2,6
1,2,3,6
1,2,6
4,6
1,2,3
1,2,6
2,6
1,2,6
2,6
2,66
1,2,6
3 3
3 3 3 3 3
3 3 33 3
3 3 3 3 3
3 3 3
3 3 3
3 3
1,3
3 3
3 33
1,3,17
4,17
3,4,17
3,4,17
4,17
4,5GA149
GA150 GA151
GA153 GA154
2,6 2,6
3,4,6 1,3,4,6 2,3,4,6
2,4
GA152
2,3,4,6 3,4 4,6 2,4,6 4 4,5 3 6
2,3,4
3,4,63,4,6,17
3,4,174,17
4,17
3,4,17
3,4,17
2,4
2,4 3,4,6
2,3,4,6
3,4,17
2,6
6 2,3
2,3,6
1,2
GF
H all wa y 1
GF Hallway 2 3
GF
H all wa y 3
3 3,17
2,4,17
3,4,5
3,4
2,3 ,6
2,3,4 2,3,4
GE101
CGB 1
P l a n
N o r t h
True North
EMERGENCY GENERATOR
ROOF
STR #7 STR #2
ST
R
#1
ST
R
#1
CHASE
ELEV
P-4
STR #1
ELEV
P-3
ELEV
P-5
ELEV
P-6
STR #5
STR #9CHASE
STR #8
ELEV
P-9
ELEV
P-10
ELEV
P-7
ELEV
P-8
CH
AS
E
STR #11STR #6
ELEV
P-12
ELEV
P-11
SUB-MECHANICAL ROOMS
TIER 1
TIER 1
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
COURTYARDCOURTYARD
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3.
GB121c
GB121c
CGB 1
CGB 2
GB105
GB118
GB109a
CG
B
GB109b
GB113
GD100
CGD 2
CG
D
CGD 3
CGD 4
CGH 7
CGH 3
CGH 2
CGH 4
CGH 5
CGH 8-1
CGH 10-1
CGH 9-1
A
B
C
D
E
F
KEY PLAN:KEY PLAN:
GROUND FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION (ABATED)
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS (ABATED)
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLACK SPRAY-ON MASTIC (WALLS)
5. BLACK MASTIC BENEATH FLOOR TILES
6. BLACK TAR SEALANT (PIPES/DUCTS)
STAIRWELLS ARE KNOWN TO HAVE ASBESTOS-CONTAINING VINYL
STAIR TREAD AND MASTIC (BROWN/BLACK)(STAIRWELL 8)
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
CGH 1
GROUND FLOOR ASBESTOS
11/12/2021 DE BWW
HA008
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
GROUND FLOOR ASBESTOS SURVEY
SEE SHEET
HA007
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BT-1
SPM-1
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
GB120b
GB121
GB118
GB118A
GB117
GB116
GB115
GB114
GB112
GB111
GB110
GB109
GB108
GD101
GD108GD107
GD101AGD102
GD103GD104GD105
GH101GH102GH103 GH100
GH119
GF105
GH104
GH117
GH118
GH106 GH107 GH108 GH110 GH111 GH115GH114 GH116
GH113GH112GH109
GH109A
GD106C
GD106D
GD106E
GD106
GD106A
GD106B
GD106B1
GD102
GD102BGD102A
GD106G
GD106F
GB104D
GB104C
GB104E GB103
GB104B
GB100
GB101
GB104
GB104F
GB106B
GB104F11 GB106A
GB106
GB106C
GB104L
GB104G
GB104JGB104H
GB104K1GB104K GB107
GB104I
GB119
3,6 2,3
3,63
2,3,4,6
1,2,3
1,2,3
1,2,3,42,3
3,4
1,4
1,2,4,6
2,4 2,6
1,2,4,6
4,6
1,2,6
1,2,4 4
1,2 ,4, GB121d
GB120c
GB120d
GB120e
GB120fGB120
GB120a
1,2
3,4
2,3,5
SIGNIFICANT MOLD GROWTH ON HVAC DUCT ON SHEET 5 OF THE TITAN PHOTO LOG
INDICATES AREAS WITH CRITICAL ASBESTOS HAZARDS
P l a n
N o r t h
True North
ELEV
P-1
ELEV
P-2
TIER 1
TIER 1
TIER 1
TIER 1
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3. ALL
ROOF AREAS ARE TIER 2.
SURVEY
TIER 1
(LAUNDRY) ROOF
OPEN TO LOWER
LEVEL OF GD106b
UPPER LEVEL
SEATING
MEDICAL MEDIA &
AUDITORIUM
PI
PE
C
HA
SE
ST
R
#3
ST
R
#4
UPPER LEVEL
ROOF (OF LOWER LEVEL)
FIRST FLOOR ASBESTOS SURVEY
HA100
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
FIRST FLOOR ASBESTOS SURVEY
1E1041E1051E1061E107
C1E 4
1E1081E1091E1101E1111E112
C1 E21E113
1E114 1E115
1E113a
C1E 3
1A127
1A1261A129
1A128
1A125
1A124
1A130a
1A130
1A123
1A122
1A121
1A131a
1A131
C1 A
1A120 1A119 1A118 1A117
C1A 2
1A116 1A116a
1A113a
1A113b 1A113
1A1141A115
1A116a
C1A 5 1A105 1A105b
1A105e1A105d
1A1031A102
1A101 1A100
C1A 4
1B117 C1B 1 1G137
1B100c
1B100d
1B100e1B100h 1B100i1B100j
C1A 3 1B100f
1A140
1B100i11A139b 1A1391A139a
1A132
1A132n
C1A 2-1
1A132m 1A132l
1A132k
1A132j1A132i1A132h
1A132g 1A132f 1A132e 1A132d 1A132c 1A132b 1A132a
C1E 1
C1F 2-1
1F100
C1F 1-1
1F138a
1F137d
1F137c 1F137f
1F137e1F138
C1F 22-1
1F137
1F137b1F137a
C1 F
-1 1F136
1F135a11F135a
1F135 1F134
1F133
1F132
1F131
C1F 19-1
1F130
1F132a1F128d1F128c
1F129
1F128
1F128b
C1 F
-1
1F143 1F144
1F142 1F185
1F141
1F140
1F145
1F185b1F186
C1 F
-1
1F139
1F139a
1F191a
1F191b
1F192
1F191
1F190
1F189
1F188
1F187 1F187d
C1 F
-1
1F187a 1F187b 1F187c
1F128a1
1F128a 1F124a
1F1261F125 1F1241F123d
C1F 10-1
C1F 13-1
1F184
1F183 1F146
1F147
1F147a1F1481F149
1F1821F1091F169
1F146a 1F170
1F1811F168c 1F168d
1F168b C1F 15-1 1F180
1F108
1F107 1F179
1F1681F168a
1F178
1F1771F105a
1F106 1F167d1F167c
1F167b C1F 16-1
1F1671F167a
C1 F
-1
C1F 3-1
1F105
1F104a
1F104
1F102
1F101a 1F103a
1F166 1F166a
1F166b 1F166c
1F101b
1F101c
1F101d 1F1031F164
1F165 1F161b
C1F 4-1
1F1631F162
1F161 1F161a
1F110
1F111
1F112
1F160 1F160a 1F113 C1
F 5-
1F159a 1F159
1F157 1F158
1F1561F114
1F115
C1F 7-1
1F155 1F155a
1F154a1F154 1F116
C1 F
6-
1F153
1F152a
1F151a1F151
1F152
C1F 8-1 1F117
1F118
1F119
1F150C1F 9-1 1F120
1F121
1F122 1F123b
1F123a
1F123c
1F123c1 1F122a
1F123
1F122a1
1F101
1,2,3,6
3,4,5
3,4
3,4,6
3 3,4,6 1,2,3,4,63
2,3,4,62,3,6
3,4,6 2,3,4,6 2,3,4
3,6
2,3
2,3,4,6
3,4,6
2,3,4,6
3,4,6
2,3,4,6
1,2,3
2,3,4,6
2,3,4,6
2,3,4,6
1,2,6 1,2,6
3,5
1,2,61,2,6
1,2,6 1B100g
3 3 3
3 3
3 3
3 3 3 3
3 3
3,4
1,2,6 1,2,6 1,2,6
1,2,6 6 1,2,6 1,2,6
3,4 3,4
3,4
3,4
2,6
1,2,3,6
3,4 3,4 3,4 3,4 3,4 3,4
1A105w4
1A105x
2,3,4,62,3,6
2,6
3 3
3 3
3 3
1B100l
SEE SHEET
HA102
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
SEE SHEET
HA101
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BT-1
SPM-1
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
3,4
2,3
KEY PLAN:KEY PLAN:
BASEMENT FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLACK MASTIC BENEATH FLOOR TILES
5. BLACK TAR SEALANT (PIPES/DUCTS)
STAIRWELLS ARE KNOWN TO HAVE ASBESTOS-CONTAINING VINYL
STAIR TREAD AND MASTIC (BROWN/BLACK)(STAIRWELL 8)
INDICATES NEW AREAS OF CONSTRUCTION THAT
SHOULD BE ASBESTOS FREE.
P l a n
N o r t h
True North
INDICATES NEWLY REMODELED AREAS AND ARE ASBESTOS FREE
1E100 3,4
1A110 2,3,4,5
ST
R
#1
ST
R
#8
STR #6
STR #7 STR #2
STR #1
ELEV
P-10
ELEV
P-9
ELEV
P-8
ELEV
P-7
ELEV
P-11
ELEV
P-2
ELEV
P-3
ELEV
P-4
ELEV
P-5
ELEV
P-6
TIER 1
TIER 1
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
COURTYARD
COURTYARD
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3. ALL
ROOF AREAS ARE TIER 2.
COURTYARD
ROOF
ROOF
H
H
1A109
1A105w3
1A105f
1B116
1G134 1G124 1G122 1G120 C1G 3
1G109 1G111
1G112 1G1131G114
1G107
C1G 1
C1G 4 1G116
1G117
1G101a
1G101
1G105
1G104
C1G 2
1G103
1G1021G100a
1G1001B111g1B111h
C1G 5
1b111h11B111i
C1B 5
1B111j1B111k1B111
C1G 8
1G1261G1271G1281G130 1G118
1G119
C1G 6
1G1211G123
1G125 1G131
1G132
1G133
C1G 7
C1B 2
1B110 1B111a 1B105b 1B105a 1B111b 1B111c 1B111d 1B111e 1B111f1B103x
1B103a
1B102g 1B102f
1B1031B103d
1B103c
1B103e1B103f1B103j
1B103h 1B103g
1B103i
1B103k
C1B 3
1B103l1B103m
1B103n 1B103o 1B103p 1B103q 1B103r 1B103s
1B103t
1B103u 1B103v 1B103w
1G1291B102e
1B102d
1B102c1 1B102c
1B102b
1B102 1B102h
1B102a 1B100m 1B100n
1B100 1B100k
1B100a
1B100b1B100l
C1B 4-1
1,2,3,4,6
1G106
3,4,663,4,64,64
3,4,5
3,4
1,2,3,4,62,4,6 4,64,64,63,4,63,4,6
1,2,6
1,2,3,5
3,6
2,62,3,62,66
3,6
3,6
3,6 3
2,3,6
2,6
2,661,2,6
1,2,3,6
2,6
3 3,6
2,3,6
1,2,3,4,6
FIRST FLOOR ASBESTOS SURVEY
11/12/2021 DE BWW
HA101
KEY PLAN:KEY PLAN:
FIRST FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION (ABATED)
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS (ABATED)
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLACK SPRAY-ON MASTIC (WALLS)
5. BLACK MASTIC BENEATH FLOOR TILES
6. BLACK TAR SEALANT (PIPES/DUCTS)
THE ROOFING SYSTEM IS KNOWN TO HAVE THE FOLLOWING
ASBESTOS-CONTAINING MATERIALS PRESENT:
1. BLACK TAR
2. BLACK GRAVEL
3. BLACK ROLLED ROOFING
4. BLACK ROOFING MASTIC
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
FIRST FLOOR ASBESTOS SURVEY
SEE SHEET
HA100
SEE SHEET
HA102
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BT-1
SPM-1
RR-1
RM-1
RM-1
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
ROLLED ROOFING, BLACK
ROOFING MASTIC, BLACK
ROOFING MASTIC, BLACK (F-03-H)
1B109g
1B109lC1B 6
1B109b
1B108a 1B108a1
1B108
1B106
1B109j
1B109a
1B109k
1B109f1B109e1B109d 1B109g
1B109i
1B107
1B107m
1B107l1B107c
1B107b
1B107a
C1B 7
1B110k1B107d1B107e1B107f
C1B 8 1B107g
1B107h 1B107j3,4,6
4,6
4,6
3,4,6 3,4,6 6
4,6 3,4
2,3,4,6 3,4,6
2,3,4,6 2,3,4,6
2,3,4,6 2,3,4,6
2,3,4
1,2,4,6
1,2,3,4,6
2,3,4
2,3,4,6
1,3 1,2,4
1,2,3,4 1, 4 3,4
1B109h 1,4
1B109c 1,3
1,3 3
3,6
1B107i 3,4,6
P l a n
N o r t h
True North
ELEV
P-1
ST
R
#4
ST
R
#3
STR #12
WATER FOUNTAINS
EMPTY SPACE
FIRE EXT. CLOSET
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3. ALL
ROOF AREAS ARE TIER 2.
1E102
1E101
1E104
1E100
1E103
C1E 5
1A1081A109
1A1071A110
1A106c 1A106b
1A106a1A106d 1A106
C1A 7 1A105x
1A105v
1A105a C1A 6
1A105u 1A105t 1A105s 1A105r
1A105k1A105j
1A105m 1A105n 1A105o
1A105p
1A105q
1A105l1A105i1A105h1A105g1A105f
1G137
1G115 1G110 1G108 1G107
3,4 4 3,4
3,4
3,4
2,3,4,6 2,3,4,6
2,3,4,62,3,4,5
2,3,4,63,4,6 2,3,4,62,4,62,3,4,63,6
2,3,4,62,3,4
2,3,4,63,4,6 2,3,4,6
3,42,3
3 3,4 3,4
2,43,4
2,3,4,6 3,4,6 3,4,6
FIRST FLOOR ASBESTOS
11/12/2021 DE BWW
HA102
KEY PLAN:KEY PLAN:
FIRST FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION (ABATED)
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS (ABATED)
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLACK SPRAY-ON MASTIC (WALLS)
5. BLACK MASTIC BENEATH FLOOR TILES
6. BLACK TAR SEALANT (PIPES/DUCTS)
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
FIRST FLOOR ASBESTOS SURVEY
S E
E
S
H E
E T
H A
SEE SHEET
HA101
DESCRIPTION HA LABEL
HARD MUDDED FITTINGS
DRAWING LABEL
PF-1
DM-1
M-1
BT-1
SPM-1
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
PIPE INSULATION-STRAIGHT RUNS 2PI-1
P l a n
N o r t h
True North
STR #9
ST
R
#1
STR #5
CHASE
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3. ALL
ROOF AREAS ARE TIER 2.
SECOND FLOOR ASBESTOS
HA201
KEY PLAN:KEY PLAN:
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
SECOND FLOOR ASBESTOS SURVEY
SECOND FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION (ABATED)
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS (ABATED)
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLACK SPRAY-ON MASTIC (WALLS)
5. BLACK MASTIC BENEATH FLOOR TILES
6. BLACK TAR SEALANT (PIPES/DUCTS)
STAIRWELLS ARE KNOWN TO HAVE ASBESTOS-CONTAINING VINYL
STAIR TREAD AND MASTIC (BROWN/BLACK)(STAIRWELL 8)
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
C2 A
C2 E
C2F 9
C2 F
C2F 3
C2 F
C2
F
2B1282B102j
2B102k
2B102n
2B102m
2A1602A1592A1582A1572A1562A155
2A157a
2A139
2A140
C2 A
C2A 2
C2A 6C2A 4
2A1542A1532A152
2A151
2A1502A150a2A149 2A1612A149a
C2A 3
2A148 2A147 2A146
2A145
2A144 2A143 2A142 2A137c1 2A137c 2A138
2A137b
2A137a 2A137
2A135 2A134
2A136f 2A136e
2A136d 2A136g
2A136c 2A136
2A136b 2A136a
2A133 2A132 2A131
2A130b
2A130
2A127a
2A125a
2E
2E1052E1062E1072E1082E1092E1102E1112E112
C2E 3
2E113 2E1142E115
2E116
2E
7 2E118
C2E 1
C2F 16
C2F 15 2F100
2F1012F102
2F125a
2F 1422F141
C2 F
2F103 2F103b
2F105b 2F103a
2F105
2F102a2F102b
C2F 10
C2 F
C2F 12
2F106 2F
2g
2F
2f
2F
2e
2F
2d
2F
2c
2F108
2F109 2F138
2F139
2F135
2F144
2F
2F
2F
7a 2F
4a
2F140
2F154
2F147
2F125b
2F125d
2F125c
2F124a
C2F 7C2F 5
2F1512F151a 2F152 2F153 2F153a 2F153b
2F150
2F134
2F133
2F132 2F130
2F129a
2F129 2F128 2F127 2F126
2F124b
2F124b1 2F124c
2F124d
2F124d1
C2F 8
C2F 1
2F110
2F110a
2F111a
2F111
2F112
2F1132F113a
2F116 2F117
2F117a2F117b 2F117c
2F117d
2F117e 2F118
2F
9 2F121d
2F121c
2F121l 2F121b 2F121a
2F121
2F121k2F121j2F121i2F121h2F121g2F121f
EGRESS TO 2F121
C2F 2 2F123 2F122
2A100
2A101
2A104 2A103a
2A103b
2A103 2A102
2B129
2B102o
SEE SHEET
HA202
S E
E
S
H E
E T
H A
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BT-1
SPM-1
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
2A129
2A128
2A127
2A125
2E100
3,6
3,6
33,43 33,43,4 1,5
3,4
3,443,4
3,4
3 3
4 3,43,4 3,4
3 3
3,4
3,4
3,4
4 43 3,4
3,4 3,4 3,4 3,4 3,4 3,4 3,4 3,4 3,4
1,3,4 1,3,4
3,5
1,3,4,5,6
1,6
3 3
3,4
3,4 3,4
3,4
3,4
3,4 3,4
44 3,4
3,4
4 4
4 4
3,4
3 3
3 3 3 3 3,4
33,4
3,4
3,4 4
43,4
4 3,4 4
3,4
3,4
3,44
4 4
3,4 3,4 3,4
3,4
3,4 3,4 3,4
3,4
3,4
3,4
3,4
3,43,4
3,43,43,4
4 4
4 2,3,4
2F107c 2F107b
2F107a
2F107
2F108a
2F106a 2F105
2F105c
2F104d
2F104c2F104e
2F106c
2F104b 2F104a
2F125
2A141
INDICATES NEWLY AREAS OF CONSTRUCTION THAT SHOULD BE ASBESTOS FREE
INDICATES NEW AREAS OF CONSTRUCTION THAT
SHOULD BE ASBESTOS FREE
P l a n
N o r t h
True North
2F124a1
ELEV
P-11
ELEV
P-2
ELEV
P-3
ELEV
P-4
ELEV
P-5
ELEV
P-6
ELEV
P-8
ELEV
P-7
ELEV
P-9
ELEV
P-10
ROOF
ROOF
2F106b
LOCKERS
TIER 1
TIER 1
TIER 1
TIER 1
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE
PROCEEDING WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND RELATED TYPE, QUANTITY, LOCATION, & COST OF EACH.
GENERAL NOTES
COURTYARD COURTYARD
ENTIRE FLOOR, WITH THE EXCEPTION OF
ROOMS LABELED "TIER 1", IS TIER 3. ALL
ROOF AREAS ARE TIER 2.
SURVEY
DN
STR #1
STR #2STR #7
STR #8
STR #6
STR
#10
"A" & "E" WING PLUMBING NOTES:
POSSIBLE FIBERGLASS P/C W/ 1% ASBESTOS PAPER
POSSIBLE ASBESTOS P/C W/ 1% ASBESTOS PAPER
ALL OTHER AREAS ARE ASBESTOS FREE
RISERS
POSSIBLE FIBERGLASS P/C W/ 1% ASBESTOS PAPER
"F" WING PLUMBING NOTES:
ALL FLOORS SHALL BE CONSIDERED TO HAVE ASBESTOS
MASTIC UNTIL DETERMINED OTHERWISE
"A" & "E" WING PLUMBING NOTES:
POSSIBLE FIBERGLASS W/ ASBESTOS PAPER
POSSIBLE ROLLED ASBESTOS (2 P/C, (2 RISERS, 10/RISER
ALL OTHER AREAS ARE ASBESTOS FREE
RISERS
ROLLED ASBESTOS INSULATION
2B120
ASBESTOS DUCT TAPE ABOVE IN CEILING
ASBESTOS P/C (PAPER)
2B121
2B122
2B123
2B124
2B125
2B118a
2B119
C2 B
2B118
C2 B
C2
B
2B126d
2B117b 2B117a
2B117
2B116
2B116a 2B1152B114
2B103 C2B 4
2B1132B1122B1112B1102B108
C2B 5 2B105
2B107
2B106
2B104 2B102
2B102a
2B102b
2B
2c
2B
2d2B102s
2B102t 2B102e
2B102r
2B102p
2B102q
2B102f
2B102g
2B100 2B101
2B102h
2B127
2B102i2B102o
2B126
2B126e
2B126a 2B126b
2G100a
2G100
SECOND FLOOR ASBESTOS
11/12/2021 DE BWW
HA202
KEY PLAN:KEY PLAN:
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
SECOND FLOOR ASBESTOS SURVEY
SECOND FLOOR ASBESTOS-CONTAINING MATERIALS PRESENT:
1. THERMAL PIPE INSULATION (ABATED)
2. THERMAL ELBOW INSULATION - HARD MUDDED PIPE FITTINGS (ABATED)
3. HVAC DUCT COMPOUND/SEALANT - WHITE & TAN
4. BLACK SPRAY-ON MASTIC (WALLS)
5. BLACK MASTIC BENEATH FLOOR TILES
6. BLACK TAR SEALANT (PIPES/DUCTS)
7. LINOLEUM FLOORING – GREEN (ROOM 2B102D-1)
KEY PLAN
NO SCALE
E
B
D
8 G
HW
C
5 18
E
A
F
100% CONSTRUCTION BID
DOCUMENTS
VEG 21.07
ASBESTOS ABATEMENT AND
REMEDIATION
635-22-127
(VA) MEDICAL CENTER OKLAHOMA CITY, OK 73104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS: STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
P l a n
N o r t h
True North
SEE SHEET
HA201
SEE SHEET
HA203
DESCRIPTION
HARD MUDDED FITTINGS
HA LABEL
PIPE INSULATION-STRAIGHT RUNS
DRAWING LABEL
PF-1 1
PI-1
DM-1
M-1
BT-1
SPM-1
LN-2
WHITE DUCT SEALANT
MASTIC-BLACK & YELLOW
TAR SEALANT-BLACK (PIPES/DUCTS)
SPRAY ON MASTIC-BLACK (ON BRICK WALLS)
LINOLEUM FLOORING-GREEN
3,4
3,6 3
1,3
3,6
1,3,5
2,3
1,2,3
1,2,3
HA
LL
W
AY
2,64
1,2,4,6
1,2,4,6
2,4,6
2,4,6
2,4,5,6 2,4,5,6 2,4,6 4,6 4,6 3,4,6
3,6
2B126c
P l a n
N o r t h
True North
2B107
2B106
INDICATES AREAS WITH CRITICAL ASBESTOS HAZARDS
ELEV
P-1
TIER 1
TIER 1
A. REFER TO GI002 FOR MECHANICAL AND PLUMBING SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO THE DOCUMENT TITAN OKC VAMC ABATEMENT COST
ESTIMATES - DAMAGED & PER FLOOR - REVISED 09/27/2021 FOR
ADDITIONAL INFORMATION ON EACH TIER OF ASBESTOS ABATEMENT
WORK, AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .